Data Extraction
NM EN T
Cmo consigo potential for energy los objetivos de mnimo recovery in my process. consumo energa? But, howde should I design
a process that achieves the energy target ?
ANALYSIS
Ener
gy
Pro s s M ce
od
SYNTHESIS
Network Design
ROAD MAP Process Improvement Road Map
c Re
THREE DAY COURSE
DE T
NT
AI
LD
N ENVIR ESIG O N M E
Tmin = 20
QHmin = 1000, QCmin = 800
220 880 180 160 2640 DIST VAP 130 CW
60
210
REACTOR
210
1220
C
3
Product
220
180
180
60
Reac. Out
270
180
180
160
210
160
160
50 Feed
210
160
Recycle
Comience en el Pinch punto de corte Start at the y luego muvase hacia afuera and move away
T
Above
PINCH
Below
Pinch
Pinch
Cmo definir los intercambios entre How should we match streams at the Pinch? corrientes en el punto de corte?
T T
Pinch
tream Ho t S
Pinch
eam r t ot S
tream Cold S
ld re St am
Co
Abajo Below
CPcold CPhot
Arriba Above
CPhot CPcold
Abajo Below
1. Match con with una corriente 1. Match a stream de IN entrada Posible si Possible if CPIN CPOUT
Arriba Above
} Tmin
2.2. Match con una Match with a corriente stream lejos del punto de corte away from the Pinch Posible Possible
Cold Utility
Encontrar los intercambios para las corrientes Finding partners for streams OUT of que salen del punto de corte es sencillo
2000 AspenTech. All Rights Reserved.
Above
CPIN CPOUT
} Tmin
2. con una 2.Match Match with acorriente Stream lejos del punto de corte away from the Pinch No Posible Not Possible (T violation)
Tmin {
Hot Utility
3. Match con servicios 3. Match with utility auxiliares No Posible Not Possible
(Cross-Pinch)
Cold Utility
Encontrar los intercambios para las corrientes Finding partners for streams going que entran de corte es ms IN al the punto Pinch is more difficult complicado
Qu cantidad dewe calor seeach debe intercambiar How big should make match? en cada match?
H
H = 100
100
H = 20
120
Try to maximize load to minimize number of matches (The Tick Off heuristic)
2000 AspenTech. All Rights Reserved.
Lo mximo posible!!!!!
H 880 1620
CP 22 18
270
180
Reac. Out
210
160
Feed
210
1000 2500
20 50
177.6
160
Recycle
PRODUCTOis es la mayor corriente PRODUCT the biggest stream IN entrante Apply the CP Rule and Tick Off heuristic
2000 AspenTech. All Rights Reserved.
10
880
Product
220 180
H 880 1620
CP 22 18
270
Reac. Out
235.6
1000
180
210
160
Feed
210
1000 2500
20 50
177.6
160
Recycle
REACTOR OUT lanext siguiente REAC. OUT is es the biggest stream IN corriente entrante Again apply the CP Rule and Tick Off heuristic
2000 AspenTech. All Rights Reserved.
11
880
Product
220 180
H 880 1620
CP 22 18
270
620
Reac. Out
235.6
1000
180
210
160
Feed
210
1000 2500
20 50
190
177.6
160
Recycle
Now place the matches away from the Pinch Ahora ubique los matches lejos Follow Tick heuristic del punto deOff corte
2000 AspenTech. All Rights Reserved.
12
880
220
H
180
CP 22 18
Product
880 1620
620
270
Reac. Out
235.6
1000
180
210
160
Feed
210
1000 2500
20 50
190
177.6
160
Recycle
1000
13
Product
180
2200
H
80
60
CP 22 18
2640 360
180
160
Reac. Out
160
50
Feed
2200
20
FEED es nica corriente FEED is la the only stream IN entrante Apply the CP rule and Tick Off heuristic
2000 AspenTech. All Rights Reserved.
14
2200
Product
180
440
80
H
60
CP 22 18
C
360
2640 360
180
Reac. Out
160
160
50
Feed
2200
20
No hay msare corrientes entrada, There no morede streams IN ahora podemos los the refrigeradores Now weubicar can place coolers
2000 AspenTech. All Rights Reserved.
15
180 180
80
C C
60 160
440
360
210 210 190 177.6 1000 160 160 50 Feed
2200
Recycle
1000
620
880
QHmin = 1000
QCmin = 800
16
8 4
HOT2
5 1 3
17
?
90 90 90 COLD3 COLD1 COLD2
?
T>90
90 90
18
CP = 2 CP
HOT1
CP = 6
8 4
HOT2
1 3 2
5 1 3
Divida una corriente de salida Splitdel a stream OUT of the Pinch punto de corte
2000 AspenTech. All Rights Reserved.
19
HOT2
3 8 5 ?
There are enough streams OUT but Hay suficientes corrientes de salida pero... CPIN CPOUT not for every Pinch Match nopossible es posible para cada match
2000 AspenTech. All Rights Reserved.
20
CP 4 9
HOT1
HOT2
CP = 2 2
3
COLD1 COLD2 COLD3
CP = 7 3 8 5
21
Sin embargo, no debemos seguir las.. reglas However do not follow the rules blindly ciegamente...
Another Example
CP 4 10
CP 4 10 3 17
HOT1 HOT2
3
HOT1 HOT2
CP = 2
2
CP = 2
1
3 17
COLD1 COLD2
CP = 13 CP = 4
COLD2
CP 4 10 3 17
HOT1 HOT2
2 1
CP = 12 CP = 5
COLD2
Always try to minimize stream splits to reduce complexity Siempre intentemos minimizar las bifurcaciones para reducir la complejidad
2000 AspenTech. All Rights Reserved.
22
Resumen
Ubique el punto de corte y divida el problema en dos partes No NinNout
Divida una corriente de salida
No CPinCPout
Ubique la mayor corriente de entrada Realice los intercambios remanentes CPinCPout Ubique los servicios auxiliares
2000 AspenTech. All Rights Reserved.
Maximice el intercambio
23