default search action
Ji-Bo Wang
Person information
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j116]Yifu Feng, Zonghai Hu, Rui Si, Ji-Bo Wang:
Study on Due-Date Assignment Scheduling with Setup Times and General Truncated Learning Effects. Asia Pac. J. Oper. Res. 41(1): 2350006:1-2350006:16 (2024) - [j115]Weidong Lei, Linhui Sun, Na Ren, Xue Jia, Ji-Bo Wang:
Research on Delivery Times Scheduling with Sum of Logarithm Processing Times-Based Learning Effect. Asia Pac. J. Oper. Res. 41(2): 2350014:1-2350014:13 (2024) - [j114]Ji-Bo Wang, Yi-Chun Wang, Congying Wan, Dan-Yang Lv, Lei Zhang:
Controllable Processing Time Scheduling with Total Weighted Completion Time Objective and Deteriorating Jobs. Asia Pac. J. Oper. Res. 41(3): 2350026:1-2350026:24 (2024) - [j113]Xiao-Yuan Wang, Dan-Yang Lv, Ping Ji, Na Yin, Ji-Bo Wang, Jin Qian:
Single machine scheduling problems with truncated learning effects and exponential past-sequence-dependent delivery times. Comput. Appl. Math. 43(4): 194 (2024) - [j112]Ming-Hui Li, Dan-Yang Lv, Zheng-Guo Lv, Li-Han Zhang, Ji-Bo Wang:
A two-agent resource allocation scheduling problem with slack due-date assignment and general deterioration function. Comput. Appl. Math. 43(4): 229 (2024) - [j111]Dan-Yang Lv, Ji-Bo Wang:
Considering the peak power consumption problem with learning and deterioration effect in flow shop scheduling. Comput. Ind. Eng. 197: 110599 (2024) - [j110]Rong-Rong Mao, Dan-Yang Lv, Na Ren, Ji-Bo Wang:
Supply chain scheduling with deteriorating jobs and delivery times. J. Appl. Math. Comput. 70(3): 2285-2312 (2024) - [j109]Ming-Hui Li, Dan-Yang Lv, Li-Han Zhang, Ji-Bo Wang:
Permutation flow shop scheduling with makespan objective and truncated learning effects. J. Appl. Math. Comput. 70(4): 2907-2939 (2024) - [j108]Yurong Zhang, Xi Wang, Li-Han Zhang, Xue Jia, Ji-Bo Wang:
Different due-window assignment scheduling with deterioration effects. J. Comb. Optim. 48(5): 43 (2024) - [j107]Yifu Feng, Xin-Na Geng, Dan-Yang Lv, Ji-Bo Wang:
Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs. Optim. Lett. 18(5): 1217-1235 (2024) - 2023
- [j106]Fei Teng, Si-Wen Luo, Dan-Yang Lv, Ji-Bo Wang:
Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects. Asia Pac. J. Oper. Res. 40(2): 2250022:1-2250022:18 (2023) - [j105]Na Ren, Ji-Bo Wang, Ershen Wang:
Research on delivery times scheduling with truncated learning effects. Comput. Appl. Math. 42(6): 243 (2023) - [j104]Lei Pan, Xinyu Sun, Ji-Bo Wang, Li-Han Zhang, Dan-Yang Lv:
Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs. J. Comb. Optim. 45(4): 100 (2023) - [j103]Wei Wu, Dan-Yang Lv, Ji-Bo Wang:
Two Due-Date Assignment Scheduling with Location-Dependent Weights and a Deteriorating Maintenance Activity. Syst. 11(3): 150 (2023) - 2022
- [j102]Ji-Bo Wang, Jing Xue, Bo Cui, Ming Gao:
Single-Machine Scheduling Problems with Variable Processing Times and Past-Sequence-Dependent Delivery Times. Asia Pac. J. Oper. Res. 39(2): 2150013:1-2150013:18 (2022) - [j101]Xiaoli Zhao, Jian Xu, Ji-Bo Wang, Lin Li:
Bicriteria Common Flow Allowance Scheduling with Aging Effect, Convex Resource Allocation, and a Rate-Modifying Activity on a Single Machine. Asia Pac. J. Oper. Res. 39(5): 2150046:1-2150046:21 (2022) - [j100]Ji-Bo Wang, Si-Han Wang, Kaipeng Cao, Mengqi Liu, Xue Jia:
Due-Window Assignment Methods and Scheduling with Generalized Positional-Dependent Weights. Asia Pac. J. Oper. Res. 39(5): 2250028:1-2250028:19 (2022) - [j99]Xue Jia, Dan-Yang Lv, Yang Hu, Ji-Bo Wang, Zhi Wang, Ershen Wang:
Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity. Asia Pac. J. Oper. Res. 39(6): 2250005:1-2250005:16 (2022) - [j98]Ji-Bo Wang, Li-Han Zhang, Zheng-Guo Lv, Dan-Yang Lv, Xin-Na Geng, Xinyu Sun:
Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects. Comput. Appl. Math. 41(8) (2022) - [j97]Ji-Bo Wang, Xue Jia, Jia-Xuan Yan, Si-Han Wang, Jin Qian:
Single machine group scheduling problem with makespan objective and a proportional linear shortening. RAIRO Oper. Res. 56(3): 1523-1532 (2022) - 2021
- [j96]Dan-Yang Lv, Ji-Bo Wang:
Study on Resource-Dependent No-Wait Flow Shop Scheduling with Different Due-Window Assignment and Learning Effects. Asia Pac. J. Oper. Res. 38(6): 2150008:1-2150008:23 (2021) - [j95]Dan-Yang Lv, Si-Wen Luo, Jing Xue, Jing-Xiao Xu, Ji-Bo Wang:
A note on single machine common flow allowance group scheduling with learning effect and resource allocation. Comput. Ind. Eng. 151: 106941 (2021) - [j94]Wanlei Wang, Jian-Jun Wang, Ji-Bo Wang:
Solution Algorithms for Single-Machine Group Scheduling with Learning Effect and Convex Resource Allocation. Complex. 2021: 6615824:1-6615824:13 (2021) - [j93]Li-Yan Wang, Mengqi Liu, Ji-Bo Wang, Yuan-Yuan Lu, Wei-Wei Liu:
Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology. Complex. 2021: 6656261:1-6656261:9 (2021) - [j92]Ji-Bo Wang, Dan-Yang Lv, Jian Xu, Ping Ji, Fuqiang Li:
Bicriterion scheduling with truncated learning effects and convex controllable processing times. Int. Trans. Oper. Res. 28(3): 1573-1593 (2021) - [j91]Ji-Bo Wang, Bo Cui, Ping Ji, Weiwei Liu:
Research on single-machine scheduling with position-dependent weights and past-sequence-dependent delivery times. J. Comb. Optim. 41(2): 290-303 (2021) - [j90]Dan-Yang Lv, Ji-Bo Wang:
Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optim. Lett. 15(6): 2311-2319 (2021) - [j89]Li-Yan Wang, Xue Huang, Wei-Wei Liu, Yu-Bin Wu, Ji-Bo Wang:
Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times. RAIRO Oper. Res. 55(Supplement): S2747-S2758 (2021) - 2020
- [j88]Xue Huang, Na Yin, Weiwei Liu, Ji-Bo Wang:
Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects. Asia Pac. J. Oper. Res. 37(1): 1950031:1-1950031:15 (2020) - [j87]Christos A. Nicolaou, Ian A. Watson, Mark Lemasters, Thierry Masquelin, Ji-Bo Wang:
Context Aware Data-Driven Retrosynthetic Analysis. J. Chem. Inf. Model. 60(6): 2728-2738 (2020) - [j86]James A. Lumley, Prashant V. Desai, Ji-Bo Wang, Suntara Cahya, Hongzhou Zhang:
The Derivation of a Matched Molecular Pairs Based ADME/Tox Knowledge Base for Compound Optimization. J. Chem. Inf. Model. 60(10): 4757-4771 (2020)
2010 – 2019
- 2019
- [j85]Weiwei Liu, Chong Jiang, Ji-Bo Wang, Yuan-Yuan Lu:
Single-machine scheduling with simultaneous considerations of resource allocation and deteriorating jobs. Comput. J. 62(1): 81-89 (2019) - [j84]Yu Ti, Ming Xu, Chong Jiang, Ji-Bo Wang, Xiao-Yuan Wang:
No-wait resource allocation flowshop scheduling with learning effect under limited cost availability. Comput. J. 62(1): 90-96 (2019) - [j83]Xinyu Sun, Xin-Na Geng, Ji-Bo Wang, Feng Liu:
Convex resource allocation scheduling in the no-wait flowshop with common flow allowance and learning effect. Int. J. Prod. Res. 57(6): 1873-1891 (2019) - [j82]Ji-Bo Wang, Feng Liu, Jian-Jun Wang:
Research on m-machine flow shop scheduling with truncated learning effects. Int. Trans. Oper. Res. 26(3): 1135-1151 (2019) - [j81]Xi-Xi Liang, Bo Zhang, Ji-Bo Wang, Na Yin, Xue Huang:
Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects. J. Appl. Math. Comput. 61(1-2): 373-388 (2019) - [j80]Ian A. Watson, Ji-Bo Wang, Christos A. Nicolaou:
A retrosynthetic analysis algorithm implementation. J. Cheminformatics 11(1): 1:1-1:12 (2019) - [j79]Yadi Zhou, Suntara Cahya, Steven A. Combs, Christos A. Nicolaou, Ji-Bo Wang, Prashant V. Desai, Jie Shen:
Exploring Tunable Hyperparameters for Deep Neural Networks with Industrial ADME Data Sets. J. Chem. Inf. Model. 59(3): 1005-1016 (2019) - 2018
- [j78]Ji-Bo Wang, Lin Li:
Machine Scheduling with Deteriorating Jobs and Modifying Maintenance Activities. Comput. J. 61(1): 47-53 (2018) - [j77]Ji-Bo Wang, Xin-Na Geng, Lu Liu, Jian-Jun Wang, Yuan-Yuan Lu:
Single Machine CON/SLK Due Date Assignment Scheduling with Controllable Processing Time and Job-dependent Learning Effects. Comput. J. 61(9): 1329-1337 (2018) - [j76]Ji-Bo Wang, Lu Liu, Jian-Jun Wang, Lin Li:
Makespan minimization scheduling with ready times, group technology and shortening job processing times. Comput. J. 61(9): 1422-1428 (2018) - [j75]Ji-Bo Wang, Jian Xu, Jing Yang:
Bicriterion Optimization for Flow Shop with a Learning Effect Subject to Release Dates. Complex. 2018: 9149510:1-9149510:12 (2018) - [j74]Lin Li, Ping Yan, Ping Ji, Ji-Bo Wang:
Scheduling jobs with simultaneous considerations of controllable processing times and learning effect. Neural Comput. Appl. 29(11): 1155-1162 (2018) - 2017
- [j73]Hongyu He, Mengqi Liu, Ji-Bo Wang:
Resource constrained scheduling with general truncated job-dependent learning effect. J. Comb. Optim. 33(2): 626-644 (2017) - 2016
- [j72]Christos A. Nicolaou, Ian A. Watson, Hong Hu, Ji-Bo Wang:
The Proximal Lilly Collection: Mapping, Exploring and Exploiting Feasible Chemical Space. J. Chem. Inf. Model. 56(7): 1253-1266 (2016) - [j71]Woong-Hee Shin, Charles Christoffer, Ji-Bo Wang, Daisuke Kihara:
PL-PatchSurfer2: Improved Local Surface Matching-Based Virtual Screening Method That Is Tolerant to Target and Ligand Structure Variation. J. Chem. Inf. Model. 56(9): 1676-1691 (2016) - [j70]Yuan-Yuan Lu, Jian Jin, Ping Ji, Ji-Bo Wang:
Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine. Neural Comput. Appl. 27(7): 1993-2000 (2016) - 2015
- [j69]Yu-Ping Niu, Long Wan, Ji-Bo Wang:
A Note on Scheduling Jobs with Extended Sum-of-Processing-Times-Based and Position-Based Learning Effect. Asia Pac. J. Oper. Res. 32(2): 1550001:1-1550001:12 (2015) - [j68]Limin Wang, Jian Jin, Ji-Bo Wang, Ping Ji:
Research on scheduling problems with general effects of deterioration and learning. Inf. Sci. 307: 89-94 (2015) - [j67]Cen Gao, Nels Thorsteinson, Ian A. Watson, Ji-Bo Wang, Michal Vieth:
Knowledge-Based Strategy to Improve Ligand Pose Prediction Accuracy for Lead Optimization. J. Chem. Inf. Model. 55(7): 1460-1468 (2015) - 2014
- [j66]Yuan-Yuan Lu, Jian-Jun Wang, Ji-Bo Wang:
Single machine group scheduling with decreasing time-dependent processing times subject to release dates. Appl. Math. Comput. 234: 286-292 (2014) - [j65]Ji-Bo Wang, Ming-Zheng Wang:
Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times. Asia Pac. J. Oper. Res. 31(5) (2014) - [j64]Xiao-Yuan Wang, Zhili Zhou, Ping Ji, Ji-Bo Wang:
Parallel machines scheduling with simple linear job deterioration and non-simultaneous machine available times. Comput. Ind. Eng. 74: 88-91 (2014) - [j63]Ji-Bo Wang, Jian-Jun Wang:
Flowshop scheduling with a general exponential learning effect. Comput. Oper. Res. 43: 292-308 (2014) - [j62]Na Yin, Liying Kang, Ping Ji, Ji-Bo Wang:
Single machine scheduling with sum-of-logarithm-processing-times based deterioration. Inf. Sci. 274: 303-309 (2014) - [j61]Ji-Bo Wang, Jian-Jun Wang:
Single machine group scheduling with time dependent processing times and ready times. Inf. Sci. 275: 226-231 (2014) - [j60]Xue-Ru Wang, Ji-Bo Wang, Jian Jin, Ping Ji:
Single machine scheduling with truncated job-dependent learning effect. Optim. Lett. 8(2): 669-677 (2014) - [j59]Ji-Bo Wang, Jian-Jun Wang:
Single machine scheduling with sum-of-logarithm-processing-times based and position based learning effects. Optim. Lett. 8(3): 971-982 (2014) - [j58]Ping Ji, Gang Li, Yunzhang Huo, Ji-Bo Wang:
Single-machine common flow allowance scheduling with job-dependent aging effects and a deteriorating maintenance activity. Optim. Lett. 8(4): 1389-1400 (2014) - 2013
- [j57]Ji-Bo Wang, Ming-Zheng Wang:
Makespan Minimization on Three-Machine Flow shop with deteriorating jobs. Asia Pac. J. Oper. Res. 30(6) (2013) - [j56]Xiaoqing Zhang, Linyan Sun, Ji-Bo Wang:
Single machine scheduling with autonomous learning and induced learning. Comput. Ind. Eng. 66(4): 918-924 (2013) - [j55]Ji-Bo Wang, Ming-Zheng Wang:
Minimizing makespan in three-machine flow shops with deteriorating jobs. Comput. Oper. Res. 40(2): 547-557 (2013) - [j54]Xiao-Yuan Wang, Zhili Zhou, Xi Zhang, Ping Ji, Ji-Bo Wang:
Several flow shop scheduling problems with truncated position-based learning effect. Comput. Oper. Res. 40(12): 2906-2929 (2013) - [j53]Ji-Bo Wang, Xiao-Yuan Wang, Linhui Sun, Linyan Sun:
Scheduling jobs with truncated exponential learning functions. Optim. Lett. 7(8): 1857-1873 (2013) - 2012
- [j52]Ji-Bo Wang, Ming-Zheng Wang, Ping Ji:
Scheduling Jobs with Processing times Dependent on Position, Starting Time, and Allotted Resource. Asia Pac. J. Oper. Res. 29(5) (2012) - [j51]Ji-Bo Wang, Ming-Zheng Wang:
Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time. Comput. Oper. Res. 39(3): 492-497 (2012) - [j50]Ming-Zheng Wang, Ji-Bo Wang:
Single-machine makespan minimization scheduling with nonlinear shortening processing times. Comput. Oper. Res. 39(3): 659-663 (2012) - [j49]Ji-Bo Wang, Ming-Zheng Wang, Ping Ji:
Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs. Int. J. Syst. Sci. 43(5): 861-868 (2012) - [j48]Ji-Bo Wang, Yu-Bin Wu, Ping Ji:
A revision of some single-machine and m-machine flowshop scheduling problems with learning considerations. Inf. Sci. 190: 227-232 (2012) - [j47]Ji-Bo Wang, Mingzheng Wang:
Worst-case analysis for flow shop scheduling problems with an exponential learning effect. J. Oper. Res. Soc. 63(1): 130-137 (2012) - [j46]Ji-Bo Wang, Ming-Zheng Wang:
Single-machine scheduling with nonlinear deterioration. Optim. Lett. 6(1): 87-98 (2012) - [j45]Ji-Bo Wang, Ping Ji, T. C. E. Cheng, Dan Wang:
Minimizing makespan in a two-machine flow shop with effects of deterioration and learning. Optim. Lett. 6(7): 1393-1409 (2012) - 2011
- [j44]Shu-Hui Yang, Ji-Bo Wang:
Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration. Appl. Math. Comput. 217(9): 4819-4826 (2011) - [j43]Ji-Bo Wang, Cai-Min Wei:
Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties. Appl. Math. Comput. 217(20): 8093-8099 (2011) - [j42]Ji-Bo Wang, Ming-Zheng Wang:
Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects. Ann. Oper. Res. 191(1): 155-169 (2011) - [j41]Xue Huang, Ming-Zheng Wang, Ji-Bo Wang:
Single-machine group scheduling with both learning effects and deteriorating jobs. Comput. Ind. Eng. 60(4): 750-754 (2011) - [j40]Ji-Bo Wang, Jian-Jun Wang:
Single-machine scheduling jobs with exponential learning functions. Comput. Ind. Eng. 60(4): 755-759 (2011) - [j39]Xiao-Yuan Wang, Ming-Zheng Wang, Ji-Bo Wang:
Flow shop scheduling to minimize makespan with decreasing time-dependent job processing times. Comput. Ind. Eng. 60(4): 840-844 (2011) - [j38]C. T. Ng, Ji-Bo Wang, T. C. Edwin Cheng, Sze Sing Lam:
Flowshop scheduling of deteriorating jobs on dominating machines. Comput. Ind. Eng. 61(3): 647-654 (2011) - [j37]Xiao-Yuan Wang, Li-Yan Wang, Ji-Bo Wang:
Erratum to "Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning" [Math. Comput. Modelling 50 (2009) 401-406]. Comput. Math. Appl. 61(5): 1471-1473 (2011) - [j36]Xiao-Yuan Wang, Li-Yan Wang, Ji-Bo Wang:
Erratum to "Notes on "Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning" [Math. Comput. Modelling 50 (2009) 401-406]" [CAMWA 61/5 (2011) 1471-1473]. Comput. Math. Appl. 61(10): 3180 (2011) - [j35]Quan Liao, Ji-Bo Wang, Ian A. Watson:
Accelerating Two Algorithms for Large-Scale Compound Selection on GPUs. J. Chem. Inf. Model. 51(5): 1017-1024 (2011) - [j34]Linhui Sun, Linyan Sun, Ji-Bo Wang:
Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs. J. Oper. Res. Soc. 62(4): 768-775 (2011) - [j33]Ji-Bo Wang, Jian-Ji Wang, Ping Ji:
Scheduling jobs with chain precedence constraints and deteriorating jobs. J. Oper. Res. Soc. 62(9): 1765-1770 (2011) - [j32]Jian-Jun Wang, Ji-Bo Wang, F. Liu:
Parallel machines scheduling with a deteriorating maintenance activity. J. Oper. Res. Soc. 62(10): 1898-1902 (2011) - [j31]Ji-Bo Wang, Ming-Zheng Wang:
A revision of machine scheduling problems with a general learning effect. Math. Comput. Model. 53(1-2): 330-336 (2011) - 2010
- [j30]Ji-Bo Wang, Dan Wang, Guo-Dong Zhang:
Single-machine scheduling with learning functions. Appl. Math. Comput. 216(4): 1280-1286 (2010) - [j29]Xue Huang, Ji-Bo Wang, Li-Yan Wang, Wen-Jun Gao, Xue-Ru Wang:
Single machine scheduling with time-dependent deterioration and exponential learning effect. Comput. Ind. Eng. 58(1): 58-63 (2010) - [j28]Dan Wang, Ming-Zheng Wang, Ji-Bo Wang:
Single-machine scheduling with learning effect and resource-dependent processing times. Comput. Ind. Eng. 59(3): 458-462 (2010) - [j27]Ji-Bo Wang, Linhui Sun, Linyan Sun:
Scheduling jobs with an exponential sum-of-actual-processing-time-based learning effect. Comput. Math. Appl. 60(9): 2673-2678 (2010) - [j26]Ji-Bo Wang, Ming-Zheng Wang:
Single machine multiple common due dates scheduling with learning effects. Comput. Math. Appl. 60(11): 2998-3002 (2010) - [j25]C. T. Ng, Ji-Bo Wang, T. C. Edwin Cheng, L. L. Liu:
A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs. Comput. Oper. Res. 37(1): 83-90 (2010) - [j24]Linhui Sun, Linyan Sun, Kai Cui, Ji-Bo Wang:
A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines. Eur. J. Oper. Res. 200(1): 309-311 (2010) - [j23]Ji-Bo Wang:
Single-machine scheduling with a sum-of-actual-processing-time-based learning effect. J. Oper. Res. Soc. 61(1): 172-177 (2010) - [j22]Ji-Bo Wang:
Response to Viewpoint on 'Single-machine with a sum-of-actual-processing-time-based learning effect'. J. Oper. Res. Soc. 61(2): 355 (2010)
2000 – 2009
- 2009
- [j21]Ji-Bo Wang, Li-Li Liu:
Two-machine flow shop scheduling with linear decreasing job deterioration. Comput. Ind. Eng. 56(4): 1487-1493 (2009) - [j20]Ji-Bo Wang, Li-Li Liu:
Two-machine flow shop problem with effects of deterioration and learning. Comput. Ind. Eng. 57(3): 1114-1121 (2009) - [j19]Ji-Bo Wang:
Single-machine scheduling with learning effect and deteriorating jobs. Comput. Ind. Eng. 57(4): 1452-1456 (2009) - [j18]Ji-Bo Wang, Dan Wang, Li-Yan Wang, Lin Lin, Na Yin, Weiwei Wang:
Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times. Comput. Math. Appl. 57(1): 9-16 (2009) - [j17]Ji-Bo Wang:
Single machine scheduling with decreasing linear deterioration under precedence constraints. Comput. Math. Appl. 58(1): 95-103 (2009) - [j16]Quan Liao, Ji-Bo Wang, Yue W. Webster, Ian A. Watson:
GPU Accelerated Support Vector Machines for Mining High-Throughput Screening Data. J. Chem. Inf. Model. 49(12): 2718-2725 (2009) - [j15]Ji-Bo Wang:
Single machine scheduling with a time-dependent learning effect and deteriorating jobs. J. Oper. Res. Soc. 60(4): 583-586 (2009) - 2008
- [j14]Ji-Bo Wang:
Erratum to: A note on flow shop scheduling problems with a learning effect on no-idle dominant machines [Appl. Math. Computation 184 (2007) 945-949]. Appl. Math. Comput. 202(2): 897-898 (2008) - [j13]Ji-Bo Wang:
Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect. Comput. Ind. Eng. 55(3): 584-591 (2008) - [j12]Ji-Bo Wang:
Single-machine scheduling with general learning functions. Comput. Math. Appl. 56(8): 1941-1947 (2008) - [j11]Ji-Bo Wang, C. T. Ng, T. C. Edwin Cheng:
Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint. Comput. Oper. Res. 35(8): 2684-2693 (2008) - 2007
- [j10]Ji-Bo Wang, T. C. Edwin Cheng:
Scheduling Problems with the Effects of deterioration and Learning. Asia Pac. J. Oper. Res. 24(2): 245-261 (2007) - [j9]Ji-Bo Wang:
Flow shop scheduling problems with decreasing linear deterioration under dominant machines. Comput. Oper. Res. 34(7): 2043-2058 (2007) - [j8]Ji-Bo Wang, Zun-Quan Xia:
Single machine scheduling problems with controllable processing times and total absolute differences penalties. Eur. J. Oper. Res. 177(1): 638-645 (2007) - 2006
- [j7]Ji-Bo Wang:
Single machine scheduling with common due date and controllable processing times. Appl. Math. Comput. 174(2): 1245-1254 (2006) - [j6]Ji-Bo Wang, C. T. Daniel Ng, T. C. Edwin Cheng, Li-Li Liu:
Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Appl. Math. Comput. 180(1): 185-193 (2006) - [j5]Ji-Bo Wang, Feng Shan, Bo Jiang, Li-Yan Wang:
Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time. Appl. Math. Comput. 182(1): 947-954 (2006) - [j4]Ji-Bo Wang:
A note on scheduling problems with learning effect and deteriorating jobs. Int. J. Syst. Sci. 37(12): 827-833 (2006) - [j3]Ji-Bo Wang, Z.-Q. Xia:
Flow shop scheduling problems with deteriorating jobs under dominating machines. J. Oper. Res. Soc. 57(2): 220-226 (2006) - 2005
- [j2]Ji-Bo Wang, Zun-Quan Xia:
Scheduling jobs under decreasing linear deterioration. Inf. Process. Lett. 94(2): 63-69 (2005) - [j1]Ji-Bo Wang, Z.-Q. Xia:
Flow-shop scheduling with a learning effect. J. Oper. Res. Soc. 56(11): 1325-1330 (2005)
Coauthor Index
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-12-23 19:28 CET by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint