Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content

Advertisement

Critical External Risks in International Joint Ventures for Construction Industry in Pakistan

  • Research Paper
  • Published:
International Journal of Civil Engineering Aims and scope Submit manuscript

Abstract

International joint ventures (IJVs) are both advantageous and challenging due to differing technical abilities, economic and political environments, and cultural and legal frameworks. This study identifies the external risks particularly political, economic, legal, social and environmental in IJVs carrying out construction projects in Pakistan. It further analyzes the impact of these risks on the project success criteria of time, cost and quality. Data are collected using questionnaire-based survey and with the help of factor analysis, 16 critical external risks are identified. The top most critical risks are fluctuation in exchange rate, weather systems, political instability and delay in approval. Analytical Hierarchy Process is applied to prioritize critical external risks discretely for project success criteria. As a result, time is found to be the most influenced project criterion by the critical external risks, followed by cost and quality. The results are of importance for local practitioners in the form of recommendations for better management of IJV risks. Future research can benefit from incorporation of more dimensions of project success.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6

Similar content being viewed by others

References

  1. Nasirzadeh F, Mazandaranizadeh H, Rouhparvar M (2016) Quantitative risk allocation in construction projects using cooperative-bargaining game theory. Int J Civ Eng 14:161–170

    Article  Google Scholar 

  2. Park H, Lee K, Jeong H, Han S (2014) Effect of institutional risks on the performance of international construction projects. Constr Res Congr. doi:10.1061/9780784413517.216

    Google Scholar 

  3. Deng X, Low SP, Li Q, Zhao X (2014) Developing competitive advantages in political risk management for international construction enterprises. J Constr Eng Manag. doi:10.1061/%28asce%29co.1943-7862.0000836

    Google Scholar 

  4. Han SH, Park SH, Kim DY, Kim H, Kang YW (2007) Causes of bad profit in overseas construction projects. J Constr Eng Manag. doi:10.1061/(asce)0733-9364(2007)133:12(932)

    Google Scholar 

  5. Yitmen I (2014) The influence of cross-cultural communication on stakeholder management process in international construction projects: Turkish stakeholders’ perspective. Int J Civ Eng 13:179–190

    Google Scholar 

  6. Walewski J, Gibson G, Vines E, Cleland D, Gareis R (2006) Risk identification and assessment for international construction project. Global Project Management Handbook. McGraw-Hill, New York, pp 1–17

    Google Scholar 

  7. Maqsoom A, Charoenngam C, Awais M (2013) Internationalization process of Pakistani contractors: an exploratory study. doi:10.1061/9780784413134.006

  8. Ministry of Finance (MoF) Overview of the Economy 2013–2014. http://www.finance.gov.pk/survey/chapters_14/Overview.pdf. Accessed 27 Aug 2016

  9. Dadpour M, Shakeri E (2016) Improving strategies of the private sector participation in water sector projects: a case study in Ministry of Energy (Iran). Int J Civ Eng 14:61–73

    Article  Google Scholar 

  10. Maqsoom A, Charoenngam C (2014) Motives and competitive assets of Pakistani international construction contracting firms: impact of size and international experience. J Financ Manag Prop Constr. doi:10.1108/jfmpc-09-2013-0037

    Google Scholar 

  11. Low SP, Liu J, He S (2009) External risk management practices of Chinese construction firms in Singapore. KSCE J Civ Eng. doi:10.1007/s12204-009-0084-9

    Google Scholar 

  12. Ma L, Zhang P (2014) Game analysis on moral hazard of construction project managers in China. Int J Civ Eng 3:4–6

    Google Scholar 

  13. Ardeshir A, Amiri M, Ghasemi Y, Errington M (2014) Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis. Int J Civ Eng 10:396–412

    Google Scholar 

  14. Al Khattab A, Anchor J, Davies E (2007) Managerial perceptions of political risk in international projects. Int J Proj Manag. doi:10.1016/j.ijproman.2007.03.006

    Google Scholar 

  15. Ardeshir A, Amiri M, Ghasemi Y, Errington M (2014) Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis. Int J Civ Eng 12:396–412

    Google Scholar 

  16. Sebt MH, Gerei A, Naghash TH (2009) A comprehensive framework for integrated management of opportunities and threats by using dynamic system. Int J Civ Eng 7:161–169

    Google Scholar 

  17. Zhang G, Zou PX (2007) Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. J Constr Eng Manag 13:771–779

    Article  Google Scholar 

  18. Abdelgawad M, Fayek AR (2010) Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. J Constr Eng Manag 136:1028–1036

    Article  Google Scholar 

  19. Taylan O, Bafail AO, Abdulaal RM, Kabli MR (2014) Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Appl Soft Comput 17:104–116

    Article  Google Scholar 

  20. Ozorhon B, Arditi D, Dikmen I, Birgonul MT (2007) Effect of host country and project conditions in international construction joint ventures. Int J Proj Manag. doi:10.1016/j.ijproman.2007.04.003

    Google Scholar 

  21. Naghash TH, Sebt MH, Maknoon R (2014) A dynamic model for adjusting contemporary construction projects behaviors in today changeable environments. Int J Civ Eng 10:466–480

    Google Scholar 

  22. Berk C (2012) A risk management proposal to the international contractors industry from the financial perspective. J Appl Financ Bank 2:199–216

    Google Scholar 

  23. Xiaopeng D, Pheng LS (2013) Understanding the critical variables affecting the level of political risks in international construction projects. KSCE J Civ Eng. doi:10.1007/s12204-013-0344-4

    Google Scholar 

  24. Benešová H, Anchor JR (2013) The determinants of the adoption of a political risk assessment function in czech international firms: a theoretical framework, pp 36–45. https://dspace.tul.cz/bitstream/handle/15240/6896/04%2036.pdf?sequence=1. Accessed 12 July 2016

  25. Ling FYY, Hoang VTP (2009) Political, economic, and legal risks faced in international projects: case study of Vietnam. J Prof Issues Eng Educ Pract. doi:10.1061/(asce)ei.1943-4441.0000014

    Google Scholar 

  26. Chan DW, Chan AP, Lam PT, Yeung JF, Chan JH (2011) Risk ranking and analysis in target cost contracts: empirical evidence from the construction industry. Int J Proj Manag 29:741–763

    Google Scholar 

  27. Khodeir LM, Mohamed AHM (2015) Identifying the latest risk probabilities affecting construction projects in Egypt according to political and economic variables. HBRC J 11:129–134

    Article  Google Scholar 

  28. Deng X, Pheng LS, Zhao X (2014) Project system vulnerability to political risks in international construction projects: the case of Chinese contractors. Proj Manag J. doi:10.1002/pmj.21397

    Google Scholar 

  29. Ling F, Loon LH (2007) Foreign firms’ financial and economic risk in China. Eng Constr Archit Manag. doi:10.1108/09699980710760667

    Google Scholar 

  30. Prasitsom A, Likhitruangsilp V (2014) Effects of organization structures on international construction joint venture risks. Int J Constr Eng Manag 4:128–148

    Google Scholar 

  31. Ozorhon B, Arditi D, Dikmen I, Birgonul MT (2010) Performance of international joint ventures in construction. J Manag Eng. doi:10.1061/(asce)me.1943-4479.0000022

    Google Scholar 

  32. KarimiAzari A, Mousavi N, Mousavi SF, Hosseini S (2011) Risk assessment model selection in construction industry. Expert Syst Appl. doi:10.1016/j.eswa.2010.12.110

    Google Scholar 

  33. Adnan H, Hashim N, Mohd N, Ahmad N (2012) Ethical issues in the construction industry: contractor’s perspective. Procedia Soc Behav Sci. doi:10.1016/j.sbspro.2012.02.142

    Google Scholar 

  34. Zhao X, Hwang BG, Pheng LS, Wu P (2014) Reducing hindrances to enterprise risk management implementation in construction firms. J Constr Eng Manag. doi:10.1061/(asce)co.1943-7862.0000944

    Google Scholar 

  35. Zhang X (2011) Social risks for international players in the construction market: a China study. Habitat Int. doi:10.1016/j.habitatint.2011.02.004

    Google Scholar 

  36. Egemen M, Mohamed A (2008) SCBMD: a knowledge-based system software for strategically correct bid/no bid and mark-up size decisions. Autom Constr. doi:10.1016/j.autcon.2008.02.013

    Google Scholar 

  37. Saaty TL (2008) Decision making with the analytic hierarchy process. Int J Serv Sci. doi:10.1404/ijssci.2008.017490

    MATH  Google Scholar 

  38. Kaveh A, Khanzadi M, Alipour M (2016) Fuzzy resource constraint project scheduling problem using CBO and CSS algorithms. Int J Civ Eng 14:324–337

    Article  Google Scholar 

  39. Junior FRL, Osiro L, Carpinetti LCR (2014) A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Appl Soft Comput 21:194–209

    Article  Google Scholar 

  40. David J, Saaty D (2007) Use analytic hierarchy process for project selection. ASQ Six Sigma Forum Mag 6:22–29

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Muhammad Jamaluddin Thaheem.

Ethics declarations

Funding

There is no funding information to disclose.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Razzaq, A., Thaheem, M.J., Maqsoom, A. et al. Critical External Risks in International Joint Ventures for Construction Industry in Pakistan. Int J Civ Eng 16, 189–205 (2018). https://doi.org/10.1007/s40999-016-0117-z

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s40999-016-0117-z

Keywords