Acus Estructuras
Acus Estructuras
Acus Estructuras
48.00
M3/DIA
UND
CUADRILLA
CANTIDAD
PRECIO
310.48
PARCIAL
MANO DE OBRA
CAPATAZ CLASE "A"
HH
0.1000
0.0167
16.3440
0.2724
OPERARIO
HH
1.0000
0.1667
13.6200
2.2700
OFICIAL
HH
2.0000
0.3333
12.0600
4.0200
PEON
HH
1.0000
0.1667
10.8900
1.8150
8.3774 ( A )
MATERIALES
CONCRETO PREMEZCLADO 175 KG/CM2 (CON BOMBA)
M3
1.0500
284.8000
GASOLINA
GL
0.0333
9.2400
299.0400
0.3080 ( B )
299.3480
EQUIPO
VIBRADORA DE CONCRETO
HM
HERRAMIENTAS MANUALES ( 3% )
1.0000
0.1667
15.0000
2.5000 ( C )
3.0000
8.3774
0.2513 ( D )
2.7513
PARTIDA :
90.00
M3/DIA
UND
CUADRILLA
CANTIDAD
PRECIO
307.74
PARCIAL
MANO DE OBRA
CAPATAZ CLASE "A"
HH
0.1000
0.0089
16.3440
0.1453
OPERARIO
HH
4.0000
0.3556
13.6200
4.8427
OFICIAL
HH
1.0000
0.0889
12.0600
1.0720
PEON
HH
2.0000
0.1778
10.8900
1.9360
7.9959 ( A )
MATERIALES
CONCRETO PREMEZCLADO 175 KG/CM2 (CON BOMBA)
M3
1.0500
284.8000
GASOLINA
GL
0.0333
9.2400
299.0400
0.3080 ( B )
299.3480
EQUIPO
VIBRADORA DE CONCRETO
HM
HERRAMIENTAS MANUALES ( 3% )
1.0000
0.0889
15.0000
5.0000
7.9959
1.3333 ( C )
0.3998 ( D )
1.7331
PARTIDA :
ENCOFRADO DE EN PLACAS
COSTO UNITARIO ( S/. X M2 ):
PRODUCCION DIARIA :
DESCRIPCION
15.00
M2/DIA
UND
CUADRILLA
CANTIDAD
PRECIO
21.42
PARCIAL
MANO DE OBRA
CAPATAZ CLASE "A"
HH
0.1000
0.0533
16.3440
0.8717
OPERARIO
HH
1.0000
0.5333
13.6200
7.2640
OFICIAL
HH
0.0000
0.0000
12.0600
0.0000
PEON
HH
1.0000
0.5333
10.8900
5.8080
13.9437
MATERIALES
ENCOFRADO METALICO
ADITIVO DESMOLDANTE
TUBO 1/2"
M2
1.0000
5.5000
5.5000
GL
0.0435
7.0000
0.3043
UND
0.5000
2.5000
1.2500
7.0543
EQUIPO
HERRAMIENTAS MANUALES ( 3% )
3.0000
13.9437
0.4183
0.4183
PARTIDA :
20.00
M2/DIA
UND
CUADRILLA
CANTIDAD
PRECIO
27.61
PARCIAL
MANO DE OBRA
CAPATAZ CLASE "A"
HH
0.1000
0.0400
16.3440
0.6538
OPERARIO
HH
1.0000
0.4000
13.6200
5.4480
OFICIAL
HH
0.0000
0.0000
12.0600
0.0000
PEON
HH
1.0000
0.4000
10.8900
4.3560
10.4578
MATERIALES
ENCOFRADO PARA TECHO
M2
1.0700
6.3000
6.7410
PANEL FENOLICO
M2
1.1500
8.3333
9.5833
ADITIVO DESMOLDANTE
GL
0.0435
7.0000
0.3043
16.6287
EQUIPO
HERRAMIENTAS MANUALES (5% )
5.0000
10.4578
0.5229
0.5229
PARTIDA :
UND
3.88
KG/DIA
CUADRILLA
CANTIDAD
PRECIO
PARCIAL
MANO DE OBRA
CAPATAZ CLASE "A"
HH
0.1000
0.0027
16.3440
0.0436
OPERARIO
HH
1.0000
0.0267
13.6200
0.3632
OFICIAL
HH
0.0000
0.0000
12.0600
0.0000
PEON
HH
1.0000
0.0267
10.8900
0.2904
0.6972
(A)
MATERIALES
ACERO FY= 4200KG/CM2
KG
1.0800
2.8500
3.0780
ALAMBRE N 16
KG
0.0200
3.2775
0.0656
3.1436
(B)
EQUIPO
HERRAMIENTAS MANUALES (5% )
5.0000
0.6972
0.0349
0.0349 ( C)