Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
skip to main content
10.5555/2433508.2433891acmconferencesArticle/Chapter ViewAbstractPublication PageswscConference Proceedingsconference-collections
research-article

Identification of information requirements using simulation for supporiting construction productivity assessment

Published: 05 December 2010 Publication History
  • Get Citation Alerts
  • Abstract

    Project managers need to assess how well construction crews are performing in terms of productivity. This paper presents the preliminary results of an effort carried out by the authors to develop a simulation based framework to support the identification of the information requirements for assessing productivity performance. A prototype to test the proposed framework for the identification of information requirements by studying the assessment of earthmoving productivity is introduced. Based on literature regarding the factors that can affect earthmoving productivity, several scenarios, representing different factors that affect earthmoving productivity, have been created and studied. These scenarios have been simulated to help to identify the information items required for assessing earthmoving productivity, such as hauling distance and loading time. Several potential data capture technologies, such as GPS, RFID and On-Board Instrument can help in acquiring the information items identified in this paper.

    References

    [1]
    Akinci, B., S. Kiziltas, E. Ergen, I. Karaesmen, and F. Keceli. 2004. Modeling and Analyzing the Impact of Technology on Data Capture and Transfer Processes at Construction Sites. Journal of Construction Engineering and Management, Vol. 132, Issue 11, pages 1148--1157.
    [2]
    ASTM E2691-09. 2009. Standard Practice for Job Productivity Measurement. ASTM standards.
    [3]
    Business Roundtable. 1980. Scheduled Overtime Effect on Construction Projects. A Construction Industry Cost Effectiveness Task Force Report, Report C-2, November.
    [4]
    Caterpillar. 2002. Caterpillar Performance handbook. Edition 33, Caterpillar Inc., Peoria, USA.
    [5]
    Caterpillar. 2006 a. 777F off-highway truck specifiations. Available via <http://www.cat.com/cda/files/376367/7/777'FSpecalogaehq5749.pdf> {accessed June 10, 2010}.
    [6]
    Caterpillar. 2006 b. AccuGrade Grade Control System for Backhoe loaders. Available via <http://www.kellytractor.com/eng/images/pdf/machine_guidance/accugrade_backhoeloaders.pdf> {accessed June 10, 2010}.
    [7]
    Chae, S., and K. Naruo. 2007. Application of Location Information by Stereo Camera Images to Project Progress Monitoring. 24th International Symposium on Automation and Robotics in Construction (ISARC 2007), Construction Automation Group, I. I. T, Madras.
    [8]
    El-Omari, S., and O. Moselhi. 2008. Integrating 3D Laser Scanning and Photogrammetry for Progress Measurement of Construction Work. Automation in Construction, 18, pp. 1--9.
    [9]
    El-Omari, S., and O. Moselhi. 2009. Integrating Automated Data Acquisition Technologies for Progress Reporting of Construction Projects. 26th International Symposium on Automation and Robotics in Construction, (ISARC 2009).
    [10]
    Hanna, A. S., C. S. Taylor, and K. T. Sullivan. 2005. Impact of Extended Overtime on Construction Labor Productivity. Journal Construction Engineering and Management, 131(6), pp 734--739.
    [11]
    Kannan, G. 1999. A Methodology for the Development of a Production Experience Database for Earthmoving Operations using Automated Data Collection. PhD Thesis, Virginia Polytechnic Institute and State University, VA
    [12]
    Martinez, J. C. 2001. EZStrobe - General-Purpose Simulation System Based on Activity Cycle Diagrams. In Proceedings of the 2001 Winter Simulation Conference, ed. B. A. Peters, J. S. Smith, D. J. Medeiros, M. W. Rohrer, 1556--1564. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    [13]
    Navon, R., E. Goldschmidt, and Y. Shpatnisky. 2004. A Concept Proving Prototype of Automated Earthmoving Control. Automation in Construction, 13, 225--239
    [14]
    Navon, R. 2007. Research in automated measurement of project performance indicators. Automation in Construction, 16(2), 176--188
    [15]
    Peurifoy R. L. and C. J. Schexnayder. 2002. Construction Planning, Equipment, and Methods. McGraw-Hill, New York, NY
    [16]
    Pradhan, A. 2009. An Approach for Fusing Data from Multiple Sources to Support Construction Productivity Analysis. PhD Thesis, Department of Civil and Environmental Engineering, Carnegie Mellon University
    [17]
    RS Means. 2007. R. S. Means, Heavy Construction Cost data

    Cited By

    View all
    • (2014)Simulation-based flexibility analysis of vehicle dispatching problem on a container terminal with GPS tracking dataProceedings of the 2014 Winter Simulation Conference10.5555/2693848.2694070(1759-1770)Online publication date: 7-Dec-2014

    Index Terms

    1. Identification of information requirements using simulation for supporiting construction productivity assessment

        Recommendations

        Comments

        Information & Contributors

        Information

        Published In

        cover image ACM Conferences
        WSC '10: Proceedings of the Winter Simulation Conference
        December 2010
        3519 pages
        ISBN:9781424498642

        Sponsors

        Publisher

        Winter Simulation Conference

        Publication History

        Published: 05 December 2010

        Check for updates

        Qualifiers

        • Research-article

        Conference

        WSC10
        Sponsor:
        WSC10: Winter Simulation Conference
        December 5 - 8, 2010
        Maryland, Baltimore

        Acceptance Rates

        WSC '10 Paper Acceptance Rate 184 of 281 submissions, 65%;
        Overall Acceptance Rate 3,413 of 5,075 submissions, 67%

        Contributors

        Other Metrics

        Bibliometrics & Citations

        Bibliometrics

        Article Metrics

        • Downloads (Last 12 months)0
        • Downloads (Last 6 weeks)0
        Reflects downloads up to 10 Aug 2024

        Other Metrics

        Citations

        Cited By

        View all
        • (2014)Simulation-based flexibility analysis of vehicle dispatching problem on a container terminal with GPS tracking dataProceedings of the 2014 Winter Simulation Conference10.5555/2693848.2694070(1759-1770)Online publication date: 7-Dec-2014

        View Options

        Get Access

        Login options

        View options

        PDF

        View or Download as a PDF file.

        PDF

        eReader

        View online with eReader.

        eReader

        Media

        Figures

        Other

        Tables

        Share

        Share

        Share this Publication link

        Share on social media