Cronograma Acelerado
Cronograma Acelerado
Cronograma Acelerado
ITEM
01
ESPECIFICACIONES
OBRAS PROVISIONALES
COSTO
PARCIAL
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
JUNIO
JULIO
AGOSTO
8,796.72
8,796.72
01.01
7,500.00
7,500.00
01.02
1,116.72
1,116.72
01.03
180.00
180.00
43,085.00
6,190.31
10,736.55
10,742.80
30,585.00
5,320.52
7,901.13
7,901.13
869.79
1,291.67
1,291.67
1,543.75
1,550.00
02
FLETE TERRESTRE
02.01
02.02
FLETE RURAL
5,000.00
02.03
7,500.00
23,373.80
3,815.80
3,959.50
3,959.50
23,373.80
3,815.80
3,959.50
3,959.50
03
03.01
04
04.01
PRESUPUESTO SOCIAL
TOTAL COSTO DIRECTO DEL COMPONENTE SOCIAL
SECTOR JACHA TITILACA
AGUA POTABLE
600,509.73
6,737.07
5,904.61
7,416.40
135,523.96
121,481.44
165,484.74
6,737.07
5,904.61
7,416.40
46,776.33
33,083.69
5,191.16
827.58
871.28
458.99
04.01.01
CAPTACION (2 und)
6,018.74
04.01.02
LINEA DE CONDUCCION
1,968.64
04.01.03
1,161.68
1,161.68
04.01.04
RESERVORIO 7 M3
7,238.63
3,601.22
120.32
518.06
3,637.41
ITEM
ESPECIFICACIONES
COSTO
PARCIAL
04.01.05
CASETA DE VALVULAS
2,630.13
04.01.06
RED DE DISTRIBUCION
29,202.99
04.01.07
04.01.08
04.01.09
04.02
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
-
6,616.75
JUNIO
-
5,904.61
JULIO
-
6,898.34
AGOSTO
1,308.49
1,321.64
6,027.00
3,756.29
1,417.82
PILETAS DOMICILIARIAS
60,126.51
18,873.98
10,471.47
CONEXIONES DOMICILIARIAS
55,719.60
9,741.52
11,671.00
434,554.99
88,366.75
88,366.75
AGUAS RESIDUALES
939.31
04.02.01
259,730.80
56,107.52
56,107.52
04.02.02
174,824.19
32,259.23
32,259.23
470.00
380.88
31.00
04.03
CONTROL DE CALIDAD
04.03.01
350.00
350.00
04.03.02
120.00
30.88
31.00
05
05.01
594,190.85
5,962.88
7,113.09
11,734.90
134,316.27
125,874.22
172,475.43
5,962.88
7,113.09
11,734.90
55,628.92
28,370.92
5,191.16
827.58
335.96
559.50
05.01.01
CAPTACION (2 und)
6,018.74
05.01.02
LINEA DE CONDUCCION
1,300.48
05.01.03
1,159.92
05.01.04
RESERVORIO 8 M3
7,903.19
79.90
29.52
325.12
1,159.92
4,680.53
3,193.14
ITEM
ESPECIFICACIONES
COSTO
PARCIAL
05.01.05
CASETA DE VALVULAS
2,724.90
05.01.06
RED DE DISTRIBUCION
39,545.39
05.01.07
05.01.08
VALVULAS DE AIRE
05.01.09
05.01.10
05.02
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
-
5,853.46
JUNIO
-
7,113.09
JULIO
-
3,256.25
AGOSTO
1,355.64
23,322.59
1,369.26
-
1,417.82
939.31
168.46
32.82
58,344.83
CONEXIONES DOMICILIARIAS
53,891.70
420,465.42
AGUAS RESIDUALES
8,153.53
10,161.18
10,161.18
9,421.94
11,288.13
77,585.89
97,451.63
05.02.01
251,280.72
46,367.28
58,239.55
05.02.02
169,184.70
31,218.61
39,212.09
1,250.00
1,101.46
51.67
1,050.00
1,050.00
200.00
51.46
51.67
05.03
CONTROL DE CALIDAD
05.03.01
05.03.02
06
06.01
06.01.01
CAPTACION (2 und)
06.01.02
06.01.03
373,385.98
5,408.52
5,712.26
1,569.75
86,097.69
93,732.34
155,041.72
5,408.52
5,712.26
1,569.75
44,920.86
43,381.78
3,004.83
2,591.67
413.16
PLANTA DE BOMBEO
33,117.73
8,569.21
10,266.50
12,379.90
10,677.66
1,702.24
ITEM
ESPECIFICACIONES
COSTO
PARCIAL
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
JUNIO
JULIO
AGOSTO
06.01.04
LINEA DE IMPULSION
9,845.00
3,568.81
6,276.19
06.01.05
RESERVORIO 5 M3
4,768.11
1,151.52
1,435.06
06.01.06
CASETA DE VALVULAS
2,643.89
1,315.34
1,328.55
06.01.07
RED DE DISTRIBUCION
27,590.61
6,109.35
9,574.25
06.01.08
562.04
372.35
06.01.09
336.92
74.40
06.01.10
31,863.29
06.01.11
CONEXIONES DOMICILIARIAS
28,929.40
217,094.26
128,742.25
06.02
AGUAS RESIDUALES
06.02.01
06.02.02
06.03
CONTROL DE CALIDAD
06.03.01
06.03.02
07
07.01
07.01.01
5,408.52
5,712.26
786.23
783.52
5,879.54
5,879.54
5,057.76
6,059.54
40,059.06
50,316.12
23,756.01
29,838.70
88,352.01
16,303.05
20,477.42
1,250.00
1,117.77
34.44
1,050.00
1,050.00
200.00
67.77
34.44
910,037.02
4,461.43
6,116.49
194,832.00
214,961.69
277,501.22
4,461.43
6,116.49
77,524.73
86,588.52
5,191.16
827.58
6,018.74
ITEM
ESPECIFICACIONES
COSTO
PARCIAL
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
101.52
JUNIO
-
JULIO
07.01.02
LINEA DE CONDUCCION
1,763.12
440.78
1,027.98
07.01.03
1,163.54
1,163.54
07.01.04
RESERVORIO 13 M3
11,505.99
1,846.40
AGOSTO
192.84
4,820.08
ITEM
ESPECIFICACIONES
COSTO
PARCIAL
07.01.05
CASETA DE VALVULAS
3,206.65
07.01.06
RED DE DISTRIBUCION
72,140.27
07.01.07
07.01.08
VALVULAS DE AIRE
07.01.09
07.01.10
07.02
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
-
4,359.91
JUNIO
-
JULIO
-
4,325.45
AGOSTO
581.36
1,517.65
14,908.99
25,011.59
1,899.78
1,258.60
701.36
154.88
88,614.94
CONEXIONES DOMICILIARIAS
90,486.83
631,715.80
AGUAS RESIDUALES
1,350.26
30,522.92
30,522.92
22,282.38
22,282.38
116,566.60
128,352.50
07.02.01
374,179.09
69,044.95
80,830.85
07.02.02
257,536.71
47,521.65
47,521.65
820.00
740.67
20.67
07.03
CONTROL DE CALIDAD
07.03.01
700.00
700.00
07.03.02
120.00
40.67
20.67
08
08.01
SECTOR JANTA
AGUA POTABLE
08.01.01
CAPTACION
08.01.02
LINEA DE CONDUCCION
08.01.03
RESERVORIO 6 M3
580,342.74
6,496.63
12,495.00
2,310.58
140,973.30
134,255.09
224,655.46
6,496.63
12,495.00
2,310.58
74,735.93
68,752.96
2,833.22
1,309.10
1,524.12
396.90
126.97
208.54
5,522.36
1,555.74
2,555.12
ITEM
ESPECIFICACIONES
COSTO
PARCIAL
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
RED DE DISTRIBUCION
08.01.06
951.20
210.06
08.01.07
VALVULAS DE AIRE
182.22
40.24
08.01.08
49,738.64
08.01.09
CONEXIONES DOMICILIARIAS
47,158.70
354,867.28
AGUAS RESIDUALES
12,495.00
AGOSTO
08.01.05
6,496.63
JULIO
CASETA DE VALVULAS
114,588.20
JUNIO
08.01.04
08.02
3,284.02
ABRIL
PLAZO DE EJECUCION
1,352.35
958.23
907.67
1,131.16
52,005.51
42,238.71
8,662.35
8,662.35
10,168.59
12,182.66
65,481.46
65,481.46
08.02.01
212,000.20
39,119.08
39,119.08
08.02.02
142,867.08
26,362.38
26,362.38
820.00
755.91
20.67
08.03
CONTROL DE CALIDAD
08.03.01
700.00
700.00
08.03.02
120.00
55.91
20.67
3,133,721.84
29,066.53
31,224.96
47,950.95
706,439.27
705,007.08
348,261.00
3,230.26
3,470.13
5,328.95
78,508.96
78,349.80
GASTOS DE SUPERVISION
135,642.60
1,258.14
1,351.57
2,075.55
30,578.10
30,516.11
GASTOS DE EXPEDIENTE
66,908.00
620.60
666.68
1,023.80
15,083.16
15,052.58
ITEM
ESPECIFICACIONES
COSTO TOTAL
% AVANCE FISICO EJECUTADO
COSTO
PARCIAL
3,684,533.44
ABRIL
PLAZO DE EJECUCION
: 240 DIAS
FECHA DE INICIO
FECHA DE TERMINO
: 06/05/2015
: 01/12/2015
MAYO
JUNIO
JULIO
AGOSTO
34,175.53
36,713.34
56,379.25
830,609.49
828,925.57
0.93%
1.00%
1.53%
22.54%
22.50%
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
8,796.72
7,500.00
1,116.72
180.00
43,085.00
10,396.25
3,662.84
1,356.25
7,646.25
1,815.97
30,585.00
1,250.00
296.87
5,000.00
1,500.00
1,550.00
1,356.25
7,500.00
3,831.77
3,959.50
3,831.77
15.96
23,373.80
3,831.77
3,959.50
3,831.77
15.96
23,373.80
124,236.66
102,356.34
96,763.96
89.29
600,509.73
21,906.70
22,142.47
21,428.19
89.29
165,484.74
6,018.74
1,968.64
1,161.68
7,238.63
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
2,630.13
29,202.99
1,417.82
478.51
10,133.68
10,471.47
10,133.68
42.23
60,126.51
11,294.51
11,671.00
11,294.51
47.06
55,719.60
102,299.96
80,185.75
75,335.77
434,554.99
54,561.50
47,926.52
45,027.73
259,730.80
47,738.46
32,259.23
30,308.04
174,824.19
30.00
28.12
470.00
350.00
120.00
30.00
28.12
116,284.30
99,133.27
93,685.44
86.48
594,190.85
21,285.45
21,500.51
20,792.28
86.48
172,475.43
6,018.74
1,300.48
1,159.92
7,903.19
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
2,724.90
39,545.39
1,417.82
168.46
478.51
49.55
51.20
34.89
9,833.40
10,161.18
9,833.40
40.96
58,344.83
10,923.99
11,288.13
10,923.99
45.52
53,891.70
94,948.85
77,585.89
72,893.16
420,465.42
56,743.83
46,367.28
43,562.79
251,280.72
38,205.03
31,218.61
29,330.37
169,184.70
50.00
46.87
1,250.00
1,050.00
200.00
50.00
46.87
74,274.95
57,288.09
49,254.25
48.13
373,385.98
25,217.73
17,194.59
11,588.10
48.13
155,041.72
9,935.32
-
4,346.70
-
3,004.83
33,117.73
12,379.90
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
1,388.77
OCTUBRE
792.76
NOVIEMBRE
DICIEMBRE
ACUMULADO
9,845.00
4,768.11
2,643.89
27,590.61
562.04
336.92
189.69
112.31
116.05
34.16
7,727.57
5,879.54
5,689.87
23.71
31,863.29
5,864.07
6,059.54
5,864.07
24.42
28,929.40
49,023.89
40,059.06
37,636.13
217,094.26
29,072.38
23,756.01
22,319.15
128,742.25
19,951.51
16,303.05
15,316.98
88,352.01
33.33
34.44
30.02
1,250.00
1,050.00
33.33
34.44
30.02
200.00
223,460.96
147,490.28
118,714.17
910,037.02
74,497.74
19,117.11
9,195.20
277,501.22
6,018.74
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
1,763.12
1,163.54
11,505.99
4,664.59
174.92
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
1,107.64
3,206.65
23,534.33
72,140.27
641.18
1,899.78
701.36
88,614.94
233.79
26,218.84
241.58
-
71.11
-
18,097.37
18,700.61
9,124.09
90,486.83
148,927.98
128,352.50
109,516.22
631,715.80
78,603.59
80,830.85
64,868.85
374,179.09
70,324.39
47,521.65
44,647.37
257,536.71
35.24
20.67
2.75
820.00
700.00
120.00
35.24
20.67
2.75
103,273.56
109,647.10
70,856.58
34.91
580,342.74
23,117.97
27,378.54
9,332.94
34.91
224,655.46
2,833.22
61.39
396.90
1,411.50
5,522.36
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
SETIEMBRE
1,094.67
-
OCTUBRE
150.52
-
NOVIEMBRE
DICIEMBRE
ACUMULADO
3,284.02
114,588.20
317.07
327.64
96.43
951.20
60.74
62.76
18.48
182.22
8,382.92
14,654.96
8,382.92
11,789.68
12,182.66
835.11
47,158.70
80,135.59
82,247.89
61,520.89
354,867.28
47,873.56
49,135.46
36,753.02
212,000.20
32,262.03
33,112.43
24,767.87
142,867.08
20.00
20.67
2.75
820.00
700.00
120.00
34.91
49,738.64
20.00
20.67
2.75
655,758.45
523,537.42
434,462.42
274.66
3,133,721.84
72,876.63
58,182.47
48,283.26
30.52
348,261.00
28,384.39
22,661.23
18,805.63
11.89
135,642.60
14,001.08
11,178.03
9,276.19
5.86
66,908.00
ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO
SETIEMBRE
Municipalidad
Distrital de Plateria
: PUNO
: PLATERIA
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
771,020.55
615,559.14
510,827.51
322.94
3,684,533.44
20.93%
16.71%
13.86%
0.01%
100.00%