Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content

Advertisement

Modeling Externality Costs and Intermittent Technologies in Generation Expansion Planning Models

  • Research
  • Published:
Operations Research Forum Aims and scope Submit manuscript

Abstract

The objective of the generation expansion master plan is to determine the necessary capacity and types of power plants for accommodating future load growth. The current software utilized for guiding generation planning primarily relies on the load duration curve (LDC) paradigm, which overlooks the chronological order of events. Additionally, the optimization process does not consider the environmental costs associated with power plants, as these costs are calculated separately once the optimal plan is finalized. This research study focuses on incorporating wind power plant modeling into generation planning models based on the LDC approach. Furthermore, the article emphasizes the integration of environmental costs into the optimization process, enabling researchers and policymakers to make more informed decisions regarding the growth of electricity and energy resources. The paper employs the widely used and reputable Wien Automatic System Planning (WASP) Package, version WASP-IV planning tool to identify the most optimal capacity expansion plans for Oman’s Main Interconnected Network (MIS) as a specific case study. In this tool, the load is represented using the LDC approach, while the built-in optimization feature does not account for environmental costs. To overcome this limitation, environmental costs are added to fuel costs so that they become part of the optimization function. The results show that when the opportunity cost of gas and environmental costs are considered in the optimization process, a significant number of wind generators are selected. To guarantee that non-dispatchable renewable technologies are fairly considered by decision-makers, the study suggests including opportunity costs as input data in generation planning models.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3

Similar content being viewed by others

Data Availability

The datasets generated during and/or analyzed during the current study are available from the corresponding author on reasonable request.

References

  1. Kreith F (1993) Integrated resource planning. J Energy Res Technol 115(2):80–85

    Article  Google Scholar 

  2. Malik AS, Cory BJ (1999) Integrated resource planning with consideration of dynamic costs of thermal units. Electric Power Systems Research 51(2):123–130

    Article  Google Scholar 

  3. Hirst E, A good integrated resource plan: guidelines for electric utilities and regulators. (1992) Oak Ridge National Laboratory: Oak Ridge. Tennessee, USA

    Google Scholar 

  4. Al Abri D et al (2022) Smart grids and smart buildings. In: Lackner M, Sajjadi B, Chen W-Y (eds) Handbook of climate change mitigation and adaptation. Springer International Publishing, Cham, pp 2215–2270

    Chapter  Google Scholar 

  5. Koltsaklis NE, Dagoumas AS (2018) State-of-the-art generation expansion planning: a review. Appl Energy 230:563–589

    Article  Google Scholar 

  6. Generation and transmission expansion model - a long term optimization model using MIP. Available from: http://www.energyonline.com/Products/Uplane.aspx

  7. Electric generation expansion analysis system (EGEAS) v10.0. Available from: https://www.epri.com/research/products/000000003002014877

  8. PLEXOS® Simulation software. Available from: https://www.energyexemplar.com/plexos

  9. Wien Automatic System Planning Package (2004) Wien Automatic System Planning Package, a computer code for power generating system expansion planning, WASP-IV. International Atomic Energy Agency, Vienna

    Google Scholar 

  10. Foley AM et al (2010) A strategic review of electricity systems models. Energy 35(12):4522–4530

    Article  Google Scholar 

  11. Gacitua L et al (2018) A comprehensive review on expansion planning: models and tools for energy policy analysis. Renew Sustain Energy Rev 98:346–360

    Article  Google Scholar 

  12. Kim Y-C, Ahu B-H (1993) Multicriteria generation-expansion planning with global environmental considerations. IEEE Trans Eng Manage 40(2):154–161

    Article  Google Scholar 

  13. Becker N, Soloveitchik D, Olshansky M (2011) Incorporating environmental externalities into the capacity expansion planning: an Israeli case study. Energy Convers Manage 52(7):2489–2494

    Article  Google Scholar 

  14. Foley A, Gallachóir BÓ (2015) Analysis of electric vehicle charging using the traditional generation expansion planning analysis tool WASP-IV. Journal of Modern Power Systems and Clean Energy 3(2):240–248

    Article  Google Scholar 

  15. Zeljko M et al (2020) Applications of Wien Automatic System Planning (WASP) model to non-standard power system expansion problems. Energies 13(6):1392

    Article  Google Scholar 

  16. Martin-del-Campo C, Estrada-Sarti G (2011) Position vector of minimum regret analysis for the selection of electricity expansion plans with external costs internalized. In: Proceedings of international congress on advances in nuclear power plants

  17. Martin-del-Campo C, Francois JL, Estrada GJ (2016) Minimal global regret analysis for electricity generation expansion. Energy Sources Part B 11(4):363–370

    Article  Google Scholar 

  18. Malik AS et al (2018) Wind generation modelling in LDC based generation planning models - a case study of Omani power sector with WASP-IV. In: 7th Brunei International Conference on Engineering and Technology 2018 (BICET 2018). Brunei Darussalam: Institution of Engineering and Technology

  19. Buehring W, Huber C, Marques de Souza J (1984) Expansion planning for electrical generating systems - a guidebook. International Atomic Energy Agency, Vienna, p 642. Available from: https://www-pub.iaea.org/MTCD/publications/PDF/TRS1/TRS241_Web.pdf

  20. OPWP’s 7-Year Statement (2016–2022) (2016) Oman power and water procurement Co. (SAOC). Available from: https://www.omanpwp.om/PDF/7YS%202016-2022%20Final%20.pdf

  21. Molina PE, Heinrich P (2001) Wien Automatic System Planning (WASP) package, version WASP-IV. International Atomic Energy Agency, Vienna. Available from: https://www-pub.iaea.org/MTCD/publications/PDF/CMS-16.pdf

  22. Malik AS, Kuba C (2013) Power generation expansion planning including large scale wind integration: a case study of Oman. Journal of Wind Energy 2013:7

    Article  Google Scholar 

  23. Malik AS, Bouzguenda M (2013) Effects of smart grid technologies on capacity and energy savings – a case study of Oman. Energy 54:365–371

    Article  Google Scholar 

  24. Malik AS et al (2018) Smart grid scenarios and their impact on strategic plan—a case study of Omani power sector. Sustain Cities Soc 37:213–221

    Article  Google Scholar 

  25. Al-Waaili A, Malik A (2023) Energy and capacity saving potential in the residential sector of Oman. Renewable Energy and Power Quality Journal (RE&PQJ) 21:633–637

    Google Scholar 

  26. Capital Cost Estimates for Utility Scale Electricity Generating Plants (2016) U.S. department of energy: Washington, DC. Available from: https://www.eia.gov/analysis/studies/powerplants/capitalcost/pdf/capcost_assumption.pdf

  27. Study on Renewable Energy Resources, Oman (2008) Authority for electricity regulation, Oman. p 134. Available from: https://regulationbodyofknowledge.org/wp-content/uploads/2013/09/AuthorityforElectricityRegulation_Oman_Study_on.pdf

  28. Al-Kharusi A, Al-Khathiri A, Al-Mahrouqi Y (2017) Generation capacity planning for Omani power sector including wind energy plants and environmental costs. Sultan Qaboos University, Oman

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Contributions

Arif Malik: Conceptualization, Methodology, Software, Data curation, Writing—Reviewing and Editing Aamir Al-Kharusi: Software, Writing-Original draft preparation Ahmed Al-Khathiri: Preparation of Figures and Writing- Original draft preparation Yousuf Al-Mahrouqi: Preparation of tables and Writing-Original draft preparation.

Corresponding author

Correspondence to Arif Saeed Malik.

Ethics declarations

Ethical Approval

Not Applicable.

Competing Interests

The authors declare no competing interests.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Malik, A.S., Al-Kharusi, A., Al-Khathiri, A. et al. Modeling Externality Costs and Intermittent Technologies in Generation Expansion Planning Models. Oper. Res. Forum 5, 83 (2024). https://doi.org/10.1007/s43069-024-00367-z

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s43069-024-00367-z

Keywords