Abstract
The IVTV Plan (Integration, Verification, Transition and Validation of the system before its Qualification) is developed and validated during the design stage. It details all the activities, resources, requirements, means, etc. requested during the realization stage so it is the hyphen between these two crucial stages in system life cycle. It is today necessary to help companies to better transfer detailed design models towards realization for many reasons discussed in this paper. Mainly, IVTV plan remains difficult to be exploited. This article proposes a first step towards a Model-Based Realization Plan, that is, a meta-model that represents the links between models that comes from Model-Based System Engineering and information required in the IVTV plan.
Chapter PDF
Similar content being viewed by others
Keywords
References
ISO/IEC 2008, IEEE Standards 15288.2008 – Systems Engineering – System Life Cycle Processes, 2nd edn (February 2008)
INCOSE, System Engineering (SE) Handbook Working Group, System Engineering Handbook, A Guide For System Life Cycle Processes And Activities Version 3.2.1, INCOSE TP 2003 002 03.2 (2011)
DCIS, Découvrir et comprendre l’Ingénierie Système, Collection AFIS sous la direction de Serge Fiorèse, Jean-Pierre Meinadier, CEPADUES Editions, Avril (in French 2012) ISBN: 97802036493.005.6
Blanchard, B.S., Fabrycky, W.J.: Systems Engineering and Analysis, 5th edn. Prentice-Hall International series in Industrial and Systems Engineering. Prentice-Hall, Englewood Cliffs (2011)
Faisandier, A.: Systems Architecture and Design. Sinergy’Com, Belberaud (2012)
INCOSE, Survey of Model-Based Systems Engineering (MBSE) Methodologies, Model Based Systems Engineering (MBSE) Initiative from International Council on Systems Engineering (INCOSE) (10 June 2008)
CORE V6.0, Vitech corporation (2010), http://www.vitechcorp.com/products/index.html
Braspenning, N.C., van de Mortel-Fronczak, J.M., Rooda, J.E.: A Model-based Integration and Testing Method to Reduce System Development Effort. Electronic Notes in Theoretical Computer Science 164(4), 13–28 (2006)
Luna, S., Lopes, A., See, Y., Tao, H., Zapata, F., Pineda, R.: Integration, Verification, Validation, Test, and Evaluation (IVVT&E) Framework for System of Systems (SoS). Procedia Computer Science 20, 298–305 (2013)
van Ruijven, L.C.: Ontology for Systems Engineering. Procedia Computer Science 16, 383–392 (2013)
BKCASE Project, System Engineering Book of Knowledge, SEBoK v1.2 (2013), http://www.sebokwiki.org/ (last visit 2013-04)
OMG, Software & Systems Process Engineering Meta-Model Specification, V2.0 (2008)
MADS MOSAR, Gestion des risques: Méthode MADS-MOSAR II Manuel de mise en oeuvre, Pierre Périlhon (2007) (in French)
Forsberg, K., Mooz, H., Cotterman, H.: Visualizing Project Management. In: Hoboken, N.J. (ed.), 3rd edn., J. Wiley & Sons (2005)
Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide ), 5th edn (2013) ISBN13: 9781935589679
Combemale, B., Cregut, X., Garoche, P.-L., Thirioux, X., Vernadat, F.: A Property-Driven Approach to Formal Verification of Process Models. In: Enterprise Information Systems, vol. 12, pp. 286–300. Springer, Heidelberg (2009)
Chapurlat, V.: UPSL-SE: A model verification framework for Systems Engineering. Comput. Ind. 64(5), 581–597 (2013)
Schamai, W., Fritzson, P., Paredis, C., Po, A.: Towards Unified System Modeling and Simulation with ModelicaML: Modeling of Executable Behavior Using Graphical Notations. In: Proceedings 7th Modelica Conference, Como, Italy, September 20-22 (2009)
System Modelling Language SysML (2010), http://www.sysml.org/
MODELICA - A Unified Object-Oriented Language for Physical Systems Modeling Language Specification Version 3.2 (see ) (March 24, 2010), http://www.modelica.org/
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 IFIP International Federation for Information Processing
About this paper
Cite this paper
Chapurlat, V., Bonjour, E. (2014). From Model Based Systems Engineering to Model Based System Realization: Role and Relevance of IVTV Plan. In: Grabot, B., Vallespir, B., Gomes, S., Bouras, A., Kiritsis, D. (eds) Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World. APMS 2014. IFIP Advances in Information and Communication Technology, vol 438. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-44739-0_14
Download citation
DOI: https://doi.org/10.1007/978-3-662-44739-0_14
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-44738-3
Online ISBN: 978-3-662-44739-0
eBook Packages: Computer ScienceComputer Science (R0)