TABLAS DE COSTOS DE CONCRETO Y MORTERO DE DIFERENTES PROPORCIONE

Cemento Arena Grava A. de playa


Costo Unit. C$ 215.62 C$ 206.72 C$ 462.04 C$ 1,168.56
en planta
CONCRETO 1-2-3 (3000 PSI)
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 4.62% 1.05 1.10
Arena 2.00 30.00% 1.30 0.00% 1.00 2.60
Grava 3.00 30.00% 1.30 0.00% 1.00 3.90
6.00 m³ 65.00% 4.62% 7.60 m³
TOTAL
Ab./Prop. Prop.xFrag.
1.27 4.50 m³ Factor
Cantidad U.M. C.U. C.T. 0.65
Cemento 8.79 Bolsa cemento 215.62 1894.82 Formula
Arena 0.58 m³ 206.72 119.44 2451.74
Grava 0.87 m³ 462.04 400.43 1.07
2414.69 1.02
CONCRETO 1-2-2 (4000 PSI)
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 5.91% 1.06 1.11
Arena 2.00 30.00% 1.30 0.00% 1.00 2.60
Grava 2.00 30.00% 1.30 0.00% 1.00 2.60
TOTAL 5.00 m³ 65.00% 5.91% 6.31 m³

Ab./Prop. Prop.xFrag.
1.26 3.75 m³ Factor
Cantidad U.M. C.U. C.T. 0.65
Cemento 10.68 Bolsa cemento 215.62 2301.80 Formula
Arena 0.69 m³ 206.72 143.33 2799.92
Grava 0.69 m³ 462.04 320.35 1.07
TOTAL 2765.47 1.01
CONCRETO 1-2-4 (2500 PSI)
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 5.91% 1.06 1.11
Arena 2.00 30.00% 1.30 0.00% 1.00 2.60
Grava 4.00 30.00% 1.30 0.00% 1.00 5.20
TOTAL 7.00 m³ 65.00% 5.91% 8.91 m³

Ab./Prop. Prop.xFrag.
1.27 5.25 m³ Factor
Cantidad U.M. C.U. C.T. 0.65
Cemento 7.63 Bolsa cemento 215.62 1644.14 Formula
Arena 0.50 m³ 206.72 102.38 2203.04
Grava 0.99 m³ 462.04 457.64 1.07
TOTAL 2204.16 1.00
MORTERO 1-3
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 7.08% 1.07 1.12
Arena 3.00 30.00% 1.30 0.00% 1.00 3.90
Grava 0.00 30.00% 1.30 0.00% 1.00 0.00
TOTAL 4.00 m³ 65.00% 7.08% 5.02 m³

Ab./Prop. Prop.xFrag.
1.26 3.00 m³ Factor
Cantidad U.M. C.U. C.T. 0.65
Cemento 13.49 Bolsa cemento 215.62 2909.07 Formula
Arena 1.30 m³ 206.72 268.74 3224.00
Grava 0.00 m³ 462.04 0.00 1.07
TOTAL 3177.81 1.01
MORTERO 1-6
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 5.67% 1.06 1.11
Arena 6.00 30.00% 1.30 0.00% 1.00 7.80
Grava 0.00 30.00% 1.30 0.00% 1.00 0.00
TOTAL 7.00 m³ 65.00% 5.67% 8.91 m³

Ab./Prop. Prop.xFrag.
1.27 5.25 m³ Factor
Cantidad U.M. C.U. C.T. 0.65
Cemento 7.61 Bolsa cemento 215.62 1640.51 Formula
Arena 1.49 m³ 206.72 307.13 1978.58
Grava 0.00 m³ 462.04 0.00 1.07
TOTAL 1947.63 1.02
FINO 1-2
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 0.00% 1.00 1.05
Arena 0.00 30.00% 1.30 0.00% 1.00 0.00
A. de playa 2.00 0.00% 1.00 0.00% 1.00 2.00
TOTAL 3.00 m³ 35.00% 0.00% 3.05 m³

Ab./Prop. Prop.xFrag.
1.02 2.25 m³ Factor
Cantidad U.M. C.U. C.T. 0.61
Cemento 16.80 Bolsa cemento 215.62 3622.38 Formula
Arena 0.00 m³ 206.72 0.00 4736.35
A. de playa 0.89 m³ 1168.56 1038.72 1.07
TOTAL 4661.10 1.02
FINO 3-3-2
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 3.00 5.00% 1.05 0.00% 1.00 3.15
Cal 3.00 0.00% 1.00 0.00% 1.00 3.00
Arena 2.00 30.00% 1.30 0.00% 1.00 2.60
TOTAL 8.00 m³ 35.00% 0.00% 8.75 m³

Ab./Prop. Prop.xFrag.
1.09 6.00 m³ Factor
Cantidad U.M. C.U. C.T. 0.61
Cemento 18.90 Bls 215.62 4,075.17 Formula
Cal 55.56 Bls 75.33 4,184.75 5077.30
Arena 0.43 m³ 206.72 89.58 1.07
TOTAL 8349.50 0.61
MEJORA DE SUELO CON CEMENTO 1-10
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 0.00% 1.00 1.05
Arena 0.00 30.00% 1.30 0.00% 1.00 0.00
Suelo A-3 10.00 10.00% 1.10 0.00% 1.00 11.00
TOTAL 11.00 m³ 45.00% 0.00% 12.05 m³

Ab./Prop. Prop.xFrag.
1.10 8.25 m³ Factor
Cantidad U.M. C.U. C.T. 0.61
Cemento 4.58 Bolsa cemento 215.62 987.92 Formula
Arena 0.00 m³ 206.72 0.00 1154.31
Suelo A-3 48.89 m³ 0.00 0.00 1.07
TOTAL 987.92 1.17
MEJORA DE SUELO CON CEMENTO 1-8
Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 1.00 5.00% 1.05 0.00% 1.00 1.05
Arena 0.00 30.00% 1.30 0.00% 1.00 0.00
Suelo A-3 8.00 0.00% 1.00 0.00% 1.00 8.00
TOTAL 9.00 m³ 35.00% 0.00% 9.05 m³

Ab./Prop. Prop.xFrag.
1.01 9.00 m³ Factor
Cantidad U.M. C.U. C.T. 1.00
Cemento 4.20 Bolsa cemento 215.62 905.59 Formula
Arena 0.00 m³ 206.72 0.00 862.47
Suelo A-3 28.44 m³ 0.00 0.00 1.07
TOTAL 905.59 0.95

MORTERO DE PEGA PARA PISOS


Material Proporción % Desperdicio F.D. % Fraguado F.F. Abundado
Cemento 0.25 5.00% 1.05 0.00% 1.00 0.26
Arena 4.00 10.00% 1.10 0.00% 1.00 4.40
CAL 1.00 3.00% 1.03 0.00% 1.00 1.03
TOTAL 5.25 m³ 18.00% 0.00% 5.69 m³

Ab./Prop. Prop.xFrag.
1.08 4.84 m³ Factor
Cantidad U.M. C.U. C.T. 0.90
Cemento 1.95 Bolsa cemento 215.62 420.82 Formula
Arena 0.91 m³ 206.72 187.85 2566.65
CAL 7.66 Bolssa 260.00 1991.12 1.07
TOTAL 2599.80 0.99
NTES PROPORCIONES

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
1.00 m³ de grava

Valor a tomar
2451.74

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
1.00 m³ de grava

Valor a tomar
2799.92

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
1.00 m³ de grava

Valor a tomar
2204.16

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
1.00 m³ de grava

Valor a tomar
3177.81

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
1.00 m³ de grava
Valor a tomar
1978.58

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
1.00 m³ de arena de playa

Valor a tomar
4736.35

Mat. x m³
36.00 bolsas de cemento
111.11 bolsa de cal de 20 lbs
1.00 m³ de arena

Valor a tomar
8,349.50

0
Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
10.00 m³ de tierra del sitio

Valor a tomar
1154.31

8
Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
8.00 m³ de tierra del sitio

Valor a tomar
905.59

Mat. x m³
36.00 bolsas de cemento
1.00 m³ de arena
36.00 bolsas de cemento
Valor a tomar
2599.80