Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Twin Falls is the site of a hydroelectric power station developed by the British Newfoundland Development Corporation (Brinco) to deliver power to mining operations in Labrador City and Wabush. The station was on the Unknown River, a tributary of the Churchill River that drains the central Labrador basin. Construction began in 1960. The river was dammed at Twin Falls to form the Ossokmanuan Reservoir. When finished in 1963, the station had a total capacity of 225 MW with two 115-mile (185 km) long transmission lines at 230,000 volts (or 230 kV). It cost $47.5 million (1963).

Property Value
dbo:abstract
  • La centrale de Twin Falls est une centrale hydroélectrique conventionnelle située au Labrador dans la province canadienne de Terre-Neuve-et-Labrador. (fr)
  • Twin Falls is the site of a hydroelectric power station developed by the British Newfoundland Development Corporation (Brinco) to deliver power to mining operations in Labrador City and Wabush. The station was on the Unknown River, a tributary of the Churchill River that drains the central Labrador basin. Construction began in 1960. The river was dammed at Twin Falls to form the Ossokmanuan Reservoir. When finished in 1963, the station had a total capacity of 225 MW with two 115-mile (185 km) long transmission lines at 230,000 volts (or 230 kV). It cost $47.5 million (1963). Twin Falls power was essential to the later development at Churchill Falls. It helped open up the area and supplied the power required during the construction phase of the project. In the planning stage, however, it became apparent that greater efficiency in the production of electricity could be achieved by diverting the flow of water from the Ossokmanuan Reservoir into the Smallwood Reservoir. Utilizing this water at the Churchill Falls plant enabled approximately three times as much electricity to be produced from the same volume of water. In July 1974 the Twin Falls plant was put into extended shutdown and the water diverted into the Smallwood Reservoir under an agreement with Churchill Falls Labrador Corporation Limited (CFLCo). (en)
dbo:buildingStartDate
  • 1960
dbo:buildingStartYear
  • 1960-01-01 (xsd:gYear)
dbo:lake
dbo:location
dbo:openingYear
  • 1963-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 1779842 (xsd:integer)
dbo:wikiPageLength
  • 4638 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1113869249 (xsd:integer)
dbo:wikiPageWikiLink
dbp:cityServed
  • Twin Falls Hydroelectric Power Station (en)
dbp:constructionBegan
  • 1960 (xsd:integer)
dbp:cost
  • 4.75E7
dbp:elevationF
  • 1463 (xsd:integer)
dbp:footnotes
  • Sources: Canada Flight Supplement (en)
dbp:location
dbp:locationMap
  • Canada Newfoundland and Labrador (en)
dbp:name
  • Twin Falls Aerodrome (en)
  • Twin Falls Hydroelectric Power Station (en)
dbp:opening
  • 1963 (xsd:integer)
dbp:operator
dbp:owner
dbp:plantCapacity
  • 225.0
dbp:plantDecommission
  • 1974 (xsd:integer)
dbp:plantTurbines
  • 7 (xsd:integer)
dbp:pushpinLabel
  • Twin Falls (en)
dbp:pushpinMap
  • Canada Newfoundland and Labrador (en)
dbp:pushpinMapCaption
  • Location in Newfoundland and Labrador (en)
dbp:r1LengthF
  • 1500 (xsd:integer)
dbp:r1LengthM
  • 457 (xsd:integer)
dbp:r1Number
  • 15 (xsd:integer)
dbp:r1Surface
  • Gravel (en)
dbp:resName
  • Ossokmanuan Reservoir (en)
dbp:summer
  • ADT (en)
dbp:timezone
dbp:type
  • Private (en)
dbp:utc
  • 240.0
dbp:utcs
  • 180.0
dbp:website
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 53.49652777777778 -64.5165
rdf:type
rdfs:comment
  • La centrale de Twin Falls est une centrale hydroélectrique conventionnelle située au Labrador dans la province canadienne de Terre-Neuve-et-Labrador. (fr)
  • Twin Falls is the site of a hydroelectric power station developed by the British Newfoundland Development Corporation (Brinco) to deliver power to mining operations in Labrador City and Wabush. The station was on the Unknown River, a tributary of the Churchill River that drains the central Labrador basin. Construction began in 1960. The river was dammed at Twin Falls to form the Ossokmanuan Reservoir. When finished in 1963, the station had a total capacity of 225 MW with two 115-mile (185 km) long transmission lines at 230,000 volts (or 230 kV). It cost $47.5 million (1963). (en)
rdfs:label
  • Centrale de Twin Falls (fr)
  • Twin Falls (Newfoundland and Labrador) (en)
owl:sameAs
geo:geometry
  • POINT(-64.516502380371 53.496528625488)
geo:lat
  • 53.496529 (xsd:float)
geo:long
  • -64.516502 (xsd:float)
prov:wasDerivedFrom
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Twin Falls Hydroelectric Power Station (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License