Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content

Exploitation of Due Date Reliability Potentials: Mathematical Investigation of the Lead Time Syndrome

  • Conference paper
  • First Online:
Dynamics in Logistics

Part of the book series: Lecture Notes in Logistics ((LNLO))

Abstract

Due date reliability is a key performance indicator that directly affects customers. Therefore, direct or indirect measures are taken to improve the due date reliability of production processes. These measures induce various problems such as the Lead Time Syndrome. To exploit new potentials regarding due date reliability, this paper presents the mathematical investigation of the Lead Time Syndrome, to point out research topics in this area.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

Notes

  1. 1.

    The terms ‘throughput time’ and ‘lead time’ are often used synonymously. According to the investigated ‘Lead Time Syndrome’, only the term ‘lead time’ is used to simplify it for the reader.

References

  • Balla J, Layer F (2006) Produktionsplanung mit SAP APO-PP/DS: Prozesse und Customizing in der Praxis. Galileo Press, Germany

    Google Scholar 

  • Bauer J (2009) Produktionscontrolling und -management mit SAP ERP: Effizientes Controlling, Logistik- und Kostenmanagement moderner Produktionssysteme. Vieweg+Teubner, Verlag

    Book  Google Scholar 

  • Bechte W (1984) Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung, 70th edn. VDI, Verlag

    Google Scholar 

  • Breithaupt J-W, Land M, Nyhuis P (2002) The workload control concept: theory and practical extensions of Load Oriented Order Release. Prod Plann Control 13:625–638

    Article  Google Scholar 

  • Burkhalter JP (2010) Steuerung- und Regelungsstrategien für Produktionstechnische Systeme. Dissertation. ETH, Zürich Nr. 18830

    Google Scholar 

  • Dittrich J, Mertens P, Hau M, Hufgard A (2009) Dispositionsparameter in der Produktionsplanung mit SAP: Einstellhinweise, Wirkungen, Nebenwirkungen. Vieweg+Teubner, Verlag

    Book  Google Scholar 

  • Gutenberg E (1951) Grundlagen der Betriebswirtschaftslehre, 1st edn. Springer, Berlin

    Google Scholar 

  • Hopp WJ, Spearman ML (2008) Factory physics, 3rd edn. McGraw-Hill/Irwin, New York

    Google Scholar 

  • Kumar SA (2006) Production and operations management. new age international (P) ltd. Publishers

    Google Scholar 

  • Lödding H (2008) Verfahren der Fertigungssteuerung, 2nd edn. Springer, Berlin

    Google Scholar 

  • Mather H, Plossl G (1977) Priority fixation versus throughput planning. Production and inventory management. J Am Prod Inventory Control Soc, APICS 3rd Q.:27–51

    Google Scholar 

  • Moscoso P, Fransoo J, Fischer D, Wäfler T (2011) The planning bullwhip: a complex dynamic phenomenon in hierarchical systems. In: Fransoo JC, Wäfler T, Wilson J (eds) Behavioral operations in planning and scheduling. Springer, Heidelberg, pp 159–186

    Google Scholar 

  • Mukherjee PN, Kachwla TT (2009) Operations management and productivity techniques. Prentice-Hall of India, New Delhi

    Google Scholar 

  • Nyhuis P (2007) Practical applications of logistic operating curves. CIRP Ann—Manufact Technol 56:483–486

    Article  Google Scholar 

  • Nyhuis P, Vogel M (2006) Entwicklung eines Modells zur Beschreibung der Termintreue von Fertigungsbereichen. PPS Manag 3:45–48

    Google Scholar 

  • Nyhuis P, Wiendahl H-P (2009) Fundamentals of production logistics: theory, tools and applications. Springer, Berlin

    Book  Google Scholar 

  • Nyhuis P, Wiendahl H-P (2006) Logistic production operating curves: basic model of the theory of logistic operating curves. CIRP Ann: Manufact Technol 55:441–444

    Article  Google Scholar 

  • Nyhuis P, Wiendahl H-P (2010) Logistische Kennlinien: Grundlagen, Werkzeuge und Anwendungen, 3rd edn. Springer, Berlin

    Google Scholar 

  • Schuh G (2006) Produktionsplanung und -steuerung: Grundlagen, Gestaltung und Konzepte. Springer, Berlin

    Book  Google Scholar 

  • Schönsleben P (2012) Integral logistics management: operations and supply chain management within and across companies, 4th edn. Auerbach Publications, Boca Raton

    Google Scholar 

  • Selçuk B, Adan IJ, de Kok TG, Fransoo JC (2009) An explicit analysis of the lead time syndrome: stability condition and performance evaluation. Int J Prod Res 47:2507–2529

    Article  MATH  Google Scholar 

  • Selçuk B, Fransoo JC, De Kok AG, DeKok A (2006) The effect of updating lead times on the performance of hierarchical planning systems. Int J Prod Econ 104:427–440

    Article  Google Scholar 

  • Wiendahl H-P (1997) Fertigungsregelung: Logistische Beherrschung von Fertigungsabläufen auf Basis des Trichtermodells. Hanser Verlag, München

    Google Scholar 

  • Wiendahl HP (2008) Betriebsorganisation für Ingenieure, 6th edn. Hanser Verlag, München

    Google Scholar 

  • Windt K, Nyhuis P, Kolev I et al (2011) Improving due date reliability of steel mills: identification of punctuality potentials, innovation in product and production. In: 21st international conference on production research

    Google Scholar 

  • Yu K-W (2001) Terminkennlinie: Eine Beschreibungsmethodik für die Terminabweichung im Produktionsbereich. Fortschritt-Berichte. VDI, Verlag

    Google Scholar 

Download references

Acknowledgments

The research of Katja Windt is supported by the Alfried Krupp Prize for Young University Teachers of the Alfried Krupp von Bohlen und Halbach-Foundation.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mathias Knollmann .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Knollmann, M., Windt, K. (2013). Exploitation of Due Date Reliability Potentials: Mathematical Investigation of the Lead Time Syndrome. In: Kreowski, HJ., Scholz-Reiter, B., Thoben, KD. (eds) Dynamics in Logistics. Lecture Notes in Logistics. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-35966-8_26

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-35966-8_26

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-35965-1

  • Online ISBN: 978-3-642-35966-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics