Proyecto Tablada Alta
Proyecto Tablada Alta
Proyecto Tablada Alta
UBICACIÓN ABANCAY
ELABORADO POR ING JORGE MOSCOSO CARBAJAL
FECHA 22 DE OCTUBRE DE 2018 AL 31 DE OCTUBRE DE 2018
OTRAS OPCIONES
de los metrados 2
CONTRATA
ADMINISTRACION DIRECTA
1 6
2 5
3
4
SI
NO
MO y EQ
TODOS
SEMANAL
MENSUAL
DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO
INSUMOS
ORIGEN - DESTINO Prec. U.
MATERIALES HUARAZ- HUARI 0.15
AGREGADOS 0.00
TUBERIAS 0.00
3919
1400
1011
RELACION DE INSUMOS BASE
1398 245
248
1001 47 MO CAPATAZ HH 10
1002 47 MO OPERARIO HH 20.1
1003 47 MO OFICIAL HH 16.5
1004 47 MO PEON HH 14.84
1005 47 MO TOPÓGRAFO HH 10
1006 47 MO OPERADOR DE EQUIPO LIVIANO HH 20.1
1007 47 MO TECNICO HH 20.1
1180 39 MA INSUMO CUYO PRECIO ES %MO %MO 12
1201 3 MA ACERO DE REFUERZO FY=4200 GRADO 60 KG 3.7
1202 2 MA ALAMBRE NEGRO # 8 KG 4.07
1203 2 MA ALAMBRE NEGRO # 16 KG 4.07
1204 4 MA ARENA FINA M3 90
1205 21 MA CEMENTO PORTLAND TIPO I (42.5KG) BLS 23.83
1206 32 MA FLETE RURAL GBL 10
1207 32 MA FLETE TERRESTRE GBL 800
1208 38 MA HORMIGON (PUESTA EN OBRA) M3 50
1209 39 MA CARTEL DE OBRA 2.4 X 3.6M UND 387.77
3900 37 HE HERRAMIENTAS MANUALES %MO 205.76
3901 37 EQ MIRA TOPOGRÁFICA HM 0.84
3902 49 EQ NIVEL TOPOGRÁFICO HM 3.36
3903 49 EQ TEODOLITO HM 4.2
1210 1 MA AGUA, INCLUYE TRANSPORTE A PIE DE OBRA M3 5
1211 43 MA ROLLIZO EUCALIPTO DE 5" X 6 m PZA 15
1212 39 MA CARTEL DE OBRA TIPO BANNER GIGANTOGRAFIA C/BAST UND 520
3904 48 EQ EQUIPO DE ESTACION TOTAL PRECISION 5" O SIMIL INCL HM 12.8
3905 48 EQ NIVEL TOPOGRAFICO AFL 320 E=0.3" CON TRIPODE Y ACC HM 7.3
1213 2 MA CLAVOS C/CABEZA PARA MADERA (PROMEDIO) KG 4.07
1214 2 MA PERNO 1/2" x 3 1/2" INC TUERCA UND 20
1215 43 MA MADERA NACIONAL P/ENCOFRADO-CARP P2 4.5
1216 54 MA PINTURA ESMALTE PARA TRAFICO GLN 42
1217 54 MA PINTURA ESMALTE SINTETICO GLN 38
1218 4 MA YESO BLS 12
1008 47 MO OPERADOR DE MAQUINARIA-EQUIPO HH 20.1
3906 49 EQ CARGADOR RETROEXCAVADOR 62 HP 1 YD3 HM 71.67
1219 28 MA MECHA LENTA ML 3
1220 28 MA FULMINANTE UND 4
1221 28 MA DINAMITA AL 65% KG 5
1222 28 MA BARRENO DE 7/8" x 5 HP UND 966.67
1223 39 MA SACOS VACIOS UND 1.5
3907 39 EQ PERFORADORA MANUAL HM 5.6
1224 1 MA AGUA, INCLUYE TRANSPORTE A PIE DE OBRA M3 5
3908 49 EQ COMPACTADOR VIBR. TIPO PLANCHA 7 HP HM 15.8
1225 5 MA MATERIAL DE PROPIO ZARANDEADO "TIPO SELECTO" (PROPIM3 20.38
1226 5 MA MATERIAL DE PRESTAMO SELECTO "ARENA GRUESA"(PROPIOM3 77.46
3909 48 EQ CAMION VOLQUETE 4x2 210-280 HP 8 M3 HM 78.33
3910 48 EQ CARGADOR S/LLANTAS 80-95 HP 1.5-1.75 YD3 HM 90
1227 39 MA LUBRICANTE PARA TUBERIA DE UNION FLEXIBLE GLN 41.5
1228 66 MA TUBERIA DE PVC UF CL-10 FS 2.5 NTP ISO 1452 PN 10 DN M 24.43
1229 66 MA TUBERIA PVC UF NTP ISO 4422 C-15 DN 160 MM PROTECCIONM 83.33
1230 66 MA TUBERIA DE PVC UF CL-10 FS 2.5 NTP ISO 1452 PN 10 DN M 24.43
1231 66 MA TUBERIA DE PVC UF CL-10 FS 2.5 NTP ISO 1452 PN 10 DN M 17.95
1232 66 MA TUBERIA DE PVC UF CL-10 FS 2.5 NTP ISO 1452 PN 10 DN 1 M 17.95
1233 66 MA TUBERIA DE PVC UF CL-10 FS 2.5 NTP ISO 1452 PN 10 DN 9 M 17.95
1234 66 MA TUBERIA PVC SAP SP NTP ISO 399.002 C-5 D=1 1/2" PROTEC M 18.1
1235 66 MA CODO INYECT. PVC U UF CL-10 PN 10 DN 110MMX22.5º NTP ISUND 38
1236 66 MA CODO INYECT. PVC U UF CL-10 PN 10 DN 90MMX45º NTP ISO 1UND 28
1237 66 MA CODO INYECT. PVC U UF CL-10 PN 10 DN 90MMX22.5º NTP ISOUND 28
1238 66 MA TEE INYEC. PVC U UF CL-10 PN 10 DN 110X110MM NTP ISO 14 UND 67
1239 66 MA TEE INYECT. PVC U UF CL-10 PN 10 DN 110MMX90MM NTP ISOUND 91.33
1240 66 MA TEE INYECT. PVC U UF CL-10 PN10 DN 90MMX90M NTP ISO 14UND 81.33
1241 66 MA TAPON PVC U UF CL-10 FS 2.5 NTP ISO 1452 PN10 DN 90 MM UND 28.33
1242 66 MA TAPON PVC U UFCL-10 FS 2.5 NTP ISO 1452 PN 10 DN 110 M UND 22.67
1243 66 MA VÁLVULA PASO RESINA TERMOPLÁSTICA DN 1/2" C/NIPLE T UND 17.67
1244 66 MA PRECINTO DE SEGURIDAD P/VALVULA DE PASO PVC-U Ø1/2" UND 17.5
1245 66 MA VÁLVULA PASO RESINA TERMOPLÁSTICA DN 1/2" CON SALID UND 15.5
1246 66 MA ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC-U Ø110 MM XUND 1 29
1247 66 MA ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC-U Ø90 MM X UND 1/ 2167
1248 66 MA ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC U D=110 MMUND X 29.33
1249 66 MA ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC U D=90 MM XUND 22.33
1250 66 MA CACHIMBA DE PVC PARA CONEXION DOMICILIARIA UF 45º DN UND 30
1251 66 MA TUBO DE PVC-U UF ISO 4435 SN-2, SDR-51 DN 200 MM INC. M 31.59
1252 66 MA TUBO DE PVC-U UF ISO 4435 SN-2, SDR-51 DN 315 MM INC. M 83.84
1253 66 MA TUBO DE PVC-U UF NORMA ISO 4435 SN-2, SDR-51 DN 110 M M 16
1254 66 MA CACHIMBA DE PVC PARA CONEXIONES DE DESAGUE DN 110MM 30
1255 66 MA VALVULA COMPUERTA Fº Fdo DUCTIL CON ELASTOMERO DN 1UND 363.33
1256 72 MA PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. D m 2.52
1257 72 MA PRUEBA HIDRAULICA+DESINFECCION TUB. DN 110MM AG m 2.56
1258 66 MA UNION REPACION PVC UF CL-10 DN 90MM UND 28
1259 66 MA UNION REPARACION PVC UF CL-10 DN 110MM UND 34
1260 4 MA CONCRETO F'C=140 KG/CM2 P/ANCLAJE Y/O BASE DE APOm3M3 497.83
1261 66 MA VALVULA COMPUERTA Fº Fdo DUCTIL CON ELASTOMERO DN UND 293.33
1262 4 MA ARENA GRUESA M3 65
1263 5 MA PIEDRA CHANCADA DE 1/2" M3 65
1264 3 MA MARCO Y TAPA F.FDO. P/REGISTRO VALVULA UND 27.5
1265 2 MA GRIFO CONTRAINCENDIO T/ POSTE DE 2 BOCAS HD DN 110 I UND 1216.67
1266 37 MA LIMPIEZA DE TERRENO MANUAL M2 0.61
1267 4 MA REVESTIMIENTO CON MORTERO 1:3 e=1.5 cm M2 34.11
1268 39 MA TRAZO, NIVELACION Y REPLANTEO M2 1.46
1269 4 MA CONCRETO F'C 140 KG/CM2 M3 301.55
1270 39 MA SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA GLB 184.21
1271 43 MA ENCOFRADO Y DESENCOFRADO NORMAL M2 52.15
1272 39 MA EXCAVACIÓN A PULSO EN TERRENO SEMIRROCOSO M3 48.91
1273 39 MA RELLENO CON MATERIAL DE PRESTAMO GRAVA (INC. PR m3 106.19
1274 39 MA ACERO ESTRUCTURAL TRABAJADO P/ESTRUCTURAS(CO kg 5.99
1275 39 MA EXCAVAC. EN T SEMIROC CON CARGADOR RETROEXCAV m3 11.47
1276 39 MA ELIMINAC. DE DESMONTE EN T. SEMIROCOSO R=10 KM C m3 18.38
1277 39 MA RELLENO COMPACT EN T. SEMIROCA CON MAQUINARIA m3 29.83
1278 39 MA CONCRETO F´C = 210 KG/CM2 P/LOSAS MACIZAS m3 461.71
1279 39 MA ENCOFRADO (INC. HABILITACION DE MADERA) P/LOSAS M m2 50.52
1280 39 MA CONCRETO F´C = 210 KG/CM2 PARA COLOCACION DE MAR m3 453.29
1281 39 MA ACABADO PULIDO DE PISO C/MORTERO 1:2 X 1.5 CM und 21.78
1282 39 MA MARCO Y TAPA DE HIERRO DUCTIL DI=0.60 m CON MECAN UND 392.15
1283 39 MA PRUEBA HIDRAULICA PARA TUBERIA DE AGUA POTABLE D M 2.35
1284 39 MA CONCRETO F´C = 100 KG/CM2 P/SOLADOS DE BUZONES,C M3 346.02
1285 39 MA CONCRETO F´C = 210 KG/CM2 P/ LOSA FONDO-BASE BUZOm3M3 478.68
1286 39 MA CONCRETO F´C = 210 KG/CM2 P/ MURO DE BUZONES M3 491.37
1287 39 MA LIBRE UND 12.36
1288 39 MA CIELO RASOS CON MORTERO 1:5 x 1.5 cm P/CAMARAS M2 41.67
1289 39 MA PROVISION Y COLOCADO DE TEKNOPORT DE 3/4 " M2 9.97
1290 39 MA ENCOFRADO (INC.HABILIT.DE MADERA) P/MUROS RECTOSm2M2 54.18
1291 39 MA ESCALERA DE TUBO F° G° CON PARANTES DE 1" POR PELm M 150.71
1292 66 MA VALVULA REDUCTORA DE PRESION DN 100 MM PN 16 UND 7453
1293 65 MA PERNO HEXAGONAL P/BRIDA DE 2" INC.TUERCA UND 4.13
1294 65 MA SOLDADURA CELLOCORD AP KG 16
1295 65 MA MANOMETRO CON GLICERINA DIAL 2 1/2" 0-10 BAR UND 193.33
1296 65 MA FILTRO YEE H DUCTIL BB DN 100 PN 16 CON MALLA M 780
1297 65 MA EMPAQUETADURA DE JEBE ENLONADO DE 100 MM UND 1.94
1298 54 MA PINTURA ANTICORROSIVA EPOX-USO NAVAL GLN 186.67
1299 54 MA BRIDA DE ACERO SCH-40 - ANCLAJE DN 100MM UND 80
1300 71 MA NIPLE DE ACERO BB SCH-40 DN 100 MM H=0.60 M UND 32
1301 71 MA NIPLE DE ACERO BB SCH-40 DN 100 MM H=1.50 M UND 50.33
1302 71 MA UNION BRIDA-ENCHUFE DN 100 MM UND 510
1303 71 MA TUBO DE ACERO SCH-40 VENTILACION DN 100MM UND 35
1304 71 MA UNION DE DESMONTAJE AUTOPORTANTE HD PN 16 DN UND 52
1305 71 MA CODO HIERRO DUCTIL BB DN 100mm x 90° ISO 2531 UND 230
1306 71 MA TEE Ho DUCTIL 3 BB PN 16 DN 100 MM x 100 MM UND 315
1307 71 MA VALVULA CPTA Ho DUCTIL-BB JUNTA ELAST. VASTAGO UND 315
3911 37 EQ GRUA HIDRAULICA AUTOP. 127HP 18TON-9M HM 75
1308 65 MA CODO PVC-U SP DE 45º Ø1/2" UND 1
1309 65 MA CODO PVC-U SP DE 90º Ø1/2" UND 1
1310 39 MA INSTALACION DE ACCESORIOS PVC-U SP-ROSCADO Ø1/2 UND 1.9
1311 39 MA INSTALACION DE CAJA Y TAPA P/MEDIDOR DN 15 EN TERRundUND 38.41
1312 39 MA INSTALACION TUBERIA PVC-U P/AGUA Ø1/2" M 1.43
1313 39 MA INSTALACION ELEMENTOS DE CONTROL PARA CONEXION UND 5.18
1314 39 MA INSTALACION ELEMENTOS DE TOMA P/CONEXION AGUA ØundUND 5.18
1315 39 BS PRUEBA HIDRAULICA P/TUBERIA AGUA POTABLE Ø1/2" M 5.18
1316 39 BS REPLANTEO FINAL DE OBRA P/CONEXION DOMICILIARIA UND 1.16
1317 39 BS RIEGO DE ZONA DE TRABAJO P/MITIGAR LA CONTAMINAC M 2.94
1318 39 BS SUMINISTRO DE CAJA DE CONCRETO MARCO Y TAPA P/M UND 1.14
1319 39 BS SUMINISTRO DE ELEMENTOS DE CONTROL P/CONEXION UND 54
1320 39 BS TRAZO Y REPLANTEO INICIAL P/CONEXION DOMICILIARIA UND 67.31
1321 72 BS TUBERIA PVC-U SP C-10 Ø1/2" INCL. ELEMENTO DE UNION M 2.73
1322 39 BS SUMINISTRO DE ELEMENTOS DE TOMA PARA CONEXION UND 2.1
1323 4 BS SOLADO DE CONCRETO F'C=140 KG/CM2 C/04 ORIFICIOS UND 2.36
1324 39 BS ELIMINACION DESMONTE(V+T) T-SEMIROCOSO D=5KM P/T M 12.18
1325 39 BS INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERI UND 18.46
1326 72 BS TUBERIA PVC-U C-5 DN 1X1/2" M 40.67
1327 72 BS CODO PVC 45° PN 10 DN 90 MM UND 40.67
1328 39 BS ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC-U DE 1/2 UND 21.67
1329 39 BS REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. M 5.44
1330 39 BS EXCAV. ZANJA (PULSO) P/TUB. TERR-SEMIROCOSO DN 6 M 17.94
1331 39 BS RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 63 A 90 M 24.53
1332 39 BS ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC-U DE 1/2 UND 29
1333 39 BS INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERI UND 13.91
1334 65 MA INSTALACION DE TUBERIA PVC-U C-5 DN 90 MM M 3.23
1335 39 BS PRUEBA HIDRAULICA P/TUBERIA AGUA POTABLE Ø1/2" M 1.16
1336 39 BS REPLANTEO FINAL DE OBRA P/CONEXION DOMICILIARIA UND 2.94
1337 39 BS RIEGO DE ZONA DE TRABAJO P/MITIGAR LA CONTAMINAC M 1.14
1338 39 BS SUMINISTRO DE CAJA DE CONCRETO MARCO Y TAPA P/M UND 54
1339 39 BS SUMINISTRO DE ELEMENTOS DE CONTROL P/CONEXION UND 67.31
1340 39 BS TRAZO Y REPLANTEO INICIAL P/CONEXION DOMICILIARIA UND 2.1
1341 39 BS TUBERIA PVC-U SP C-10 Ø1/2" INCL. ELEMENTO DE UNION M 2.7
1342 39 BS TUBERIA PVC-U SP C-10 Ø1/2" INCL. ELEMENTO DE UNION M 2.7
1343 39 BS TUBERIA PVC-U SP C-10 Ø1/2" INCL. ELEMENTO DE UNION M 2.73
1344 39 BS SUMINISTRO DE ELEMENTOS DE TOMA PARA CONEXION UND 26.85
1345 39 BS ELIMINACION DESMONTE(V+T) T-SEMIROCOSO D=5KM P/T M 2.21
1346 39 BS TUBERIA PVC-U C-5 DN 1X1/2" M 18.46
1347 65 BS INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERI und 12.18
1348 39 MA MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO UND 136
1349 72 MA CINTA TEFLON UND 1
1350 72 MA PEGAMENTO PARA PVC GLN 102.67
3912 48 EQ CAMION CISTERNA 4X2 (AGUA) 1,500 GAL HM 65
3913 48 EQ MOTOBOMBA 5 HP DE 2" INCLUYE MANGUERA HM 9.5
1351 66 MA MALLA HDP COLOR ANARANJADO DE 1 M DE ALTURA m 1.1
3914 48 EQ VOLQUETE DE 10 M3 HM 165
1352 2 MA CLAVOS DE FIERRO (PROMEDIO) KG 4.07
1353 5 MA PIEDRA CHANCADA DE 3/4" M3 65
1354 43 MA MADERA CORRIENTE DE 2"X3"X10' P2 12.2
1355 43 MA MADERA CORRIENTE DE 1 1/2"X8"X10' P2 24.5
3915 2 EQ MOLDE METALICO PARA BUZON UND 26.67
3916 2 EQ VIBRADOR DE CONCRETO 4 HP 2.40" HM 9.5
3917 2 EQ MEZCLADORA DE CONCRETO TROMPO 8HP 9 P3 HM 19.33
1356 1 MA ACEITE PARA MOTOR SAE-30 gln 81.67
1357 1 MA GASOLINA 84 OCTANOS M3 14.5
1358 3 MA TAPA DE FIERRO FUNDIDO PARA BUZON D=0.60 m UND 380
1359 39 MA PRUEBAS PROCTOR MODIFICADO DE CAMPO UND 220
1360 39 MA PRUEBA : DENSIDAD DE CAMPO UND 75
1361 5 MA PRUEBA : ROTURA DE PROBETA UND 30
1362 39 BS REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 1 M 1.32
1363 39 BS RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN M 21.71
1364 39 BS ELIMINACION DESMONTE (CARG + VOLQ) T. NORMAL D=5 M 1.56
1365 39 BS SUMINISTRO DE CAJA DE CONCRETO SIMPLE Y TAPA CO UND 200
1366 72 BS INSTALACION DE CAJA DE CºSºNº Y TAPA DE CºAº DE 0.30 UND 82.19
1367 39 BS SUMINISTRO DE ELEMENTO DE EMPOTRAMIENTO DE TUB UND 34.49
1368 72 BS EXCAVACION ZANJA(PULSO) P/TUB DESAGUE T-SEMIROC M 31.66
1369 39 BS INSTALACIÓN DE ELEMENTO DE EMPOTRAMIENTO DE TU UND 39.23
1370 39 BS TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 110 MM M 16.34
1371 39 BS INSTALACIÓN DE TUBERÍA DE PVC P/DESAGÜE DN 110 I M 3.22
1372 39 BS INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 110 INCm M 4.73
1373 72 BS TUBERIA PVC-U UF NTP ISO 4435 SERIE 25 DN 110 INC. ANm M 16.36
1009 47 MO EXPOSITOR HH 600
1374 39 MA CARTULINA PLG 1
1375 39 MA ALQUILER DE LOCAL GLB 150
1376 39 MA LAPICEROS UND 1
1377 39 MA PLUMONES JGO 24
1378 39 MA PAPELOTES UND 0.5
1379 39 MA CUADERNOS UND 5
1380 39 MA REFRIGERIO UND 10
3918 39 EQ EQUIPO DE SONIDO UND 375
3919 39 EQ EQUIPO AUDIOVISUAL (DATA SHOW + LAPTOP) UND 77.5
1381 39 MA EDUCATIVO AVISO UND 1
1382 39 MA RADIAL D 100
1383 39 MA MATERIAL EDUCATIVO UND 1
1384 2 MA CLAVOS PARA MADERA C/C 3" KG 4.07
1385 2 MA CILINDRO DE COLORES (ROJO, NEGRO, MARRON) UND 78.33
1386 2 MA LETRERO SEGUN DISEÑO INCLUYE MARCO DE MADERA D UND 50
1387 43 MA MADERA AGUANO (p2) P2 4.58
1388 47 MA SERVICIO DE ENSAYO DE LA CALIDAD DEL AIRE UND 800
1389 47 MA SERVICIO DE ENSAYO DE LA CALIDAD DEL RUIDO UND 900
1390 47 MA MONITOREO DEL AGUA PTO 800
1391 39 MA ALQUILER DE EQUIPOS DE EMERGENCIA (CAMILLA, BOTIQ UND 1200
1392 39 MA CINTA PLASTICA PARA SEÑAL DE SEGURIDAD DE OBRA M 0.2
1393 39 MA SEÑALES DE 40 X 40 CM UND 25
1394 39 MA SEÑALES DE 75 X 75 CM UND 35
1395 43 MA MADERA CORRIENTE DE 2"X2"X10' P2 8.3
1010 47 MO LICENCIADO ARQUEOLOGO MES 3500
1011 47 MO ASISTENTE EN ARQUEOLOGIA MES 2500
1396 39 MA MATERIALES DE CAMPO GLB 400
1397 39 MA MATERIALES DE OFICINA GLB 200
1398 39 MA FLETE LOCAL UND 45068.44
1399 72 MA TUBERIA DE PVC UF CL-10 FS 2.5 NTP ISO 1452 PN 10 DN 9 M 17.22
1400 39 BS SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULA GLB 191.21
ULO DE FLETES
FLETE CON ACEMILA Y PEON
ORIGEN - DESTINO Prec. U. p.u.Cemento
HUARI - OBRA(YUPAN) 0.06 2.5
HUARI - OBRA(YUPAN) 1.20 L A H
0.00 6 2.2 1.5
10 3.11 3.11
20.1 6.24 6.24
16.5 5.12 5.12
14.84 4.61 4.61
10 3.11 3.11
20.1 6.24 6.24
20.1 6.24 6.24
10.17 3.73 3.16
3.14 1.15 0.97
3.45 1.26 1.07
3.45 1.26 1.07
76.27 27.95 23.69
20.19 7.4 6.27
8.47 3.11 2.64
677.97 248.45 210.55
42.37 15.53 13.16
328.62 120.43 102.06
174.37 63.9 54.15
0.71 0.26 0.22
2.85 1.04 0.88
3.56 1.3 1.1
4.24 1.55 1.31
12.71 4.66 3.95
440.68 161.49 136.86
10.85 3.98 3.37
6.19 2.27 1.92
3.45 1.26 1.07
16.95 6.21 5.26
3.81 1.4 1.19
35.59 13.04 11.05
32.2 11.8 10
10.17 3.73 3.16
20.1 6.24 6.24
60.74 22.26 18.86
2.54 0.93 0.79
3.39 1.24 1.05
4.24 1.55 1.31
819.21 300.21 254.42
1.27 0.47 0.4
4.75 1.74 1.47
4.24 1.55 1.31
13.39 4.91 4.16
17.27 6.33 5.36
65.64 24.06 20.39
66.38 24.33 20.62
76.27 27.95 23.69
35.17 12.89 10.92
20.7 7.59 6.43
70.62 25.88 21.93
20.7 7.59 6.43
15.21 5.57 4.72
15.21 5.57 4.72
15.21 5.57 4.72
15.34 5.62 4.76
32.2 11.8 10
23.73 8.7 7.37
23.73 8.7 7.37
56.78 20.81 17.64
77.4 28.36 24.03
68.92 25.26 21.41
24.01 8.8 7.46
19.21 7.04 5.97
14.97 5.49 4.65
14.83 5.43 4.6
13.14 4.81 4.08
24.58 9.01 7.64
1836.44 672.98 570.32
24.86 9.11 7.72
18.92 6.93 5.87
25.42 9.32 7.9
26.77 9.81 8.31
71.05 26.04 22.07
13.56 4.97 4.21
25.42 9.32 7.9
307.91 112.84 95.63
2.14 0.78 0.66
2.17 0.8 0.68
23.73 8.7 7.37
28.81 10.56 8.95
421.89 154.61 131.03
248.58 91.1 77.2
55.08 20.19 17.11
55.08 20.19 17.11
23.31 8.54 7.24
1031.08 377.85 320.21
0.52 0.19 0.16
28.91 10.59 8.97
1.24 0.45 0.38
255.55 93.65 79.36
156.11 57.21 48.48
44.19 16.2 13.73
41.45 15.19 12.87
89.99 32.98 27.95
5.08 1.86 1.58
9.72 3.56 3.02
15.58 5.71 4.84
25.28 9.26 7.85
391.28 143.39 121.52
42.81 15.69 13.3
384.14 140.77 119.3
18.46 6.76 5.73
332.33 121.79 103.21
1.99 0.73 0.62
293.24 107.46 91.07
405.66 148.66 125.98
416.42 152.6 129.32
10.47 3.84 3.25
35.31 12.94 10.97
8.45 3.1 2.63
45.92 16.83 14.26
127.72 46.8 39.66
6316.1 2314.6 1961.53
3.5 1.28 1.08
13.56 4.97 4.21
163.84 60.04 50.88
661.02 242.24 205.29
1.64 0.6 0.51
158.19 57.97 49.13
67.8 24.84 21.05
27.12 9.94 8.42
42.65 15.63 13.25
432.2 158.39 134.23
29.66 10.87 9.21
44.07 16.15 13.69
194.92 71.43 60.53
266.95 97.83 82.91
266.95 97.83 82.91
63.56 23.29 19.74
0.85 0.31 0.26
0.85 0.31 0.26
1.61 0.59 0.5
32.55 11.93 10.11
1.21 0.44 0.37
4.39 1.61 1.36
4.39 1.61 1.36
4.39 1.61 1.36
0.98 0.36 0.31
2.49 0.91 0.77
0.97 0.35 0.3
45.76 16.77 14.21
57.04 20.9 17.71
2.31 0.85 0.72
1.78 0.65 0.55
2 0.73 0.62
10.32 3.78 3.2
15.64 5.73 4.86
34.47 12.63 10.7
34.47 12.63 10.7
18.36 6.73 5.7
4.61 1.69 1.43
15.2 5.57 4.72
20.79 7.62 6.46
24.58 9.01 7.64
11.79 4.32 3.66
2.74 1 0.85
0.98 0.36 0.31
2.49 0.91 0.77
0.97 0.35 0.3
45.76 16.77 14.21
57.04 20.9 17.71
1.78 0.65 0.55
2.29 0.84 0.71
2.29 0.84 0.71
2.31 0.85 0.72
22.75 8.34 7.07
1.87 0.69 0.58
15.64 5.73 4.86
10.32 3.78 3.2
115.25 42.24 35.8
0.85 0.31 0.26
87.01 31.89 27.03
55.08 20.19 17.11
8.05 2.95 2.5
0.93 0.34 0.29
139.83 51.24 43.42
3.45 1.26 1.07
55.08 20.19 17.11
10.34 3.79 3.21
20.76 7.61 6.45
22.6 8.28 7.02
8.05 2.95 2.5
16.38 6 5.08
69.21 25.36 21.49
12.29 4.5 3.81
322.03 118.01 100.01
186.44 68.32 57.9
63.56 23.29 19.74
25.42 9.32 7.9
1.12 0.41 0.35
18.4 6.74 5.71
1.32 0.48 0.41
169.49 62.11 52.64
69.65 25.52 21.63
29.23 10.71 9.08
26.83 9.83 8.33
33.25 12.18 10.32
13.85 5.07 4.3
2.73 1 0.85
4.01 1.47 1.25
13.86 5.08 4.31
600 186.34 186.34
0.85 0.31 0.26
127.12 46.58 39.47
0.85 0.31 0.26
20.34 7.45 6.31
0.42 0.16 0.14
4.24 1.55 1.31
8.47 3.11 2.64
317.8 116.46 98.69
65.68 24.07 20.4
0.85 0.31 0.26
84.75 31.06 26.32
0.85 0.31 0.26
3.45 1.26 1.07
66.38 24.33 20.62
42.37 15.53 13.16
3.88 1.42 1.2
677.97 248.45 210.55
762.71 279.5 236.86
677.97 248.45 210.55
1016.95 372.67 315.82
0.17 0.06 0.05
21.19 7.76 6.58
29.66 10.87 9.21
7.03 2.58 2.19
3500 1086.96 1086.96
2500 776.4 776.4
338.98 124.22 105.27
169.49 62.11 52.64
38193.59 13996.41 11861.36
14.59 5.35 4.53
162.04 59.38 50.32
1014 57 2
481 4
1119 Cifra de redondeo decimal del parcial 2
Cod Denominación Rto UND
1001 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 1.7 UND 746.89
1001C
1005 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D 2 UND 427.47
1005C
1006 PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Pr 2 UND 1668.9
1006C
1013 TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INC 1 M 25.86
1013C
1014 INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 180 M 4.19
1014C
1016 SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1 UND 67.33
1016C
1017 SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1 1 UND 91.66
1017C
1018 SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1 UND 81.66
1018C
1020 SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO1 UND 28.33
1020C
1022 SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO1 UND 22.88
1022C
1024 UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 1 UND 28.33
1024C
1025 UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 10 UND 34.33
1025C
1028 VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM 1 UND 293.33
1028C
1029 VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM 1 UND 363.33
1029C
1045 CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE 250 MIL 1.04
1045C
1046 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D 2 UND 427.47
1046C
1076 TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 1 M 33.21
1076C
MO MA EQ TOTAL
0.00 0.00 0.00 0.00
Und Cuad./cant. Cantidad P.U. Parcial
ORMULA MODELO
RELACION DE INSUMOS DEL PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE
Proyecto ALTA-ILLANYA DEL DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY-APURIMAC
Lugar ABANCAY
Elab. Por ING JORGE MOSCOSO CARBAJAL
Fecha 22 DE OCTUBRE DE 2018 AL 31 DE OCTUBRE DE 2018
PARTIDAS UND
EDES DE AGUA POTABLE
01 TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC FLETE LOCAL. UND
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL KM
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM
TRANQUERA TIPO TIJERA DE 2.40mx1.20M P/SEÑAL DE PELIGRO UND
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D UND
PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Prov.duran.obra) UND
02 MOVIMIENTO DE TIERRAS - AMPLIACION
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 90-110 MM H=1.01 A 1.25M M
EXCAV. A PULSO (C/EXPLOSIVO) P/TUB.DE AGUA TERRENO ROCOSO DN 90-110MM M
REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. DN 90 - 110 PARA TODA PROF, M
RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN 90 - 110 DE 1.01 -1.15 PROF. M
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 90-110 MM PARA TODA PROF. M
03 SUMINISTRO E INSTALACION DE TUBERÍA PVC UF NTP ISO 1452
TUBERIA PVC-U UF NTP ISO 1452 PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS M
TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INCL. ANILLO+2%DESPERDICIOS M
INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 INCLUYE PRUEBA HIDRAULICA M
INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA M
04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PVC NTP ISO 1452
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX110 MM INL. ANILL UND
SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX90 MM INCL. ANILL UND
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX90 MM INCL. ANILL UND
SUMINISTRO CODO INYECTADO PVC U UF CL 10 NTP ISO 1452 PN 10 DN 110MMX22.5° INCL, ANI UND
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX22.5° INL. ANILL UND
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX45º INCL. ANILLOUND
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL. ANILLO UND
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCL.ANILLO UND
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCLANILLOS UND
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL ANILLOS UND
INSTALACIÓN DE ACCESORIOS DE PVC UF DN 90 - 110MM ANILLOS UND
CONCRETO F'C=140KG/CM2 PARA ANCLAJES INC ENCOFRADO UND
05 SUMINISTRO E INSTALACION DE VALVULAS Y GCI PARA REDES DE DISTRIBUCION - AMPLIACION
VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM UND
VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM UND
INSTALACION DE VALVULA COMPUERTA DN 90 A 110 MM INC. REGISTRO UND
GRIFO CONTRA INCENDIO DN 110 INCL. ACCESORIOS (VER PLANO) UND
INSTALACION DE GRIFO CONTRAINCENDIO-POSTE DE 2 BOCAS UND
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 90MM UND
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 110MM UND
06 VALVULA REDUCTORA DE PRESION
CAMARA P/VALV REDUCTORA DE PRESION T.SEMIROCOSO CARG+VOLQ.P/MATRIZ DN 100 A 400 UND
VALVULA REDUCTORA CONTROL DE FLUJO BB DN 100 MM UND
SUMINISTRO DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESIÓN DE 100MM UND
MONTAJE DE ACCESORIOS Y VALVULA REDUCTORA DE PRESIÓN DN 100 E INST. HIDRAULICA UND
07 CONEXIONES DOMICILIARIAS
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 90 MM T-SEMIROCOSO SISTEMA CONVENCI UND
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110 MM T-SEMIROCOSO-SISTEMA CONVENCI UND
RENOVACIONES DE CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110MM T-SEMIROCOSO - UND
08 MICROMEDICION
MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO MULTIPLE S/ESPECIFICACION INCL. UND
INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2" UND
EDES DE ALCANTARILLADO
01 TRABAJOS PRELIMINARES
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL KM
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp
M
CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE SEGURIDAD OBRA MIL
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D UND
02 MOVIMIENTO DE TIERRAS
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.01 A 1.25M M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.26 A 1.50M M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.51 A 1.75M M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.76 A 2.00M M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=2.01 A 2.50M M
EXCAV. ZANJA PULSO P/TUB. DE ALCANTARILLADO TERRENO ROCOSO DN 200-315 MM M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.01 - 1.25 M M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.26 - 1.50 M M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.51 - 1.75 M M
EXCAV. ZANJA (MAQ) T.SEMIROCOS DN 200-250 MM H=1.76 - 2.00 M M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=2.01 - 2.50 M M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.26 A 1.50M M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.76 A 2.00M M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=2.01 A 2.50M M
REFINE Y NIVELACION DE ZANJA TERRENO SEMIROCOSO P/TUB. 200 - 250 MM. P/TODA PROFUN M
REFINE Y NIVELACION ZANJA T. SEMIROCOSO PARA TUB. DN 300-350 PARA TODA PROF. M
REFINE Y NIVELACION ZANJA T. ROCOSO PARA TUB. DN 200-315 PARA TODA PROF. M
RELLENO COMP. ZANJA (PULSO) T - SEMIROCA DN 200 - 250 DE 1.01 - 1.25 PROF. M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.26 A 1.50M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.51 A 1.75M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.76 A 2.00M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=2.01 A 2.50M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355 MM H=1.26 A 1.50M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=1.76 A 2.00M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=2.01 A 2.5M M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 315MM PARA TODA PROF. M
ELIMIN. DESMONTE (CARG+VOLQ) TERRENO SEMIROCOSO D=10 KM. P/TUBERIA DN 200 - 250 M M
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 315-355MM PARA TODA PROF. M
ELIMIN. DESMONTE (CARG+VOLQ) T-ROCOSO D=10KM DN 200-315MM PARA TODA PROF. M
03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF NTP ISO 4435 SN-2
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 MM INC. ANILLO+2% DESPERDICIOS M
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 315 MM INC. ANILLO+2% DESPERDICIOS M
INSTALACIÓN DE TUBERÍA PVC P/ALCANTARILLADO. DN 200 INCLUYE PRUEBA HIDRAULICA M
INSTALACION DE TUBERIA PVC P/DESAGUE DN 315 MM INCL. PRUEBA HIDRAULICA ML
04 CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR)
02.04.01 MOVIMIENTO DE TIERRAS
EXCAVACION C/ MAQUINA T-SEMIROCOSO DE 1.0 a 2.50mt DE H. M3
EXCAVACION MANUAL EN T-SEMIROCOSO DE 1.0 a 2.50 mt DE H. M3
EXCAVACION EN TERRENO ROCOSO CON EXPLOSIVO M3
REFINE, NIVELACIÓN Y COMPACTACIÓN M2
RELLENO Y APISONADO CON MATERIAL PROPIO M3
ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO D=10km M3
02.04.02 OBRAS DE CONCRETO SIMPLE
SOLADO DE 3" PARA BUZONES (MEZCLA DE 1:10 CEMENTO - HORMIGON) M2
02.04.03 OBRAS DE CONCRETO ARMADO
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 1.50 m UND
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.0 m UND
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.50 m UND
02.04.04 EMPOTRAMIENTO DE TAPA SANITARIA
CONCRETO F'C 175 KG/CM2 M3
02.04.05 MEDIA CAÑA
CONCRETO F'C 175 KG/CM2 M3
02.04.06 REVOQUES Y SOLAQUEADO
PULIDO DE SUPERFICIE EN MEDIA CAÑA M2
SOLAQUEADO EN BUZONES INTERIORES M2
02.04.07 CARPINTERIA METALICA
TAPA DE FIERRO FUNDIDO DE Ø 60cm, INC/MARCO UND
05 VARIOS
PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 200 MM M
PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 315 MM M
06 PRUEBAS DE LABORATORIO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO UND
07 CONEXIONES DOMICILIARIAS - ALCANTARILLADO
CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 200 UND
CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 315 UND
DUCACIÓN SANITARIA Y CAPACITACIÓN SOCIAL
01 EDUCACIÓN SANITARIA
MATERIALES, EQUIPOS Y PERSONALES GLB
02 CUIDADOS DEL RECURSO HIDRICO
MATERIALES, EQUIPOS Y PERSONALES C.R.H. GLB
03 CUIDADOS DE LA INFRAESTRUCTURA (AGUA)
CUIDADO DE LA INFRAESTRUCTURA (AGUA) GLB
MITIGACION AMBIENTAL
01 PLAN DE PARTICIPACIÓN CIUDADANA - GESTIÓN SOCIAL Y DIFUSIÓN
PLAN DE DIFUSIÓN Y CONSULTA AMBIENTAL GLB
02 MEDIDAS DE PREVENCIÓN, MITIGACIÓN, REMEDIACIÓN Y COMPENSACIÓN
CAPACITACIÓN E INFORMACIÓN AL PERSONAL DE OBRA UND
APERTURA DE CAMPAMENTO UND
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POLVO M
03 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS
CAPACITACIÓN EN EL MANEJO DE RESIDUOS SOLIDOS AL PERSONAL DE OBRA UND
ADQUISICION DE CONTENEDORES DE RESIDUOS SOLIDOS UND
04 PROGRAMA DE SEGUIMIENTO Y CONTROL
MONITOREO DE CALIDAD DE AIRE UND
MONITOREO DE CALIDAD DE RUIDO UND
MONITOREO DE CALIDAD DE AGUA UND
05 PLAN DE CONTINGENCIA
CAPACITACIÓN AL PERSONAL DE OBRA UND
SIMULACROS UND
06 SEÑALIZACION Y SEGURIDAD
CINTA PLÁSTICA SEÑALIZADORA PARA LÍMITE DE SEGURIDAD DE OBRA M
SEÑAL INFORMATIVA Y SEÑALIZACIÓN DE DESVIOS EN OBRA UND
LAN DE MONITOREO ARQUEOLOGICO
ELABORACION DEL PLAN DE MONITOREO E INFORME FINAL UND
MONITOREO ARQUEOLOGICO MES
EL PROYECTO
ITARIO DEL SECTOR TABLADA ALTA-ILLANYA DEL DISTRITO
1756097.63
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
Sistemas RW7pro
CALCULO DEL FLETE
Proyecto : MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y
Lugar : ALCANTARILLADO
ABANCAY
SANITARIO DEL SECTOR TABLADA ALTA-ILLANYA DEL DISTRITO DE
PARTIDAS
01 REDES DE AGUA POTABLE
01.01 TRABAJOS PRELIMINARES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC FLETE LOCAL.
01.01.02 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
01.01.03 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
01.01.04 TRANQUERA TIPO TIJERA DE 2.40mx1.20M P/SEÑAL DE PELIGRO
01.01.05 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
01.01.06 PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Prov.duran.obra)
01.02 MOVIMIENTO DE TIERRAS - AMPLIACION
01.02.01 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 90-110 MM H=1.01 A 1.25M
01.02.02 EXCAV. A PULSO (C/EXPLOSIVO) P/TUB.DE AGUA TERRENO ROCOSO DN 90-110MM
01.02.03 REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. DN 90 - 110 PARA TODA PROF,
01.02.04 RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN 90 - 110 DE 1.01 -1.15 PROF.
01.02.05 ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 90-110 MM PARA TODA PROF.
01.03 SUMINISTRO E INSTALACION DE TUBERÍA PVC UF NTP ISO 1452
01.03.01 TUBERIA PVC-U UF NTP ISO 1452 PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS
01.03.02 TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INCL. ANILLO+2%DESPERDICIOS
01.03.03 INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 INCLUYE PRUEBA HIDRAULICA
01.03.04 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA
01.04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PVC NTP ISO 1452
01.04.01 SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX110 MM INL. ANILL
01.04.02 SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX90 MM INCL. ANILL
01.04.03 SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX90 MM INCL. ANILL
01.04.04 SUMINISTRO CODO INYECTADO PVC U UF CL 10 NTP ISO 1452 PN 10 DN 110MMX22.5° INCL, ANI
01.04.05 SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX22.5° INL. ANILL
01.04.06 SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX45º INCL. ANILLO
01.04.07 SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL. ANILLO
01.04.08 SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCL.ANILLO
01.04.09 UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCLANILLOS
01.04.10 UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL ANILLOS
01.04.11 INSTALACIÓN DE ACCESORIOS DE PVC UF DN 90 - 110MM ANILLOS
01.04.12 CONCRETO F'C=140KG/CM2 PARA ANCLAJES INC ENCOFRADO
01.05 SUMINISTRO E INSTALACION DE VALVULAS Y GCI PARA REDES DE DISTRIBUCION - AMPLIACION
01.05.01 VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM
01.05.02 VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM
01.05.03 INSTALACION DE VALVULA COMPUERTA DN 90 A 110 MM INC. REGISTRO
01.05.04 GRIFO CONTRA INCENDIO DN 110 INCL. ACCESORIOS (VER PLANO)
01.05.05 INSTALACION DE GRIFO CONTRAINCENDIO-POSTE DE 2 BOCAS
01.05.06 SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 90MM
01.05.07 SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 110MM
01.06 VALVULA REDUCTORA DE PRESION
01.06.01 CAMARA P/VALV REDUCTORA DE PRESION T.SEMIROCOSO CARG+VOLQ.P/MATRIZ DN 100 A 400
01.06.02 VALVULA REDUCTORA CONTROL DE FLUJO BB DN 100 MM
01.06.03 SUMINISTRO DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESIÓN DE 100MM
01.06.04 MONTAJE DE ACCESORIOS Y VALVULA REDUCTORA DE PRESIÓN DN 100 E INST. HIDRAULICA
01.07 CONEXIONES DOMICILIARIAS
01.07.01 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 90 MM T-SEMIROCOSO SISTEMA CONVENCI
01.07.02 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110 MM T-SEMIROCOSO-SISTEMA CONVENCI
01.07.03 RENOVACIONES DE CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110MM T-SEMIROCOSO -
01.08 MICROMEDICION
01.08.01 MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO MULTIPLE S/ESPECIFICACION INCL.
01.08.02 INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2"
02 REDES DE ALCANTARILLADO
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
02.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
02.01.03 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp
02.01.04 CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE SEGURIDAD OBRA
02.01.05 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.01 A 1.25M
02.02.02 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.26 A 1.50M
02.02.03 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.51 A 1.75M
02.02.04 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.76 A 2.00M
02.02.05 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=2.01 A 2.50M
02.02.06 EXCAV. ZANJA PULSO P/TUB. DE ALCANTARILLADO TERRENO ROCOSO DN 200-315 MM
02.02.07 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.01 - 1.25 M
02.02.08 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.26 - 1.50 M
02.02.09 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.51 - 1.75 M
02.02.10 EXCAV. ZANJA (MAQ) T.SEMIROCOS DN 200-250 MM H=1.76 - 2.00 M
02.02.11 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=2.01 - 2.50 M
02.02.12 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.26 A 1.50M
02.02.13 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.76 A 2.00M
02.02.14 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=2.01 A 2.50M
02.02.15 REFINE Y NIVELACION DE ZANJA TERRENO SEMIROCOSO P/TUB. 200 - 250 MM. P/TODA PROFUN
02.02.16 REFINE Y NIVELACION ZANJA T. SEMIROCOSO PARA TUB. DN 300-350 PARA TODA PROF.
02.02.17 REFINE Y NIVELACION ZANJA T. ROCOSO PARA TUB. DN 200-315 PARA TODA PROF.
02.02.18 RELLENO COMP. ZANJA (PULSO) T - SEMIROCA DN 200 - 250 DE 1.01 - 1.25 PROF.
02.02.19 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.26 A 1.50M
02.02.20 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.51 A 1.75M
02.02.21 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.76 A 2.00M
02.02.22 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=2.01 A 2.50M
02.02.23 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355 MM H=1.26 A 1.50M
02.02.24 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=1.76 A 2.00M
02.02.25 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=2.01 A 2.5M
02.02.26 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 315MM PARA TODA PROF.
02.02.27 ELIMIN. DESMONTE (CARG+VOLQ) TERRENO SEMIROCOSO D=10 KM. P/TUBERIA DN 200 - 250 M
02.02.28 ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 315-355MM PARA TODA PROF.
02.02.29 ELIMIN. DESMONTE (CARG+VOLQ) T-ROCOSO D=10KM DN 200-315MM PARA TODA PROF.
02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF NTP ISO 4435 SN-2
02.03.01 TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 MM INC. ANILLO+2% DESPERDICIOS
02.03.02 TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 315 MM INC. ANILLO+2% DESPERDICIOS
02.03.03 INSTALACIÓN DE TUBERÍA PVC P/ALCANTARILLADO. DN 200 INCLUYE PRUEBA HIDRAULICA
02.03.04 INSTALACION DE TUBERIA PVC P/DESAGUE DN 315 MM INCL. PRUEBA HIDRAULICA
02.04 CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR)
02.04.01 MOVIMIENTO DE TIERRAS
02.04.01.01 EXCAVACION C/ MAQUINA T-SEMIROCOSO DE 1.0 a 2.50mt DE H.
02.04.01.02 EXCAVACION MANUAL EN T-SEMIROCOSO DE 1.0 a 2.50 mt DE H.
02.04.01.03 EXCAVACION EN TERRENO ROCOSO CON EXPLOSIVO
02.04.01.04 REFINE, NIVELACIÓN Y COMPACTACIÓN
02.04.01.05 RELLENO Y APISONADO CON MATERIAL PROPIO
02.04.01.06 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO D=10km
02.04.02 OBRAS DE CONCRETO SIMPLE
02.04.02.01 SOLADO DE 3" PARA BUZONES (MEZCLA DE 1:10 CEMENTO - HORMIGON)
02.04.03 OBRAS DE CONCRETO ARMADO
02.04.03.01 BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 1.50 m
02.04.03.02 BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.0 m
02.04.03.03 BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.50 m
02.04.04 EMPOTRAMIENTO DE TAPA SANITARIA
02.04.04.01 CONCRETO F'C 175 KG/CM2
02.04.05 MEDIA CAÑA
02.04.05.01 CONCRETO F'C 175 KG/CM2
02.04.06 REVOQUES Y SOLAQUEADO
02.04.06.01 PULIDO DE SUPERFICIE EN MEDIA CAÑA
02.04.06.02 SOLAQUEADO EN BUZONES INTERIORES
02.04.07 CARPINTERIA METALICA
02.04.07.01 TAPA DE FIERRO FUNDIDO DE Ø 60cm, INC/MARCO
02.05 VARIOS
02.05.01 PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 200 MM
02.05.02 PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 315 MM
02.06 PRUEBAS DE LABORATORIO
02.06.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
02.06.02 PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO
02.07 CONEXIONES DOMICILIARIAS - ALCANTARILLADO
02.07.01 CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 200
02.07.02 CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 315
03 EDUCACIÓN SANITARIA Y CAPACITACIÓN SOCIAL
03.01 EDUCACIÓN SANITARIA
03.01.01 MATERIALES, EQUIPOS Y PERSONALES
03.02 CUIDADOS DEL RECURSO HIDRICO
03.02.01 MATERIALES, EQUIPOS Y PERSONALES C.R.H.
03.03 CUIDADOS DE LA INFRAESTRUCTURA (AGUA)
03.03.01 CUIDADO DE LA INFRAESTRUCTURA (AGUA)
04 MITIGACION AMBIENTAL
04.01 PLAN DE PARTICIPACIÓN CIUDADANA - GESTIÓN SOCIAL Y DIFUSIÓN
04.01.01 PLAN DE DIFUSIÓN Y CONSULTA AMBIENTAL
04.02 MEDIDAS DE PREVENCIÓN, MITIGACIÓN, REMEDIACIÓN Y COMPENSACIÓN
04.02.01 CAPACITACIÓN E INFORMACIÓN AL PERSONAL DE OBRA
04.02.02 APERTURA DE CAMPAMENTO
04.02.03 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POLVO
04.03 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS
04.03.01 CAPACITACIÓN EN EL MANEJO DE RESIDUOS SOLIDOS AL PERSONAL DE OBRA
04.03.02 ADQUISICION DE CONTENEDORES DE RESIDUOS SOLIDOS
04.04 PROGRAMA DE SEGUIMIENTO Y CONTROL
04.04.01 MONITOREO DE CALIDAD DE AIRE
04.04.02 MONITOREO DE CALIDAD DE RUIDO
04.04.03 MONITOREO DE CALIDAD DE AGUA
04.05 PLAN DE CONTINGENCIA
04.05.01 CAPACITACIÓN AL PERSONAL DE OBRA
04.05.02 SIMULACROS
04.06 SEÑALIZACION Y SEGURIDAD
04.06.01 CINTA PLÁSTICA SEÑALIZADORA PARA LÍMITE DE SEGURIDAD DE OBRA
04.06.02 SEÑAL INFORMATIVA Y SEÑALIZACIÓN DE DESVIOS EN OBRA
05 PLAN DE MONITOREO ARQUEOLOGICO
05.01 ELABORACION DEL PLAN DE MONITOREO E INFORME FINAL
05.02 MONITOREO ARQUEOLOGICO
06 OTROS
06.01 FLETE LOCAL
TOTAL
25.
5.02%
4.90%
0.00%
I ni ci o Me s 01 Me
Sistemas RW7pro
PA EA
100.00%
88.75%
67.32%
45.47%
25.01%
Me s 02 Me s 03 Me s 04 Me s 05 Me s 06
METRADOS
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06
1
2.95
2.95
0.82 1.03 1.12 1.03
2.83 1.17
1.42 0.58
964.71 1929.41
54.32
589.69 2358.75
2358.75 589.69
2948.44
374.45 582.48
779.29 1212.22
382.77 574.16
1991.51
4
14
4
27
3
2
2
7 3
23
38
127
127
8
3
11
3
3
7
2
1
1
1
1
24
23.47 20.53
25.41 28.59
47.74 74.26
122
4.07
4.07
4068.57
1479.48 369.87 739.74 1479.48
4
45.78
171.02
12.55
113.28
98.49
256.19 109.79
160.41
846.08 362.61
419.16
80.67
26.12
1121.7
94.85
149.87
681.38 1654.79
683.21 683.21
320.23 45.75
206.19
197.1 1182.61
431.71
64.65 129.3
126.61
1121.7
94.85
59.95 89.92
365.98
3037.02
888.18 888.18
475.77
590.78 2025.51
266.25 1186.03
2616.29
871.37 580.91
214.98 122.84
107.44
35.31
307.34
47.23 100.35
288.71
307.34
60 33
15
13
20.57
21.3
136.72
380.77 380.77
66.55 54.45
2616.29
806.82 645.46
4
4
106
58
1
1
2004.86 2004.86 2004.86 1002.43
1 1
10
1 1
1 1
1 1
1 1
1 1
333.33 666.67
20
1
1.23 1.18 1.27 1.18 0.15
0.29 0.14 0.29 0.29
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DEL SECTOR TABLADA ALTA-ILLANYA DEL DIS
LUGAR: ABANCAY Inicio: 10/22/2018
Fecha 22 DE OCTUBRE DE 2018 AL 31 DE OCTUBRE DE 2018 Plazo (días calendarios): 150
Costo Directo S/. 1756097.63 Fin: 3/20/2019
Unidad de programación: SEMANAS
CUADRI
PUEST
METR
PRES
ADO
DIAS
LLA
PAR T I DAS UND PRECE DENCIA
O
U
Inicio
01 REDES DE AGUA POTABLE
01.01 TRABAJOS PRELIMINARES
### 01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC FLETE LOCAL. UND 1.00 746.89 0.588 1 10CC
### 01.01.02 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION T KM 2.95 1447.86 0.281 7 13CC
### 01.01.03 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 2.95 1684.42 0.295 10 14CC+112
### 01.01.04 TRANQUERA TIPO TIJERA DE 2.40mx1.20M P/SEÑAL DE PELIGRO UND 4.00 1240.64 0.022 93 14CC+15
### 01.01.05 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D UND 4.00 1709.88 0.083 24 14CC+17
### 01.01.06 PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Prov.duran.obra) UND 2.00 3337.8 0.042 24 14CC+17
01.02 MOVIMIENTO DE TIERRAS - AMPLIACION
### 01.02.01 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 90-110 MM H=1.01 A 1.25M M 2894.12 41270.2 1.723 24 14CC+50
### 01.02.02 EXCAV. A PULSO (C/EXPLOSIVO) P/TUB.DE AGUA TERRENO ROCOSO DN 90-110MM M 54.32 4678.04 0.97 8 20FC
### 01.02.03 REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. DN 90 - 110 PARA TODA PROF, M 2948.44 16039.5 3.276 20 21CC+6
### 01.02.04 RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN 90 - 110 DE 1.01 -1.15 PROF. M 2948.44 187816 5.46 30 22CC+4
### 01.02.05 ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 90-110 MM PARA TODA PR M 2948.44 27273.1 1.024 9 23CC+26
01.03 SUMINISTRO E INSTALACION DE TUBERÍA PVC UF NTP ISO 1452
### 01.03.01 TUBERIA PVC-U UF NTP ISO 1452 PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS M 956.93 17502.3 41.61 23 10CC
### 01.03.02 TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INCL. ANILLO+2%DESPERDICIOS M 1991.51 51500.5 86.59 23 26CC
### 01.03.03 INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 INCLUYE PRUEBA HIDRAULICA M 956.93 4009.54 1.063 5 22CC+2
### 01.03.04 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA M 1991.51 8424.09 1.006 11 28FC
01.04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PVC NTP ISO 1452
### 01.04.01 SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX110 MM INUND 4.00 269.32 1 4 29CC
### 01.04.02 SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX90 MM INCLUND 14.00 1283.24 1 14 31CC
### 01.04.03 SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX90 MM INCUND 4.00 326.64 1 4 32CC+3
### 01.04.04 SUMINISTRO CODO INYECTADO PVC U UF CL 10 NTP ISO 1452 PN 10 DN 110MMX22.5° INUND 27.00 1034.91 1.929 14 33CC
### 01.04.05 SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX22.5° INLUND 3.00 84.99 1 3 34CC+6
### 01.04.06 SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX45º INCLUND 2.00 56.66 1 2 35FC
### 01.04.07 SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL. AUND 2.00 45.76 1 2 36CC
### 01.04.08 SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCL.ANUND 10.00 285 1 10 37FC
### 01.04.09 UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCLANILLOS UND 23.00 651.59 2.091 11 38CC+7
### 01.04.10 UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL ANILLOS UND 38.00 1304.54 0.95 4 39CC
### 01.04.11 INSTALACIÓN DE ACCESORIOS DE PVC UF DN 90 - 110MM ANILLOS UND 127.00 1076.96 0.977 13 40CC
### 01.04.12 CONCRETO F'C=140KG/CM2 PARA ANCLAJES INC ENCOFRADO UND 127.00 2844.8 9.071 14 41CC
01.05 SUMINISTRO E INSTALACION DE VALVULAS Y GCI PARA REDES DE DISTRIBUCION - AMPLIACION
### 01.05.01 VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM UND 8.00 2346.64 1 8 31CC+22
### 01.05.02 VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM UND 3.00 1089.99 1 3 44FC
### 01.05.03 INSTALACION DE VALVULA COMPUERTA DN 90 A 110 MM INC. REGISTRO UND 11.00 1858.67 0.393 2 45FC
### 01.05.04 GRIFO CONTRA INCENDIO DN 110 INCL. ACCESORIOS (VER PLANO) UND 3.00 3650.01 1 3 46FC
### 01.05.05 INSTALACION DE GRIFO CONTRAINCENDIO-POSTE DE 2 BOCAS UND 3.00 896.76 1 1 47CC
### 01.05.06 SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 90MM UND 7.00 7418.95 1.167 2 48CC
### 01.05.07 SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 110MM UND 2.00 2133.7 0.222 3 49CC
01.06 VALVULA REDUCTORA DE PRESION
### 01.06.01 CAMARA P/VALV REDUCTORA DE PRESION T.SEMIROCOSO CARG+VOLQ.P/MATRIZ DN 10UND 1.00 8046.99 1 1 45FC
### 01.06.02 VALVULA REDUCTORA CONTROL DE FLUJO BB DN 100 MM UND 1.00 7453 1 1 52FC
### 01.06.03 SUMINISTRO DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESIÓN DE 100MM UND 1.00 6594.37 1 1 53FC
### 01.06.04 MONTAJE DE ACCESORIOS Y VALVULA REDUCTORA DE PRESIÓN DN 100 E INST. HIDRAUUND 1.00 1189.49 0.5 2 54FC
01.07 CONEXIONES DOMICILIARIAS
### 01.07.01 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 90 MM T-SEMIROCOSO SISTEMA C UND 24.00 17515.9 1 8 21FC+2
### 01.07.02 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110 MM T-SEMIROCOSO-SISTEMA C UND 44.00 33221.8 1.467 30 57FC
### 01.07.03 RENOVACIONES DE CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110MM T-SEMIR UND 54.00 40772.2 1.059 17 57CC+16
01.08 MICROMEDICION
### 01.08.01 MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO MULTIPLE S/ESPECIFICACIO UND 122.00 16592 5.304 23 26CC
### 01.08.02 INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2" UND 122.00 2355.82 0.968 14 59CC+10
02 REDES DE ALCANTARILLADO
02.01 TRABAJOS PRELIMINARES
### 02.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION T KM 4.07 1997.56 0.388 7 13CC
### 02.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 4.07 2323.93 1.018 4 65CC+120
### 02.01.03 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua
M 4068.57 6102.86 1.017 4 66CC
### 02.01.04 CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE SEGURIDAD OBRA MIL 4068.57 4231.31 1.017 16 65CC
### 02.01.05 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D UND 4.00 1709.88 1 2 65CC
02.02 MOVIMIENTO DE TIERRAS
### 02.02.01 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.01 A 1.25M M 45.78 1999.21 0.818 2 65FC
### 02.02.02 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.26 A 1.50M M 171.02 8043.07 0.94 7 71FC
### 02.02.03 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.51 A 1.75M M 12.55 639.42 0.523 1 72FC
### 02.02.04 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.76 A 2.00M M 113.28 6296.1 1.03 5 73FC
### 02.02.05 EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=2.01 A 2.50M M 98.49 6021.68 0.985 5 74FC
### 02.02.06 EXCAV. ZANJA PULSO P/TUB. DE ALCANTARILLADO TERRENO ROCOSO DN 200-315 MM M 365.98 38885.4 6.1 10 75FC
### 02.02.07 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.01 - 1.25 M M 160.41 2287.45 1.146 2 76CC
### 02.02.08 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.26 - 1.50 M M 1208.69 18468.8 1.86 10 77FC
### 02.02.09 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.51 - 1.75 M M 419.16 6937.1 1.747 4 78FC
### 02.02.10 EXCAV. ZANJA (MAQ) T.SEMIROCOS DN 200-250 MM H=1.76 - 2.00 M M 80.67 1462.55 1.467 1 79FC
### 02.02.11 EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=2.01 - 2.50 M M 26.12 518.74 0.522 1 80FC
### 02.02.12 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.26 A 1.50M M 1121.70 18642.7 2.077 9 81FC
### 02.02.13 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.76 A 2.00M M 94.85 1719.63 0.862 2 82FC
### 02.02.14 EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=2.01 A 2.50M M 149.87 2989.91 1 3 83FC
### 02.02.15 REFINE Y NIVELACION DE ZANJA TERRENO SEMIROCOSO P/TUB. 200 - 250 MM. P/TOD M 2336.17 12708.8 2.163 24 75FC
### 02.02.16 REFINE Y NIVELACION ZANJA T. SEMIROCOSO PARA TUB. DN 300-350 PARA TODA PROF. M 1366.42 7433.32 2.169 14 85FC
### 02.02.17 REFINE Y NIVELACION ZANJA T. ROCOSO PARA TUB. DN 200-315 PARA TODA PROF. M 365.98 1990.93 1.017 8 86CC
### 02.02.18 RELLENO COMP. ZANJA (PULSO) T - SEMIROCA DN 200 - 250 DE 1.01 - 1.25 PROF. M 206.19 7956.87 1.031 5 85FC
### 02.02.19 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.26 A 1.50M M 1379.71 58182.4 2.593 14 88FC
### 02.02.20 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.51 A 1.75M M 431.71 18680.1 1 12 89FC
### 02.02.21 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.76 A 2.00M M 193.95 8688.96 0.951 6 90FC
### 02.02.22 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=2.01 A 2.50M M 126.61 5894.96 0.989 4 91FC
### 02.02.23 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355 MM H=1.26 A 1.50M M 1121.70 46258.9 2.683 11 92FC
### 02.02.24 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=1.76 A 2.00M M 94.85 4618.25 0.93 3 93FC
### 02.02.25 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=2.01 A 2.5M M 149.87 7545.95 0.937 5 94FC
### 02.02.26 RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 315MM PARA TODA PROF. M 365.98 15836 1.271 8 95FC+2
### 02.02.27 ELIMIN. DESMONTE (CARG+VOLQ) TERRENO SEMIROCOSO D=10 KM. P/TUBERIA DN 200 M 3037.02 21593.2 1.012 4 88CC
### 02.02.28 ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 315-355MM PARA TODA P M 1776.35 12629.9 1.184 2 93FC
### 02.02.29 ELIMIN. DESMONTE (CARG+VOLQ) T-ROCOSO D=10KM DN 200-315MM PARA TODA PROF. M 475.77 3382.72 0.634 1 95FC
02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF NTP ISO 4435 SN-2
### 02.03.01 TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 MM INC. ANILLO+2% DESPERDIC M 2616.29 86887 84.4 31 10CC+2
### 02.03.02 TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 315 MM INC. ANILLO+2% DESPERDIC M 1452.28 127946 48.41 30 101CC+1.5
### 02.03.03 INSTALACIÓN DE TUBERÍA PVC P/ALCANTARILLADO. DN 200 INCLUYE PRUEBA HIDRAUL M 2616.29 6540.73 1.026 15 78FC
### 02.03.04 INSTALACION DE TUBERIA PVC P/DESAGUE DN 315 MM INCL. PRUEBA HIDRAULICA ML 1452.28 4095.43 0.968 10 103FC
02.04 CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR)
02.04.01 MOVIMIENTO DE TIERRAS
### 02.04.01.0 EXCAVACION C/ MAQUINA T-SEMIROCOSO DE 1.0 a 2.50mt DE H. M3 337.82 4209.24 0.384 11 77FC
### 02.04.01.0 EXCAVACION MANUAL EN T-SEMIROCOSO DE 1.0 a 2.50 mt DE H. M3 107.44 4379.25 8.953 4 107FC
### 02.04.01.0 EXCAVACION EN TERRENO ROCOSO CON EXPLOSIVO M3 35.31 3376.34 1.009 5 108FC
### 02.04.01.0 REFINE, NIVELACIÓN Y COMPACTACIÓN M2 307.34 2624.68 0.96 8 109CC
### 02.04.01.0 RELLENO Y APISONADO CON MATERIAL PROPIO M3 147.58 3415 0.984 25 110FC
### 02.04.01.0 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO D=10km M3 288.71 3634.86 0.902 2 111FC
02.04.02 OBRAS DE CONCRETO SIMPLE
### 02.04.02.0 SOLADO DE 3" PARA BUZONES (MEZCLA DE 1:10 CEMENTO - HORMIGON) M2 307.34 11313.2 0.96 8 110FC
02.04.03 OBRAS DE CONCRETO ARMADO
### 02.04.03.0 BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 1.50 m UND 93.00 183877 3 31 108CC
### 02.04.03.0 BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.0 m UND 15.00 30763.8 3 5 116FC
### 02.04.03.0 BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.50 m UND 13.00 27830.3 3.25 4 117FC
02.04.04 EMPOTRAMIENTO DE TAPA SANITARIA
### 02.04.04.0 CONCRETO F'C 175 KG/CM2 M3 20.57 8501.99 1.371 1 116CC+8
02.04.05 MEDIA CAÑA
### 02.04.05.0 CONCRETO F'C 175 KG/CM2 M3 21.30 8803.72 1.42 1 120
02.04.06 REVOQUES Y SOLAQUEADO
### 02.04.06.0 PULIDO DE SUPERFICIE EN MEDIA CAÑA M2 136.72 2819.17 0.977 5 122CC
### 02.04.06.0 SOLAQUEADO EN BUZONES INTERIORES M2 761.54 12466.4 0.989 22 124CC
02.04.07 CARPINTERIA METALICA
### 02.04.07.0 TAPA DE FIERRO FUNDIDO DE Ø 60cm, INC/MARCO UND 121.00 56993.4 1.008 20 125CC
02.05 VARIOS
### 02.05.01 PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 200 MM M 2616.29 7063.98 0.969 15 116CC
### 02.05.02 PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 315 MM M 1452.28 4734.43 1.009 9 129FC
02.06 PRUEBAS DE LABORATORIO
### 02.06.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 4.00 574.4 1.333 1 130FC
### 02.06.02 PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO UND 4.00 1823.2 1 4 132FC
02.07 CONEXIONES DOMICILIARIAS - ALCANTARILLADO
### 02.07.01 CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SNUND 106.00 76727 2.409 22 130FC
### 02.07.02 CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SNUND 58.00 48696.8 2.636 11 135FC
03 EDUCACIÓN SANITARIA Y CAPACITACIÓN SOCIAL
03.01 EDUCACIÓN SANITARIA
### 03.01.01 MATERIALES, EQUIPOS Y PERSONALES GLB 1.00 7443 1 1 14CC+26
03.02 CUIDADOS DEL RECURSO HIDRICO
### 03.02.01 MATERIALES, EQUIPOS Y PERSONALES C.R.H. GLB 1.00 7443 1 1 139CC
03.03 CUIDADOS DE LA INFRAESTRUCTURA (AGUA)
### 03.03.01 CUIDADO DE LA INFRAESTRUCTURA (AGUA) GLB 1.00 6252.5 1 1 141CC
04 MITIGACION AMBIENTAL
04.01 PLAN DE PARTICIPACIÓN CIUDADANA - GESTIÓN SOCIAL Y DIFUSIÓN
### 04.01.01 PLAN DE DIFUSIÓN Y CONSULTA AMBIENTAL GLB 1.00 1909 1 1 14CC+18
04.02 MEDIDAS DE PREVENCIÓN, MITIGACIÓN, REMEDIACIÓN Y COMPENSACIÓN
### 04.02.01 CAPACITACIÓN E INFORMACIÓN AL PERSONAL DE OBRA UND 1.00 541.5 1 1 146CC
### 04.02.02 APERTURA DE CAMPAMENTO UND 1.00 784.78 1 1 148CC
### 04.02.03 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POLVO M 7017.01 10525.5 1 7 149CC
04.03 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS
### 04.03.01 CAPACITACIÓN EN EL MANEJO DE RESIDUOS SOLIDOS AL PERSONAL DE OBRA UND 2.00 1035 1 2 146FC
### 04.03.02 ADQUISICION DE CONTENEDORES DE RESIDUOS SOLIDOS UND 10.00 2006.7 1 5 65CC+9
04.04 PROGRAMA DE SEGUIMIENTO Y CONTROL
### 04.04.01 MONITOREO DE CALIDAD DE AIRE UND 2.00 1600 0.05 2 14CC+12
### 04.04.02 MONITOREO DE CALIDAD DE RUIDO UND 2.00 1800 1 2 155CC
### 04.04.03 MONITOREO DE CALIDAD DE AGUA UND 2.00 1600 1 2 156CC
04.05 PLAN DE CONTINGENCIA
### 04.05.01 CAPACITACIÓN AL PERSONAL DE OBRA UND 2.00 1035 1 2 14CC+34
### 04.05.02 SIMULACROS UND 2.00 2400 1 2 159CC
04.06 SEÑALIZACION Y SEGURIDAD
### 04.06.01 CINTA PLÁSTICA SEÑALIZADORA PARA LÍMITE DE SEGURIDAD DE OBRA M 1000.00 620 1.111 3 14CC+11
### 04.06.02 SEÑAL INFORMATIVA Y SEÑALIZACIÓN DE DESVIOS EN OBRA UND 20.00 1677 1.333 1 162CC
05 PLAN DE MONITOREO ARQUEOLOGICO
### 05.01 ELABORACION DEL PLAN DE MONITOREO E INFORME FINAL UND 1.00 3500 0.5 2 14CC+120
### 05.02 MONITOREO ARQUEOLOGICO MES 5.00 33000 0.049 102 14CC+9
06 OTROS
### 06.01 FLETE LOCAL GLB 1.00 45068.4 1 1 166CC+5
AVANCE MENSUAL(%)
PROGRAMADO
AVANCE ACUMULADO(%)
1 1
7 6 1 0
10 4 6
93 2 6 6 5 1 5 6 6 5 1 4 6 6 6 4 2 6 6 6 4 0
24 6 6 5 1 5 1
24 6 6 5 1 5 1
24 2 5 1 4 6 6
8 6 2 0
20 4 0 2 6 6 2
30 2 6 6 6 4 2 4
9 6 3
23 6 3 2 6 6
23 6 3 2 6 6
5 2 0 2 1
11 5 6
4 4
14 5 6 3
4 2 2
14 2 6 6
3 2 1
2 2
2 2
10 3 4 2 1
11 2 6 3
4 2 2
13 2 6 5
14 2 6 6
8 1 6 1
3 3
2 2
3 3
1 1
2 2
3 3
1 1
1 1
1 1
2 2
8 2 6
30 6 6 4 2 6 6
17 4 4 2 6 1
23 6 3 2 6 6
14 6 6 2
7 6 1
4 2 2
4 2 2
4S22,4S20,4S25 11 4 1 2 1 3
2 2
2 2 0
7 2 5
1 1
5 5
5 1 4
10 2 5 1 2
2 2
10 5 1 4
4 1 3
1 1
1 1
9 1 6 2
2 2
3 1 1 1
24 2 5 1 5 6 5
14 1 5 1 4 3
8 1 5 1 1
5 1 4
14 1 1 4 6 2
12 4 6 2
6 2 2 2
4 4
11 6 5
3 1 2
5 2 2 1
8 3 5
4 1 3
1S4 2 1 1
1 1
31 4 3 2 6 6 6 4
30 3 3 2 6 6 6 5
15 1 6 6 2
10 3 1 4 2
11 5 1 5
4 4
5 2 3
8 2 6
25 5 1 4 6 6 3
2 2
8 5 1 2
31 6 6 5 1 4 6 3
5 3 2
4 4
1 1
1 1
5 3 2
22 3 5 1 4 6 3
20 3 5 1 4 6 1
15 6 6 3
9 2 1 4 2
1 1
4 3 1
22 4 6 6 4 2
11 6 5
1 1
1 1
1 1
1 1
1S35 1 1
1 1
2S15,2S22,2S23 7 2 2 2 1
1S38 2 1 1
5 2 3
1S40 2 1 1
1S40 2 1 1
1S40 2 1 1
1S58 2 1 1
1S58 2 1 1
1S26 3 1 2
1 1
2 2
102 2 6 6 6 5 1 5 6 6 5 1 4 6 6 6 4 2 6 6 6 4 2 1
2S22,3S20,3S25,2S35
7 2 1 2 2
4.90% 19.86% 19.31% 22.85% 21.83% 11.25% 0.00% 0.00% 0.00% 0.00%
4.90% 24.76% 44.07% 66.92% 88.75% 100.00% 100.00% 100.00% 100.00% 100.00%
TICAS
Jul-19
1
######
######
######
######
######
######
Aug-19
1 1 1 1
######
######
######
######
######
######
Sep-19
1 1 1 1 1
######
######
######
######
######
######
Oct-19
1 1 1 1
######
######
######
######
######
######
Nov-19
1 1 1 1
######
######
######
######
######
######
Dec-19
1 1 1 1 1
######
######
######
######
######
######
Jan-20
1 1 1 1
######
######
######
######
######
######
Feb-20
1 1 1 1
######
######
######
######
######
######
Mar-20
1 1 1 1 1
######
######
######
######
######
######
Apr-20
1 1 1 1
######
######
######
######
######
######
May-20
######
1 1 1 1 1
######
######
######
######
1 1 1
######
Jun-20
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
00.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Jun-20
1
######
######
######
######
######
######
Jul-20
1 1 1 1
######
######
######
######
######
######
Aug-20
######
1 1 1 1 1
######
######
######
######
######
Sep-20
1 1 1 1
######
######
######
######
######
######
Oct-20
1 1 1 1
######
######
######
######
######
######
Nov-20
1 1 1 1 1
######
######
######
######
######
######
Dec-20
1 1 1 1
######
######
######
######
######
######
Jan-21
######
1 1 1 1 1
######
######
######
######
######
Feb-21
1 1 1 1
######
######
######
######
######
######
Mar-21
1 1 1 1
######
######
######
######
######
######
Apr-21
1 1 1 1
######
######
######
######
######
1 1 1
######
May-21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
00.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
May-21
######
1 1
######
######
######
######
######
Jun-21
1 1 1 1
######
######
######
######
######
######
Jul-21
1 1 1 1
######
######
######
######
######
######
Aug-21
1 1 1 1 1
######
######
######
######
######
######
Sep-21
1 1 1 1
######
######
######
######
######
######
Oct-21
######
1 1 1 1 1
######
######
######
######
######
Nov-21
1 1 1 1
######
######
######
######
######
######
Dec-21
1 1 1 1
######
######
######
######
######
######
Jan-22
######
1 1 1 1 1
######
######
######
######
######
Feb-22
1 1 1 1
######
######
######
######
######
######
Mar-22
1 1 1 1
######
######
######
######
######
1 1 1
######
Apr-22
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
00.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
00.00% 100.00% 100.00% 100.00% 100.00% 100.00%
SNL
SL
DNL
DL
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PROGRAMACION ARQUITECTONICA
AMBIENTESCANTIDAD
BLOQUE 01
Aula 2
Depósito de m 2
Sshh niños 1
Sshh niñas 1
Muros 1
BLOQUE 02
Aula 1
Depósito de m 1
Dirección 1
Tópico 1
Sala de profe 1
Sshh persona 1
Hall – espera 1
Muros 1
BLOQUE 03
Aula de psic 1
Muros 1
BLOQUE 04
Cocina 1
Depósito de 1
Depósito de 1
Muros
TOTAL ÁREA CONSTRUIDA
OBRAS COMPLEMENTARIAS
Atrio de ingre 1
Cobertura de 1
Patio de hono 1
Área de jueg 1
Áreas libres 1
Veredas de ci 1
Cerco perimét 1
AMACION ARQUITECTONICA CATEGORÍAS CASOS %
AREA OCUPAREA TOTAL Agricultura, ganadería, caza y silvicultura 868 5%
M2 Pesca 2 0%
164.94 Explotación de minas y canteras 85 0%
59 118 Industrias manufactureras 852 5%
6 12 Suministro electricidad, gas y agua 68 0%
6.2 6.2 Construcción 1366 8%
6.2 6.2 Venta,mant.y rep.veh.autom.y motoc. 337 2%
22.54 22.54 Comercio por mayor 190 1%
187.14 Comercio por menor 3504 20%
59 59 Hoteles y restaurantes 1130 7%
6 6 Transp.almac.y comunicaciones 1249 7%
13.7 13.7 Intermediación financiera 154 1%
15.3 15.3 Activit.inmobil.,empres.y alquileres 807 5%
17 17 Admin.pub.y defensa;p.segur.soc.afil. 1636 9%
2.6 2.6 Enseñanza 2616 15%
16.2 16.2 Servicios sociales y de salud 878 5%
57.34 57.34 Otras activi. serv.comun.,soc.y personale 606 4%
77.58 Hogares privados y servicios domésticos 601 3%
68.4 68.4 Organiz.y organos extraterritoriales 1 0%
9.18 Actividad económica no especificada 333 2%
22.31 Total 17283 100%
9.3 9.3
4 4
4.5 4.5
4.51 4.51
REA CONSTRUIDA 451.97
OMPLEMENTARIAS
20 20
60 60
60 60
28.2 32
53.46 53.46
95.95 95.95
62.44 62.44
CALENDARIO VALORIZADO DE OBRA
Proyecto
Lugar
Elab. Por
Fecha
PARTIDAS
EDES DE AGUA POTABLE
01 TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC FLETE LOCAL.
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
TRANQUERA TIPO TIJERA DE 2.40mx1.20M P/SEÑAL DE PELIGRO
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Prov.duran.obra)
02 MOVIMIENTO DE TIERRAS - AMPLIACION
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 90-110 MM H=1.01 A 1.25M
EXCAV. A PULSO (C/EXPLOSIVO) P/TUB.DE AGUA TERRENO ROCOSO DN 90-110MM
REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. DN 90 - 110 PARA TODA PROF,
RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN 90 - 110 DE 1.01 -1.15 PROF.
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 90-110 MM PARA TODA PROF.
03 SUMINISTRO E INSTALACION DE TUBERÍA PVC UF NTP ISO 1452
TUBERIA PVC-U UF NTP ISO 1452 PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS
TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INCL. ANILLO+2%DESPERDICIOS
INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 INCLUYE PRUEBA HIDRAULICA
INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA
04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PVC NTP ISO 1452
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX110 MM INL. ANILL
SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX90 MM INCL. ANILL
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX90 MM INCL. ANILL
SUMINISTRO CODO INYECTADO PVC U UF CL 10 NTP ISO 1452 PN 10 DN 110MMX22.5° INCL, ANI
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX22.5° INL. ANILL
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX45º INCL. ANILLO
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL. ANILLO
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCL.ANILLO
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCLANILLOS
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL ANILLOS
INSTALACIÓN DE ACCESORIOS DE PVC UF DN 90 - 110MM ANILLOS
CONCRETO F'C=140KG/CM2 PARA ANCLAJES INC ENCOFRADO
05 SUMINISTRO E INSTALACION DE VALVULAS Y GCI PARA REDES DE DISTRIBUCION - AMPLIACION
VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM
VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM
INSTALACION DE VALVULA COMPUERTA DN 90 A 110 MM INC. REGISTRO
GRIFO CONTRA INCENDIO DN 110 INCL. ACCESORIOS (VER PLANO)
INSTALACION DE GRIFO CONTRAINCENDIO-POSTE DE 2 BOCAS
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 90MM
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 110MM
06 VALVULA REDUCTORA DE PRESION
CAMARA P/VALV REDUCTORA DE PRESION T.SEMIROCOSO CARG+VOLQ.P/MATRIZ DN 100 A 400
VALVULA REDUCTORA CONTROL DE FLUJO BB DN 100 MM
SUMINISTRO DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESIÓN DE 100MM
MONTAJE DE ACCESORIOS Y VALVULA REDUCTORA DE PRESIÓN DN 100 E INST. HIDRAULICA
07 CONEXIONES DOMICILIARIAS
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 90 MM T-SEMIROCOSO SISTEMA CONVENCI
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110 MM T-SEMIROCOSO-SISTEMA CONVENCI
RENOVACIONES DE CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110MM T-SEMIROCOSO -
08 MICROMEDICION
MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO MULTIPLE S/ESPECIFICACION INCL.
INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2"
EDES DE ALCANTARILLADO
01 TRABAJOS PRELIMINARES
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp
CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE SEGURIDAD OBRA
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
02 MOVIMIENTO DE TIERRAS
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.01 A 1.25M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.26 A 1.50M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.51 A 1.75M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.76 A 2.00M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=2.01 A 2.50M
EXCAV. ZANJA PULSO P/TUB. DE ALCANTARILLADO TERRENO ROCOSO DN 200-315 MM
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.01 - 1.25 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.26 - 1.50 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.51 - 1.75 M
EXCAV. ZANJA (MAQ) T.SEMIROCOS DN 200-250 MM H=1.76 - 2.00 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=2.01 - 2.50 M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.26 A 1.50M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.76 A 2.00M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=2.01 A 2.50M
REFINE Y NIVELACION DE ZANJA TERRENO SEMIROCOSO P/TUB. 200 - 250 MM. P/TODA PROFUN
REFINE Y NIVELACION ZANJA T. SEMIROCOSO PARA TUB. DN 300-350 PARA TODA PROF.
REFINE Y NIVELACION ZANJA T. ROCOSO PARA TUB. DN 200-315 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) T - SEMIROCA DN 200 - 250 DE 1.01 - 1.25 PROF.
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.26 A 1.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.51 A 1.75M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.76 A 2.00M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=2.01 A 2.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355 MM H=1.26 A 1.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=1.76 A 2.00M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=2.01 A 2.5M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 315MM PARA TODA PROF.
ELIMIN. DESMONTE (CARG+VOLQ) TERRENO SEMIROCOSO D=10 KM. P/TUBERIA DN 200 - 250 M
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 315-355MM PARA TODA PROF.
ELIMIN. DESMONTE (CARG+VOLQ) T-ROCOSO D=10KM DN 200-315MM PARA TODA PROF.
03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF NTP ISO 4435 SN-2
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 MM INC. ANILLO+2% DESPERDICIOS
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 315 MM INC. ANILLO+2% DESPERDICIOS
INSTALACIÓN DE TUBERÍA PVC P/ALCANTARILLADO. DN 200 INCLUYE PRUEBA HIDRAULICA
INSTALACION DE TUBERIA PVC P/DESAGUE DN 315 MM INCL. PRUEBA HIDRAULICA
04 CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR)
02.04.01 MOVIMIENTO DE TIERRAS
EXCAVACION C/ MAQUINA T-SEMIROCOSO DE 1.0 a 2.50mt DE H.
EXCAVACION MANUAL EN T-SEMIROCOSO DE 1.0 a 2.50 mt DE H.
EXCAVACION EN TERRENO ROCOSO CON EXPLOSIVO
REFINE, NIVELACIÓN Y COMPACTACIÓN
RELLENO Y APISONADO CON MATERIAL PROPIO
ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO D=10km
02.04.02 OBRAS DE CONCRETO SIMPLE
SOLADO DE 3" PARA BUZONES (MEZCLA DE 1:10 CEMENTO - HORMIGON)
02.04.03 OBRAS DE CONCRETO ARMADO
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 1.50 m
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.0 m
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.50 m
02.04.04 EMPOTRAMIENTO DE TAPA SANITARIA
CONCRETO F'C 175 KG/CM2
02.04.05 MEDIA CAÑA
CONCRETO F'C 175 KG/CM2
02.04.06 REVOQUES Y SOLAQUEADO
PULIDO DE SUPERFICIE EN MEDIA CAÑA
SOLAQUEADO EN BUZONES INTERIORES
02.04.07 CARPINTERIA METALICA
TAPA DE FIERRO FUNDIDO DE Ø 60cm, INC/MARCO
05 VARIOS
PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 200 MM
PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 315 MM
06 PRUEBAS DE LABORATORIO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO
07 CONEXIONES DOMICILIARIAS - ALCANTARILLADO
CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 200
CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 315
DUCACIÓN SANITARIA Y CAPACITACIÓN SOCIAL
01 EDUCACIÓN SANITARIA
MATERIALES, EQUIPOS Y PERSONALES
02 CUIDADOS DEL RECURSO HIDRICO
MATERIALES, EQUIPOS Y PERSONALES C.R.H.
03 CUIDADOS DE LA INFRAESTRUCTURA (AGUA)
CUIDADO DE LA INFRAESTRUCTURA (AGUA)
MITIGACION AMBIENTAL
01 PLAN DE PARTICIPACIÓN CIUDADANA - GESTIÓN SOCIAL Y DIFUSIÓN
PLAN DE DIFUSIÓN Y CONSULTA AMBIENTAL
02 MEDIDAS DE PREVENCIÓN, MITIGACIÓN, REMEDIACIÓN Y COMPENSACIÓN
CAPACITACIÓN E INFORMACIÓN AL PERSONAL DE OBRA
APERTURA DE CAMPAMENTO
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POLVO
03 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS
CAPACITACIÓN EN EL MANEJO DE RESIDUOS SOLIDOS AL PERSONAL DE OBRA
ADQUISICION DE CONTENEDORES DE RESIDUOS SOLIDOS
04 PROGRAMA DE SEGUIMIENTO Y CONTROL
MONITOREO DE CALIDAD DE AIRE
MONITOREO DE CALIDAD DE RUIDO
MONITOREO DE CALIDAD DE AGUA
05 PLAN DE CONTINGENCIA
CAPACITACIÓN AL PERSONAL DE OBRA
SIMULACROS
06 SEÑALIZACION Y SEGURIDAD
CINTA PLÁSTICA SEÑALIZADORA PARA LÍMITE DE SEGURIDAD DE OBRA
SEÑAL INFORMATIVA Y SEÑALIZACIÓN DE DESVIOS EN OBRA
LAN DE MONITOREO ARQUEOLOGICO
ELABORACION DEL PLAN DE MONITOREO E INFORME FINAL
MONITOREO ARQUEOLOGICO
FLETE LOCAL
TOTAL
911.27
1422.40 1365.50 56.90
19380.72 0.00 0.00
2346.64
1089.99
1858.67
3650.01
896.76
7418.95
2119.70
8046.99 15236.86 0.00
8046.99
7453.00
6594.37
1189.49
19856.67 22575.57 49077.60
15326.43 2189.49
4530.24 18120.96 10570.56
2265.12 38507.04
3438.42 14956.33 553.07
2765.33 13273.60 553.07
673.09 1682.73
255329.84 202542.99 112228.45
4618.91 2323.93 0.00
4.07
2323.93
2909.03
1709.88
144170.25 78924.30 4318.64
45.78
171.02
12.55
113.28
98.49
9561.98 11474.37 72
160.41
381.69
179.64
80.67
26.12
177.11
3665.99 4887.98
5203.32
6365.50
37172.07 21010.30
18680.09
8688.96
5894.96
23129.46 23129.46
4618.25
4527.57 3018.38
4750.79 11085.17
4318.64 4318.64 4318.64 607.4
4209.95 592.12
3382.72
0.00 0.00 0.00
675.17 1941.12
374.78 1077.5
106540.68 75336.36 14248.36
1530.73 0.00 0.00
253.37
437.93 10.74
1092.80
2.95
0.8 0.8 0.8
0.4 0.8 1.2
0.8 0.4
917.65
64.24
956.93
1991.51
1
6 17
38
19.54 107.46
63.5 60.96 2.54
8
3
11
3
3
7
2
1
1
1
1
21 3
6 24 14
3 51
4.07
4068.57
1271.43 2797.14
4
95.99 90 107.99
827
239.52
944.59
94.85
149.87
763.75 673.9 898.53
409.93 956.49
365.98
41.24 164.95
881.48 498.23
431.71
193.95
126.61
560.85 560.85
94.85
89.92 59.95
109.79 256.19
607.4 607.4 607.4 607.4
592.12 592.12
475.77
2616.29
1452.28
84.46
85.95 10.74
35.31
307.34
100.35 47.23
288.71
307.34
52.7 40.3
11 4
5 8
20.57
21.3
136.72
761.54
90.75 30.25
1220.94 1395.35
1129.55 322.73
4
4
30.92 75.08
16.92 41.08
0.00%
I ni ci o
0.5
2631.38 2631.38
1
10
1
1
1
1 1
1 1
500
1
1.06 1.11 1.06 0.58
4.56%
Me s 01 Me s 02
PA
PA
69.96%
46.25%
46.25%
Me s 03 Me s 04
100.00%
89.86%
Me s 05 Me s 06
CALENDARIO VALORIZADO DE OBRA
Proyecto
Lugar
Elab. Por
Fecha
PARTIDAS
EDES DE AGUA POTABLE
01 TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC FLETE LOCAL.
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
TRANQUERA TIPO TIJERA DE 2.40mx1.20M P/SEÑAL DE PELIGRO
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Prov.duran.obra)
02 MOVIMIENTO DE TIERRAS - AMPLIACION
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 90-110 MM H=1.01 A 1.25M
EXCAV. A PULSO (C/EXPLOSIVO) P/TUB.DE AGUA TERRENO ROCOSO DN 90-110MM
REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. DN 90 - 110 PARA TODA PROF,
RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN 90 - 110 DE 1.01 -1.15 PROF.
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 90-110 MM PARA TODA PROF.
03 SUMINISTRO E INSTALACION DE TUBERÍA PVC UF NTP ISO 1452
TUBERIA PVC-U UF NTP ISO 1452 PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS
TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INCL. ANILLO+2%DESPERDICIOS
INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 INCLUYE PRUEBA HIDRAULICA
INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA
04 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PVC NTP ISO 1452
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX110 MM INL. ANILL
SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX90 MM INCL. ANILL
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX90 MM INCL. ANILL
SUMINISTRO CODO INYECTADO PVC U UF CL 10 NTP ISO 1452 PN 10 DN 110MMX22.5° INCL, ANI
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX22.5° INL. ANILL
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX45º INCL. ANILLO
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL. ANILLO
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCL.ANILLO
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCLANILLOS
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL ANILLOS
INSTALACIÓN DE ACCESORIOS DE PVC UF DN 90 - 110MM ANILLOS
CONCRETO F'C=140KG/CM2 PARA ANCLAJES INC ENCOFRADO
05 SUMINISTRO E INSTALACION DE VALVULAS Y GCI PARA REDES DE DISTRIBUCION - AMPLIACION
VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM
VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM
INSTALACION DE VALVULA COMPUERTA DN 90 A 110 MM INC. REGISTRO
GRIFO CONTRA INCENDIO DN 110 INCL. ACCESORIOS (VER PLANO)
INSTALACION DE GRIFO CONTRAINCENDIO-POSTE DE 2 BOCAS
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 90MM
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 110MM
06 VALVULA REDUCTORA DE PRESION
CAMARA P/VALV REDUCTORA DE PRESION T.SEMIROCOSO CARG+VOLQ.P/MATRIZ DN 100 A 400
VALVULA REDUCTORA CONTROL DE FLUJO BB DN 100 MM
SUMINISTRO DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESIÓN DE 100MM
MONTAJE DE ACCESORIOS Y VALVULA REDUCTORA DE PRESIÓN DN 100 E INST. HIDRAULICA
07 CONEXIONES DOMICILIARIAS
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 90 MM T-SEMIROCOSO SISTEMA CONVENCI
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110 MM T-SEMIROCOSO-SISTEMA CONVENCI
RENOVACIONES DE CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110MM T-SEMIROCOSO -
08 MICROMEDICION
MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO MULTIPLE S/ESPECIFICACION INCL.
INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2"
EDES DE ALCANTARILLADO
01 TRABAJOS PRELIMINARES
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp
CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE SEGURIDAD OBRA
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
02 MOVIMIENTO DE TIERRAS
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.01 A 1.25M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.26 A 1.50M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.51 A 1.75M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.76 A 2.00M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=2.01 A 2.50M
EXCAV. ZANJA PULSO P/TUB. DE ALCANTARILLADO TERRENO ROCOSO DN 200-315 MM
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.01 - 1.25 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.26 - 1.50 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.51 - 1.75 M
EXCAV. ZANJA (MAQ) T.SEMIROCOS DN 200-250 MM H=1.76 - 2.00 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=2.01 - 2.50 M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.26 A 1.50M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.76 A 2.00M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=2.01 A 2.50M
REFINE Y NIVELACION DE ZANJA TERRENO SEMIROCOSO P/TUB. 200 - 250 MM. P/TODA PROFUN
REFINE Y NIVELACION ZANJA T. SEMIROCOSO PARA TUB. DN 300-350 PARA TODA PROF.
REFINE Y NIVELACION ZANJA T. ROCOSO PARA TUB. DN 200-315 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) T - SEMIROCA DN 200 - 250 DE 1.01 - 1.25 PROF.
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.26 A 1.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.51 A 1.75M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.76 A 2.00M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=2.01 A 2.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355 MM H=1.26 A 1.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=1.76 A 2.00M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=2.01 A 2.5M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 315MM PARA TODA PROF.
ELIMIN. DESMONTE (CARG+VOLQ) TERRENO SEMIROCOSO D=10 KM. P/TUBERIA DN 200 - 250 M
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 315-355MM PARA TODA PROF.
ELIMIN. DESMONTE (CARG+VOLQ) T-ROCOSO D=10KM DN 200-315MM PARA TODA PROF.
03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF NTP ISO 4435 SN-2
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 MM INC. ANILLO+2% DESPERDICIOS
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 315 MM INC. ANILLO+2% DESPERDICIOS
INSTALACIÓN DE TUBERÍA PVC P/ALCANTARILLADO. DN 200 INCLUYE PRUEBA HIDRAULICA
INSTALACION DE TUBERIA PVC P/DESAGUE DN 315 MM INCL. PRUEBA HIDRAULICA
04 CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR)
02.04.01 MOVIMIENTO DE TIERRAS
EXCAVACION C/ MAQUINA T-SEMIROCOSO DE 1.0 a 2.50mt DE H.
EXCAVACION MANUAL EN T-SEMIROCOSO DE 1.0 a 2.50 mt DE H.
EXCAVACION EN TERRENO ROCOSO CON EXPLOSIVO
REFINE, NIVELACIÓN Y COMPACTACIÓN
RELLENO Y APISONADO CON MATERIAL PROPIO
ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO D=10km
02.04.02 OBRAS DE CONCRETO SIMPLE
SOLADO DE 3" PARA BUZONES (MEZCLA DE 1:10 CEMENTO - HORMIGON)
02.04.03 OBRAS DE CONCRETO ARMADO
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 1.50 m
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.0 m
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.50 m
02.04.04 EMPOTRAMIENTO DE TAPA SANITARIA
CONCRETO F'C 175 KG/CM2
02.04.05 MEDIA CAÑA
CONCRETO F'C 175 KG/CM2
02.04.06 REVOQUES Y SOLAQUEADO
PULIDO DE SUPERFICIE EN MEDIA CAÑA
SOLAQUEADO EN BUZONES INTERIORES
02.04.07 CARPINTERIA METALICA
TAPA DE FIERRO FUNDIDO DE Ø 60cm, INC/MARCO
05 VARIOS
PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 200 MM
PRUEBA HIDRAULICA DE TUBERIA DESAGUE DN 315 MM
06 PRUEBAS DE LABORATORIO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO
07 CONEXIONES DOMICILIARIAS - ALCANTARILLADO
CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 200
CONEXION DE DESAGUE TUBO PVC DN 110 MM T-SEMIROCOSO EN TUBERIA PVC UF SN2 Ø 315
DUCACIÓN SANITARIA Y CAPACITACIÓN SOCIAL
01 EDUCACIÓN SANITARIA
MATERIALES, EQUIPOS Y PERSONALES
02 CUIDADOS DEL RECURSO HIDRICO
MATERIALES, EQUIPOS Y PERSONALES C.R.H.
03 CUIDADOS DE LA INFRAESTRUCTURA (AGUA)
CUIDADO DE LA INFRAESTRUCTURA (AGUA)
MITIGACION AMBIENTAL
01 PLAN DE PARTICIPACIÓN CIUDADANA - GESTIÓN SOCIAL Y DIFUSIÓN
PLAN DE DIFUSIÓN Y CONSULTA AMBIENTAL
02 MEDIDAS DE PREVENCIÓN, MITIGACIÓN, REMEDIACIÓN Y COMPENSACIÓN
CAPACITACIÓN E INFORMACIÓN AL PERSONAL DE OBRA
APERTURA DE CAMPAMENTO
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION POLVO
03 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS
CAPACITACIÓN EN EL MANEJO DE RESIDUOS SOLIDOS AL PERSONAL DE OBRA
ADQUISICION DE CONTENEDORES DE RESIDUOS SOLIDOS
04 PROGRAMA DE SEGUIMIENTO Y CONTROL
MONITOREO DE CALIDAD DE AIRE
MONITOREO DE CALIDAD DE RUIDO
MONITOREO DE CALIDAD DE AGUA
05 PLAN DE CONTINGENCIA
CAPACITACIÓN AL PERSONAL DE OBRA
SIMULACROS
06 SEÑALIZACION Y SEGURIDAD
CINTA PLÁSTICA SEÑALIZADORA PARA LÍMITE DE SEGURIDAD DE OBRA
SEÑAL INFORMATIVA Y SEÑALIZACIÓN DE DESVIOS EN OBRA
LAN DE MONITOREO ARQUEOLOGICO
ELABORACION DEL PLAN DE MONITOREO E INFORME FINAL
MONITOREO ARQUEOLOGICO
FLETE LOCAL
TOTAL
120.00%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
40.00%
20.00%
0.00%
Inicio Mes 01 Mes 02
Sistemas RW7pro
PA
PA
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06
METRADOS
Mes 06 Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06
58613.19
2864.94
1
2.95
1684.42 2.95
1.6 0.8 0.8 0.8
512.96 1.6 0.4 0.8 1.2
667.56 0.8 0.8 0.4
6060.68
211.76 1764.71 917.65
54.32
402.06 1072.16 1116.83 357.39
884.53 1228.52 835.39
6060.68 2293.23 655.21
0.00
216.08 740.85
321.21 1606.06 64.24
956.93
1991.51
56.90
4
14
4
27
3
2
2
9 1
6 17
38
19.54 107.46
56.90 63.5 60.96 2.54
0.00
8
3
11
3
3
7
2
0.00
1
1
1
1
49077.60
21 3
10570.56 6 24 14
38507.04 3 51
553.07
553.07 20.33 97.6 4.07
34.86 87.14
112228.45
0.00
4.07
4.07
4068.57
1271.43 2797.14
4
4318.64
45.78
171.02
12.55
113.28
98.49
72 95.99 90 107.99
160.41
381.69 827
179.64 239.52
80.67
26.12
177.11 944.59
94.85
149.87
763.75 673.9 898.53
409.93 956.49
365.98
41.24 164.95
881.48 498.23
431.71
193.95
126.61
560.85 560.85
94.85
89.92 59.95
109.79 256.19
4318.64 607.4 607.4 607.4 607.4 607.4
592.12 592.12 592.12
475.77
0.00
675.17 1941.12
374.78 1077.5
2616.29
1452.28
14248.36
0.00
253.37 84.46
10.74 85.95 10.74
35.31
307.34
100.35 47.23
288.71
0.00
307.34
0.00
52.7 40.3
11 4
5 8
0.00
20.57
0.00
21.3
0.00
136.72
761.54
14248.36
14248.36 90.75 30.25
4819.56
3767.46 1220.94 1395.35
1052.10 1129.55 322.73
0.00
4
4
88841.89
54348.32 30.92 75.08
34493.57 16.92 41.08
0.00
0.00
1
0.00
1
0.00
1
0.00
0.00
1
0.00
0.5 0.5
1
1754.25 2631.38 2631.38
0.00
1 1
10
0.00
1 1
1 1
1 1
0.00
1 1
1 1
0.00
500 500
20
7296.46
3500.00 1
3796.46 0.09 1.11 1.06 1.11 1.06 0.58
0.00
0.42 0.25 0.17 0.17
178138.10
Mes 06
100.00%
10.14%
Sistemas RW7pro
PROYECTO:
LUGAR:
Fecha
Costo Directo S/.
PAR T I DAS
PROGRAMADO
PROGRAMACIÓN DE LA EJECUCI
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DEL SECTOR TA
ABANCAY
22 DE OCTUBRE DE 2018 AL 31 DE OCTUBRE DE 2018
1756097.63
PAR T I DAS
ES DE AGUA POTABLE
TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC FLETE LOCAL.
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
TRANQUERA TIPO TIJERA DE 2.40mx1.20M P/SEÑAL DE PELIGRO
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
PUENTE DE MADERA P/PASE VEHICULAR S/ZANJA S/D (Prov.duran.obra)
MOVIMIENTO DE TIERRAS - AMPLIACION
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 90-110 MM H=1.01 A 1.25M
EXCAV. A PULSO (C/EXPLOSIVO) P/TUB.DE AGUA TERRENO ROCOSO DN 90-110MM
REFINE Y NIVELACION DE ZANJA T-SEMIROCOSO P/TUB. DN 90 - 110 PARA TODA PROF,
RELLENO COMP. ZANJA (PULSO) P/TUB. T - SEMIROCA DN 90 - 110 DE 1.01 -1.15 PROF.
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 90-110 MM PARA TODA PROF.
SUMINISTRO E INSTALACION DE TUBERÍA PVC UF NTP ISO 1452
TUBERIA PVC-U UF NTP ISO 1452 PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS
TUBERIA PVC-U UF NTP ISO 1452 PN10 DN 110 MM INCL. ANILLO+2%DESPERDICIOS
INSTALACIÓN DE TUBERÍA PVC P/AGUA POTAB. DN 90 INCLUYE PRUEBA HIDRAULICA
INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM INC PRUEBA HIDRAULICA
SUMINISTRO E INSTALACIÓN DE ACCESORIOS PVC NTP ISO 1452
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX110 MM INL. ANILLO
SUMINISTRO TEE INYETADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MMX90 MM INCL. ANILLO
SUMINISTRO TEE INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX90 MM INCL. ANILLO
SUMINISTRO CODO INYECTADO PVC U UF CL 10 NTP ISO 1452 PN 10 DN 110MMX22.5° INCL, ANILLO
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX22.5° INL. ANILLO
SUMINISTRO CODO INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MMX45º INCL. ANILLO
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL. ANILLO
SUMINISTRO TAPON INYECTADO PVC U UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCL.ANILLO
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 90MM INCLANILLOS
UNION REPARACION PVC UF CL-10 NTP ISO 1452 PN 10 DN 110MM INCL ANILLOS
INSTALACIÓN DE ACCESORIOS DE PVC UF DN 90 - 110MM ANILLOS
CONCRETO F'C=140KG/CM2 PARA ANCLAJES INC ENCOFRADO
SUMINISTRO E INSTALACION DE VALVULAS Y GCI PARA REDES DE DISTRIBUCION - AMPLIACION
VÁLVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=90MM
VALVULA COMPUERTA Fº Fdo NTP ISO 2531 DN=110MM
INSTALACION DE VALVULA COMPUERTA DN 90 A 110 MM INC. REGISTRO
GRIFO CONTRA INCENDIO DN 110 INCL. ACCESORIOS (VER PLANO)
INSTALACION DE GRIFO CONTRAINCENDIO-POSTE DE 2 BOCAS
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 90MM
SUMINISTRO E INSTALACIÓN DE PURGA DE AGUA PARA DN 110MM
VALVULA REDUCTORA DE PRESION
CAMARA P/VALV REDUCTORA DE PRESION T.SEMIROCOSO CARG+VOLQ.P/MATRIZ DN 100 A 400MM
VALVULA REDUCTORA CONTROL DE FLUJO BB DN 100 MM
SUMINISTRO DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESIÓN DE 100MM
MONTAJE DE ACCESORIOS Y VALVULA REDUCTORA DE PRESIÓN DN 100 E INST. HIDRAULICA
CONEXIONES DOMICILIARIAS
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 90 MM T-SEMIROCOSO SISTEMA CONVENCIONAL
CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110 MM T-SEMIROCOSO-SISTEMA CONVENCIONA
RENOVACIONES DE CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 110MM T-SEMIROCOSO - SISTEMA
MICROMEDICION
MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO MULTIPLE S/ESPECIFICACION INCL. PRUEBAS
INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2"
ES DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL
REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL
RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp Surtidor
CERCO DE MALLAHDP DE 1.00M ALTURA PARA LIMITE SEGURIDAD OBRA
PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/D
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.01 A 1.25M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.26 A 1.50M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.51 A 1.75M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=1.76 A 2.00M
EXCAV. ZANJA ( PULSO) P/TUB.T.SEMIROCOSO DN 200-250 MM H=2.01 A 2.50M
EXCAV. ZANJA PULSO P/TUB. DE ALCANTARILLADO TERRENO ROCOSO DN 200-315 MM
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.01 - 1.25 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.26 - 1.50 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=1.51 - 1.75 M
EXCAV. ZANJA (MAQ) T.SEMIROCOS DN 200-250 MM H=1.76 - 2.00 M
EXCAV. ZANJA (MAQ) T- SEMIROCOSO . DN 200 - 250MM H=2.01 - 2.50 M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.26 A 1.50M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=1.76 A 2.00M
EXCAV. ZANJA (MAQ) P/TUB.TERRENO SEMIROCOSO DN 315-355 MM H=2.01 A 2.50M
REFINE Y NIVELACION DE ZANJA TERRENO SEMIROCOSO P/TUB. 200 - 250 MM. P/TODA PROFUNDIDAD
REFINE Y NIVELACION ZANJA T. SEMIROCOSO PARA TUB. DN 300-350 PARA TODA PROF.
REFINE Y NIVELACION ZANJA T. ROCOSO PARA TUB. DN 200-315 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) T - SEMIROCA DN 200 - 250 DE 1.01 - 1.25 PROF.
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.26 A 1.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.51 A 1.75M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=1.76 A 2.00M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 250MM H=2.01 A 2.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355 MM H=1.26 A 1.50M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=1.76 A 2.00M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 315 A 355MM H=2.01 A 2.5M
RELLENO COMP. ZANJA (PULSO) T-SEMIROCA - DN 200 A 315MM PARA TODA PROF.
ELIMIN. DESMONTE (CARG+VOLQ) TERRENO SEMIROCOSO D=10 KM. P/TUBERIA DN 200 - 250 MM P/TODA
ELIMIN.DESMONTE (CARG+VOLQ) T-SEMIROCOSO D=10KM DN 315-355MM PARA TODA PROF.
ELIMIN. DESMONTE (CARG+VOLQ) T-ROCOSO D=10KM DN 200-315MM PARA TODA PROF.
SUMINISTRO E INSTALACION DE TUBERIA PVC U UF NTP ISO 4435 SN-2
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 200 MM INC. ANILLO+2% DESPERDICIOS
TUBERIA PVC-U UF NTP ISO 4435 SN-2, SDR-51 DN 315 MM INC. ANILLO+2% DESPERDICIOS
INSTALACIÓN DE TUBERÍA PVC P/ALCANTARILLADO. DN 200 INCLUYE PRUEBA HIDRAULICA
INSTALACION DE TUBERIA PVC P/DESAGUE DN 315 MM INCL. PRUEBA HIDRAULICA
CONSTRUCCION DE BUZONES (RED COLECTOR Y EMISOR)
.01 MOVIMIENTO DE TIERRAS
EXCAVACION C/ MAQUINA T-SEMIROCOSO DE 1.0 a 2.50mt DE H.
EXCAVACION MANUAL EN T-SEMIROCOSO DE 1.0 a 2.50 mt DE H.
EXCAVACION EN TERRENO ROCOSO CON EXPLOSIVO
REFINE, NIVELACIÓN Y COMPACTACIÓN
RELLENO Y APISONADO CON MATERIAL PROPIO
ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO D=10km
.02 OBRAS DE CONCRETO SIMPLE
SOLADO DE 3" PARA BUZONES (MEZCLA DE 1:10 CEMENTO - HORMIGON)
.03 OBRAS DE CONCRETO ARMADO
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 1.50 m
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.0 m
BUZONES DE CONCRETO STANDAR D= 1.20 m, H <= 2.50 m
.04 EMPOTRAMIENTO DE TAPA SANITARIA
CONCRETO F'C 175 KG/CM2
.05 MEDIA CAÑA
CONCRETO F'C 175 KG/CM2
.06 REVOQUES Y SOLAQUEADO
PULIDO DE SUPERFICIE EN MEDIA CAÑA
SOLAQUEADO EN BUZONES INTERIORES
.07 CARPINTERIA METALICA
TAPA DE FIERRO FUNDIDO DE Ø 60cm, INC/MARCO
FLETE LOCAL
PROGRAMADO
SL
N DE LA EJECUCION FISICA DE LA OBRA V
ARIO DEL SECTOR TABLADA ALTA-ILLANYA DEL DISTRITO DE ABANCAY, J
Inicio: 10/22/2018 M
Plazo (días calendarios): 150 124 días labor M
Fin: 3/20/2019 L 1
Unidad de programación: SEMANAS DNL 1 1
CUADRI
PUEST Oct-18
METR
PRES
MES
ADO
DIAS
CADENA DE
LLA
UND O PRECE DENCIA
U
SEPARACION
DIAS C.
6 6
5 7
6 7
Inicio DIAS L.
1 1 1 1 1 1
Oct-18 Nov-18
6 7
3 4
0 0
2 3
6 7
6 7
6 7
5 6
1
2
1 1
2 2
1 1
3 2 6 6 6 5
6 2
4 5
4 3 2 6 6 6 4
2 3 2 6 6 6 5
4
4 6 4
2 2
4
3
2
2
4 5
2 1 0
2 0
2 5
1
5
1 4
1 6 5
2
1 5
3
1
1
3
1
1
5 3 2 6 6 6 3
5 3 2 6 6 6 3
3
3
1
1
2
1
1
1
1
1
1
2 2 6 6 6 5
2 3
4.56% 20.76%
4.56% 25.32%
1
1 1
1 1 1 1 1
Dec-18
0 0
1 1
5 7
6 7
6 7
5 7
1 2
4 5
1
1
1
1 5 6 1
1 5 6 6 5 1 4
6 6 5 1 4
1
3 2
1 6 4
1
5 1 4
3 1
1 1 4
4
3 1
4 1 4
1 5 6 4
1 5 6 1
1 3
0
0
1 5 6 4
2
3
5 6 5 1 4
3 5 1 4
3 5
1 4
2
1
1
4 6 6
4 6
0 1
0 1 5 6 6 5 1 3
5
5 3
5 6 5 1 4
2
5 3
5 6 5 1 4
5 5 1 4
4 1 4
2 1
1
1
1
1
1
1
1 5 6 6 5 1 4
3
20.93%
46.25%
1
1 1 1 1 1 1
Jan-19 Feb-19
5 7
6 7
6 7
4 5
0 0
2 2
6 7
6 7
1
2
1
5 6 6 4 2 6
5 6 6 4 2 6 6
5 6 2
5 2
5 6 6 4 2 6 6
4 4
2 1
1
3
1
2 0
1 0
1 0
1
1
1
3 4 0 1
2 4 0 2 6 6
1 4 2 6 6
4 2 6 2
1 3
5 2
2
5 6 4 2 6 6
5 2 4 2 6 6
5 6 6
5 6 6 4 2 6 5
2 6 4
5 1
4
5 6 4 2 6 6
3 0
3 2
3 2 5
1
1
1
4
5 4
1 4
1 6 6
5
1
5 6 6 4 2 6 6
2
23.71% 19.90%
69.96% 89.86%
1 1 1 1 1 1
Feb-19 Mar-19
6 7
4 5
0 0
2 2
6 7
6 7
6 7
6 7
1 2
1 0
3
1
3
3 4 2
6 4 1
6 4 0 2 6 6
1 0 2 6 6 3
6 4 1
1 1
6 3 0
6 4 0 2 3
3 4 2 6
3 4 2
1
3 1
3 4 0 2 6 6 3
3 4 0 2 6 6 3
1
1
6 4 2 6 5
2
19.90% 10.14%
89.86% 100.00%
1
0 1
######
######
######
###### Apr-19
1 1 1 1
######
######
######
######
######
######
May-19
1 1 1 1
######
######
######
######
######
######
Jun-19
######
1 1 1 1 1
######
######
######
######
######
Jul-19
1 1 1 1
######
######
######
######
######
######
Aug-19
1 1 1 1
######
######
######
######
######
######
Sep-19
1 1 1 1 1
######
######
######
Oct-19
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
######
######
######
Oct-19
1 1 1 1
######
######
######
######
######
###### Nov-19
1 1 1 1
######
######
######
######
######
######
Dec-19
1 1 1 1 1
######
######
######
######
######
######
Jan-20
1 1 1 1
######
######
######
######
######
######
Feb-20
1 1 1 1
######
######
######
######
######
######
Mar-20
1 1 1 1 1
######
######
######
######
######
######
Apr-20
1 1 1 1
######
######
######
May-20
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
######
######
######
May-20
######
1 1 1 1 1
######
######
######
######
###### Jun-20
1 1 1 1
######
######
######
######
######
######
Jul-20
1 1 1 1
######
######
######
######
######
######
Aug-20
######
1 1 1 1 1
######
######
######
######
######
Sep-20
1 1 1 1
######
######
######
######
######
######
Oct-20
1 1 1 1
######
######
######
######
######
######
Nov-20
1 1 1 1 1
######
######
######
Dec-20
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
######
######
######
Dec-20
1 1 1 1
######
######
######
######
######
###### Jan-21
######
1 1 1 1 1
######
######
######
######
######
Feb-21
1 1 1 1
######
######
######
######
######
######
Mar-21
1 1 1 1
######
######
######
######
######
######
Apr-21
1 1 1 1
######
######
######
######
######
######
May-21
######
1 1 1 1 1
######
######
######
######
######
Jun-21
1 1 1 1
######
######
######
Jul-21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
######
######
######
Jul-21
1 1 1 1
######
######
######
######
######
###### Aug-21
1 1 1 1 1
######
######
######
######
######
######
Sep-21
1 1 1 1
######
######
######
######
######
######
Oct-21
######
1 1 1 1 1
######
######
######
######
######
Nov-21
1 1 1 1
######
######
######
######
######
######
Dec-21
1 1 1 1
######
######
######
######
######
######
Jan-22
######
1 1 1 1 1
######
######
Feb-22
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
######
######
######
Feb-22
1 1 1 1
######
######
######
######
######
###### Mar-22
1 1 1 1
######
######
######
######
######
######
Apr-22
1 1 1 1
######
######
######
######
######
######
May-22
1 1 1 1 1
######
######
######
######
######
######
Jun-22
1 1 1 1
######
######
######
######
######
######
Jul-22
######
1 1 1 1 1
######
######
######
######
######
Aug-22
1 1 1 1
######
######
######
Sep-22
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
1 1 1 1
Sep-22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
######
######
######
######
######
1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00%
100.00%
SNL
SL
DNL
DL
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PRESUPUESTO ANALITICO
Proyecto MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y
ALCANTARILLADO SANITARIO DEL SECTOR TABLADA ALTA-ILLANYA DEL
DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY-APURIMAC
Lugar ABANCAY
Elab. Por ING JORGE MOSCOSO CARBAJAL
Fecha 22 DE OCTUBRE DE 2018 AL 31 DE OCTUBRE DE 2018
Unidad de programación:
METRADO
CUADRILLA
PUESTO
PRESU
PAR T I DAS UND
AVANCE DIARIO(%)
PROGRAMADO
AVANCE ACUMULADO(%)
CA DE LA OBRA
CANTARILLADO SANITARIO DEL SECTOR TABLADA ALTA-ILLANYA DEL DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY-APUR
Inicio: 1/1/2018
o (días calendarios): 90
Fin: 3/31/2018
ad de programación: DIAS SL
DNL D D D
01/01/18
02/01/18
03/01/18
04/01/18
05/01/18
06/01/18
07/01/18
08/01/18
09/01/18
10/01/18
12/01/18
13/01/18
14/01/18
15/01/18
16/01/18
17/01/18
18/01/18
19/01/18
20/01/18
21/01/18
22/01/18
23/01/18
24/01/18
11/01/18
DIAS
PRECE DENCIA
FECHA
DIAS N. L. 1 1 1
25/01/18
26/01/18
27/01/18
1
D
28/01/18
29/01/18
CIA DE ABANCAY-APURIMAC
30/01/18
31/01/18
01/02/18
02/02/18
03/02/18
1
D
04/02/18
05/02/18
06/02/18
07/02/18
08/02/18
09/02/18
10/02/18
1
D
11/02/18
12/02/18
13/02/18
14/02/18
15/02/18
16/02/18
17/02/18
1
D
18/02/18
19/02/18
20/02/18
21/02/18
22/02/18
23/02/18
24/02/18
1
D
25/02/18
26/02/18
27/02/18
28/02/18
01/03/18
02/03/18
03/03/18
1
D
04/03/18
05/03/18
06/03/18
07/03/18
08/03/18
09/03/18
1 10/03/18
D
11/03/18
12/03/18
13/03/18
14/03/18
15/03/18
16/03/18
17/03/18
1
D
18/03/18
19/03/18
20/03/18
21/03/18
22/03/18
23/03/18
24/03/18
1
D
25/03/18
26/03/18
27/03/18
28/03/18
29/03/18
30/03/18
31/03/18
1
D
01/04/18
02/04/18
03/04/18
04/04/18
05/04/18
06/04/18
07/04/18
1
D
08/04/18
09/04/18
10/04/18
11/04/18
12/04/18
13/04/18
14/04/18
1
D
15/04/18
16/04/18
17/04/18
18/04/18
19/04/18
20/04/18
21/04/18
1
D
22/04/18
23/04/18
24/04/18
25/04/18
26/04/18
27/04/18
28/04/18
1
D
29/04/18
30/04/18
01/05/18
02/05/18
03/05/18
04/05/18
05/05/18
1
D
06/05/18
07/05/18
08/05/18
09/05/18
10/05/18
11/05/18
12/05/18
1
D
13/05/18
14/05/18
15/05/18
16/05/18
17/05/18
18/05/18
19/05/18
1
D
20/05/18
21/05/18
22/05/18
23/05/18
24/05/18
25/05/18
26/05/18
1
D
27/05/18
28/05/18
29/05/18
30/05/18
31/05/18
01/06/18
02/06/18
1
D
03/06/18
04/06/18
05/06/18
06/06/18
07/06/18
08/06/18
09/06/18
1
D
10/06/18
11/06/18
12/06/18
13/06/18
14/06/18
15/06/18
16/06/18
1
D
17/06/18
18/06/18
19/06/18
20/06/18
21/06/18
22/06/18
23/06/18
1
D
24/06/18
25/06/18
26/06/18
27/06/18
28/06/18
29/06/18
30/06/18
1
D
01/07/18
02/07/18
03/07/18
04/07/18
05/07/18
06/07/18
07/07/18
1
D
08/07/18
09/07/18
10/07/18
11/07/18
12/07/18
13/07/18
14/07/18
1
D
15/07/18
16/07/18
17/07/18
18/07/18
19/07/18
20/07/18
21/07/18
1
D
22/07/18
23/07/18
24/07/18
25/07/18
26/07/18
27/07/18
28/07/18
1
D
29/07/18
30/07/18
31/07/18
01/08/18
02/08/18
03/08/18
04/08/18
1
D
05/08/18
06/08/18
07/08/18
08/08/18
09/08/18
10/08/18
11/08/18
1
D
12/08/18
13/08/18
14/08/18
15/08/18
16/08/18
17/08/18
18/08/18
1
D
19/08/18
20/08/18
21/08/18
22/08/18
23/08/18
24/08/18
25/08/18
1
D
26/08/18
27/08/18
28/08/18
29/08/18
30/08/18
31/08/18
01/09/18
1
D
02/09/18
03/09/18
04/09/18
05/09/18
06/09/18
07/09/18
08/09/18
1
D
09/09/18
10/09/18
11/09/18
12/09/18
13/09/18
14/09/18
15/09/18
1
D
16/09/18
17/09/18
18/09/18
19/09/18
20/09/18
21/09/18
22/09/18
1
D
23/09/18
24/09/18
25/09/18
26/09/18
27/09/18
28/09/18
29/09/18
1
D
30/09/18
01/10/18
02/10/18
03/10/18
04/10/18
05/10/18
06/10/18
1
D
07/10/18
08/10/18
09/10/18
10/10/18
11/10/18
12/10/18
13/10/18
1
D
14/10/18
15/10/18
16/10/18
17/10/18
18/10/18
19/10/18
20/10/18
1
D
21/10/18
22/10/18
23/10/18
24/10/18
25/10/18
26/10/18
27/10/18
1
D
28/10/18
29/10/18
30/10/18
31/10/18
01/11/18
02/11/18
03/11/18
1
D
04/11/18
05/11/18
06/11/18
07/11/18
08/11/18
09/11/18
10/11/18
1
D
11/11/18
12/11/18
13/11/18
14/11/18
15/11/18
16/11/18
17/11/18
1
D
18/11/18
19/11/18
20/11/18
21/11/18
22/11/18
23/11/18
24/11/18
1
D
25/11/18
26/11/18
27/11/18
28/11/18
29/11/18
30/11/18
01/12/18
1
D
02/12/18
03/12/18
04/12/18
05/12/18
06/12/18
07/12/18
08/12/18
1
D
09/12/18
10/12/18
11/12/18
12/12/18
13/12/18
14/12/18
15/12/18
1
D
16/12/18
17/12/18
18/12/18
19/12/18
20/12/18
21/12/18
22/12/18
1
D
23/12/18
24/12/18
25/12/18
26/12/18
27/12/18
28/12/18
29/12/18
1
D
30/12/18
31/12/18
01/01/19
SNL
SL
DNL
DL
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DEL SECTOR TABLADA ALTA-ILLANYA
LUGAR: ABANCAY Inicio: 1/1/2018
Fecha 22 DE OCTUBRE DE 2018 AL 31 DE OCTUBRE DE 2018 Plazo (días calendarios): 90 Feriados
C. D. S/. 0.00 Fin: 3/31/2018 SL
Unidad de programación: MESES DNL 4 4 4 5 4
CUADRILL
METRAD
2018
PUESTO
PRESU
DIAS
PAR T I DAS UND PRECE DENCIA MES
27 May
24 Feb
27 Mar
27 Jan
25 Apr
DIAS L.
OR TABLADA ALTA-ILLANYA DEL DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY-APURIMAC
4 5 4 5 4 4 5 4 4 5 4 4 5
2018 2019
27 May
27 Aug
25 Sep
26 Nov
26 Dec
24 Feb
26 Mar
26 Jun
27 Jan
25 Jun
27 Oct
26 Apr
26 Jul
Sistemas RW7pro
AVANCE FISICO VALORIZADO
SALDOS
ACTUAL ACUMULADA
% METR. VALORIZADO % METR. VALORIZADO
3.71% 19728.64 3.71% 511352.22
24.64% 2504.91 24.64% 7662.58
100.00% 1.00 746.89 100.00% 0.00 0.00
100.00% 2.95 1447.86 100.00% 0.00 0.00
0.00% 0.00 0.00 0.00% 2.95 1684.42
25.00% 1.00 310.16 25.00% 3.00 930.48
0.00% 0.00 0.00 0.00% 4.00 1709.88
0.00% 0.00 0.00 0.00% 2.00 3337.80
0.00% 0.00 0.00% 277076.40
0.00% 0.00 0.00 0.00% 2894.12 41270.15
0.00% 0.00 0.00 0.00% 54.32 4678.04
0.00% 0.00 0.00 0.00% 2948.44 16039.51
0.00% 0.00 0.00 0.00% 2948.44 187815.63
0.00% 0.00 0.00 0.00% 2948.44 27273.07
21.15% 17223.73 21.15% 64212.60
24.98% 239.00 4371.31 24.98% 717.93 13130.94
24.96% 497.00 12852.42 24.96% 1494.51 38648.03
0.00% 0.00 0.00 0.00% 956.93 4009.54
0.00% 0.00 0.00 0.00% 1991.51 8424.09
0.00% 0.00 0.00% 9264.41
0.00% 0.00 0.00 0.00% 4.00 269.32
0.00% 0.00 0.00 0.00% 14.00 1283.24
0.00% 0.00 0.00 0.00% 4.00 326.64
0.00% 0.00 0.00 0.00% 27.00 1034.91
0.00% 0.00 0.00 0.00% 3.00 84.99
0.00% 0.00 0.00 0.00% 2.00 56.66
0.00% 0.00 0.00 0.00% 2.00 45.76
0.00% 0.00 0.00 0.00% 10.00 285.00
0.00% 0.00 0.00 0.00% 23.00 651.59
0.00% 0.00 0.00 0.00% 38.00 1304.54
0.00% 0.00 0.00 0.00% 127.00 1076.96
0.00% 0.00 0.00 0.00% 127.00 2844.80
0.00% 0.00 0.00% 19394.72
0.00% 0.00 0.00 0.00% 8.00 2346.64
0.00% 0.00 0.00 0.00% 3.00 1089.99
0.00% 0.00 0.00 0.00% 11.00 1858.67
0.00% 0.00 0.00 0.00% 3.00 3650.01
0.00% 0.00 0.00 0.00% 3.00 896.76
0.00% 0.00 0.00 0.00% 7.00 7418.95
0.00% 0.00 0.00 0.00% 2.00 2133.70
0.00% 0.00 0.00% 23283.85
0.00% 0.00 0.00 0.00% 1.00 8046.99
0.00% 0.00 0.00 0.00% 1.00 7453.00
0.00% 0.00 0.00 0.00% 1.00 6594.37
0.00% 0.00 0.00 0.00% 1.00 1189.49
0.00% 0.00 0.00% 91509.84
0.00% 0.00 0.00 0.00% 24.00 17515.92
0.00% 0.00 0.00 0.00% 44.00 33221.76
0.00% 0.00 0.00 0.00% 54.00 40772.16
0.00% 0.00 0.00% 18947.82
0.00% 0.00 0.00 0.00% 122.00 16592.00
0.00% 0.00 0.00 0.00% 122.00 2355.82
5.22% 57151.41 5.22% 1037623.92
12.21% 1997.56 12.21% 14367.98
100.00% 4.07 1997.56 100.00% 0.00 0.00
0.00% 0.00 0.00 0.00% 4.07 2323.93
0.00% 0.00 0.00 0.00% 4068.57 6102.86
0.00% 0.00 0.00 0.00% 4068.57 4231.31
0.00% 0.00 0.00 0.00% 4.00 1709.88
0.42% 1454.21 0.42% 346858.56
72.74% 33.30 1454.21 72.74% 12.48 545.00
0.00% 0.00 0.00 0.00% 171.02 8043.07
0.00% 0.00 0.00 0.00% 12.55 639.42
0.00% 0.00 0.00 0.00% 113.28 6296.10
0.00% 0.00 0.00 0.00% 98.49 6021.68
0.00% 0.00 0.00 0.00% 365.98 38885.38
0.00% 0.00 0.00 0.00% 160.41 2287.45
0.00% 0.00 0.00 0.00% 1208.69 18468.78
0.00% 0.00 0.00 0.00% 419.16 6937.10
0.00% 0.00 0.00 0.00% 80.67 1462.55
0.00% 0.00 0.00 0.00% 26.12 518.74
0.00% 0.00 0.00 0.00% 1121.70 18642.65
0.00% 0.00 0.00 0.00% 94.85 1719.63
0.00% 0.00 0.00 0.00% 149.87 2989.91
0.00% 0.00 0.00 0.00% 2336.17 12708.76
0.00% 0.00 0.00 0.00% 1366.42 7433.32
0.00% 0.00 0.00 0.00% 365.98 1990.93
0.00% 0.00 0.00 0.00% 206.19 7956.87
0.00% 0.00 0.00 0.00% 1379.71 58182.37
0.00% 0.00 0.00 0.00% 431.71 18680.09
0.00% 0.00 0.00 0.00% 193.95 8688.96
0.00% 0.00 0.00 0.00% 126.61 5894.96
0.00% 0.00 0.00 0.00% 1121.70 46258.91
0.00% 0.00 0.00 0.00% 94.85 4618.25
0.00% 0.00 0.00 0.00% 149.87 7545.95
0.00% 0.00 0.00 0.00% 365.98 15835.95
0.00% 0.00 0.00 0.00% 3037.02 21593.21
0.00% 0.00 0.00 0.00% 1776.35 12629.85
0.00% 0.00 0.00 0.00% 475.77 3382.72
23.82% 53699.64 23.82% 171769.38
25.00% 654.00 21719.34 25.00% 1962.29 65167.65
25.00% 363.00 31980.30 25.00% 1089.28 95965.57
0.00% 0.00 0.00 0.00% 2616.29 6540.73
0.00% 0.00 0.00 0.00% 1452.28 4095.43
0.00% 0.00 0.00% 365008.15
0.00% 0.00 0.00% 21639.37
0.00% 0.00 0.00 0.00% 337.82 4209.24
0.00% 0.00 0.00 0.00% 107.44 4379.25
0.00% 0.00 0.00 0.00% 35.31 3376.34
0.00% 0.00 0.00 0.00% 307.34 2624.68
0.00% 0.00 0.00 0.00% 147.58 3415.00
0.00% 0.00 0.00 0.00% 288.71 3634.86
0.00% 0.00 0.00% 11313.19
0.00% 0.00 0.00 0.00% 307.34 11313.19
0.00% 0.00 0.00% 242470.88
0.00% 0.00 0.00 0.00% 93.00 183876.81
0.00% 0.00 0.00 0.00% 15.00 30763.80
0.00% 0.00 0.00 0.00% 13.00 27830.27
0.00% 0.00 0.00% 8501.99
0.00% 0.00 0.00 0.00% 20.57 8501.99
0.00% 0.00 0.00% 8803.72
0.00% 0.00 0.00 0.00% 21.30 8803.72
0.00% 0.00 0.00% 15285.58
0.00% 0.00 0.00 0.00% 136.72 2819.17
0.00% 0.00 0.00 0.00% 761.54 12466.41
0.00% 0.00 0.00% 56993.42
0.00% 0.00 0.00 0.00% 121.00 56993.42
0.00% 0.00 0.00% 11798.41
0.00% 0.00 0.00 0.00% 2616.29 7063.98
0.00% 0.00 0.00 0.00% 1452.28 4734.43
0.00% 0.00 0.00% 2397.60
0.00% 0.00 0.00 0.00% 4.00 574.40
0.00% 0.00 0.00 0.00% 4.00 1823.20
0.00% 0.00 0.00% 125423.84
0.00% 0.00 0.00 0.00% 106.00 76727.04
0.00% 0.00 0.00 0.00% 58.00 48696.80
0.00% 0.00 0.00% 21138.50
0.00% 0.00 0.00% 7443.00
0.00% 0.00 0.00 0.00% 1.00 7443.00
0.00% 0.00 0.00% 7443.00
0.00% 0.00 0.00 0.00% 1.00 7443.00
0.00% 0.00 0.00% 6252.50
0.00% 0.00 0.00 0.00% 1.00 6252.50
0.00% 0.00 0.00% 27534.50
0.00% 0.00 0.00% 1909.00
0.00% 0.00 0.00 0.00% 1.00 1909.00
0.00% 0.00 0.00% 11851.80
0.00% 0.00 0.00 0.00% 1.00 541.50
0.00% 0.00 0.00 0.00% 1.00 784.78
0.00% 0.00 0.00 0.00% 7017.01 10525.52
0.00% 0.00 0.00% 3041.70
0.00% 0.00 0.00 0.00% 2.00 1035.00
0.00% 0.00 0.00 0.00% 10.00 2006.70
0.00% 0.00 0.00% 5000.00
0.00% 0.00 0.00 0.00% 2.00 1600.00
0.00% 0.00 0.00 0.00% 2.00 1800.00
0.00% 0.00 0.00 0.00% 2.00 1600.00
0.00% 0.00 0.00% 3435.00
0.00% 0.00 0.00 0.00% 2.00 1035.00
0.00% 0.00 0.00 0.00% 2.00 2400.00
0.00% 0.00 0.00% 2297.00
0.00% 0.00 0.00 0.00% 1000.00 620.00
0.00% 0.00 0.00 0.00% 20.00 1677.00
0.00% 0.00 0.00% 36500.00
0.00% 0.00 0.00 0.00% 1.00 3500.00
0.00% 0.00 0.00 0.00% 5.00 33000.00
25.00% 11267.11 25.00% 33801.33
25.00% 0.25 11267.11 25.00% 0.75 33801.33
88147.16 1667950.47
13841.60 261915.48
101988.76 1929865.95
4042.42 76492.07
106031.18 2006358.02
5.02% 94.98%
Sistemas RW7pro
Lugar :
Elab. Por :
Fecha :
CONFORMACION DE MONOMIOS
COEF. SIMB. % COEF.
N°M N° IU IU ELEMENTO INICIAL AGRUP. INCID. ACUM.
AVANCE FISICO DE OBRA VAL
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE
ALTA-ILLANYA DEL DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY-APURIMAC
MES :
PRESUPUESTO BASE
P A R T I D A S UND.
METR. C.U.
SICO DE OBRA VALORIZADO Nº …….
TARILLADO SANITARIO DEL SECTOR TABLADA FECHA DE INICIO DE PLAZO
MAC
PLAZO DE EJECUCION
FECHA DE TERMINO PROGR.
(S/.) (S/.)
8. MONTO NETO FACTURABLE SIN I.G.V. (5+6+ 303 376.66 270 915.25
SALDOS
POR
PAGAR
(S/.)
###
###
###
0.00
###
0.00
0.00
###
###
0.00
###
###
###