Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Jump to content

Eastern Busway, Brisbane: Difference between revisions

Coordinates: 27°29′51.72″S 153°01′33.08″E / 27.4977000°S 153.0258556°E / -27.4977000; 153.0258556
From Wikipedia, the free encyclopedia
Content deleted Content added
m top: dmy tagging
mNo edit summary
 
(19 intermediate revisions by 14 users not shown)
Line 1: Line 1:
{{Short description|Bus route in Brisbane, Australia}}
{{For|the busway in Melbourne, Australia|Eastern Busway, Melbourne}}
{{Use Australian English|date=June 2020}}
{{Use dmy dates|date=August 2019}}
{{Use dmy dates|date=August 2019}}
{{For|the busway in Auckland, New Zealand|Eastern Busway, Auckland}}
{{Infobox bus line
{{Infobox bus line
|logo = <!-- bus logo (ex: Image_name.png) -->
|logo = <!-- bus logo (ex: Image_name.png) -->
Line 6: Line 8:
|logo_alt = <!-- logo image alternate text (only works if logo_width is supplied) -->
|logo_alt = <!-- logo image alternate text (only works if logo_width is supplied) -->
|name = Eastern Busway
|name = Eastern Busway
|bgcolor = #f58604
|bgcolor = #{{rcr|TransLink (Queensland)|Eastern}}
|titlecolor = white
|titlecolor = white
|box_width = <!-- width of the infobox itself -->
|box_width = <!-- width of the infobox itself -->
Line 16: Line 18:
|image_alt = <!-- alternate text for main image -->
|image_alt = <!-- alternate text for main image -->
|caption = <!-- caption for the main image -->
|caption = <!-- caption for the main image -->
|system = [[TransLink (South East Queensland)|TransLink]]
|system = [[Translink (Queensland)|Translink]]
|operator = [[Brisbane Transport]]
|operator = [[Transport for Brisbane]]
|garage =
|garage =
|vehicle =
|vehicle =
Line 53: Line 55:
|timetable_link = <!-- external link to an online timetable (ex: [http://www.example.com/timetable.html Line xx timetable]) -->
|timetable_link = <!-- external link to an online timetable (ex: [http://www.example.com/timetable.html Line xx timetable]) -->
|map_link = <!-- external link to an online map (ex: [http://www.example.com/map.html Line xx map]) -->
|map_link = <!-- external link to an online map (ex: [http://www.example.com/map.html Line xx map]) -->
|map = {{Infobox rdt|Eastern Busway|legend=no}}
|map = {{Eastern Busway}}
|map_state = expanded
|map_state = expanded
|map_name = <!-- name of the map (defaults to 'Route map') -->
|map_name = <!-- name of the map (defaults to 'Route map') -->
Line 64: Line 66:


==Development==
==Development==
The Eastern Busway was built and opened in stages. The first section between the [[UQ Lakes busway station|University of Queensland]] and the [[South East Busway]] opened in August 2009<ref>{{cite web |url=http://www.busnews.com.au/index.cfm?storyid=37683&cp=displaystory&type=s |title=Sod turned on stage two of Brisbane's Eastern Busway |accessdate=2009-09-22 |date=13 August 2009 |work=Australasian Bus News |publisher=Trader Business Media |archive-url=https://web.archive.org/web/20090821172535/http://www.busnews.com.au/index.cfm?storyid=37683&cp=displaystory&type=s |archive-date=21 August 2009 |dead-url=yes }}</ref>and the [[Buranda busway station|Buranda]] to Main Avenue section in August 2011.<ref name="mainaveopen">{{citation |url=http://translink.com.au/about-translink/what-we-do/infrastructure-projects/eastern-busway/buranda-to-coorparoo |title=Buranda to Main Avenue |accessdate=24 August 2011 |publisher=TransLink |deadurl=yes |archiveurl=https://web.archive.org/web/20120316135959/http://translink.com.au/about-translink/what-we-do/infrastructure-projects/eastern-busway/buranda-to-coorparoo |archivedate=16 March 2012 |df= }}</ref>
The Eastern Busway was built and opened in stages. The first section between the [[UQ Lakes busway station|University of Queensland]] and the [[South East Busway]] opened in August 2009<ref>{{cite web |url=http://www.busnews.com.au/index.cfm?storyid=37683&cp=displaystory&type=s |title=Sod turned on stage two of Brisbane's Eastern Busway |access-date=2009-09-22 |date=13 August 2009 |work=Australasian Bus News |publisher=Trader Business Media |archive-url=https://web.archive.org/web/20090821172535/http://www.busnews.com.au/index.cfm?storyid=37683&cp=displaystory&type=s |archive-date=21 August 2009 |url-status=dead }}</ref> and the [[Buranda busway station|Buranda]] to Main Avenue section in August 2011.<ref name="mainaveopen">{{citation |url=http://translink.com.au/about-translink/what-we-do/infrastructure-projects/eastern-busway/buranda-to-coorparoo |title=Buranda to Main Avenue |access-date=24 August 2011 |publisher=TransLink |url-status=dead |archive-url=https://web.archive.org/web/20120316135959/http://translink.com.au/about-translink/what-we-do/infrastructure-projects/eastern-busway/buranda-to-coorparoo |archive-date=16 March 2012 }}</ref>


===UQ Lakes to Buranda section===
===UQ Lakes to Buranda section===
[[File:PA Hospital busway station.JPG|thumb|[[PA Hospital busway station]]]]
[[File:PA Hospital busway station.JPG|thumb|[[PA Hospital busway station]]]]
Construction began in April 2007 on the {{convert|1.5|km|mi}} [[UQ Lakes busway station|UQ Lakes]] to [[Buranda busway station|Buranda]] section with it opening on 3 August 2009.<ref>[https://web.archive.org/web/20090811080454/http://www.translink.com.au/servicechange.php?id=55 Eastern Busway service changes - effective 3 August 2009] TransLink</ref><ref name="translink">{{cite web|url=http://www.translink.com.au/boggoroad.php |title=TransLink: Boggo Road Busway |accessdate=2009-07-19 |date=2009-07-14 |publisher=[[TransLink (South East Queensland)|TransLink Transit Authority]] |deadurl=yes |archiveurl=https://web.archive.org/web/20090720113653/http://www.translink.com.au/boggoroad.php |archivedate=July 20, 2009 }}</ref><ref>[https://www.busnews.com.au/industry-news/0908/brisbane-busway-officially-opens-for-business Btisbane busway officially open for business] ''Australasian Bus & Coach'' 3 August 2009</ref> The UQ Lakes to Buranda section of the busway was built under an alliance with [[CIMIC Group#Thiess|Thiess]], [[Sinclair Knight Merz]] and the [[Department of Transport and Main Roads]].<ref name="translink"/> It included a 640 metre long tunnel built under the old [[Bogga Road Gaol]].<ref name="ats"/> Tunnelling was done with a [[Voest-Alpine Industrieanlagenbau]] AM105 [[roadheader]] machine.<ref name="ats">{{cite web |url=http://www.ats.org.au/index.php?option=com_content&task=view&id=241&Itemid=4 |title=Boggo Road Busway Tunnel, Brisbane |author= |accessdate=2009-07-19 |format=extract |work=Brisbane ATS Newsletter March 2008 |publisher=Australian Tunnelling Society }}</ref> A second tunnel passes under the [[Pacific Motorway (Brisbane–Brunswick Heads)|Pacific Motorway]] to connect with the [[South East Busway, Brisbane|South East Busway]] at Buranda.
Construction began in April 2007 on the {{convert|1.5|km|mi}} [[UQ Lakes busway station|UQ Lakes]] to [[Buranda busway station|Buranda]] section with it opening on 3 August 2009.<ref>[https://web.archive.org/web/20090811080454/http://www.translink.com.au/servicechange.php?id=55 Eastern Busway service changes - effective 3 August 2009] TransLink</ref><ref name="translink">{{cite web|url=http://www.translink.com.au/boggoroad.php |title=TransLink: Boggo Road Busway |access-date=2009-07-19 |date=2009-07-14 |publisher=[[TransLink (Queensland)|TransLink Transit Authority]] |url-status=dead |archive-url=https://web.archive.org/web/20090720113653/http://www.translink.com.au/boggoroad.php |archive-date=July 20, 2009 }}</ref><ref>[https://www.busnews.com.au/industry-news/0908/brisbane-busway-officially-opens-for-business Btisbane busway officially open for business] {{Webarchive|url=https://web.archive.org/web/20170318094157/https://www.busnews.com.au/industry-news/0908/brisbane-busway-officially-opens-for-business |date=18 March 2017 }} ''Australasian Bus & Coach'' 3 August 2009</ref> The UQ Lakes to Buranda section of the busway was built under an alliance with [[Thiess Pty Ltd|Thiess]], [[Sinclair Knight Merz]] and the [[Department of Transport and Main Roads]].<ref name="translink"/> It included a {{convert|640|m|ft|0|adj=mid|-long}} tunnel built under the old [[Boggo Road Gaol]].<ref name="ats"/> Tunnelling was done with a [[Voest-Alpine Industrieanlagenbau]] AM105 [[roadheader]] machine.<ref name="ats">{{cite web |url=http://www.ats.org.au/index.php?option=com_content&task=view&id=241&Itemid=4 |title=Boggo Road Busway Tunnel, Brisbane |access-date=2009-07-19 |format=extract |work=Brisbane ATS Newsletter March 2008 |publisher=Australian Tunnelling Society |archive-url=https://web.archive.org/web/20110216175651/http://www.ats.org.au/index.php?option=com_content&task=view&id=241&Itemid=4 |archive-date=16 February 2011 |url-status=live }}</ref> A second tunnel passes under the [[Pacific Motorway (Brisbane–Brunswick Heads)|Pacific Motorway]] to connect with the [[South East Busway, Brisbane|South East Busway]] at Buranda.


====Fatality during construction====
====Fatality during construction====
On 1 December 2008, a worker was killed in an accident during construction of the section near the [[Princess Alexandra Hospital (Brisbane)|Princess Alexandra Hospital]]. The accident occurred when an 18 tonne concrete bridge beam fell from its pier supports.<ref>{{cite news |last1=Calligeros |last2=Molloy |title=Crushed busway worker dies |url=http://www.brisbanetimes.com.au/news/queensland/crushed-brisbane-busway-worker-dies/2008/12/01/1227979905460.html |newspaper=[[Brisbane Times]] |publisher=[[Fairfax Digital]] |accessdate=11 March 2011 |date=1 December 2008}}</ref><ref>[https://www.busnews.com.au/industry-news/0812/fatal-busway-accident-to-be-fully-investigated Fatal busway accident to be fully investigated] ''Australasian Bus & Coach'' 2 December 2008</ref>
On 1 December 2008, a worker was killed in an accident during construction of the section near the [[Princess Alexandra Hospital (Brisbane)|Princess Alexandra Hospital]]. The accident occurred when an 18 tonne concrete bridge beam fell from its pier supports.<ref>{{cite news |last1=Calligeros |last2=Molloy |title=Crushed busway worker dies |url=http://www.brisbanetimes.com.au/news/queensland/crushed-brisbane-busway-worker-dies/2008/12/01/1227979905460.html |newspaper=[[Brisbane Times]] |publisher=[[Fairfax Digital]] |access-date=11 March 2011 |date=1 December 2008 |archive-url=https://web.archive.org/web/20110706102812/http://www.brisbanetimes.com.au/news/queensland/crushed-brisbane-busway-worker-dies/2008/12/01/1227979905460.html |archive-date=6 July 2011 |url-status=live }}</ref><ref>[https://www.busnews.com.au/industry-news/0812/fatal-busway-accident-to-be-fully-investigated Fatal busway accident to be fully investigated] {{Webarchive|url=https://web.archive.org/web/20170318112749/https://www.busnews.com.au/industry-news/0812/fatal-busway-accident-to-be-fully-investigated |date=18 March 2017 }} ''Australasian Bus & Coach'' 2 December 2008</ref>


The accident led to the suspension of construction for several days<ref>{{cite news|title=Work ban remains at fatal busway project site|url=http://www.abc.net.au/news/stories/2008/12/09/2441624.htm|work=ABC News|publisher=Australian Broadcasting Corporation|accessdate=11 March 2011|date=9 December 2008}}</ref> and charges being laid against construction contractor Theiss in relation to alleged breaches of the ''Workplace Health and Safety Act''.<ref>{{cite web|title=Charges laid over Eastern Busway Project death|url=http://www.justice.qld.gov.au/corporate/media-centre/media-statements/2009-media-statements/workplace-health-and-safety/charges-laid-over-eastern-busway-project-death|publisher=Queensland Government, Department of Justice|accessdate=11 March 2011|date=16 December 2009}}</ref> This death was the only recorded construction-related fatality on the busway network to date.
The accident led to the suspension of construction for several days<ref>{{cite news|title=Work ban remains at fatal busway project site|url=http://www.abc.net.au/news/stories/2008/12/09/2441624.htm|work=ABC News|publisher=Australian Broadcasting Corporation|access-date=11 March 2011|date=9 December 2008|archive-url=https://web.archive.org/web/20110629020701/http://www.abc.net.au/news/stories/2008/12/09/2441624.htm|archive-date=29 June 2011|url-status=live}}</ref> and charges being laid against construction contractor Theiss in relation to alleged breaches of the ''Workplace Health and Safety Act''.<ref>{{cite web|title=Charges laid over Eastern Busway Project death|url=http://www.justice.qld.gov.au/corporate/media-centre/media-statements/2009-media-statements/workplace-health-and-safety/charges-laid-over-eastern-busway-project-death|publisher=Queensland Government, Department of Justice|access-date=11 March 2011|date=16 December 2009|archive-url=https://web.archive.org/web/20110317094528/http://www.justice.qld.gov.au/corporate/media-centre/media-statements/2009-media-statements/workplace-health-and-safety/charges-laid-over-eastern-busway-project-death|archive-date=17 March 2011|url-status=live}}</ref> This death was the only recorded construction-related fatality on the busway network to date.


===Buranda to Coorparoo sections===
===Buranda to Coorparoo sections===
In June 2008, the [[Government of Queensland|Queensland Government]] approved the project's Concept Design and Impact Management Plan. The Concept Design and Impact Management Plan projects for a long-term investment in the future of the eastern suburbs.
In June 2008, the [[Government of Queensland|Queensland Government]] approved the project's Concept Design and Impact Management Plan. The Concept Design and Impact Management Plan projects for a long-term investment in the future of the eastern suburbs.


The Government committed $466 million for the next section of the Eastern Busway.<ref>[https://www.busnews.com.au/industry-news/0810/bligh-announces-winning-busway-designer Bligh announces winning busway designer] ''Australasian Bus & Coach'' 14 October 2008</ref> This funding included 96 property resumptions between [[Buranda, Queensland|Buranda]] and [[Cavendish Road, Brisbane|Cavendish Road]], [[Coorparoo]] and construction of the {{convert|1.05|km|mi}} section between the South East Busway and Main Avenue, Coorparoo with stations at [[Stones Corner busway station|Stones Corner]] and [[Langlands Park busway station|Langlands Park]].<ref>{{cite news |url=http://www.brisbanetimes.com.au/news/queensland/300-homes-to-be-resumed-for-eastern-busway/2008/06/05/1212258970171.html |title=300 homes to be resumed for Eastern Busway |accessdate=22 September 2009 |date=5 June 2008 |newspaper=[[Brisbane Times]] |publisher=[[Fairfax Digital]] }}</ref>
The Government committed $466 million for the next section of the Eastern Busway.<ref>[https://www.busnews.com.au/industry-news/0810/bligh-announces-winning-busway-designer Bligh announces winning busway designer] {{Webarchive|url=https://web.archive.org/web/20170318092641/https://www.busnews.com.au/industry-news/0810/bligh-announces-winning-busway-designer |date=18 March 2017 }} ''Australasian Bus & Coach'' 14 October 2008</ref> This funding included 96 property resumptions between [[Buranda, Queensland|Buranda]] and [[Cavendish Road, Brisbane|Cavendish Road]], [[Coorparoo]] and construction of the {{convert|1.05|km|mi}} section between the South East Busway and Main Avenue, Coorparoo with stations at [[Stones Corner busway station|Stones Corner]] and [[Langlands Park busway station|Langlands Park]].<ref>{{cite news |url=http://www.brisbanetimes.com.au/news/queensland/300-homes-to-be-resumed-for-eastern-busway/2008/06/05/1212258970171.html |title=300 homes to be resumed for Eastern Busway |access-date=22 September 2009 |date=5 June 2008 |newspaper=[[Brisbane Times]] |publisher=[[Fairfax Digital]] |archive-url=https://web.archive.org/web/20090415215943/http://www.brisbanetimes.com.au/news/queensland/300-homes-to-be-resumed-for-eastern-busway/2008/06/05/1212258970171.html |archive-date=15 April 2009 |url-status=live }}</ref>


In December 2008, the Queensland Government announced the Eastern Busway Alliance of [[CIMIC Group#CPB Contractors|Leighton Contractors]], [[Sinclair Knight Merz]], Maunsell and [[AECOM]] to build this section.<ref>[http://www.asx.com.au/asxpdf/20081223/pdf/31fbnx5lng8fld.pdf Leighton Contractors joins alliance to deliver Eastern Busway] Leighton Contractors 23 December 2008</ref><ref>[http://www.cimic.com.au/__data/assets/pdf_file/0015/9402/110809_mr.pdf Leighton Contractors expands Brisbane's unique bus network] Leighton Contractors 11 August 2009</ref>
In December 2008, the Queensland Government announced the Eastern Busway Alliance of [[Leighton Contractors]], [[Sinclair Knight Merz]], Maunsell and [[AECOM]] to build this section.<ref>[http://www.asx.com.au/asxpdf/20081223/pdf/31fbnx5lng8fld.pdf Leighton Contractors joins alliance to deliver Eastern Busway] {{Webarchive|url=https://web.archive.org/web/20170318084915/http://www.asx.com.au/asxpdf/20081223/pdf/31fbnx5lng8fld.pdf |date=18 March 2017 }} Leighton Contractors 23 December 2008</ref><ref>[http://www.cimic.com.au/__data/assets/pdf_file/0015/9402/110809_mr.pdf Leighton Contractors expands Brisbane's unique bus network] {{Webarchive|url=https://web.archive.org/web/20170318084905/http://www.cimic.com.au/__data/assets/pdf_file/0015/9402/110809_mr.pdf |date=18 March 2017 }} Leighton Contractors 11 August 2009</ref>


The Buranda to Main Avenue section connects the existing South East Busway at Buranda with Coorparoo via [[Stones Corner]]. Busway stations have been built at [[Stones Corner busway station|Stones Corner]] and [[Langlands Park busway station|Langlands Park]].<ref>{{citation |url=http://download.translink.com.au/busways/eastern/090501_changereport.pdf |title=Eastern Busway Buranda to Main Avenue Project Change Report May 2009 |date=May 2009 |accessdate=2010-07-25 |publisher=TransLink }}{{Dead link|date=August 2019 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>
The Buranda to Main Avenue section connects the existing South East Busway at Buranda with Coorparoo via [[Stones Corner]]. Busway stations have been built at [[Stones Corner busway station|Stones Corner]] and [[Langlands Park busway station|Langlands Park]].<ref>{{citation |url=http://download.translink.com.au/busways/eastern/090501_changereport.pdf |title=Eastern Busway Buranda to Main Avenue Project Change Report May 2009 |date=May 2009 |access-date=2010-07-25 |publisher=TransLink }}{{Dead link|date=August 2019 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>


Construction work on the section commenced in August 2009.<ref>{{cite news |url=http://www.brisbanetimes.com.au/queensland/busway-on-track-for-early-arrival-20100830-143lg.html |title=Busway on track for early arrival |accessdate=30 August 2010 |date=30 August 2010 |newspaper=[[Brisbane Times]] |publisher=[[Fairfax Digital]]}}</ref><ref>[https://www.busnews.com.au/industry-news/0908/sod-turned-on-stage-two-of-brisbanes-eastern-busway Sod turned on stage two of Brisbane's Eastern Busway] ''Australasian Bus & Coach'' 13 August 2009</ref> The section opened on 29 August 2011.<ref name="mainaveopen"/><ref>[http://www.brisbanetimes.com.au/queensland/eastern-busway-to-open-monday-20110825-1jcaj.html Busway to open Monday] ''[[Brisbane Times]]'' 26 August 2011</ref><ref>[https://www.busnews.com.au/industry-news/1108/busway-sends-message Busway sends message] ''Australasian Bus & Coach'' 30 August 2011</ref>
Department of Transport and Main Roads compulsorily resumed the Myer building for Eastern Busway project on 31 July 2009. Construction work on the section commenced in August 2009. The Coorparoo bus station and busway proposed at the Myer building are not built. <ref>{{cite news |url=http://www.brisbanetimes.com.au/queensland/busway-on-track-for-early-arrival-20100830-143lg.html |title=Busway on track for early arrival |access-date=30 August 2010 |date=30 August 2010 |newspaper=[[Brisbane Times]] |publisher=[[Fairfax Digital]] |archive-url=https://web.archive.org/web/20100831091559/http://www.brisbanetimes.com.au/queensland/busway-on-track-for-early-arrival-20100830-143lg.html |archive-date=31 August 2010 |url-status=live }}</ref><ref>[https://www.busnews.com.au/industry-news/0908/sod-turned-on-stage-two-of-brisbanes-eastern-busway Sod turned on stage two of Brisbane's Eastern Busway] {{Webarchive|url=https://web.archive.org/web/20170318111239/https://www.busnews.com.au/industry-news/0908/sod-turned-on-stage-two-of-brisbanes-eastern-busway |date=18 March 2017 }} ''Australasian Bus & Coach'' 13 August 2009</ref> The section opened on 29 August 2011.<ref name="mainaveopen"/><ref>[http://www.brisbanetimes.com.au/queensland/eastern-busway-to-open-monday-20110825-1jcaj.html Busway to open Monday] {{Webarchive|url=https://web.archive.org/web/20170318172417/http://www.brisbanetimes.com.au/queensland/eastern-busway-to-open-monday-20110825-1jcaj.html |date=18 March 2017 }} ''[[Brisbane Times]]'' 26 August 2011</ref><ref>[https://www.busnews.com.au/industry-news/1108/busway-sends-message Busway sends message] {{Webarchive|url=https://web.archive.org/web/20170318095708/https://www.busnews.com.au/industry-news/1108/busway-sends-message |date=18 March 2017 }} ''Australasian Bus & Coach'' 30 August 2011</ref>


===Further extensions===
===Further extensions===
Further stages of the Eastern Busway are ready for immediate delivery, should funding become available under the Australian Government's Infrastructure Australia program.
Further stages of the Eastern Busway are ready for immediate delivery, should funding become available under the Australian Government's Infrastructure Australia program.
The Queensland Government's Transport and Main Roads Department has stated that [quote] Planning for the ultimate Eastern Busway between Main Avenue, Coorparoo and Capalaba is currently being revised, with further stages subject to funding and government priorities.<ref>[https://www.tmr.qld.gov.au/busways.aspx]</ref> ''Busways - Department of Transport and Main Roads''
The Queensland Government's Transport and Main Roads Department has stated that [quote] Planning for the ultimate Eastern Busway between Main Avenue, Coorparoo and Capalaba is currently being revised, with further stages subject to funding and government priorities.<ref>{{Cite web |url=https://www.tmr.qld.gov.au/busways.aspx |title=Busways (Department of Transport and Main Roads) |access-date=14 March 2019 |archive-url=https://web.archive.org/web/20190314114220/https://www.tmr.qld.gov.au/busways.aspx |archive-date=14 March 2019 |url-status=live }}</ref> ''Busways - Department of Transport and Main Roads''


The department is developing cost-effective short and medium term options on Old Cleveland Road, including intersection upgrades to allow for bus priority.It is proposed to extend the Eastern Busway along the [[Old Cleveland Road]] corridor via the suburbs of [[Coorparoo]], [[Camp Hill, Queensland|Camp Hill]], [[Carina, Queensland|Carina]], [[Carindale]] and [[Chandler, Queensland|Chandler]] to [[Capalaba]].<ref>[https://www.busnews.com.au/industry-news/1008/election-update-newman-pushes-feds-on-busway-extension Election Update: Newman pushes Feds on busway extension] ''Australasian Bus & Coach'' 6 August 2010</ref> Historically, the Old Cleveland Road corridor was a major [[Trams in Brisbane#Electric tram routes|tram route]] until closure of Brisbane's tram network in 1969.
The department is developing cost-effective short and medium term options on Old Cleveland Road, including intersection upgrades to allow for bus priority. It is proposed to extend the Eastern Busway along the [[Old Cleveland Road]] corridor via the suburbs of [[Coorparoo]], [[Camp Hill, Queensland|Camp Hill]], [[Carina, Queensland|Carina]], [[Carindale]] and [[Chandler, Queensland|Chandler]] to [[Capalaba]].<ref>[https://www.busnews.com.au/industry-news/1008/election-update-newman-pushes-feds-on-busway-extension Election Update: Newman pushes Feds on busway extension] {{Webarchive|url=https://web.archive.org/web/20170318094151/https://www.busnews.com.au/industry-news/1008/election-update-newman-pushes-feds-on-busway-extension |date=18 March 2017 }} ''Australasian Bus & Coach'' 6 August 2010</ref> Historically, the Old Cleveland Road corridor was a major [[Trams in Brisbane#Electric tram routes|tram route]] until closure of Brisbane's tram network in 1969.


==Stations==
==Stations==
Line 110: Line 112:


===Boggo Road Station platform numbering===
===Boggo Road Station platform numbering===
[[Boggo Road busway station]] is located alongside the [[Park Road railway station]]. The busway platforms are listed as Platform 5 (toward Buranda) and 6 (toward UQ Lakes) to align with the existing platforms at Park Road station.<ref>{{cite web |url=http://download.translink.com.au/maps/090801_boggo.pdf |title=Boggo Road / Park Road Station Map |accessdate=2010-07-24 |publisher=[[TransLink (South East Queensland)|Translink]] |archive-url=https://web.archive.org/web/20100613035207/http://download.translink.com.au/maps/090801_boggo.pdf |archive-date=2010-06-13 |dead-url=yes }}</ref> This may cause confusion to busway users as on each other station in the Busway network, inbound (toward city) traffic is designated Platform 1 while outbound (away from city) traffic is designated Platform 2.
[[Boggo Road busway station]] is located alongside the [[Park Road railway station]]. The busway platforms are listed as Platform 5 (toward Buranda) and 6 (toward UQ Lakes) to align with the existing platforms at Park Road station.<ref>{{cite web |url=http://download.translink.com.au/maps/090801_boggo.pdf |title=Boggo Road / Park Road Station Map |access-date=2010-07-24 |publisher=[[TransLink (Queensland)|Translink]] |archive-url=https://web.archive.org/web/20100613035207/http://download.translink.com.au/maps/090801_boggo.pdf |archive-date=2010-06-13 |url-status=dead }}</ref> This may cause confusion to busway users as on each other station in the Busway network, inbound (toward city) traffic is designated Platform 1 while outbound (away from city) traffic is designated Platform 2.


==Services==
==Services==
All services on the busway are operated by [[Brisbane Transport]].<ref>{{Queensland Timetables|Eastern Busway Map}}</ref>
All services on the busway are operated by [[Transport for Brisbane]].<ref>{{Queensland Timetables|Eastern Busway Map}}</ref>


==References==
==References==

Latest revision as of 13:20, 7 January 2024

Eastern Busway
Overview
SystemTranslink
OperatorTransport for Brisbane
StatusOpen
Began service3 August 2009 (2009-08-03)
Route
StartUniversity of Queensland
ViaEleanor Schonell Bridge
Old Cleveland Road
EndLanglands Park
Stations6
Route map

UQ Lakes
Eleanor Schonell Bridge
over Brisbane River
Dutton Park Place
Boggo Road
PA Hospital
Buranda
SE Busway
Logan Road/O'Keefe Street
Stones Corner
Langlands Park
under planning
Coorparoo
Bridgewater Creek
Camp Hill
Carina
Zone
1
2
Carindale
Belmont
Chandler
Tingalpa Creek
Capalaba
←      →

The Eastern Busway is a bus-only road running from the University of Queensland's St Lucia campus to Langlands Park busway station in Queensland, Australia.

Development

[edit]

The Eastern Busway was built and opened in stages. The first section between the University of Queensland and the South East Busway opened in August 2009[1] and the Buranda to Main Avenue section in August 2011.[2]

UQ Lakes to Buranda section

[edit]
PA Hospital busway station

Construction began in April 2007 on the 1.5 kilometres (0.93 mi) UQ Lakes to Buranda section with it opening on 3 August 2009.[3][4][5] The UQ Lakes to Buranda section of the busway was built under an alliance with Thiess, Sinclair Knight Merz and the Department of Transport and Main Roads.[4] It included a 640-metre-long (2,100 ft) tunnel built under the old Boggo Road Gaol.[6] Tunnelling was done with a Voest-Alpine Industrieanlagenbau AM105 roadheader machine.[6] A second tunnel passes under the Pacific Motorway to connect with the South East Busway at Buranda.

Fatality during construction

[edit]

On 1 December 2008, a worker was killed in an accident during construction of the section near the Princess Alexandra Hospital. The accident occurred when an 18 tonne concrete bridge beam fell from its pier supports.[7][8]

The accident led to the suspension of construction for several days[9] and charges being laid against construction contractor Theiss in relation to alleged breaches of the Workplace Health and Safety Act.[10] This death was the only recorded construction-related fatality on the busway network to date.

Buranda to Coorparoo sections

[edit]

In June 2008, the Queensland Government approved the project's Concept Design and Impact Management Plan. The Concept Design and Impact Management Plan projects for a long-term investment in the future of the eastern suburbs.

The Government committed $466 million for the next section of the Eastern Busway.[11] This funding included 96 property resumptions between Buranda and Cavendish Road, Coorparoo and construction of the 1.05 kilometres (0.65 mi) section between the South East Busway and Main Avenue, Coorparoo with stations at Stones Corner and Langlands Park.[12]

In December 2008, the Queensland Government announced the Eastern Busway Alliance of Leighton Contractors, Sinclair Knight Merz, Maunsell and AECOM to build this section.[13][14]

The Buranda to Main Avenue section connects the existing South East Busway at Buranda with Coorparoo via Stones Corner. Busway stations have been built at Stones Corner and Langlands Park.[15]

Department of Transport and Main Roads compulsorily resumed the Myer building for Eastern Busway project on 31 July 2009. Construction work on the section commenced in August 2009. The Coorparoo bus station and busway proposed at the Myer building are not built. [16][17] The section opened on 29 August 2011.[2][18][19]

Further extensions

[edit]

Further stages of the Eastern Busway are ready for immediate delivery, should funding become available under the Australian Government's Infrastructure Australia program. The Queensland Government's Transport and Main Roads Department has stated that [quote] Planning for the ultimate Eastern Busway between Main Avenue, Coorparoo and Capalaba is currently being revised, with further stages subject to funding and government priorities.[20] Busways - Department of Transport and Main Roads

The department is developing cost-effective short and medium term options on Old Cleveland Road, including intersection upgrades to allow for bus priority. It is proposed to extend the Eastern Busway along the Old Cleveland Road corridor via the suburbs of Coorparoo, Camp Hill, Carina, Carindale and Chandler to Capalaba.[21] Historically, the Old Cleveland Road corridor was a major tram route until closure of Brisbane's tram network in 1969.

Stations

[edit]

Busway stations on the Eastern Busway currently include:

Major proposed stations on the busway include:

Road access to the busway is available at Dutton Park, Buranda (via the South East Busway and O'Keefe Street) and Langlands Park (via Old Cleveland Road and Main Avenue).

Boggo Road Station platform numbering

[edit]

Boggo Road busway station is located alongside the Park Road railway station. The busway platforms are listed as Platform 5 (toward Buranda) and 6 (toward UQ Lakes) to align with the existing platforms at Park Road station.[22] This may cause confusion to busway users as on each other station in the Busway network, inbound (toward city) traffic is designated Platform 1 while outbound (away from city) traffic is designated Platform 2.

Services

[edit]

All services on the busway are operated by Transport for Brisbane.[23]

References

[edit]
  1. ^ "Sod turned on stage two of Brisbane's Eastern Busway". Australasian Bus News. Trader Business Media. 13 August 2009. Archived from the original on 21 August 2009. Retrieved 22 September 2009.
  2. ^ a b Buranda to Main Avenue, TransLink, archived from the original on 16 March 2012, retrieved 24 August 2011
  3. ^ Eastern Busway service changes - effective 3 August 2009 TransLink
  4. ^ Btisbane busway officially open for business Archived 18 March 2017 at the Wayback Machine Australasian Bus & Coach 3 August 2009
  5. ^ a b "Boggo Road Busway Tunnel, Brisbane" (extract). Brisbane ATS Newsletter March 2008. Australian Tunnelling Society. Archived from the original on 16 February 2011. Retrieved 19 July 2009.
  6. ^ Calligeros; Molloy (1 December 2008). "Crushed busway worker dies". Brisbane Times. Fairfax Digital. Archived from the original on 6 July 2011. Retrieved 11 March 2011.
  7. ^ Fatal busway accident to be fully investigated Archived 18 March 2017 at the Wayback Machine Australasian Bus & Coach 2 December 2008
  8. ^ "Work ban remains at fatal busway project site". ABC News. Australian Broadcasting Corporation. 9 December 2008. Archived from the original on 29 June 2011. Retrieved 11 March 2011.
  9. ^ "Charges laid over Eastern Busway Project death". Queensland Government, Department of Justice. 16 December 2009. Archived from the original on 17 March 2011. Retrieved 11 March 2011.
  10. ^ Bligh announces winning busway designer Archived 18 March 2017 at the Wayback Machine Australasian Bus & Coach 14 October 2008
  11. ^ "300 homes to be resumed for Eastern Busway". Brisbane Times. Fairfax Digital. 5 June 2008. Archived from the original on 15 April 2009. Retrieved 22 September 2009.
  12. ^ Leighton Contractors joins alliance to deliver Eastern Busway Archived 18 March 2017 at the Wayback Machine Leighton Contractors 23 December 2008
  13. ^ Leighton Contractors expands Brisbane's unique bus network Archived 18 March 2017 at the Wayback Machine Leighton Contractors 11 August 2009
  14. ^ Eastern Busway Buranda to Main Avenue Project Change Report May 2009 (PDF), TransLink, May 2009, retrieved 25 July 2010[permanent dead link]
  15. ^ "Busway on track for early arrival". Brisbane Times. Fairfax Digital. 30 August 2010. Archived from the original on 31 August 2010. Retrieved 30 August 2010.
  16. ^ Sod turned on stage two of Brisbane's Eastern Busway Archived 18 March 2017 at the Wayback Machine Australasian Bus & Coach 13 August 2009
  17. ^ Busway to open Monday Archived 18 March 2017 at the Wayback Machine Brisbane Times 26 August 2011
  18. ^ Busway sends message Archived 18 March 2017 at the Wayback Machine Australasian Bus & Coach 30 August 2011
  19. ^ "Busways (Department of Transport and Main Roads)". Archived from the original on 14 March 2019. Retrieved 14 March 2019.
  20. ^ Election Update: Newman pushes Feds on busway extension Archived 18 March 2017 at the Wayback Machine Australasian Bus & Coach 6 August 2010
  21. ^ "Boggo Road / Park Road Station Map" (PDF). Translink. Archived from the original (PDF) on 13 June 2010. Retrieved 24 July 2010.
  22. ^ "Eastern Busway Network Map" (PDF). Translink. 19 August 2019.
[edit]

Media related to Eastern Busway at Wikimedia Commons

27°29′51.72″S 153°01′33.08″E / 27.4977000°S 153.0258556°E / -27.4977000; 153.0258556