Metrado Gaviones
Metrado Gaviones
Metrado Gaviones
PROYECTO:
ZONA:
N VI - ZONA DE SERVICIOS
FECHA:
ABRIL-2015
N
01.00.00
01.01.00
01.01.01
DESCRIPCION
UND
1.50
175.00
1.00
2.00
25.00
1.00
2.00
5.00
7.00
1.50
175.00
1.00
2.00
25.00
1.00
2.00
5.00
7.00
2.00
200.00
M2
01.02.01
LONG. VOLUM
M2
01.02.00
SUB-TOTAL
TRABAJOS PRELIMINARES
01.01.03
CANT
01.01.02
MEDIDAS
ANCHO LARGO ALTO
0.70
1.00
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTO DE GAVIONES
M3
25.00
3.99
1.00
99.75
25.00
2.35
1.00
58.75
25.00
2.80
1.00
70.00
25.00
2.40
1.00
60.00
25.00
2.10
1.00
52.50
HOJA DE METRADO
PROYECTO:
ZONA:
N VI - ZONA DE SERVICIOS
FECHA:
ABRIL-2015
DESCRIPCION
UND
1.00
45.00
25.00
1.77
1.00
44.25
25.00
2.45
1.00
61.25
25.00
2.76
1.00
69.00
25.00
2.57
1.00
64.25
7.00
70.00
2.00
1.00
1.50
175.00
1.00
2.00
25.00
1.00
2.00
5.00
7.00
1.00
189.50
M3
1.00
1.00
189.50
1.00
505.25
M3
Factor=
01.03.01
5.00
M2
Relleno En Gaviones
01.03.00
LONG. VOLUM
1.80
01.02.04
SUB-TOTAL
25.00
01.02.03
CANT
MEDIDAS
ANCHO LARGO ALTO
1.30
GAVIONES
SUMINISTRO E INSTALACION DE GAVIONES INCL. PIEDRA
h=2.30m.
Gaviones T1
M
175.00
1.00
HOJA DE METRADO
PROYECTO:
ZONA:
N VI - ZONA DE SERVICIOS
FECHA:
ABRIL-2015
01.03.02
DESCRIPCION
UND
CANT
Gaviones T2
01.03.03
MEDIDAS
ANCHO LARGO ALTO
25.00
1.00
5.00
7.00
SUB-TOTAL
LONG. VOLUM
SUB-TOTAL
AREA
UNIDAD
KG.
TOTAL
382.50
262.50
50.00
70.00
382.50
262.50
50.00
70.00
280.00
280.00
694.75
SUB-TOTAL
AREA
UNIDAD
KG.
TOTAL
382.50
262.50
50.00
70.00
189.50
656.83
175.00
175.00
SUB-TOTAL
AREA
UNIDAD
KG.
TOTAL
25.00
25.00
35.00
35.00