Solution methods for material requirement planning with lot-size dependent lead times

  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

A mixed zero-one programming model of an MRP lot-sizing problem whose lead times are dependent on lot sizes is considered. The algorithm is tested under different randomly generated parameter values and computerized results are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. P. Afentakis and B. Gavish, Optimal lot-sizing algorithms for complex product structures, Operations Research 34(1986)237 - 249.

    Google Scholar 

  2. P. Afentakis, B. Gavish and U. Karmarkar, Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems, Management Science 30(1984)222 -239.

    Google Scholar 

  3. J.D. Blackburn and R.A. Millen, Improved heuristics for multi-stage requirements planning systems, Management Science 28(1982)44 - 56.

    Google Scholar 

  4. M.L. Fisher, The Lagrangian relaxation method for solving integer programming problems, Management Science 27(1981)1 - 18.

    Google Scholar 

  5. M. Florian and M. Klein, Deterministic production planning with concave costs and capacity constraints, Management Science 18(1971)12 - 20.

    Google Scholar 

  6. E.T. Grasso and B.W. Taylor, A simulation-based experimental investigation of supplyytiming uncertainty in MRP systems, Int. J. Prod. Res. 22(1984)485- 497.

    Google Scholar 

  7. R. Jagannathan and M.R. Rao, A class of deterministic production planning problems, Management Science 19(1973)1295 - 1300.

    Google Scholar 

  8. S. Love, Bounded production and inventory models with piecewise concave costs, Management Science 20(1973)313 - 318.

    Google Scholar 

  9. B.J. McLaren, A study of multiple level lot sizing techniques for material requirements planning systems, unpublished Ph.D. Dissertation, Purdue University, 1976.

  10. S. Nahmias, Production and Operations Analysis, 2nd ed., Irwin, Homewood, IL, 1993.

    Google Scholar 

  11. C. New, Requirements Planning, Gower Press, Essex, England, 1974.

    Google Scholar 

  12. J. Orlicky, Material Requirements Planning, McGraw-Hill, New York, 1971.

    Google Scholar 

  13. R. Roundy, Efficient, effective lot sizing for multistage production systems, Operations Research 41 (1993)371 - 385.

    Google Scholar 

  14. E.A. Silver and R. Peterson, Decision Systems for Inventory Management and Production Planning, 2nd ed., Wiley, 1985.

  15. E. Steinberg and H.A. Napier, Optimal multi-level lot sizing for requirement planning systems, Management Science 26(1980)1258 - 1271.

    Google Scholar 

  16. H.M. Wagner and T.M. Whitin, Dynamic version of the economic lot size model, Management Science 5(1958)89 - 96.

    Google Scholar 

Download references

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Jagannathan, R., Juang, L.S. Solution methods for material requirement planning with lot-size dependent lead times. Annals of Operations Research 76, 201–217 (1998). https://doi.org/10.1023/A:1018992404128

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/A:1018992404128