Surrogate Modeling of the CLIC Final-Focus System using Artificial Neural Networks
Authors:
J. Ogren,
C. Gohil,
D. Schulte
Abstract:
Artificial neural networks can be used for creating surrogate models that can replace computationally expensive simulations. In this paper, a surrogate model was created for a subset of the Compact Linear Collider (CLIC) final-focus system. By training on simulation data, we created a model that maps sextupole offsets to luminosity and beam sizes, thus replacing computationally intensive tracking…
▽ More
Artificial neural networks can be used for creating surrogate models that can replace computationally expensive simulations. In this paper, a surrogate model was created for a subset of the Compact Linear Collider (CLIC) final-focus system. By training on simulation data, we created a model that maps sextupole offsets to luminosity and beam sizes, thus replacing computationally intensive tracking and beam-beam simulations. This model was then used for optimizing the parameters of a random walk procedure for sextupole alignment.
△ Less
Submitted 23 February, 2021; v1 submitted 14 September, 2020;
originally announced September 2020.
-
Luminosity Performance of the Compact Linear Collider at 380 GeV with Static and Dynamic Imperfections
Authors:
C. Gohil,
P. N. Burrows,
N. Blaskovic Kraljevic,
A. Latina,
J. Ögren,
D. Schulte
Abstract:
The Compact Linear Collider is one of the two main European options for a collider in a post Large Hadron Collider era. This is a linear $e^+e^-$ collider with three centre-of-mass energy stages: 380 GeV, 1.5 TeV and 3 TeV. The luminosity performance of the first stage at 380 GeV is presented including the impact of static and dynamic imperfections. These calculations are performed with fully real…
▽ More
The Compact Linear Collider is one of the two main European options for a collider in a post Large Hadron Collider era. This is a linear $e^+e^-$ collider with three centre-of-mass energy stages: 380 GeV, 1.5 TeV and 3 TeV. The luminosity performance of the first stage at 380 GeV is presented including the impact of static and dynamic imperfections. These calculations are performed with fully realistic tracking simulations from the exit of the damping rings to the interaction point and including beam-beam effects in the collisions. A luminosity of $4.3\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$ can be achieved with a perfect collider, which is almost three times the nominal luminosity target of $1.5\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$. In simulations with static imperfections, a luminosity of $2.35\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$ or greater is achieved by 90% of randomly misaligned colliders. Expressed as a percentage of the nominal luminosity target, this is a surplus of approximately 57%. Including the impact of ground motion, a luminosity surplus of 53% or greater can be expected for 90% of colliders. The average expected luminosity is $2.8\times10^{34}~\text{cm}^{-2}\text{s}^{-1}$, which is almost twice the nominal luminosity target.
△ Less
Submitted 2 September, 2020;
originally announced September 2020.
-
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.
-
Updated baseline for a staged Compact Linear Collider
Authors:
The CLIC,
CLICdp collaborations,
:,
M. J. Boland,
U. Felzmann,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
C. Balazs,
T. K. Charles,
K. Afanaciev,
I. Emeliantchik,
A. Ignatenko,
V. Makarenko,
N. Shumeiko,
A. Patapenka,
I. Zhuk,
A. C. Abusleme Hoffman,
M. A. Diaz Gutierrez,
M. Vogel Gonzalez,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu
, et al. (493 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-q…
▽ More
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-quark measurements. Subsequent stages will focus on measurements of rare Higgs processes, as well as searches for new physics processes and precision measurements of new states, e.g. states previously discovered at LHC or at CLIC itself. In the 2012 CLIC Conceptual Design Report, a fully optimised 3 TeV collider was presented, while the proposed lower energy stages were not studied to the same level of detail. This report presents an updated baseline staging scenario for CLIC. The scenario is the result of a comprehensive study addressing the performance, cost and power of the CLIC accelerator complex as a function of centre-of-mass energy and it targets optimal physics output based on the current physics landscape. The optimised staging scenario foresees three main centre-of-mass energy stages at 380 GeV, 1.5 TeV and 3 TeV for a full CLIC programme spanning 22 years. For the first stage, an alternative to the CLIC drive beam scheme is presented in which the main linac power is produced using X-band klystrons.
△ Less
Submitted 27 March, 2017; v1 submitted 26 August, 2016;
originally announced August 2016.