-
The DAMIC-M Experiment: Status and First Results
Authors:
I. Arnquist,
N. Avalos,
P. Bailly,
D. Baxter,
X. Bertou,
M. Bogdan,
C. Bourgeois,
J. Brandt,
A. Cadiou,
N. Castelló-Mor,
A. E. Chavarria,
M. Conde,
N. J. Corso,
J. Cortabitarte Gutiérrez,
J. Cuevas-Zepeda,
A. Dastgheibi-Fard,
C. De Dominicis,
O. Deligny,
R. Desani,
M. Dhellot,
J-J. Dormard,
J. Duarte-Campderros,
E. Estrada,
D. Florin,
N. Gadola
, et al. (47 additional authors not shown)
Abstract:
The DAMIC-M (DArk Matter In CCDs at Modane) experiment employs thick, fully depleted silicon charged-coupled devices (CCDs) to search for dark matter particles with a target exposure of 1 kg-year. A novel skipper readout implemented in the CCDs provides single electron resolution through multiple non-destructive measurements of the individual pixel charge, pushing the detection threshold to the eV…
▽ More
The DAMIC-M (DArk Matter In CCDs at Modane) experiment employs thick, fully depleted silicon charged-coupled devices (CCDs) to search for dark matter particles with a target exposure of 1 kg-year. A novel skipper readout implemented in the CCDs provides single electron resolution through multiple non-destructive measurements of the individual pixel charge, pushing the detection threshold to the eV-scale. DAMIC-M will advance by several orders of magnitude the exploration of the dark matter particle hypothesis, in particular of candidates pertaining to the so-called "hidden sector." A prototype, the Low Background Chamber (LBC), with 20g of low background Skipper CCDs, has been recently installed at Laboratoire Souterrain de Modane and is currently taking data. We will report the status of the DAMIC-M experiment and first results obtained with LBC commissioning data.
△ Less
Submitted 25 November, 2022; v1 submitted 11 October, 2022;
originally announced October 2022.
-
The Physics of the B Factories
Authors:
A. J. Bevan,
B. Golob,
Th. Mannel,
S. Prell,
B. D. Yabsley,
K. Abe,
H. Aihara,
F. Anulli,
N. Arnaud,
T. Aushev,
M. Beneke,
J. Beringer,
F. Bianchi,
I. I. Bigi,
M. Bona,
N. Brambilla,
J. B rodzicka,
P. Chang,
M. J. Charles,
C. H. Cheng,
H. -Y. Cheng,
R. Chistov,
P. Colangelo,
J. P. Coleman,
A. Drutskoy
, et al. (2009 additional authors not shown)
Abstract:
This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.
Please note that version 3 on the archive is the auxiliary…
▽ More
This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.
Please note that version 3 on the archive is the auxiliary version of the Physics of the B Factories book. This uses the notation alpha, beta, gamma for the angles of the Unitarity Triangle. The nominal version uses the notation phi_1, phi_2 and phi_3. Please cite this work as Eur. Phys. J. C74 (2014) 3026.
△ Less
Submitted 31 October, 2015; v1 submitted 24 June, 2014;
originally announced June 2014.
-
A 16-channel Digital TDC Chip with internal buffering and selective readout for the DIRC Cherenkov counter of the BABAR experiment
Authors:
P. Bailly,
J. Chauveau,
J. F. Genat,
J. F. Huppert,
H. Lebbolo,
L. Roos,
B. Zhang
Abstract:
A 16-channel digital TDC chip has been built for the DIRC Cherenkov counter of the BaBar experiment at the SLAC B-factory (Stanford, USA). The binning is 0.5 ns, the conversion time 32 ns and the full-scale 32 mus. The data driven architecture integrates channel buffering and selective readout of data falling within a programmable time window. The time measuring scale is constantly locked to the…
▽ More
A 16-channel digital TDC chip has been built for the DIRC Cherenkov counter of the BaBar experiment at the SLAC B-factory (Stanford, USA). The binning is 0.5 ns, the conversion time 32 ns and the full-scale 32 mus. The data driven architecture integrates channel buffering and selective readout of data falling within a programmable time window. The time measuring scale is constantly locked to the phase of the (external) clock. The linearity is better than 80 ps rms. The dead time loss is less than 0.1% for incoherent random input at a rate of 100 khz on each channel. At such a rate the power dissipation is less than 100 mw. The die size is 36 mm2.
△ Less
Submitted 10 February, 1999;
originally announced February 1999.