Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac
Authors:
Kazuro Furukawa,
Mitsuo Akemoto,
Dai Arakawa,
Yoshio Arakida,
Yusei Bando,
Hiroyasu Ego,
Yoshinori Enomoto,
Toshiyasu Higo,
Hiroyuki Honma,
Naoko Iida,
Kazuhisa Kakihara,
Takuya Kamitani,
Hiroaki Katagiri,
Masato Kawamura,
Shuji Matsumoto,
Toshihiro Matsumoto,
Hideki Matsushita,
Katsuhiko Mikawa,
Takako Miura,
Fusashi Miyahara,
Hiromitsu Nakajima,
Takuya Natsui,
Yujiro Ogawa,
Satoshi Ohsawa,
Yuichi Okayasu
, et al. (17 additional authors not shown)
Abstract:
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construc…
▽ More
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
△ Less
Submitted 4 July, 2022;
originally announced July 2022.
-
Development of an intense positron source using a crystal--amorphous hybrid target for linear colliders
Authors:
Y. Uesugi,
T. Akagi,
R. Chehab,
O. Dadoun,
K. Furukawa,
T. Kamitani,
S. Kawada,
T. Omori,
T. Takahashi,
K. Umemori,
J. Urakawa,
M. Satoh,
V. Strakhovenko,
T. Suwada,
A. Variola
Abstract:
In a conventional positron source driven by a few GeV electron beam, a high amount of heat is loaded into a positron converter target to generate intense positrons required by linear colliders, and which would eventually damage the converter target. A hybrid target, composed of a single crystal target as a radiator of intense gamma--rays, and an amorphous converter target placed downstream of the…
▽ More
In a conventional positron source driven by a few GeV electron beam, a high amount of heat is loaded into a positron converter target to generate intense positrons required by linear colliders, and which would eventually damage the converter target. A hybrid target, composed of a single crystal target as a radiator of intense gamma--rays, and an amorphous converter target placed downstream of the crystal, was proposed as a scheme which could overcome the problem.This paper describes the development of an intense positron source with the hybrid target. A series of experiments on positron generation with the hybrid target has been carried out with a 8--GeV electron beam at the KEKB linac. We observed that positron yield from the hybrid target increased when the incident electron beam was aligned to the crystal axis and exceeded the one from the conventional target with the converter target of the same thickness, when its thickness is less than about 2 radiation length. The measurements in the temperature rise of the amorphous converter target was successfully carried out by use of thermocouples. These results lead to establishment to the evaluation of the hybrid target as an intense positron source.
△ Less
Submitted 16 October, 2013; v1 submitted 15 October, 2013;
originally announced October 2013.
-
Accelerator Control System at KEKB and the Linac
Authors:
Kazuro Furukawa,
Atsuyoshi Akiyama,
Eiichi Kadokura,
Miho Kurashina,
Katsuhiko Mikawa,
Tatsuro Nakamura,
Jun-ichi Odagiri,
Masanori Satoh,
Tsuyoshi Suwada
Abstract:
KEKB completed all of the technical milestones, and had offered important insights into the flavor structure of elementary particles, especially the CP violation. The accelerator control system at KEKB and injector linac was initiated by a combination of scripting languages at the operation layer and EPICS at the equipment layer. During the project many features were implemented to achieve extreme…
▽ More
KEKB completed all of the technical milestones, and had offered important insights into the flavor structure of elementary particles, especially the CP violation. The accelerator control system at KEKB and injector linac was initiated by a combination of scripting languages at the operation layer and EPICS at the equipment layer. During the project many features were implemented to achieve extreme performance out of the machine. Especially the online linkage to the accelerator simulation played an essential role. In order to further improve the reliability and flexibility two major concepts were additionally introduced later in the project, namely the channel access everywhere and the dual-tier controls. Based on the improved control system a concept of virtual accelerators were realized that enables the single injector linac serve as three separate injectors to KEKB HER, LER and Photon Factory, respectively. Those control technologies are indispensable for the future particle accelerators.
△ Less
Submitted 28 December, 2012; v1 submitted 25 November, 2012;
originally announced November 2012.
-
Pulse-to-pulse Beam Modulation and Event-based Beam Feedback System at KEKB Linac
Authors:
Kazuro Furukawa,
Masanori Satoh,
Tsuyoshi Suwada,
Tatsuro Nakamura
Abstract:
Beam injections to KEKB and Photon Factory are performed with pulse-to-pulse modulation at 50 Hz. Three very different beams are switched every 20 ms in order to inject those beams into KEKB HER, LER and Photon Factory (PF) simultaneously. Human operators work on one of those three virtual accelerators, which correspond to three-fold accelerator parameters. Beam charges for PF injection and the pr…
▽ More
Beam injections to KEKB and Photon Factory are performed with pulse-to-pulse modulation at 50 Hz. Three very different beams are switched every 20 ms in order to inject those beams into KEKB HER, LER and Photon Factory (PF) simultaneously. Human operators work on one of those three virtual accelerators, which correspond to three-fold accelerator parameters. Beam charges for PF injection and the primary electron for positron generation are 50-times different, and beam energies for PF and HER injection are 3-times different. Thus, the beam stabilities are sensitive to operational parameters, and if any instability in accelerator equipment occurred, beam parameter adjustments for those virtual accelerators have to be performed. In order to cure such a situation, beam energy feedback system was installed that can respond to each of virtual accelerators independently.
△ Less
Submitted 13 June, 2010;
originally announced June 2010.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.
-
Beam Feedback Systems and BPM Read-out System for the Two-Bunch Acceleration at Kekb Linac
Authors:
K. Furukawa,
N. Kamikubota,
T. Suwada,
T. Obata
Abstract:
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and orbit of each bunch is indispensable. Thus the beam energy and orbit feedback systems have been upgraded.
Since beam characteristics are acquired through bea…
▽ More
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and orbit of each bunch is indispensable. Thus the beam energy and orbit feedback systems have been upgraded.
Since beam characteristics are acquired through beam position monitors (BPM), their read-out system was improved to meet two-bunch requirements. Combined waveforms from BPM's were adjusted with delay cables avoiding overlaps and they enabled simultaneous measurement of beam positions of two bunches.
The beam energies of two bunches were balanced by tuning rf pulse timings, and the average energy was stabilized by adjusting the accelerating rf phases. The average beam orbits were also stabilized. Slow feedback systems at the injector section for charge and bunching stabilities are being planned as well. These systems were used successfully in the test beams and will be employed in the routine operation.
△ Less
Submitted 7 February, 2002; v1 submitted 26 November, 2001;
originally announced November 2001.
-
Beam Switching and Beam Feedback Systems at KEKB Linac
Authors:
K. Furukawa,
A. Enomoto,
N. Kamikubota,
T. Kamitani,
T. Matsumoto,
Y. Ogawa,
S. Ohsawa,
K. Oide,
T. Suwada
Abstract:
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning.
A software panel is used to choose one of four beam modes and a switching sequence is execut…
▽ More
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning.
A software panel is used to choose one of four beam modes and a switching sequence is executed in about two minutes. Most items in a sequence are simple operations followed by failure recoveries. The magnet standardization part consumes most of the time. The sequence can be re-arranged easily by accelerator operators. Linac beam modes are switched about fifty times a day using this software.
In order to stabilize linac beam energy and orbits, as well as some accelerator equipment, about thirty software beam feedback loops have been installed. They have been utilized routinely in all beam modes, and have improved its beam quality. Since its software interfaces are standardized, it is easy to add new feedback loops simply defining monitors and actuators.
△ Less
Submitted 11 September, 2000; v1 submitted 18 August, 2000;
originally announced August 2000.
-
Numerical Analysis of a Beam-Energy-Spread Monitor Using Multi-Stripline Electrodes
Authors:
Tsuyoshi Suwada
Abstract:
A beam-energy-spread monitor is under development in order to control and stabilize the energy spread of high-current single-bunch electron beams for producing a sufficient number of positrons. The author has proposed a new monitor using multi-stripline electrodes in order to reinforce this purpose. This report describes the basic design of the monitor based on a numerical analysis. The analysis…
▽ More
A beam-energy-spread monitor is under development in order to control and stabilize the energy spread of high-current single-bunch electron beams for producing a sufficient number of positrons. The author has proposed a new monitor using multi-stripline electrodes in order to reinforce this purpose. This report describes the basic design of the monitor based on a numerical analysis. The analysis result shows that the resolution of an energy-spread measurement is expected to be less than 0.3% for nominal operation conditions.
△ Less
Submitted 9 September, 2000; v1 submitted 3 August, 2000;
originally announced August 2000.