10
1.2 Objetivos
13
1.3 Alcances
14
14
16
16
55
59
61
62
64
67
69
69
ii 2
73
73
80
80
80
82
90
97
98
98
106
113
120
123
128
CONCLUSIONES
131
RECOMENDACIONES
133
FUENTES DE INFORMACIN
135
ANEXOS
137
3
iii
RESUMEN
que amurallaban con terraplenes levantados con los mismos relaves y una
vez que se agotaba el yacimiento, estos depsitos quedaban abandonados.
v5
ABSTRACT
The present work, it is one of the important topics associated with the
mining works, corresponds to all that related with re-wash, the constructive
works of disposition, in the surface of the land known as Warehouses of rewash that are residues mining product of metallurgical activities.
Until a few decades ago it was common in Peru and in other countries of
mining tradition, to come undone, for example, of re-wash derivatives of the
operations miner metalworkers, throwing them in beds of rivers, lagoons,
gorges, vales or to the sea and when in the outskirts of anyone one was not
arranging mining chores of these so "suitable" natural sectors, the mining
businessmen usually accumulated re-wash them in areas of containment,
which they were walling with terraces raised with the same ones re-wash and
once the deposit was becoming exhausted, these deposits were left
abandoned.
vi6
At present, the legal, technical and environmental regulation that has our
country for the construction, operation, maintenance and closing of the
deposits of re-wash, is required that there should be fulfilled diverse requests
of safety, destined to the protection of the persons and the environment, for it
all the efforts that are done to establish criteria to been born in mind on the
control of the risks and impacts are of supreme importance.
vii
7
INTRODUCCIN
ix9
CAPTULO I
MARCO TERICO
1.1 Antecedentes
Una breve revisin de la evolucin del manejo de relaves a nivel mundial
nos proporciona antecedentes tiles para comprender la tecnologa actual.
Aunque se sabe que el oro y la plata ya haban sido explotados por los incas
en tiempos pre-colombinos, la historia documentada de la minera en el Per
data de la conquista por Pizarro en 1535. A travs del Viejo y Nuevo Mundo
en ese entonces, el oro era extrado por reduccin directa (fundicin) de
minerales excepcionalmente ricos, pero principalmente por amalgamacin
con mercurio. La amalgamacin de los minerales de oro y posteriormente,
extendida a la plata a fines del siglo XVI, empleaba molinos de mineral
impulsados por caballos para moler el mineral en un patio circular, algunas
veces en adicin a molinos primitivos cuya energa era proporcionada por
cadas de agua donde esta fuera disponible. Desde el punto de vista
ambiental, la cantidad de roca chancada y de desmonte fue pequea y se
hicieron esfuerzos para recuperar y conservar el mercurio, el cual era casi
tan preciado como el mismo mineral. Sin embargo, grandes cantidades de
mercurio permanecen distribuidas alrededor de la ubicacin de las viejas
minas de plata en el Per y constituyen un serio riesgo ambiental en la
actualidad.
10
de
los
antiguos
depsitos
de
relaves
para
ser
usados
1.2 Objetivos
1.2.1 Objetivos generales
Establecer procesos constructivos para la ejecucin de un dique
empleando el relave.
Evitar la contaminacin ambiental, producido por el relave.
Preservar la infraestructura a largo plazo y los bienes.
Construir el dique para el almacenamiento de relaves que se
genera por el tratamiento metalrgico.
Evaluar las caractersticas del suelo, de la presa y las propiedades
fsicas mecnicas del material de relave que conforme el dique.
Lograr que el impacto ambiental, tanto en la operacin como el
cierre del proyecto cumplan con la normativa ambiental del sector,
sea ambientalmente sostenible y compatible con el desarrollo
socioeconmico local y regional.
1.2.2 Objetivos especficos
Reciclar el relave minero emplendolo en la construccin de un
dique.
Direccionar constructivamente el uso correcto del relave.
13
UBICACIN
Unidad Minera Catalina Huanca
Norte
Este
8448,000
607,000
8458,000
620,000
16
Tabla N2. Distancias entre los principales centros poblados y las operaciones de
Catalina Huanca Sociedad Minera (CHSM). Distancias expresadas en Km
Zona de Operacin
Sacllani
Mishca
Localidad
Huanca Pampa
Chumbilla
Santa Rosa de Sacllani ( Desmontera Snchez)
Raccaya
Apongo
2.4
0.59
2.73
5.5
3.4
7.3
7.2
5.7
2.62
3.8
600000
550000
8500000
8500000
CANGALLO
VILCANCHOS
VILCAS HUAMAN
ICA
ALCAMENCA
SARHUA
HUAMANQUIQUIA
COLCA
HUANCARAYLLA
VICTOR FAJARDO
HUANCAPI
CAYARA
HUANCA SANCOS
HUAYA
8450000
APONGO
8450000
SUCRE
CANARIA
ASQUIPATA
LUCANAS
550000
600000
17
MINA
PLANTA
CAMPAMENTO
Figura N2. Ubicacin de las zonas de trabajo en Catalina Huanca-Ayacucho
Fuente: Unidad Minera Catalina Huanca
1.6.4 Sismicidad
El borde occidental de Amrica del Sur se caracteriza por ser una
de las regiones ssmicamente ms activas en el mundo. El Per forma parte
de esta regin y la actividad ssmica ms importante est asociada al
proceso de subduccin de la Placa de Nazca (ocenica), bajo la Placa
Sudamericana (continental), generando con relativa frecuencia terremotos
de gran magnitud. Un segundo tipo de sismicidad es el producido por las
deformaciones corticales, presentes a lo largo de la cordillera andina, con
sismos menores, tanto en magnitud como en frecuencia.
1.6.5 Geologa
El rea del proyecto, geolgicamente, est constituido por
depsitos
no
consolidados
del
Cuaternario,
eventualmente
podra
19
no
consolidado,
est
constituido
por
rocas
calizas
con
20
21
estas
operan
desde
la
administracin
anterior,
no
son
tan
1.6.8 Hidrologa
El sistema hidrolgico est formado por un conjunto de glaciares,
lagunas alto andinas, ros aportantes, que constituyen ecosistemas
especiales (humedales alto andinos) y suministran agua para uso
poblacional y para las operaciones minero-metalrgicas.
rea
de
operaciones
mineras,
industriales
actuales
23
24
operaciones
mineras,
planta
concentradora,
oficinas
administrativas,
permanentes
reducido
(rboles),
este
circunscribindose
uso
a
del
terreno
pequeas
es
terrazas,
Tierras boscosas, este uso del terreno est referido a las reas con
especies arbreas silvestres que se encuentran asociadas con vegetacin
arbustiva. Su distribucin es reducida en el rea del proyecto
28
b) Flora
En la zona de evaluacin, se registraron un total de 71 especies de
plantas entre vasculares y no vasculares, Se distribuyen en tres divisiones:
bryophyta (2 especies), pteridophyta (5 especies) y angiospermae (64
especies). Las plantas estuvieron distribuidas en 34 familias, de las cuales
las Asteraceae tuvieron mayor riqueza especfica formando el 17 % del total.
El otro grupo representativo fueron las Poaceas ogramneas con un 10%.
c) Fauna
En el rea de estudio, se registr un total de 20 especies de aves
distribuidas en 17 gneros y 14 familias de aves; la avifauna est compuesta
mayormente por especies de la familia emberizidae los cuales son de
hbitos granvoros principalmente (25 %). Estas especies son comunes a
este tipo de ecosistemas y su abundancia y presencia depende,
exclusivamente, de la disponibilidad de recursos (hbitat y alimentos), siendo
la emberizidae Zonotrichia capensis la ms abundante.
29
de
las
divisiones
Bacillariophyta,
Chlorophyta,
Euglenophyta y Crisophyta.
33
es
una
comunidad
campesina
con
185
34
35
Lugares
CC y centros poblados
del rea
de Influencia directa por
criterio
social y ambiental AID
Anexo de Chumbilla
Anexo de Huancapampa
CC y centros
poblados
del rea de
influencia
indirecta AII
X
X
a) Sexo: hay mayor presencia de mujeres que varones, lo que significa una
tasa de masculinidad de 91.6 hombres de cada 100 mujeres, en ambos
grupos de centros poblados; en el AID por criterio ambiental, la tasa de
masculinidad es ms alta, el 93.4 que en AID por criterio social, que es
85.1.
37
38
perspectiva de las
autoridades
a) Agua potable: No todos los pueblos cuentan con una red pblica de
agua, aun cuando muchas viviendas cuentan con este servicio a nivel
domiciliario. En casi todos los pueblos, el problema principal es la
escasez de agua. Las fuentes de captacin de agua son las
vertientes, manantiales o puquios que, por lo general, son de
agua permanente durante todo el ao.
autoridades
expresaron
que
este
servicio
ha
mejorado
b) Transporte pblico
En la zona, existe un reducido flujo de transporte pblico. En el mbito
de operaciones de CHSM, la empresa minera, desde 2005, ha
instaurado el servicio del Bus Popular, el cual partiendo de Canaria
recorre los poblados de la zona hasta llegar a Apongo.
de
salud
autoridades
La zona estudiada es deficitaria en lo que a servicio de
salud se refiere, salvo Taca y Apongo los dems centros poblados
estudiados carecen de este servicio, razn por la cual deben caminar
kilmetros e invertir horas en viajar hasta un centro poblado donde exista por
lo menos, un puesto de salud. El puesto de salud existente en Uyuccasa
pertenece a CHSM y solo presta apoyo a la poblacin en casos de
emergencias.
Por esta razn, los pobladores se ven precisados a salir a Huamanga, Nazca
o Ica para aliviar sus problemas de salud. Los puestos de Salud de Taca y
Apongo es para las emergencias simples, pues las ms graves no las
pueden atender.
41
44
AII,
la
segunda
accin
solicitada
fue
recibir
capacitacin
45
49
50
Produccin
(Ica-Per)
15 000 TPD
Cobriza (Huancavelica-Per)
5 000 TPD
1000 TPD
200 TPD
Chinchan
(Per)
200 TPD
La Coipa
(Chile)
18 000 TPD
Manto Verde
(Chile)
12 000 TPD
El Peon
(Chile)
3 000 TPD
Toqui
(Chile)
1 800 TPD
Consistencia del
relave
Pulpa
Espesado
Pasta
Filtrado
3,468 msnm
- Ancho de corona:
variable
- Longitud de corona:
27 m
1.5:1 (H:V)
- Volumen de relleno:
3,506 m
Dique 1 Etapa
- Cota de corona:
3,502 msnm
- Ancho de corona:
4m
- Longitud de corona:
94 m
- Borde libre:
1.00 m
1:1 (H:V)
1.5 H : 1 V - 1.75 H : 1 V
62,420 m
3,520 msnm
- Ancho de corona:
6m
- Longitud de corona:
161.5 m
- Borde libre:
1.00 m
1:1 (H:V)
1.75 H : 1 V
219,840 m
52
3,564 msnm
- Ancho de corona:
32 m
- Longitud de corona:
175.5 m
- Borde libre:
1.00 m
1:1 (H:V)
2.5 H : 1 V
340,960 m
3,584 msnm
- Ancho de corona:
48 m
- Longitud de corona:
186.5 m
- Borde libre:
1.00 m
1:1 (H:V)
2.5 H : 1 V
360,410 m
3,468 msnm
- Ancho de corona:
variable
- Longitud de corona:
111.8 m
1.5 H : 1 V
94,579 m
3,443 msnm
- Ancho de corona:
2.00 m
- Longitud de corona:
29.00 m
1H:4V
1H:4V
4,116 m
53
3575 msnm
- Altura mxima:
110 m
- Talud de relleno:
4:1 (H:V)
- Volumen de almacenamiento:
656,952 m
54
CAPTULO II
IMPACTO AMBIENTAL
evaluacin
de
impactos
ambientales
desarrollar
la
a) Metodologa
La metodologa empleada para la evaluacin del impacto ambiental tuvo
por objetivo evaluar la viabilidad de los componentes del proyecto,
utilizando herramientas cualitativas de identificacin y cuantitativas para la
asignacin de valores y determinacin de la importancia del impacto, para
ello se utiliz la matriz de causa-efecto para la identificacin de impactos y
para la calificacin de los mismos.
55
b) Resultados
De la evaluacin de impactos potenciales se concluye que:
La alteracin del relieve y en consecuencia del paisaje circundante, que
se generar por las actividades relacionadas con movimiento de tierras
y excavaciones en roca y terreno natural, as como para la construccin
de los diques de los depsitos y el emplazamiento de los componentes
del proyecto, se considera un impacto medianamente significativo; sin
embargo, sus posibilidades de manejo se orientan a la aplicacin de
medidas de mitigacin que reduzcan el impacto o restituyan el medio
del rea alterada al final de las operaciones.
La alteracin de la calidad del aire por el incremento de material
particulado y polvo principalmente que se generen de las actividades
de construccin por el movimiento de tierras, la extraccin de material,
el transporte de maquinaria y equipos; en la etapa de operacin se
originara por el transporte de relave, pasta de relleno, y desmonte
detrtico y en la etapa de cierre, por el movimiento de tierras producto
de la demolicin de las estructuras se considera un impacto
medianamente significativo, puesto que el rea de posible afectacin
estara limitada al rea de influencia directa, de acuerdo con la
direccin del viento y las actividades por realizar en cada uno de los
componentes. Sin embargo, se estima que la dispersin de los
contaminantes no abarcara ms all del rea de influencia directa.
lncremento de presin sonora o nivel del ruido, que se originar por el
uso de las maquinarias necesarias para el desarrollo de las actividades
en la etapa de construccin, as como por el transporte de relaves,
equipos, desmonte, etc., se considera un impacto poco significativo,
sobre todo por la puntualidad del impacto, es decir que no es generado
por una fuente continua que generar un permanente incremento del
ruido ambiental, sino ms bien por actividades en la etapa de
construccin y espordicas. Este impacto tambin puede ser prevenido
mediante el mantenimiento adecuado de las maquinarias que se vayan
a utilizar, dando como resultado una evaluacin de impacto y manejo
56
qumicos
para
captura
destruccin
de
sustancias
Para evitar posibles desbordes del ro Mishka, ser necesario realizar los
estudios necesarios a fin de tomar las medidas de contingencia pertinente y
evitar as un dao que podra afectar no solo a los pobladores de la zona,
sino a todo poblador que reside a lo largo del curso del ro, especialmente a
los pobladores de Apongo, quienes manifiestan que esas aguas se usan
para regar las tierras bajas de la comunidad.
59
Todo esto supone un trabajo sostenido con los pobladores, para ello la
realizacin de talleres de consulta de informacin y difusin, para informar
acerca de la actividad minera, los cuidados ambientales que se han puesto
en marcha para la proteccin del medio ambiente, la participacin de
jvenes y mujeres de la comunidad en el progreso de la zona y la regin, la
posibilidad de llevar a cabo proyectos de desarrollo sostenible en las
comunidades involucradas, entre otros temas lo que son importantes
desarrollar con cierta periodicidad.
60
Todo esto dentro del marco de ese Programa de Accin del Plan de
Relaciones Comunitarias, que incluye. Programas de capacitacin en
Relaciones Comunitarias al personal, contratacin de personal de la zona,
compra de productos locales, comunicacin y divulgacin de informacin
pertinente, apoyo a comunidades en proyectos de desarrollo social,
aplicacin del cdigo de conducta para los trabajadores.
63
67
El
Comit
de
seguridad
desarrolla
propone
polticas,
68
del
suelo
superficial
(fertilizacin)
para
su
posterior
70
Demolicin,
salvamento
disposicin:
las
estructuras
que
garanticen mantener una estabilidad del terreno (talud) y que queden bajo el
nivel del mismo se dejar insitu. Las dems estructuras sobre terreno sern
demolidas con el uso de un martillo neumtico. En la medida de lo posible,
todo el material de demolicin ser enterrado en las proximidades, para lo
cual se har una zanja donde se depositar el material demolido, y
finalmente, una vez compactado se cubrir con el propio suelo de desbroce.
71
72
CAPTULO III
METODOLOGA
73
74
75
del relave filtrado logra 17% a 18%, permite su manejo con equipos de
movimiento de tierra, es suficientemente alto como para tener un relleno
prcticamente saturado.
Figura N04: Planta San Jernimo CHSM, en esta imagen se aprecia el relave
filtrado produccin 1000 TMD
Elaboracin: El autor
76
78
80
tiene
capacidad
para
conducir
el
caudal
extremo
84
3.6.3 Pedrapln
El pedrapln o bolonera acomodada es una estructura que se ha
construido con las rocas que se extrajeron de canteras seleccionadas, la
construccin del pedrapln se hizo necesaria para la pronta conformacin
del dique de contencin en la primera etapa de la operacin.
86
87
puedan ser captadas en un rea definida para luego ser evacuadas fuera
del rea de depsito de relaves mediante tuberas flexibles de 4 a 6, de
ser necesario. Los caudales de agua de lluvia que deben evacuarse
depender de la intensidad y tiempo de duracin de la lluvia, sin embargo,
para un ao de operacin normal se estima suficiente contar con tuberas
livianas de HDPE con capacidad de evacuar 10 l/s, y 300 l/s en una
condicin de lluvias excepcionales.
90
Elaboracin: El autor
91
94
95
CAPTULO IV
PRUEBAS Y RESULTADOS
Se describe a continuacin:
Anlisis granulomtrico por tamizado
ASTM D-422
Lmites de consistencia
ASTM D-4318
Contenido de humedad
ASTM D-2216
Densidad mxima
ASTM D-4253
Densidad mnima
ASTM D-4254
Limite liquido
ASTM D-423
Limite plstico
ASTM D-424
Peso volumtrico
ASTM D-2937
ASTM D-854
ASTM D-1557
97
ASTM D-5030
ML
CL
SP
SM
Arena limosa
SC
Arena arcillosa
GM
Grava limosa
GS
Grava arcillosa
SW
GC
Grava arcillosa
98
Figura N 23. Realizando ensayo para lmite lquido con equipo Casagrande
Elaboracin: El autor
99
100
Proyecto
Ubicacin
Cliente
Fecha
: 22/04/2014
Muestra
: Relave
N Ensayo
2014-001
LIMITE LIQUIDO
Tara N
N de Golpes
28
22
15
95.69
94.41
93.78
90.18
92.04
91.52
Peso de Agua
3.65
2.89
3.60
Peso de Tara
70.75
75.25
70.91
21.29
16.27
19.27
17.14
17.76
18.68
LIMITE PLASTICO
Tara N
75.69
76.57
75.23
76.07
Peso de Agua
0.46
0.50
Peso de Tara
Peso del Suelo Seco
Humedad (%)
71.62
72.05
3.61
4.02
12.74
12.44
y = -2.458ln(x) + 25.344
19.00
Limites de Consistencia
Limite
17.43
Liquido
18.00
Limite
Plastico
17.00
12.59
Indice
4.84
Plastico
16.00
15.00
Observaciones
14.00
13.00
10
100
Y=(A).(LN(X))+B
(A)=
-2.458
(B)=
25.344
Y=
17.43
102
Proyecto
Ubicacin
Cliente
Muestra
: Relave
Fecha
: 22/04/2014
N Ensayo
: 2014 -002
TAMIZ
ABERTURA
(m m )
PESO
RETENIDO
(gr.)
PARCIAL
RETENIDO
(%)
RETENIDO
ACUMULADO
(%)
3"
76.200
0.00
0.00
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
PESO INICIAL(gr):
100.00
0.00
0.00
100.00
HUMEDAD (%):
16.10
0.00
0.00
100.00
GRUESOS(%):
26.92
0.00
0.00
100.00
GRAVA(%)
0.00
0.00
0.00
100.00
ARENA(%)
26.92
0.00
0.00
100.00
FINOS(%)
73.08
2"
50.800
1"
38.100
1"
"
"
3/8"
#4
25.400
19.050
12.700
9.525
4.750
Suma
TAMIZ.
#10
0.00
0.00
0.00
0.00
0.00
0.00
OBSERVACIONES
ANALISIS DE LA M UESTRA
0.00
ABERTURA
(m m )
2.000
#20
0.850
#40
0.425
#60
0.00
0.250
#100
0.150
#200
0.075
PESO
RETENIDO
(gr.)
0.00
0.00
0.58
1.72
7.47
17.15
Bandeja
1.16
Suma
28.08
BANDEJA N
PARCIAL
RETENIDO
(%)
0.00
0.00
0.58
1.72
7.47
17.15
RETENIDO
ACUMULADO
(%)
0.00
0.00
0.58
2.30
9.77
26.92
OBSERVACIONES
>#20
Total
100.00
100.00
100.00
100.00
99.42
99.42
PESO INICIAL
97.70
97.70
MENOR DE LA
90.23
90.23
MALLA # 4(gr):
73.08
73.08
ANALISIS DE LA M UESTRA
100.00
73.08
BANDEJA N
17.43
Clasificacion SUCS
12.59
CL-ML
4.84
D60 (m m )
0.00
D30 (m m )
0.00
0.00
% Pasa
Granulometria
100
10
Mallas
103
PESO INICIAL(gr):
100.00
HUMEDAD (%):
16.10
GRUESOS(%):
26.92
GRAVA(%)
0.00
ARENA(%)
26.92
FINOS(%)
73.08
17.43
12.59
4.84
104
Proyecto
Ubicacin
Cliente
Fecha
N Ensayo
: 2014 - 003
: Relave
: Relave
: CL - ML
Muestra
Sondaje
SUCS
Proctor Tipo:
N de Capas:
N Golpes por Capa:
Altura de caida:
Peso del Martillo:
1 Ensayo N
Modificado
5
25
45,72cm
4,54kg.
6236
6375
6420
6384
4180
4180
4180
4180
2150
2056
2195
2240
2204
-2150
945
945
945
945
2111
2.18
2.32
2.37
2.33
-1.02
CONTENIDO DE HUMEDAD
7 Cdigo del recipiente.
201.30
855.00
245.43
224.12
214.22
212.60
193.48
189.36
194.00
810.00
230.24
210.67
197.14
195.72
178.55
175.14
7.30
45.00
15.19
13.45
17.08
16.88
14.93
14.22
73.50
70.75
50.12
50.50
50.07
50.38
72.05
73.55
120.50
739.25
180.12
160.17
147.07
145.34
106.50
101.59
6.06
6.09
8.43
8.40
11.61
11.61
14.02
10
14.00
6.1
8.4
11.6
14.0
2.05
2.14
2.12
2.05
Resultados
OCH =9,72%
MDS =2.157g/cm3
CURVA DE COMPACTACION
2.18
M.D.S
2.13
2.08
O .C.H.
2.03
1.98
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
Humedad (%)
105
CURVA DE COMPACTACION
2,18
M.D.S
2,13
2,08
O.C.H.
2,03
1,98
5,0
6,0
7,0
8,0
9,0
10,0
11,0
12,0
13,0
14,0
15,0
Humedad (%)
106
Proyecto
Ubicacin
Cliente
Fecha
: 23/04/2014
N Ensayo
: 2014 - 004
: Material Prestamo
Muestra
LIMITE LIQUIDO
Tara N
N de Golpes
35
27
18
94.43
98.77
93.71
88.56
89.43
93.05
Peso de Agua
5.00
5.72
5.15
Peso de Tara
71.93
73.77
72.09
17.50
19.28
16.47
28.57
29.67
31.27
LIMITE PLASTICO
Tara N
16.71
16.49
15.84
15.63
Peso de Agua
Peso de Tara
0.87
0.86
10.77
10.63
5.07
5.00
17.16
17.20
y = -4.047ln(x) + 42.978
Limites de Consistencia
Limite
Liquido
31.00
Limite
Plastico
Indice
29.95
17.18
12.77
Plastico
29.00
Observaciones
27.00
10
100
-4.047
(B)=
42.978
y = - 4.047ln(x) + 42.978
Donde el lmite lquido se hall para 25 golpes.
107
Limites de Consistencia
Limite
Liquido
Limite
Plastico
Indice
29.95
17.18
12.77
Plastico
108
Proyecto
Ubicacin
Cliente
Muestra
: Material de Prestamo
Fecha
: 23/04/2014
N Ensayo
: 2014 -005
TAMIZ
ABERTURA
(m m )
3"
76.200
2"
50.800
1"
38.100
1"
"
"
3/8"
#4
25.400
19.050
12.700
9.525
4.750
Suma
TAMIZ.
#10
PARCIAL
RETENIDO
(%)
RETENIDO
ACUMULADO
(%)
0.00
0.00
0.00
100.00
5.61
5.61
94.39
4.83
10.44
89.56
PESO INICIAL(gr):
5.92
16.36
83.64
HUMEDAD (%):
9.61
3.50
19.86
80.14
GRUESOS(%):
65.56
5.84
25.70
74.30
GRAVA(%)
36.33
3.52
29.22
70.78
ARENA(%)
29.23
7.11
36.33
63.67
FINOS(%)
34.44
860.00
741.20
907.00
537.00
895.00
539.00
1090.20
OBSERVACIONES
ANALISIS DE LA M UESTRA
5569.40
ABERTURA
(m m )
2.000
#20
0.850
#40
0.425
#60
PESO
RETENIDO
(gr.)
0.250
#100
0.150
#200
0.075
PESO
RETENIDO
(gr.)
26.27
23.65
16.75
15.11
14.73
18.27
Bandeja
4.00
Suma
118.78
15333.54
BANDEJA N
PARCIAL
RETENIDO
(%)
10.51
9.46
6.70
6.04
5.89
7.31
RETENIDO
ACUMULADO
(%)
10.51
19.97
26.67
32.71
38.60
45.91
OBSERVACIONES
>#20
Total
89.49
56.98
80.03
50.96
73.33
46.69
PESO INICIAL
67.29
42.84
MENOR DE LA
61.40
39.09
MALLA # 4(gr):
54.09
34.44
ANALISIS DE LA M UESTRA
250.00
34.44
BANDEJA N
29.95
Clasificacion SUCS
17.18
GC
12.77
D60 (m m )
2.96
D30 (m m )
0.00
0.00
5688.18
% Pasa
Granulometria
100
10
Mallas
109
PESO INICIAL(gr):
15333.54
HUMEDAD (%):
9.61
GRUESOS(%):
65.56
GRAVA(%)
36.33
ARENA(%)
29.23
FINOS(%)
34.44
29.95
17.18
12.77
110
Proyecto
Ubicacin
Cliente
Fecha
N Ensayo
: 2014 - 006
: Material Prestamo
: Material Prestamo
: GC
Muestra
Sondaje
SUCS
Proctor Tipo:
N de Capas:
N Golpes por Capa:
Altura de caida:
Peso del Martillo:
1 Ensayo N
Modificado
5
25
45,72cm
4,54kg.
11198
11464
11573
11418
6572
6572
6572
6572
2150
4626
4892
5001
4846
-2150
2125
2125
2125
2125
2111
2.18
2.30
2.35
2.28
-1.02
CONTENIDO DE HUMEDAD
7 Cdigo del recipiente.
292.30
315.20
309.70
293.90
299.60
329.90
288.00
276.00
279.50
301.00
291.60
276.70
277.50
305.00
262.90
252.20
12.80
14.20
18.10
17.20
22.10
24.90
25.10
23.80
50.00
49.94
50.46
50.70
50.30
50.08
50.55
50.70
229.50
251.06
241.14
226.00
227.20
254.92
212.35
201.50
5.58
5.66
7.51
7.61
9.73
9.77
11.82
10
11.81
5.6
7.6
9.7
11.8
2.06
2.14
2.14
2.04
Resultados
OCH =8,82%
MDS =2.156g/cm
CURVA DE COMPACTACION
2.16
2.14
M.D.S
2.12
2.10
2.08
O .C.H.
2.06
2.04
2.02
2.00
3.0
4.0
5.0
6.0
7.0
8.0
9.0
Humedad (%)
10.0
11.0
12.0
13.0
111
CURVA DE COMPACTACIN
2,16
2,14
M.D.S
2,12
2,10
O.C.H.
2,08
2,06
2,04
2,02
2,00
3,0
4,0
5,0
6,0
7,0
112
113
Proyecto
Ubicacin
Cliente
Fecha
: 24/04/2014
N Ensayo
: 2014 - 007
: Relave (3) , Prestamo (1)
Muestra
LIMITE LIQUIDO
Tara N
N de Golpes
32
25
18
96.62
99.91
100.73
96.56
93.04
95.81
Peso de Agua
3.58
4.10
4.17
Peso de Tara
72.05
73.07
74.71
20.99
22.74
21.85
17.06
18.03
19.08
LIMITE PLASTICO
Tara N
15.13
14.87
14.60
14.36
Peso de Agua
Peso de Tara
0.53
0.51
10.76
10.63
3.84
3.73
13.80
13.67
Limites de Consistencia
y = -3.509ln(x) + 29.258
Limite
Liquido
20.00
Limite
Plastico
17.96
13.74
Indice
4.23
Plastico
18.00
Observaciones
16.00
10
100
- 3.509
(B)=
29.258
y = - 3.509ln(x) + 29.258
Donde el lmite lquido se hall para 25 golpes.
114
Limite
Liquido
Limite
Plastico
Indice
Plastico
17.96
13.74
4.23
115
Proyecto
Ubicacin
Cliente
Muestra
Fecha
: 24/04/2014
N Ensayo
: 2014 -008
TAMIZ
ABERTURA
(m m )
3"
76.200
2"
50.800
1"
38.100
1"
"
"
3/8"
#4
25.400
19.050
12.700
9.525
4.750
Suma
TAMIZ.
#10
PARCIAL
RETENIDO
(%)
RETENIDO
ACUMULADO
(%)
0.00
0.00
0.00
100.00
1.65
1.65
98.35
2.05
3.70
96.30
PESO INICIAL(gr):
3.64
7.34
92.66
HUMEDAD (%):
8.90
2.90
10.24
89.76
GRUESOS(%):
50.88
3.48
13.72
86.28
GRAVA(%)
20.13
2.37
16.09
83.91
ARENA(%)
30.75
4.04
20.13
79.87
FINOS(%)
49.12
214.40
266.50
473.30
377.10
453.10
308.50
525.70
OBSERVACIONES
ANALISIS DE LA M UESTRA
2618.60
ABERTURA
(m m )
2.000
#20
0.850
#40
0.425
#60
PESO
RETENIDO
(gr.)
0.250
#100
0.150
#200
0.075
PESO
RETENIDO
(gr.)
9.64
6.43
3.12
3.75
24.87
48.42
Bandeja
0.00
Suma
96.23
13005.27
BANDEJA N
PARCIAL
RETENIDO
(%)
3.86
2.57
1.25
1.50
9.95
19.37
RETENIDO
ACUMULADO
(%)
3.86
6.43
7.68
9.18
19.13
38.50
OBSERVACIONES
>#20
Total
96.14
76.79
93.57
74.73
92.32
73.74
PESO INICIAL
90.82
72.54
MENOR DE LA
80.87
64.59
MALLA # 4(gr):
61.50
49.12
ANALISIS DE LA M UESTRA
250.00
49.12
BANDEJA N
17.96
Clasificacion SUCS
13.74
SC-SM
4.22
D60 (m m )
0.12
D30 (m m )
0.00
0.00
% Pasa
Granulometria
100
10
Mallas
116
HUMEDAD (%):
8.90
GRUESOS(%):
50.88
GRAVA(%)
20.13
ARENA(%)
30.75
FINOS(%)
49.12
17.96
13.74
4.22
117
118
Proyecto
Ubicacin
Cliente
Fecha
N Ensayo
: 2014 - 009
: Relave (3) , Prestamo (1)
: Mezcla 3.0x1.0
: SC - SM
Muestra
Sondaje
SUCS
Proctor Tipo:
N de Capas:
N Golpes por Capa:
Altura de caida:
Peso del Martillo:
1 Ensayo N
Modificado
5
25
45,72cm
4,54kg.
6294
6403
6520
6404
4182
4182
4182
4182
2150
2112
2221
2338
2222
-2150
937
937
937
937
2111
2.25
2.37
2.50
2.37
-1.02
CONTENIDO DE HUMEDAD
7 Cdigo del recipiente.
201.08
201.62
223.66
212.37
210.59
219.14
205.73
206.71
192.21
194.79
195.40
213.48
202.78
198.52
205.99
191.58
6.29
6.22
10.18
9.59
12.07
13.15
14.15
14.50
70.93
71.93
73.77
72.09
75.25
70.75
73.75
71.62
123.86
123.47
139.71
130.69
123.27
135.24
117.83
120.59
5.08
5.04
7.29
7.34
9.79
9.72
12.01
10
12.02
5.1
7.3
9.8
12.0
2.15
2.21
2.27
2.12
Resultados
OCH =9.58%
MDS =2.276g/cm
CURVA DE COMPACTACION
2.30
2.28
M.D.S
2.26
2.24
2.22
2.20
O .C.H.
2.18
2.16
2.14
2.12
2.10
2.08
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
Humedad (%)
119
120
121
PROYECTO:
ZONA:
CLIENTE:
FECHA:
03-jun-14
AREA:
3600.12
TURNO:
DIA
CAPA:
0.30 cm
ITEM
UNI.
DESCRIPCION:
ENSAYO 1
ENSAYO 2
ENSAYO 3
ENSAYO 4
Agua
Recipiente N
5
6
gr
740.00
585.00
680.00
570.00
gr
710.00
562.00
648.00
545.00
(1-2)
gr
30.00
23.00
32.00
25.00
gr
400.00
310.00
310.00
280.00
Suelo Seco
(2-4)
gr
310.00
252.00
338.00
265.00
Humedad
(3/5x100)
9.68
9.13
9.47
9.43
gr
6,530
6,850
6,160
7,140
Recipiente
gr
20
20
20
20
gr
6,510
6,830
6,140
7,120
gr
1,905
1,850
1,995
2,330
10
11
(10/(1+6/100)
gr
1,736.91
1,695.27
1,822.46
2,129.14
12
(9-10)
gr
4,605.00
4,980.00
4,145.00
4,790.00
13
(12/(1+6/100)
gr
4,198.68
4,563.49
3,786.51
4,377.07
14
(11+13)
gr
5,935.59
6,258.76
5,608.97
6,506.21
(7-8)
15
16
(10/15)
17
Porcentaje de Grava
(11/14x100)
gr/cm
2.53
2.53
2.53
2.53
cm
752.96
731.23
788.54
920.95
29.26
27.09
32.49
32.72
18
gr
7,955
6,875
6,625
6,915
19
gr
2,815
1,350
1,680
1,300
20
21
22
23
Volumen excavacion
24
25
gr
1,415
1,585
1,452
1,585
gr
3,725.00
3,940.00
3,493.00
4,030.00
gr/cm
1.43
1.43
1.43
1.43
(21/22)
cm
2,604.90
2,755.24
2,442.66
2,818.18
(16)
cm
752.96
731.23
788.54
920.95
(23-24)
cm
1,851.93
2,024.02
1,654.12
1,897.23
(18-(19+20))
DENSIDAD NATURAL
26
(9/23)
gr/cm
2.50
2.48
2.51
2.53
27
(14/23)
gr/cm
2.28
2.27
2.30
2.31
(13/25)
28
29
30
Porcentaje de Compactacin
(27/29)x100
gr/cm
2.27
2.25
2.29
2.31
gr/cm
2.35
2.35
2.35
2.35
96.96
96.66
97.71
98.24
122
123
Proyecto
Ubicacin
Cliente
Fecha:
Calicata :
D-1
Profundidad de Ensayo (m): 0.50
Cota :
3476.00
Peso Inicial
(Kg)
Peso Final
(Kg)
Peso Neto
(Kg)
Recipiente
Peso Inicial
(Kg)
Peso Final
(Kg)
Peso Neto
(Kg)
R1
R2
R3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
R4
R5
R6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total (Kg)
0.00
0.001
0.00
Peso Inicial
(Kg)
Peso Final
(Kg)
Peso Neto
(Kg)
Saco
Peso Inicial
(Kg)
Peso Final
(Kg)
Peso Neto
(Kg)
B1
B2
B3
B4
B5
B6
B7
68.84
99.80
93.06
93.06
90.58
92.04
83.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68.84
99.80
93.06
93.06
90.58
92.04
83.58
B8
B9
B10
B11
B12
B13
B14
111.08
97.10
87.00
27.32
118.34
100.00
134.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
111.08
97.10
87.00
27.32
118.34
100.00
134.00
Total (Kg)
C) VOLUMEN FINAL (V2) - Agua usada para llenar el hoyo + anillo / marco
1,295.80
Recipiente
Peso Inicial
(Kg)
Peso Final
(Kg)
Peso Neto
(Kg)
Recipiente
Peso Inicial
(Kg)
Peso Final
(Kg)
Peso Neto
(Kg)
R1
R2
R3
R4
R5
R6
R7
R8
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
R9
R10
R11
R12
R13
R14
R15
R16
40.00
40.00
40.00
40.00
40.00
40.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
40.00
40.00
40.00
40.00
20.00
0.00
Total (Kg)
Densidad del Agua (Kg/cm3)
Volumen de Agua usada para llenar el anillo sin marco (cm3)
D) CONTENIDO DE HUMEDAD (w%)
Contenido de humedad (%)
580.00
0.001
580,000.00
5.60%
E) CLCULOS
E.1.E.2.E.3.E.4.E5E6-
1,295,800.00
580,000.00
2.23
2.12
2.59
15.93%
124
CAPTULO V
DISCUSIN Y APLICACIONES
PESO INICIAL(gr):
100.00
HUMEDAD (%):
16.10
GRUESOS(%):
26.92
GRAVA(%)
0.00
ARENA(%)
FINOS(%)
17.43
26.92
12.59
73.08
4.84
126
PESO INICIAL(gr):
15333.54
HUMEDAD (%):
9.61
GRUESOS(%):
65.56
GRAVA(%)
36.33
ARENA(%)
29.23
FINOS(%)
34.44
29.95
17.18
12.77
densidad
seca
MDS=2.156
gr/cm3;
en
esta
muestra
8.90
GRUESOS(%):
50.88
GRAVA(%)
20.13
ARENA(%)
30.75
FINOS(%)
49.12
17.96
13.74
4.22
El contenido de slidos a la salida del filtro debe ser como mnimo 88% o
su equivalente en contenido de agua de 17%. el rango ideal es 88 a 89%
de contenido de slidos.
Peso
Peso
% relave en Peso % Cal en
Fecha
acumulado de
la mezcla cal (Tn) mezcla
relave (Tn)
mezcla (Tn)
05/05/2014
06/05/2014
07/05/2014
08/05/2014
09/05/2014
100
80
80
80
80
101
181
261
341
421
99
99.4
99.6
99.7
99.8
1
0
0
0
0
1
0.6
0.4
0.3
0.2
H% Ubicacin
17.05
16.60
15.24
14.41
13.77
12.90
pacuni
pacuni
pacuni
pacuni
pacuni
pacuni
Observacin
humedad inicial
humedad de la mezcla
adiciono 80tn al cono
adiciono 80tn al cono
adiciono 80tn al cono
adiciono 80tn al cono
Elaboracin: El autor
trabajo del secado del relave, ya que aumentara la humedad del relave por
las fuertes precipitaciones.
Entonces se busc la manera de cmo poder contrarrestar las
inclemencias del clima que afectan las actividades que se realiza a diario en
la construccin del Dique, es por eso que se busc una posible alternativa,
que es el uso de la cal mezclando con el relave para disminuir el porcentaje
de humedad del relave saturado en un menor tiempo, cuando llueve y luego
cesa de llover, tranquilamente se puede mezclar el relave con la cal sin
necesidad de esperar que el clima empiece a despejar y solear, ya que la cal
genera el calor necesario para poder disminuir el porcentaje de humedad.
Elaboracin: El autor
129
m1
18.26
17.81
16.45
15.82
15.18
14.46
m2
17.96
16.98
16.10
15.75
15.05
14.03
m3
17.84
17.45
16.17
15.29
14.23
13.45
m4
17.05
16.60
15.24
14.41
13.77
12.90
19
18.5
18
17.5
17
16.5
16
15.5
m1
15
m2
14.5
m3
14
m4
13.5
13
12.5
12
11.5
11
1
Elaboracin: El autor
130
CONCLUSIONES
1. La planta de beneficio de la Unidad Minera Catalina Huanca produce
por da 1000TMD, de ello solo el 15% es el mineral en s y el restante
es el relave 850TMD, el relave filtrado de Planta tiene un contenido de
slidos de 88%, una humedad de 17%.
puede
haber
complicaciones
futuras,
como
132
RECOMENDACIONES
133
un
sistema
de
mediciones
ha
hitos
topogrficos
134
FUENTES DE INFORMACIN
Bibliogrficas
7. Unidad Minera Catalina Huanca. Abril del 2013. Planos y fotografas del
relave.
135
Hemerogrficas
8. Artculo Gentileza de Alvaro Huerta, Head of Tailings-Geotechnics
Services.
136
ANEXOS
137
MATRZ DE CONSISTENCIA
CONSTRUCCIN DE DIQUE CON TRATAMIENTO DEL RELAVE, EN MINA CATALINA HUANCA- REGIN AYACUCHO
PROBLEMA
OBJETIVOS
HIPTESIS
Problema General:
Objetivo General:
Hiptesis General:
De qu manera se puede
utilizar como material de
construccin de un dique, el
desecho minero (relave)?
Direccionar e Incorporar
constructivamente el uso
correcto del relave y
establecer procesos
constructivos para la
ejecucin de un dique
empleando el relave.
Construir un dique
empleando el relave como
uno de los materiales
principales, en mina Catalina
Huanca-Ayacucho.
VARIABLES
Variable Independiente:
Construccin de un dique
Variable Dependiente:
Contaminacin Ambiental por
filtraciones del relave
saturado.
METODOLOGAS
DISEO DE
INVESTIGACIN
El enfoque de investigacin
es de tipo cuantitativo, de nivel
exploratorio. Explicativo y
correlacional
138
VARIABLES
INDICADORES
DIMENSIN
Hiptesis General:
Construir un dique empleando el
relave como uno de los materiales
principales, en mina Catalina HuancaAyacucho.
Variable Independiente:
Construccin de un dique
Variable Dependiente:
Contaminacin Ambiental por
filtraciones del relave saturado.
Variable Independiente:
Comportamiento de la mezcla con
relave.
Variable Dependiente:
Contaminacin ambiental
Hiptesis Secundario:
1. Concientizando a la unidad minera
para evitar la contaminacin del
medio ambiente, mejorar y elevar la
calidad de vida.
a)ptimo contenido de
humedad
b)densidad mxima seca
a) 10.10%
b)2.33 gr/cm3
139
140
ANEXO 4. Plano topogrfico en corte del Dique con Relave en Mina Catalina Huanca
141
142
143
144