Abstract
Due date reliability is a key performance indicator that directly affects customers. Therefore, direct or indirect measures are taken to improve the due date reliability of production processes. These measures induce various problems such as the Lead Time Syndrome. To exploit new potentials regarding due date reliability, this paper presents the mathematical investigation of the Lead Time Syndrome, to point out research topics in this area.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
Notes
- 1.
The terms ‘throughput time’ and ‘lead time’ are often used synonymously. According to the investigated ‘Lead Time Syndrome’, only the term ‘lead time’ is used to simplify it for the reader.
References
Balla J, Layer F (2006) Produktionsplanung mit SAP APO-PP/DS: Prozesse und Customizing in der Praxis. Galileo Press, Germany
Bauer J (2009) Produktionscontrolling und -management mit SAP ERP: Effizientes Controlling, Logistik- und Kostenmanagement moderner Produktionssysteme. Vieweg+Teubner, Verlag
Bechte W (1984) Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung, 70th edn. VDI, Verlag
Breithaupt J-W, Land M, Nyhuis P (2002) The workload control concept: theory and practical extensions of Load Oriented Order Release. Prod Plann Control 13:625–638
Burkhalter JP (2010) Steuerung- und Regelungsstrategien für Produktionstechnische Systeme. Dissertation. ETH, Zürich Nr. 18830
Dittrich J, Mertens P, Hau M, Hufgard A (2009) Dispositionsparameter in der Produktionsplanung mit SAP: Einstellhinweise, Wirkungen, Nebenwirkungen. Vieweg+Teubner, Verlag
Gutenberg E (1951) Grundlagen der Betriebswirtschaftslehre, 1st edn. Springer, Berlin
Hopp WJ, Spearman ML (2008) Factory physics, 3rd edn. McGraw-Hill/Irwin, New York
Kumar SA (2006) Production and operations management. new age international (P) ltd. Publishers
Lödding H (2008) Verfahren der Fertigungssteuerung, 2nd edn. Springer, Berlin
Mather H, Plossl G (1977) Priority fixation versus throughput planning. Production and inventory management. J Am Prod Inventory Control Soc, APICS 3rd Q.:27–51
Moscoso P, Fransoo J, Fischer D, Wäfler T (2011) The planning bullwhip: a complex dynamic phenomenon in hierarchical systems. In: Fransoo JC, Wäfler T, Wilson J (eds) Behavioral operations in planning and scheduling. Springer, Heidelberg, pp 159–186
Mukherjee PN, Kachwla TT (2009) Operations management and productivity techniques. Prentice-Hall of India, New Delhi
Nyhuis P (2007) Practical applications of logistic operating curves. CIRP Ann—Manufact Technol 56:483–486
Nyhuis P, Vogel M (2006) Entwicklung eines Modells zur Beschreibung der Termintreue von Fertigungsbereichen. PPS Manag 3:45–48
Nyhuis P, Wiendahl H-P (2009) Fundamentals of production logistics: theory, tools and applications. Springer, Berlin
Nyhuis P, Wiendahl H-P (2006) Logistic production operating curves: basic model of the theory of logistic operating curves. CIRP Ann: Manufact Technol 55:441–444
Nyhuis P, Wiendahl H-P (2010) Logistische Kennlinien: Grundlagen, Werkzeuge und Anwendungen, 3rd edn. Springer, Berlin
Schuh G (2006) Produktionsplanung und -steuerung: Grundlagen, Gestaltung und Konzepte. Springer, Berlin
Schönsleben P (2012) Integral logistics management: operations and supply chain management within and across companies, 4th edn. Auerbach Publications, Boca Raton
Selçuk B, Adan IJ, de Kok TG, Fransoo JC (2009) An explicit analysis of the lead time syndrome: stability condition and performance evaluation. Int J Prod Res 47:2507–2529
Selçuk B, Fransoo JC, De Kok AG, DeKok A (2006) The effect of updating lead times on the performance of hierarchical planning systems. Int J Prod Econ 104:427–440
Wiendahl H-P (1997) Fertigungsregelung: Logistische Beherrschung von Fertigungsabläufen auf Basis des Trichtermodells. Hanser Verlag, München
Wiendahl HP (2008) Betriebsorganisation für Ingenieure, 6th edn. Hanser Verlag, München
Windt K, Nyhuis P, Kolev I et al (2011) Improving due date reliability of steel mills: identification of punctuality potentials, innovation in product and production. In: 21st international conference on production research
Yu K-W (2001) Terminkennlinie: Eine Beschreibungsmethodik für die Terminabweichung im Produktionsbereich. Fortschritt-Berichte. VDI, Verlag
Acknowledgments
The research of Katja Windt is supported by the Alfried Krupp Prize for Young University Teachers of the Alfried Krupp von Bohlen und Halbach-Foundation.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Knollmann, M., Windt, K. (2013). Exploitation of Due Date Reliability Potentials: Mathematical Investigation of the Lead Time Syndrome. In: Kreowski, HJ., Scholz-Reiter, B., Thoben, KD. (eds) Dynamics in Logistics. Lecture Notes in Logistics. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-35966-8_26
Download citation
DOI: https://doi.org/10.1007/978-3-642-35966-8_26
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-35965-1
Online ISBN: 978-3-642-35966-8
eBook Packages: EngineeringEngineering (R0)