HONORABLE MUNICIPALIDAD DISTRITAL SANTIAGO DE

SANTIAGO DE CUSCO
GERENCIA DE INFRAESTRUCTURA
Sub Gerencia de Obras

INFORME MENSUAL N° 006


DICIEMBRE 2018

OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE A


COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URB
SANTIAGO - CUSCO

Residente de Obra ING. ALBERT MONZON VALER


Inspector de Obra ING. FREDY RAUL HUALLPAMAYTA TAMAYO

HONORABLE MUNICIPALIDAD DISTRITAL SANTIAGO DE


SANTIAGO DE CUSCO
GERENCIA DE INFRAESTRUCTURA
Sub Gerencia de Obras

INFORME MENSUAL N° 006


DICIEMBRE 2018
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE A
COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URB
SANTIAGO - CUSCO

Residente de Obra ING. ALBERT MONZON VALER


Inspector de Obra ING. FREDY RAUL HUALLPAMAYTA TAMAYO
ITAL SANTIAGO DE CUSCO
DE CUSCO
ESTRUCTURA
de Obras

AL N° 006
E 2018

STRIBUCION DE AGUA Y LAS REDES


EN EL CASCO URBANO DISTRITO DE
USCO

PAMAYTA TAMAYO

ITAL SANTIAGO DE CUSCO


CUSCO
ESTRUCTURA
de Obras

AL N° 006
E 2018
STRIBUCION DE AGUA Y LAS REDES
EN EL CASCO URBANO DISTRITO DE
USCO
PAMAYTA TAMAYO
Ficha Técnica Proyecto o Actividad
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTO
SANTIAGO - CUSCO

GI - DO
A.1 RESIDENTE DE OBRA ING. ALBERT MONZON VALER
CIP:203127

Nro de Asientos del mes : 25


Ultimo Asiento del Cuaderno (a la fecha informada): 1416
A.2 SUPERVISOR ING. FREDY RAUL HUALLPAMAYTA TAMAYO
CIP:86480

Nro de Asientos del mes : 7


Ultimo Asiento del Cuaderno (a la fecha informada): 1417
A.3 DATOS DEL PROYECTO :
Código SNIP :212955
Unidad Ejecutora : Gerencia de Infraestructura - Division de obras
Meta SIAF del año :0107-2018
Meta Física (resumen) : Descripción de los Componentes del Proyecto;

El proyecto se encuentra, en el Casco Urbano del Distrito de Santiago, y se tiene planificado realizar el
mejoramiento de las redes de agua y desagüe el cual esta dividido en tres componentes de ejecucion
-Mejoramiento del Sistema de Agua = 6,789.99 m.
-Mejoramiento del Redes Colectoras Secundarias = 5,858.23 m.
-Impacto ambiental y Educacion Sanitaria

LA CUAL SE INTERVENDRA EN 03 SECTORES:


• Sector Nº 01 Desde Malampata, hasta la Calle Santiago, Sector Nº 02 Desde la Calle Santiago, hasta la
Calle Belen, Sector Nº 03 Desde la Calle Belen hasta Av Grau.
se ha proyectado 1005 conexiones domiciliarias de agua, 52 vavulas de hierro ductil de diferentes diametros,
17 grifos contran incendio y 458 conexiones domiciliarias de Desague compuestos de las diferentes partidas
que abarcan todo el proyecto.

Fuente de Financiamiento : Estado Actual


Canon y Sobrecanon del Proyecto:
Modalidad de Ejecución :
En Ejecución
Ejecución Presupuestaria Directa
Ubicación:
Localidad : Santiago Distrito : Santiago
Presupuesto :
Ppto. Aprobado del Perfil SNIP : S/. 3,333,959.53 Ppto. ejecutado años anteriores :
Ppto. Aprobado del Expediente Técnico : S/. 4,284,587.53 PIM para el año 2018:
Presupuesto Total Costo Directo: S/. 3,788,909.92 Ppto. Aprobado p/ Adicionales (Ms.Ms.):
Total Costos Indirectos (G.G. Exp. Sup Ev y Liq): S/. 495,677.61 Total PEA (Personal Técnico, Administrativo y O

1,580,903.90 Necesita Verificación de Viabilidad ?

EXPEDIENTE TECNICO APROBADO (AVANCE FINANCIERO C/R COSTO DIRECTO)

DESCRIPCION COSTO DIRECTO AVANCE FINANCIERO


Personal 1,919,633.08 1,580,903.90
Materiales y Equipos 693,974.82 1,260,087.00
Servicios 1,175,302.02 122,719.57
Total 3,788,909.92 2,963,710.47

EXPEDIENTE TECNICO APROBADO (AVANCE FINANCIERO C/R PRESUPUESTO TOTAL)


DESCRIPCION EXP. TEC. APROBADO AVANCE FINANCIERO
COSTO DIRECTO 3,788,909.92 2,963,710.47
GASTOS GENERALES 363,480.45 593,228.89
GASTOS DE SUPERVISION 87,856.09 120,138.74
GASTOS DE LIQUIDACION 15,712.96 0.00
GASTOS DE ELAB. EXP. TEC. 28,628.11 26,164.10
COSTO TOTAL 4,284,587.53 3,703,242.20
A.4 DOCUMENTACION ADMINISTRATIVA:
DESCRIPCION DOCUMENTO NUM
Aprobación Expediente Resolución RESOLUCION DE ALCAL
Designación de Jefe de Proyecto/ Residente de obra Memorandum MEMORANDUM N° 009-20
Designación de Supervisor Memorandum MEMORANDUM Nº 107-2
Aprobación Adicional de Plazo-01 Resolución RESOLUCION DE GEREN
Aprobación Adicional de Plazo-02 Resolución RESOLUCION DE GEREN
Paralización de Proyecto Acta(s) CUADERNO DE OBRA Nº 01
Reinicio de obra Acta(s) CUADERNO DE OBRA Nº 01
Paralización de Proyecto Acta(s) CUADERNO DE OBRA Nº 06
Reinicio de obra Acta(s) CUADERNO DE OBRA Nº 06
Paralización de Proyecto Acta(s) CUADERNO DE OBRA Nº 10
Reinicio de obra Acta(s) CUADERNO DE OBRA Nº 10
Paralización de Proyecto Acta(s) - corte CUADERNO DE OBRA Nº 11
Reinicio de obra Acta(s) CUADERNO DE OBRA Nº 12
Ampliacion de plazo - 03 Informe N° 20 TRAMITE Y R
Culminacion de Obra

Relacion de Residentes y Supervisores/Inspectores (DESDE EL INICIO DE OBRA HASTA LA FECHA)


CARGO NOMBRES Y APELLIDOS DOCUMENTO DE
Residente :ING. ANTOLY B. MONTERROSO HUAMAN Memor
Residente : ING. FRANK E. DUEÑAS PALOMINO Memor
Residente : ING. AUGUSTO MASIAS QUISPE Memor
Residente :ING. ALBERT MONZON VALER Memor

CARGO NOMBRES Y APELLIDOS DOCUMENTO DE


Supervisor :ING. ABEL RONDAN PINARES Memor
Supervisor : ING. JORGEMEDINE ZAVALETA Memor
Supervisor :ING. DEVORAH M GUTIERREZ PINTO Memor
Supervisor :ING. STEVE LUNA GUTIERREZ Memor
Supervisor :ING. HELMUT PILARES PALOMINO Memor
Supervisor :ING SANDRO MENDOZA ESCALANTE Memor
Supervisor :ING. JAVIER LLUMPO NANAYAY Memor
Supervisor :ING FREDY RAAUL HUALLPAMAYTA TAMAYO Memor
o Actividad de Inversión Pública
REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE
NTIAGO - CUSCO

Informado al: 31 de DICIEMBRE del 2018

Provincia : Cusco

o años anteriores : S/. 3,550,283.00


o 2018: S/. 630,000.00
o p/ Adicionales (Ms.Ms.): S/. 0.00
nal Técnico, Administrativo y Obrero) 4
cación de Viabilidad ? NO

% AVANCE SALDO

41.72% 338,729.18
33.26% -566,112.18
3.24% 1,052,582.45
78.22% 825,199.45
% AVANCE SALDO
78.22% 825,199.45
163.21% -229,748.44
136.74% -32,282.65
0.00% 15,712.96
91.39% 2,464.01
86.43% 581,345.33

NUMERO De FECHA
ESOLUCION DE ALCALDIA Nº 165-A/MDS-SG-13 07 DE MAYO DEL 2013
MORANDUM N° 009-2018-ACOR/JDO/GI-MDS/C 07 DE JUNIO DEL 2018
EMORANDUM Nº 107-2018-MDS-GM/OSI/CAFY 07 DE AGOSTO DEL 2018
SOLUCION DE GERENCIA N°379-2014-GM/MDS 15 DE DICIEMBRE DEL 2014
ESOLUCION DE GERENCIA Nº 332-2015-A-MDS 30 DE SETIEMBRE-2015
ERNO DE OBRA Nº 01 ASIENTOS Nº 003 DEL 2013 18 DE JUNIO AL 26-JUNIO-2013
ERNO DE OBRA Nº 01 ASIENTOS Nº 005 DEL 2013 23 DE JUNIO 2013
ERNO DE OBRA Nº 06 ASIENTOS Nº 565DEL 2013 15 -SEPTIEMBRE 2014 AL 18- FEBRERO 2015
ERNO DE OBRA Nº 06 ASIENTOS Nº 566DEL 2013 18 DE FEBRERO DEL 2015
ERNO DE OBRA Nº 10 ASIENTOS Nº 1174 DEL 2015 30 -NOVIEMBRE 2015 AL 01- JUNIO 2016
ERNO DE OBRA Nº 10 ASIENTOS Nº 1176 DEL 2016 01 JUNIO 2016
ERNO DE OBRA Nº 11 ASIENTO Nº 1268 DEL 2016 31 DE AGOSTO - 2016
ERNO DE OBRA Nº 12 ASIENTO Nº 1269 DEL 2016 01 JULIO 2018
TRAMITE Y RESOLUCION 13 DE AGOSTO 2018
17 DE ABRIL 2019

DOCUMENTO DE DESIGNACION FECHA INICIO


Memorandum 6/3/2013
Memorandum 4/14/2014
Memorandum 2/1/2015
Memorandum 7/1/2018

DOCUMENTO DE DESIGNACION FECHA INICIO

Memorandum 6/26/2013
Memorandum 9/16/2013
Memorandum 3/18/2014
Memorandum 2/18/2015
Memorandum 4/1/2015
Memorandum 4/17/2015
Memorandum 7/1/2018
Memorandum 8/1/2018
Ficha Técnica Proyecto o Actividad de Inversión Pública
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDAR
EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

GI - DO Informado al: 30 Noviembre d

A.5 AVANCE DE PROYECTO MENSUAL VALORIZADO: (SOLO AL COSTO DIRECTO)


AVANCE FISICO REPROGRAMADO AVANCE FISICO EJECUTADO AVANCE FINANCIERO
Nro. Meses Presupuesto Exp. Porcentaje c/r al Porcentaje c/r al
Presupuesto Presupuesto
Tec. C.D. C.D.
1 AÑO 2013 762,637.21 20.13% 762,637.21 20.13% 968,699.99
2 AÑO 2014 632,863.84 16.70% 632,863.84 16.70% 1,296,784.04
3 AÑO 2015 598,194.43 15.79% 598,194.43 15.79% 932,056.05
4 AÑO 2016 117,835.23 3.11% 117,835.23 3.11% 236,553.27
6 JULIO 2018 9,813.91 0.26% 9,813.91 0.26% 0.00
7 AGOSTO 2018 51,896.22 1.37% 51,896.22 1.37% 49,521.34
8 SETIEMBRE 2018 40,552.35 1.07% 40,552.35 1.07% 88,375.65
9 OCTUBRE 2018 19,639.79 0.52% 19,639.79 0.52% 90,466.66
10 NOVIEMBRE 2018 56,987.89 1.50% 57,638.75 1.52% 40,785.20
11 DICIEMBRE 2018 50,876.34 1.34% 38,526.06 1.02% 0.00
12 ENERO 2019 361,903.18 9.55% 0.00 0.00% 0.00
13 FEFRERO 2019 361,903.18 9.55% 0.00 0.00% 0.00
14 MARZO 2019 361,903.18 9.55% 0.00 0.00% 0.00
15 ABRIL 2019 361,903.18 9.55% 0.00 0.00% 0.00
TOTALES 3,788,909.92 100.00% 2,329,597.79 61.48% 3,703,242.20

MAYORES METRADOS

1 AÑO 2016 38,433.80 1.01% 38,433.80 1.01%


TOTALES 38,433.80 1.01% 38,433.80 1.01%

PARTIDAS NUEVAS

1 AÑO 2017 245,034.72 6.47% 195,812.60 5.17%


TOTALES 245,034.72 6.47% 195,812.60 5.17%
TOTAL 2,613,066.31 68.97% 2,563,844.53 67.67% 3,703,242.20
Porcentaje de Avance Acumulado c/r al % Av. Físico
Ppto. Aprobado del Expediente Técnico : Programado
67.67% Acum. C.A.O.
Informado:

A.8 MODIFICACIONES AL EXPEDIENTE TECNICO: (Aprobado(s) mediante Resolución(es)).


Partidas Nuevas /
Descripcion Documento de aprobación (Resolución) Mayores Metrados
Adicionales
Ampliacion Presupuestal 0.00 0.00

A.9 AVANCE DEL PLAZO DE EJECUCION:


Descripcion Documento de aprobación (Resolución) Fecha Inicio
Plazo de Ejecucion Según
RESOLUCION DE ALCALDIA Nº 165-A/MDS-SG-13 6/17/2013
Expediente

Primera Ampliacion de Plazo RESOLUCION DE ALCALDIA Nº Nº 379-2014/GM/MDS 8/11/2014

Segunda Ampliacion de Plazo RESOLUCION DE ALCALDIA Nº 332-2015-A-MDS 2/1/2015

Reinicio de Obra ACTA 7/1/2018

A.10 MOVIMIENTO DE ALMACEN


SALDO ANTERIOR INGRESO MENSUAL EGRESO MENSUAL

S/. 295,628.02 S/. 2,550.50 S/. 14,727.48

A.11 LIMITACIONES, RECOMENDACIONES y/o COMENTARIOS:


.- Se recomienda a equipo y maquinaria que mantenga el orden y displina al momento de la programacion por obras, y
repercute en nuestras actividades programadas a diario
.- Se menciona que el atrazo de obra se ve reflejado por los brucos cambios climaticos (lluvias intensas y regulares), la
materiales que hasta el momento repercuten con los trabajos necesarios en campo y la falta de presencia por parte de
.- Se da en conocimiento que el atrazo de obra se ve reflejado tambien por la poca presencia de personal, ya que esto
desarrollo de nuestras actvidades según nuestra programacion diaria como tambien no tenemos respuesta por parte d
pedido para contar con mas personal obrero
sión Pública
ECTORAS SECUNDARIAS DE DESAGUE
SCO

o al: 30 Noviembre del 2018

AVANCE FINANCIERO
SALDO
Porcentaje c/r al Financiero
Total Presup. Exp.
23% 3,315,887.54
30.27% 2,019,103.50
21.75% 1,087,047.45
5.52% 850,494.18
0.00% 850,494.18
1.16% 800,972.84
2.06% 712,597.19
2.11% 622,130.53
0.95% 581,345.33
0.00% 0.00
0.00% 0.00
0.00% 0.00
0.00% 0.00
0.00% 0.00
86.43% 581,345.33

###

###

86.43% 581,345.33
Proyecto
100.00%

Deductivos TOTAL MODIF.

0.00 0.00

Nº Dias Calendario Fecha de Conclusion

420.00 8/11/2014

173.00 2/1/2015

335.00 12/31/2015

105.00 10/14/2018
SALDO ACTUAL

S/. 283,451.04

ogramacion por obras, ya que eso

intensas y regulares), la mala calidad de


presencia por parte de Sedacusco
de personal, ya que esto afecta en el
s respuesta por parte de personal a nuesro
Ficha Técnica Proyecto
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES

A.1 RESIDENTE DE OBRA ING. ALBERT MONZON VALER


Ultimo Asiento del Cuaderno (a la fecha informada): Nro. CIP:203127

A.2 INSPECTOR DE OBRA ING. FREDY RAUL HUALLPAMAYTA TAMAYO


Nro. Asientos de Supervisión en el mes informado: 1267 CIP:86480

A.3 DATOS DEL PROYECTO : DICIEMBRE 2018


Código SNIP :212955
Unidad Ejecutora :Gerencia de Infraestructura - Division de
Meta SIAF del año :0107-2018
Meta Física (resumen) :Meta fisica del proyecto:

El proyecto se encuentra, en el Casco Urbano del Distrito de Santiago, y se tiene planificado realizar el mejoramiento
dividido en tres componentes de ejecucion
-Mejoramiento del Sistema de Agua = 6,789.99 m.
-Mejoramiento del Redes Colectoras Secundarias = 5,858.23 m.
-Impacto ambiental y Educacion Sanitaria
LA CUAL SE INTERVENDRA EN 03 SECTORES:
• Sector Nº 01 Desde Malampata, hasta la Calle Santiago, Sector Nº 02 Desde la Calle Santiago, hasta la Calle Belen,
Grau.
se ha proyectado 1005 conexiones domiciliarias de agua, 52 vavulas de hierro ductil de diferentes diametros, 17 grifo
domiciliarias de Desague compuestos de las diferentes partidas que abarcan todo el proyecto.

Fuente de Financiamiento : Canon y Sobrecanon

Modalidad de Ejecución : Ejecución Presupuestaria Directa

Ubicación:
Localidad : Santiago S/. 2,391,685.25
Presupuesto :
Ppto. Aprobado del Perfil Técnico SNIP : S/. S/. 3,333,959.53
Ppto. Aprobado del Expediente Técnico : S/. S/. 4,284,587.53
Presupuesto Total Costo Directo: S/. S/. 3,788,909.92
Total Costos Indirectos (G.G. Exp. Sup y Liq): S/. S/. 495,677.61

A.4 EJECUCION FISICA AL COSTO DIRECTO

EJECUCION FINANCIERO DE OBRA EXP. TEC. APROBADO %

2.6.2.3.2.4 PERSONAL 1,175,302.02 31.02%

2.6.2.3.2.5 BIENES 1,919,633.08 50.66%

2.6.2.3.2.6 SERVICIOS 693,974.82 18.32%

TOTAL 3,788,909.92 100.00%

A.5 EJECUCION FINANCIERA DE OBRA AL COSTO TOTAL

DESCRIPCION EXP. TEC. APROBADO %


Ficha Técnica Proyecto
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES

COSTO DIRECTO 3,788,909.92 88.43%


GASTOS GENERALES 363,480.45 8.48%
GASTOS DE SUPERVISION 87,856.09 2.05%
GASTOS DE LIQUIDACION 15,712.96 0.37%
GASTOS DE ELAB. EXP. TEC. 28,628.11 0.67%
COSTO TOTAL 4,284,587.53 100.00%

A.6 DOCUMENTACION ADMINISTRATIVA:


DESCRIPCION
Aprobación Expediente
Designación de Jefe de Proyecto/ Residente de obra
Prorroga en el Plazo de Ejecución
Designación de Supervisor
Aprobación Adicionales
Aprobación Adicional de Plazo-01
Aprobación Adicional de Plazo-02
Entrega de Terreno
Inicio de Proyecto
Paralización de Proyecto
Reinicio de obra
Paralización de Proyecto
Reinicio de obra
Paralización de Proyecto
Reinicio de obra
Paralización de Proyecto
Reinicio de obra

A.7 AVANCE DE PROYECTO MENSUAL VALORIZADO


AVANCE FISICO PROGRAMADO AVANCE FISICO EJEC
Nro. Meses
Presupuesto Porcentaje c/r al C.D. Presupuesto
01 JUNIO-2013. 282,138.72 7.45% 53,538.69
02 JULIO-2013. 794,468.68 20.97% 81,379.56
03 AGOSTO-2013. 233,901.97 6.17% 124,642.10
04 SETIEMBRE-2013. 276,195.27 7.29% 148,102.19
05 OCTUBRE-2013. 337,003.42 8.89% 173,424.28

NOVIEMBRE-2013. 306,554.43 8.09% 181,550.39


06
07 DICIEMBRE-2013. 0.00 0.00 0.00
08 ENERO-2014. 255,594.88 6.75% 142,889.78
09 FEBRERO-2014. 224,127.00 5.92% 70,227.75
10 MARZO-2014. 124,596.93 3.29% 110,221.06
11 ABRIL-2014. 73,169.24 1.93% 33,262.66
12 MAYO-2014. 129,033.96 3.41% 43,009.20
13 JUNIO-2014. 131,912.43 3.48% 47,442.99
14 JULIO-2014. 364,935.27 9.63% 49,449.36
15 AGOSTO-2014. 255,277.71 6.74% 52,984.92
HASTA AGOSTO-2014. 3,788,909.92 100.00% 1,312,124.93
1,312,124.93 34.63%
16 SETIEMBRE-2014. 35,558.05 0.94% 35,558.05
17 OCTUBRE-2014. 43,999.31 1.16% 43,999.31
18 NOVIEMBRE-2014. 3,818.76 0.10% 3,818.76
19 DICIEMBRE-2014. 0.00 0.00% 0.00
20 ENERO-2015. 0.00 0.00% 0.00
HASTA DICIEMBRE-2014. 1,395,501.05 36.83% 1,395,501.05
20 ENERO-2015. 0.00 0.00% 0.00
21 FEBRERO-2015. 238,337.39 6.29% 0.00
22 MARZO-2015. 243,144.28 6.42% 79,969.92
23 ABRIL-2015. 243,144.28 6.42% 53,811.15
24 MAYO-2015. 243,144.28 6.42% 74,973.18
25 JUNIO-2015. 255,350.93 6.74% 76,683.98
26 JULIO-2015. 255,350.93 6.74% 87,094.09
27 AGOSTO-2015. 257,776.71 6.80% 89,534.48
28 SEPTIEMBRE-2015. 254,278.47 6.71% 93,707.37
29 OCTUBRE-2015. 208,952.49 5.51% 19,123.36
30 NOVIEMBRE-2015. 193,929.11 5.12% 23,296.90
31 DICIEMBRE-2015. 0.00% 0.00
HASTA-DICIEMBRE-2015. 3,788,909.92 100.00% 1,993,695.49
Ficha Técnica Proyecto
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES

1,993,695.49 52.62%
37 JUNIO-2016. 191,887.09 5.06% 27,738.93
38 JULIO-2015. 267,539.89 7.06% 58,184.20
39 AGOSTO-2016. 267,899.46 7.07% 31,912.10
40 SEPTIEMBRE-2016. 337,783.34 8.92% 0.00
41 OCTUBRE-2016. 273,361.25 7.21% 0.00
42 NOVIEMBRE-2016. 266,801.25 7.04% 0.00
43 DICIEMBRE-2016. 189,942.15 5.01% 0.00
HASTA-DICIEMBRE-2016. 3,788,909.92 100.00% 117,835.23
2,111,530.72 55.73%
38 JULIO-2018. S/. 369,023.42 9.74% S/. 9,813.91
39 AGOSTO-2018. S/. 754,820.64 19.92% S/. 51,896.22
40 SEPTIEMBRE-2018. S/. 470,504.87 12.42% S/. 40,552.35
41 OCTUBRE-2018. S/. 83,030.27 2.19% S/. 15,517.29
42 NOVIEMBRE-2018. S/. - 0.00% S/. -
43 DICIEMBRE-2018. S/. - 0.00% S/. -
HASTA-DICIEMBRE-2018. 3,788,909.92 100.00% 117,779.76
TOTAL 3,788,909.92 100.00% 2,229,310.48
Porcentaje de Avance Acumulado c/r al
Ppto. Aprobado del Expediente Técnico:
Ficha Técnica Proyecto
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES

MAYORES METRADOS

AVANCE FISICO PROGRAMADO AVANCE FISICO EJEC


Nro. Meses
Presupuesto Porcentaje c/r al C.D. Presupuesto
1 AGOSTO-2016. 38,433.80 1.01% 38,433.80
HASTA-DICIEMBRE-2018. 38,433.80 1.01% 38,433.80
TOTAL 38,433.80 1.01% 38,433.80

PARTIDAS NUEVAS

AVANCE FISICO PROGRAMADO AVANCE FISICO EJEC


Nro. Meses
Presupuesto Porcentaje c/r al C.D. Presupuesto
1 AGOSTO-2016. 178,198.89 4.70% 178,198.89
HASTA-DICIEMBRE-2018. 178,198.89 4.70% 178,198.89
TOTAL 178,198.89 4.70% 178,198.89

AVANCE FISICO EXP. TECNICO ANTERIOR %

Val. Part. Programadas 3,788,909.92 2,173,240.85 57.36%


Val. Mayores Metrados 38,433.80 38,433.80 1.01%
Val. Partidas Nuevas (en tramite) 178,199.22 178,199.22 4.70%

Valor. Acumulada Total 100.00% 2,389,873.87 63.08%

A.8 MODIFICACIONES AL EXPEDIENTE TECNICO: (Aprobado(s) mediante Resolución(es)).


Descripcion Documento de aprobación (Resolución)

Ampliacion Presupuestal

A.9 AVANCE DEL PLAZO DE EJECUCION:


Descripcion Documento de aprobación (Resolución)

Plazo de Ejecucion Según Expediente RESOLUCION DE ALCALDIA Nº 165-A/MDS-SG-13

Primera Ampliacion de Plazo RESOLUCION DE ALCALDIA Nº Nº 379-2014/GM/MDS

Segunda Ampliacion de Plazo RESOLUCION DE ALCALDIA Nº 332-2015-A-MDS

Reinicio de Obra ACTA

A.10 MOVIMIENTO DE ALMACEN


SALDO ANTERIOR INGRESO MENSUAL

S/. 302,264.10 S/. 15,926.12

A.11 LIMITACIONES, RECOMENDACIONES y/o COMENTARIOS:

.- Se recomienda a equipo y maquinaria que tenga las maquinarias en perfecto estado de funcionamiento
.- Se recomienda a jefatura de obras tener coordinacion con Sedacusco sobre el sistema agua y desague de la obra.
.- Se menciona que el atrazo de obra se ve reflejado por la presencia de lluvias, la falta de materiales y falta de presenc
cnica Proyecto o Actividad de Inversión Pública.
N DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSC

:Fotos de acciones ejecutadas

cia de Infraestructura - Division de obras

o realizar el mejoramiento de las redes de agua y desagüe el cual esta

iago, hasta la Calle Belen, Sector Nº 03 Desde la Calle Belen hasta Av

erentes diametros, 17 grifos contran incendio y 458 conexiones


cto.

Estado Actual
del Proyecto:

EN EJECUCION
(*) Compatibilidad, En Ejecución, Paralizada, Concluída, Pre-Liquidación.

Distrito : Provincia : Cusco

PIM para el año 2013 : S/.


PIM para el año 2014: S/.
PIM para el año 2015 : S/.
PIM para el año 2016 : S/.
PIM para el año 2018 : S/.
Ppto. Aprobado p/ Adicionales (Ms.Ms.): S/.
Total PEA (Personal Técnico, Administrativo y Obrero)
Necesita Verificación de Viabilidad ?

DEL MES % ACUMULADO

46,822.39 1.24% 1,559,282.07

28,802.50 0.76% 1,267,380.50

0.00 0.00% 107,326.07

75,624.89 2.00% 2,933,988.64

AVANCE FINANCIERO % SALDOS


cnica Proyecto o Actividad de Inversión Pública.
N DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSC

2,933,988.64 77.44% 854,921.28


582,165.52 160.16% -218,685.07
120,138.74 136.74% -32,282.65
0.00 0.00% 15,712.96
26,164.10 91.39% 2,464.01
3,662,457.00 85.48% 622,130.53

DOCUMENTO NUMERO
Resolución RESOLUCION DE ALCALDIA Nº 165-A/MDS-SG-13
Memorandum MEMORANDUM Nº 039-2015-JCQV/JDO-MDS/C
Resolución(es) NO SE TIENE
Memorandum NO SE TIENE
Resolución(es) NO SE TIENE
Resolución RESOLUCION DE GERENCIA Nº 379-2014-GM/MDS
Resolución RESOLUCION DE GERENCIA Nº 332-2015-A-MDS
Acta NO SE TIENE
Acta NO SE TIENE
Acta(s) CUADERNO DE OBRA Nº 01 ASIENTOS Nº 003 DEL 2013
Acta(s) CUADERNO DE OBRA Nº 01 ASIENTOS Nº 005 DEL 2013
Acta(s) CUADERNO DE OBRA Nº 06 ASIENTOS Nº 565DEL 2013
Acta(s) CUADERNO DE OBRA Nº 06 ASIENTOS Nº 566DEL 2013
Acta(s) CUADERNO DE OBRA Nº 10 ASIENTOS Nº 1174 DEL 2015
Acta(s) CUADERNO DE OBRA Nº 10 ASIENTOS Nº 1176 DEL 2016
Acta(s) - corte CUADERNO DE OBRA Nº 11 ASIENTO Nº 1268 DEL 2016
Acta(s) CUADERNO DE OBRA Nº 12 ASIENTO Nº 1269 DEL 2016

AVANCE FISICO EJECUTADO AVANCE FINANCIERO


Porcentaje c/r al C.D. Presupuesto Porcentaje
1.41% 126,075.90 2.94%
2.15% 58,917.12 1.38%
3.29% 177,249.76 4.14%
3.91% 99,185.33 2.31%
4.58% 149,675.00 3.49%

4.79% 186,743.95 4.36%

0.00% 173,496.57 4.05%


3.77% 0.00 0.00%
1.85% 61,700.75 1.44%
2.91% 522,121.65 12.19%
0.88% 72,119.37 1.68%
1.14% 186,883.36 4.36%
1.25% 87,253.63 2.04%
1.31% 111,505.42 2.60%
1.40% 34,156.19 0.80%
34.63% 2,047,084.00 47.78%

0.94% 58,794.37 1.37%


1.16% 58,552.22 1.55%
0.10% 56,141.50 1.31%
0.00% 58,263.54 1.36%
0.00% 0.00 0.00%
36.83% 231,751.63 5.59%
0.00% 0.00 0.00%
0.00% 0.00 0.00%
2.11% 107,261.14 2.50%
1.42% 71,309.75 1.66%
1.98% 116,895.61 2.73%
2.02% 133,878.37 3.12%
2.30% 156,170.44 3.64%
2.36% 93,225.26 2.18%
2.47% 114,176.30 2.66%
0.50% 78,421.14 1.83%
0.61% 52,429.18 1.22%
0.00% 0.00 0.00%
52.62% 923,767.19 21.56%
cnica Proyecto o Actividad de Inversión Pública.
N DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSC

0.73% 45,863.84 1.07%


1.54% 86,849.83 2.03%
0.84% 77,622.59 1.81%
0.00% 3,982.26 0.09%
0.00% 17,172.01 0.40%
0.00% 0.00 0.00%
0.00% 0.00 0.00%
3.11% 231,490.53 5.40%

0.26% S/. - 0.00%


1.37% S/. 49,521.34 1.16%
1.07% S/. 88,375.65 2.06%
0.41% S/. - 0.00%
0.00% S/. - 0.00%
0.00% S/. - 0.00%
3.11% 137,896.99 3.22%
58.84% 3,571,990.34 83.55%
% Av. Físico Programado Acum.
C.A.O. Informado:
58.84% 83.55%
cnica Proyecto o Actividad de Inversión Pública.
N DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSC

AVANCE FISICO EJECUTADO AVANCE FINANCIERO


Porcentaje c/r al C.D. Presupuesto Porcentaje
1.01% - -
1.01% - 0.00%
1.01% 0.00 0.00%

AVANCE FISICO EJECUTADO AVANCE FINANCIERO


Porcentaje c/r al C.D. Presupuesto Porcentaje
4.70% - 0.00%
4.70% - 0.00%
4.70% 0.00 0.00%

DEL MES % ACUMULADO

40,552.35 1.07% 2,213,793.20


0.00 0.00% 38,433.80
0.00 0.00% 178,199.22

40,552.35 1.07% 2,430,426.22

Mayores Metrados Partidas Nuevas / Adicionales Deductivos

0.00 0.00 0.00

Fecha Inicio Nº Dias Calendario

6/17/2013 420.00

8/11/2014 173.00

2/1/2015 335.00

7/1/2018 105.00

EGRESO MENSUAL SALDO ACTUAL

S/. 17,291.99 S/.

ncionamiento
ua y desague de la obra.
ateriales y falta de presencia de Sedacusco
sión Pública.
GUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

DEL 01 AL 31 DE DICIEMBER DEL 2018


:Fotos de acciones ejecutadas

1,076,990.00
1,298,753.00
937,540.00 ###

237,000.00
630,000.00
0.00
4.00
NO

41.15%

33.45%

2.83%

77.44%

OBSERVACIONES
sión Pública.
GUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

Se evidencia que se tiene negtivo en los saldos ya


indicados por las anteriores residencias por las
ampliaciones de plazo N° 01 y N° 02

DE FECHA

02 DE FEBERO DEL 2015

15 DE DICIEMBRE DEL 2014


30 DE SETIEMBRE-2015

18 DE JUNIO AL 26-JUNIO-2013
23 DE JUNIO 2013
15 -SEPTIEMBRE 2014 AL 18- FEBRERO 2015
18 DE FEBRERO DEL 2015
30 -NOVIEMBRE 2015 AL 01- JUNIO 2016
01 JUNIO 2016
31 DE AGOSTO - 2016
01 JULIO 2018

SALDO
Financiero
4,158,511.63
4,099,594.51
3,922,344.75
3,823,159.42
3,673,484.42

3,486,740.47

3,313,243.90
3,313,243.90
3,251,543.15
2,729,421.50
2,657,302.13
2,470,418.77
2,383,165.14
2,271,659.72
2,237,503.53

2,271,659.72
2,178,709.16
2,120,156.94
2,064,015.44
2,005,751.90
2,005,751.90

2,005,751.90
2,005,751.90
1,898,490.76
1,827,181.01
1,710,285.40
1,576,407.03
1,420,236.59
1,327,011.33
1,212,835.03
1,134,413.89
1,081,984.71
1,081,984.71
sión Pública.
GUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

1,036,120.87
949,271.04
871,648.45
867,666.19
850,494.18
850,494.18
850,494.18

850,494.18
800,972.84
712,597.19
712,597.19
712,597.19
712,597.19

850,494.18
Proyecto

ATRASADO
sión Pública.
GUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

SALDO
Financiero
-

0.00

SALDO
Financiero
-

0.00

58.43%
1.01%
4.70%

64.15%

TOTAL MODIF.

0.00

Fecha de Conclusion

8/11/2014

2/1/2015

12/31/2015

10/14/2018

SALDO ACTUAL

S/. 300,898.23
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
DIVISIÓN DE OBRAS

INFORME MENSUAL 2018


DICIEMBRE 2018
DEL 01 AL 31 DE DICIEMBER DEL 2018

OBRA:"MEJORAMIENTO DE LAS REDES DE


DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS
SECUNDARIAS DE DESAGUE EN EL CASCO URBANO
DISTRITO DE SANTIAGO - CUSCO."

INSPECTOR DE OBRA : ING. FREDY RAUL HUALLPAMAYTA TAMAYO


RESIDENTE DE OBRA : ING. ALBERT MONZON VALER
PRESUPUESTO ASIGNADO : 630,000.00

SANTIAGO, DICIEMBRE 2018

GESTIÓN 2015 - 2018


CONTENIDO INFORME TÉCNICO MENSUAL

1 INFORME DE PRESENTACIÓN DEL RESIDENTE

2 COPIA DIGITAL DEL INFORME PRESENTADO (Formatos Word, Excel, AutoCAD, S10, etc

3 RESOLUCION DE APROBACION DEL EXPEDIENTE TECNICO (Solo 1er Informe)

4 MEMORANDUM DE ASIGNACION DEL RESIDENTE DE OBRA

5 MEMORANDUM DE ASIGNACION DEL INSPECTOR DE OBRA

6 ACTA DE ENTREGA DE TERRENO (Sólo Primer Informe)

7 ACTA DE REINICIO DE OBRA

8 COPIA DE ACTA DE TERMINACIÓN DE OBRA (Sólo Informe Final)

9 FICHA TECNICA

10 MEMORIA DESCRIPTIVA

11 PLANILLA DE METRADOS DE AVANCE DEL MES RESPECTIVO

12 VALORIZACIÓN FISICA DE OBRA

13 CRONOGRAMA DE AVANCE DE OBRA VALORIZADO

14 RESUMEN VALORIZADO

15 RESUMEN GENERAL

16 RESUMEN POR COMPONENTES

17 EJECUCION PRESUPUESTAL

18 RESUMEN DEL ESTADO FINANCIERO

19 MOVIMIENTO DE ALMACEN DEL MES DE INFORME

20 SALDO VALORIZADO DE MATERIALES EN CANCHA

21 VALORIZACION DE ALMACEN

22 NOTAS DE ENTRADA

23 NOTAS DE SALIDA

24 PARTES DIARIOS DE CONTROL DE MAQUINARIA (LIVIANA Y PESADA)

25 VALORIZACION DE MAQUINARIA LIVIANA Y PESADA POR MES

26 PLANILLA DE TAREO DE PERSONAL

RECURSOS EMPLEADOS EN EL MES (Personal Técnico-Administrativo, Obrero,


27 Equipo, Valorizaciones, Tareos, Etc)

28 PRUEBAS DE CALIDAD Y/O ACTA DE INSPECCION Y PRUEBA


29 COPIA DE CUADERNO DE OBRA DEL MES RESPECTIVO (Asientos del Residente)

30 PANEL FOTOGRAFICO DEL PROCESO DE EJECUCIÓN DE LA OBRA

31 INFORME MENSUAL DEL PLAN DE MONITOREO ARQUEOLÓGICO

32 INFORME MENSUAL DEL AREA DE SSOMA

33 PLANOS

34 ANEXOS

P: Presentado
N: No presento
X: No corresponde
SUAL
CONTROL

X
P

P
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION D
DE DESAGUE DEL CASCO URBANO DISTRIT

FECHA: NOVIEMB

RESUMEN DE VALORIZAC

AVANCE ANTERIOR
PRESUPUESTO
EXPEDIENTE TÉCNICO VALORIZADO
ITEM DESCRIPCION: COSTO %
DIRECTO

COMPONENTES
COMPONENTE N° O1: 1,669,496.93 868,075.91
1.00 MEJORAMIENTO DEL SISTEMA DE AGUA

COMPONENTE N° O2:
2.00 MEJORAMIENTO DEL SISTEMA DE DESAGUE 2,075,914.58 1,381,519.94

COMPONENTE N° O3:
3.00 SENSIBILIZACION A LA POBLACION 43,498.40 41,457.37

COSTO DIRECTO TOTAL 3,788,909.92 2,291,053.22 60.47%


GASTOS GENERALES 363,480.45 238,745.32
GASTOS DE SUPERVICION 87,856.09 52,946.82
ELABORACION DE EXPEDIENT TECNICO 28,628.11 28,628.11
LIQUIDACION DE OBRA 15,712.96 -
COSTO TOTAL 4,284,587.53 2,611,373.47 60.95%
RIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS
NO DISTRITO DE SANTIAGO - CUSCO-CUSCO

A: NOVIEMBRE - 2018

VALORIZACION DE OBRA
AVANCE AVANCE
AVANCE ACTUAL AVANCE VALORIZADO TOTAL
VALORIZADO VALORIZADO
VALORIZADO % % % ACUMULADO CTO %
ACUMULADO ADICIONALES DE DIRECTO+ADICIONALES
COSTO DIRECTO OBRA ACUMULADO
COSTO DIRECTO
- 868,075.91 91,803.99 959,879.90

36,485.03 1,418,004.97 124,829.03 1,542,834.00

2,041.03 43,498.40 43,498.40

38,526.06 1.02% 2,329,579.28 61.48% 216,633.02 5.72% 2,546,212.30 67.20%


11,063.37 249,808.69 - 249,808.69
52,946.82 - 52,946.82
- 28,628.11 - 28,628.11
- - - -
49,589.43 1.16% 2,660,962.90 62.11% 216,633.02 5.72% 2,877,595.92 67.82%
CO
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

PRESUPUESTO DE OBRA
ITEM DESCRIPCION UNID
METRADO P.U
01 SISTEMA DE AGUA POTABLE
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA und 3.00 646.99
01.01.02 ALMACEN mes 14.00 350.00
01.01.03 PUESTA EN OPERACION DEL SISTEMA ml 6,783.99 0.56
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELACION Y REPLANTEO m 6,783.99 1.14
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 6,783.99 1.36
01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 2,654.32 6.50
01.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 4,135.68 35.90
01.02.05 PIQUES EN EMPALMES und 31.00 136.98
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y GBL 1.00 1,900.00
SALUD EN EL TRABAJO
01.03.02 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 972.07 16.49
01.03.03 PROTECCION DE RED DE TELEFONIA m 220.00 16.49
01.03.04 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE UND 1,005.00 16.95
01.03.05 CINTA DE SEGURIDAD m 13,567.98 0.73
01.03.06 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO und 28.00 69.16
VEHICULAR
01.03.07 PUENTES PEATONALES PROVISIONALES und 28.00 77.84
01.03.08 LIMPIEZA FINAL DE LA OBRA m2 6,783.99 1.65
01.03.09 SERVICIOS HIGIENICOS PARA OBRA SISTEMA MODULAR und 3.00 1,500.00
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA m 5,711.10 16.92
110MM
01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") m 5,711.10 2.26
- 110mm (4")
01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. M.L 5,711.10 6.56
01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") m 5,711.10 14.32
H=1.50M
01.04.05 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA m 1,072.00 16.92
250MM
01.04.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 200mm a m 1,072.89 2.58
250mm
01.04.07 CAMA DE APOYO P/TUB. 200mm a 250mm TERRENO NORMAL m 1,072.89 6.83
01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,424.64 15.56
01.04.09 RELLENO COMP.ZANJA TERR.NORMAL"C"P/TUB.8"-10" HASTA 1.50 M m 1,072.89 15.23
01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 1,424.64 15.23
01.05 TUBERIAS Y ACCESORIOS
01.05.01 SUMINISTRO DE TUBERIAS
01.05.01.01 TUBERIA PVC C-10 U.F. 63 mm ISO 1452 m 204.53 8.03
01.05.01.02 TUBERIA PVC C-10 U.F. 90 mm ISO 1452 m 48.30 15.98
01.05.01.03 TUBERIA PVC C-10 U.F. 110mm ISO1452 m 5,458.27 24.44
01.05.01.04 TUBERIA PVC C-10 U.F. 200mm ISO 1452 m 692.14 75.92
01.05.01.05 TUBERIA PVC C-10 U.F. 250mm ISO 1452 m 380.75 123.04
01.05.02 SUMINISTRO DE ACCESORIOS
01.05.02.01 UNION MECANICA DE AMPLIO RANGO 2"(50mm) DE RANGO (59.5-72 und 6.00 145.00
mm)
01.05.02.02 UNION MECANICA DE AMPLIO RANGO 3"(80mm) DE RANGO (88.1- und 5.00 178.90
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2- und 31.00 199.00
127.8 mm)
01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2- und 2.00 315.00
181.86 mm)
01.05.02.05 UNION MECANICA DE AMPLIO RANGO 8"(200mm) DE RANGO (218.1- und 7.00 485.00
235.0 mm)
01.05.02.06 UNION MECANICA DE AMPLIO RANGO 10"(250mm) DE RANGO (272- und 2.00 645.00
289 mm)
01.05.02.07 UNION MECANICA DE AMPLIO RANGO 12"(300mm) DE RANGO (315- und 1.00 859.50
332 mm)
01.05.02.08 CODO PVC C-10 P/AGUA 63mm x 45ª UF. und 1.00 24.00
01.05.02.09 CODO PVC C-10 P/AGUA 110mm x22.5º UF und 3.00 58.00
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 13.00 58.00
01.05.02.11 CODO PVC C-10 P/AGUA 110mm x90º UF und 3.00 58.00
01.05.02.12 CODO PVC C-10 P/AGUA 200mm x 22.5º UF und 3.00 331.00
01.05.02.13 CODO PVC C-10 P/AGUA 200mm x 90º UF und 3.00 331.00
01.05.02.14 CURVA PVC C-10 P/AGUA 200mm x 90º UF und 2.00 696.00
01.05.02.15 CODO PVC C-10 P/AGUA 250mm x 90º UF und 1.00 441.00
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 37.00 125.00
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. und 4.00 349.00
01.05.02.18 CRUZ DE PVC C-10 DE 110 mm U.F. und 17.00 300.00
01.05.02.19 CRUZ DE PVC C-10 DE 160 mm U.F. und 1.00 352.00
01.05.02.20 CRUZ DE PVC C-10 DE 200 mm U.F. und 2.00 530.00
01.05.02.21 REDUCCION PVC 110 mm. - 50mm U.F und 4.00 191.00
01.05.02.22 REDUCCION PVC 110 mm. - 63mm U.F und 4.00 46.00
01.05.02.23 REDUCCION PVC 110 mm. - 90mm U.F und 2.00 47.00
01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F und 2.00 126.50
01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm und 9.00 171.90
01.05.02.26 REDUCCIÓN PVC P/AGUA 300 mm x 250 mm und 1.00 160.00
01.05.02.27 TAPON DE PVC P/AGUA C-10 TUBERIA DE 63 mm U.F. und 3.00 21.00
01.05.02.28 TAPON DE PVC P/AGUA C-10 TUBERIA DE 90 mm U.F. und 1.00 32.00
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 11.00 40.00
01.05.03 INSTALACION TUBERIAS Y ACCESORIOS
01.05.03.01 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m 5,711.10 1.74
01.05.03.02 INSTALAC. TUBERIA PVC C-10 DE 200mm a 250mm m 1,072.89 5.72
01.05.03.03 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A und 146.00 9.06
110mm
01.05.03.04 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 200mm a und 35.00 22.27
250mm
01.05.04 ANCLAJES / DADOS DE CONCRETO
01.05.04.01 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. und 105.00 52.11
01.06 VALVULAS Y GRIFOS CONTRA INCENDIO
01.06.01 SUMINISTRO DE VALVULAS
01.06.01.01 VALVULA PURGA HIERRO DUCTIL ISO 7259 Ø 63mm und 6.00 400.00
01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm und 48.00 525.00
01.06.01.03 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 200mm und 3.00 1,656.00
01.06.01.04 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 250mm und 1.00 2,760.00
01.06.02 INSTALACION DE VALVULAS
01.06.02.01 INSTALACION DE VALVULA DE PURGA Ø 63mm und 6.00 281.01
01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm und 48.00 134.26
01.06.02.03 INSTALACION DE VALVULA COMPUERTA Ø 200mm a 250mm und 4.00 559.26
01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO
01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM und 17.00 2,404.36
01.07 CONEXIONES DOMICILIARIAS DE AGUA
01.07.01 TRAZO Y REPLANTEO m2 2,192.59 5.67
01.07.02 DEMOLICION DE VEREDA m2 502.50 16.29
01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,385.18 16.53
01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO m3 657.78 15.03
USANDO CARRETILLA)
01.07.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 657.78 17.25
01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 160 MM m 4,385.18 3.43
01.07.07 CAMA DE APOYO m 4,385.18 7.21
01.07.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 657.78 15.56
01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M m 4,385.18 13.39
01.07.10 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 41.00 36.25
P/CONEX AGUA 63MM x 1/2"
01.07.11 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 10.00 40.40
P/CONEZ AGUA 90MM x 1/2"
01.07.12 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 888.00 56.90
P/CONEZ AGUA 110MM x 1/2"
01.07.13 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 66.00 207.90
P/CONEZ AGUA 200MM x 1/2"
01.07.14 SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. und 1,005.00 147.67
DOM.
01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES und 1,005.00 83.55
01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) und 1,005.00 127.25
01.08 CAMARAS / CAJAS PARA VALVULAS
01.08.01 EXCAVACION PARA CAJA DE VALVULA m3 26.25 81.08
01.08.02 CONCRETO f'c 175 kg/cm² m3 13.69 749.46
01.09 PRUEBAS DE CONTROL DE CALIDAD
01.09.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m 5,711.10 1.02
01.09.02 PRUEBA HIDRAULICA Y DESINFECCION TUB. HASTA 250MM m 1,072.89 2.69
01.09.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - und 45.00 35.50
DENSIDAD DE CAMPO)
01.09.04 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA und 9.00 33.67
COMPRESION)
01.10 MITIGACION DE IMPACTOS
01.10.01 AGUA PARA HUMEDECER TERRENO M3. 2,035.20 2.10
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 150.50 80.00
01.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 111.85 91.02
02 SISTEMA DE DESAGUE
02.01 OBRAS PROVISIONALES
02.01.01 PUESTA EN OPERACION DEL SISTEMA M.L 5,858.23 0.56
02.02 TRABAJOS PRELIMINARES
02.02.01 TRAZO NIVELACION Y REPLANTEO m 5,858.23 1.07
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 5,858.23 2.49
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 5,224.49 6.50
02.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 6,251.35 35.90
02.02.05 DEMOLICION DE BUZONES UND 130.00 195.49
02.02.06 REMOCION DE TUB DE ALCANTARILLA CSN CON MAQUINARIA ML 5,858.23 4.02
02.03 SEGURIDAD Y SALUD
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 170.38 16.49
02.03.02 PROTECCION DE RED DE TELEFONIA m 292.91 16.49
02.03.03 ENTIBADO Y APUNTALAMIENTO M.L 1,417.37 53.94
02.03.04 CINTA DE SEGURIDAD m 11,716.46 0.73
02.03.05 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO und 90.00 69.16
VEHICULAR
02.03.06 PUENTES PEATONALES PROVISIONALES und 135.00 77.84
02.03.07 LIMPIEZA FINAL DE LA OBRA m2 4,100.76 1.65
02.04 MOVIMIENTO DE TIERRAS
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M m 2,907.88 16.07
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M m 2,554.97 20.08
02.04.03 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=3.00 M m 395.38 32.23
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m 5,858.23 3.10
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m 5,858.23 6.92
02.04.06 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,230.23 15.56
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 m 1,744.73 14.28
M
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 m 1,788.48 17.72
M
02.04.09 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 3.00 m 316.30 31.47
M
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 2,460.46 15.23
02.05 TUBERIAS
02.05.01 SUMINISTRO
02.05.01.01 TUBERIA DE U.F.PVC ISO 4435 DN 200mm m 5,246.05 29.75
02.05.01.02 TUBERIA DE U.F.PVC ISO 4435 DN 250mm m 280.23 49.35
02.05.01.03 TUBERIA DE U.F.PVC ISO 4435 DN 315mm m 182.49 78.75
02.05.01.04 TUBERIA DE U.F.PVC ISO 4435 DN 355mm m 149.46 115.50
02.05.02 TRANSPORTE DE TUBERIA
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -375mm MANUAL und 976.00 6.49
02.05.03 INSTALACION DE TUBERIAS
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 375MM m 5,858.23 4.27
02.06 BUZONES DE INSPECCION
02.06.01 BUZON DE DESAGUE TIPO "A" D=1.20, H=1.50 M. und 72.00 2,960.31
02.06.02 BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und 44.00 3,684.98
02.06.03 BUZON DE DESAGUE TIPO "A" D=1.20, H=3.00 M. und 16.00 3,962.26
02.07 MANTENIMIENTO DE COLECTORES LATERALES
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON m 2,513.57 2.98
EQUIPO
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE und 16.00 42.93
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE
02.08.01 TRAZO Y REPLANTEO m2 3,288.35 5.67
02.08.02 DEMOLICION DE VEREDA m2 568.92 16.29
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,697.65 16.53
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO m3 1,674.24 15.03
USANDO CARRETILLA)
02.08.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 1,674.24 17.25
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 160MM m 4,697.65 3.43
02.08.07 CAMA DE APOYO m 4,697.25 7.21
02.08.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 845.58 14.58
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 20MM" HASTA 1.50 M m 3,147.42 13.39
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und 692.00 438.40
02.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 160mm) und 24.00 473.30
02.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (300 -160mm) und 24.00 498.80
02.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 160 mm) und 18.00 568.80
02.09 PRUEBAS DE CONTROL DE CALIDAD
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE m 5,858.23 4.36
02.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - und 135.00 35.50
DENSIDAD DE CAMPO)
02.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00 33.67
02.10 MITIGACION DE IMPACTOS
02.10.01 AGUA PARA HUMEDECER TERRENO M3. 5,828.23 2.04
02.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 29.29 80.00
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 14.45 91.02
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES m3 4,373.20 1.83
EXCEDENTES
03 IMPACTO AMBIENTAL Y EDUCACION SANITARIA
03.01 INFORMACION A LA POBLACION
03.01.01 INFORMACION A LA POBLACION und 14.00 200.00
03.01.02 LETREROS INFORMATIVOS und 24.00 453.73
03.02 EDUCACION SANITARIA
03.02.01 EDUCACION SANITARIA A LA POBLACION GBL 14.00 2,000.00
03.02.02 CONTENEDOR DE RESIDUOS SOLIDOS und 24.00 75.37

COSTO DIRECTO
GASTOS GENERALES
SUPERVISION
LIQUIDACION
EXPEDIENTE TECNICO
PRESUPUESTO TOTAL
VALORIZACION MENSUAL DE OBRA
CORRESPONDIENTE AL MES DE FEBRERO DEL 2015
SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

VALORIZACION A
VALORIZACION A

UESTO DE OBRA VALORIZACION ANTERIOR VALORIZACION ACTUAL


PRESUPUESTO METRADO VALORIZACION % METRADO VALORIZACION % METRADO
1,669,496.93 520,036.64 - -
10,640.00 4,574.65 - -
1,940.97 3.00 1,940.97 100.00% - - 0.00% 3.00
4,900.00 5.00 1,750.00 35.71% - - 0.00% 5.00
3,799.03 1,578.00 883.68 23.26% - - 0.00% 1,578.00
186,930.35 64,398.50 - -
7,733.75 3,234.01 3,686.77 47.67% - - 0.00% 3,234.01
9,226.23 2,964.81 4,032.14 43.70% - - 0.00% 2,964.81
17,253.08 971.00 6,311.50 36.58% - - 0.00% 971.00
148,470.91 1,372.49 49,272.25 33.19% - - 0.00% 1,372.49
4,246.38 8.00 1,095.84 25.81% - - 0.00% 8.00
68,306.19 21,645.54 - -
1,900.00 1.00 1,900.00 100.00% - - 0.00% 1.00

16,029.43 138.00 2,275.62 14.20% - - 0.00% 138.00


3,627.80 109.00 1,797.41 49.55% - - 0.00% 109.00
17,034.75 196.00 3,322.20 19.50% - - 0.00% 196.00
9,904.63 4,367.80 3,188.49 32.19% - - 0.00% 4,367.80
1,936.48 16.00 1,106.56 57.14% - - 0.00% 16.00
2,179.52 25.00 1,946.00 89.29% - - 0.00% 25.00
11,193.58 1,884.40 3,109.26 27.78% - - 0.00% 1,884.40
4,500.00 2.00 3,000.00 66.67% - - 0.00% 2.00
317,225.59 77,048.20 - -
96,631.81 275.00 4,653.00 4.82% - - 0.00% 275.00
12,907.09 2,353.91 5,319.84 41.22% - - 0.00% 2,353.91
37,464.82 2,473.91 16,228.85 43.32% - - 0.00% 2,473.91
81,782.96 2,297.86 32,905.36 40.23% - - 0.00% 2,297.86
18,138.24 25.00 423.00 2.33% - - 0.00% 25.00
2,768.06 79.00 203.82 7.36% - - 0.00% 79.00
7,327.84 64.00 437.12 5.97% - - 0.00% 64.00
22,167.40 401.56 6,248.21 28.19% - - 0.00% 401.56
16,340.11 107.90 1,643.32 10.06% - - 0.00% 107.90
21,697.27 590.00 8,985.70 41.41% - - 0.00% 590.00
293,980.18 131,797.49 - -
235,209.08 98,207.51 - -
1,642.38 121.00 971.63 59.16% - - 0.00% 121.00
771.83 - - 0.00% - - 0.00% -
133,400.12 3,810.81 93,136.20 69.82% - - 0.00% 3,810.81
52,547.27 54.00 4,099.68 7.80% - - 0.00% 54.00
46,847.48 - - 0.00% - - 0.00% -
35,123.10 26,529.90 - -
870.00 1.00 145.00 16.67% - - 0.00% 1.00
894.50 1.00 178.90 20.00% - - 0.00% 1.00
VALORIZACION MENSUAL DE OBRA
6,169.00 31.00 6,169.00 100.00% - - 0.00% 31.00
630.00 - - 0.00% - - 0.00% -
3,395.00 2.00 970.00 28.57% - - 0.00% 2.00
1,290.00 2.00 1,290.00 100.00% - - 0.00% 2.00
859.50 1.00 859.50 100.00% - - 0.00% 1.00
24.00 1.00 24.00 100.00% - - 0.00% 1.00
174.00 3.00 174.00 100.00% - - 0.00% 3.00
754.00 13.00 754.00 100.00% - - 0.00% 13.00
174.00 3.00 174.00 100.00% - - 0.00% 3.00
993.00 - - 0.00% - - 0.00% -
993.00 3.00 993.00 100.00% - - 0.00% 3.00
1,392.00 2.00 1,392.00 100.00% - - 0.00% 2.00
441.00 - - 0.00% - - 0.00% -
4,625.00 37.00 4,625.00 100.00% - - 0.00% 37.00
1,396.00 4.00 1,396.00 100.00% - - 0.00% 4.00
5,100.00 16.00 4,800.00 94.12% - - 0.00% 16.00
352.00 - - 0.00% - - 0.00% -
1,060.00 2.00 1,060.00 100.00% - - 0.00% 2.00
764.00 - - 0.00% - - 0.00% -
184.00 4.00 184.00 100.00% - - 0.00% 4.00
94.00 - - 0.00% - - 0.00% -
253.00 - - 0.00% - - 0.00% -
1,547.10 5.00 859.50 55.56% - - 0.00% 5.00
160.00 - - 0.00% - - 0.00% -
63.00 2.00 42.00 66.67% - - 0.00% 2.00
32.00 - - 0.00% - - 0.00% -
440.00 11.00 440.00 100.00% - - 0.00% 11.00
18,176.45 4,558.81 - -
9,937.31 2,083.21 3,624.79 36.48% - - 0.00% 2,083.21
6,136.93 54.00 308.88 5.03% - - 0.00% 54.00
1,322.76 69.00 625.14 47.26% - - 0.00% 69.00
779.45 - - 0.00% - - 0.00% -
5,471.55 2,501.28 - -
5,471.55 48.00 2,501.28 45.71% - - 0.00% 48.00
86,569.70 43,027.60 - -
35,328.00 14,700.00 - -
2,400.00 - - 0.00% - - 0.00% -
25,200.00 28.00 14,700.00 58.33% - - 0.00% 28.00
4,968.00 - - 0.00% - - 0.00% -
2,760.00 - - 0.00% - - 0.00% -
10,367.58 1,879.64 - -
1,686.06 - - 0.00% - - 0.00% -
6,444.48 14.00 1,879.64 29.17% - - 0.00% 14.00
2,237.04 - - 0.00% - - 0.00% -
40,874.12 26,447.96 - -
40,874.12 11.00 26,447.96 64.71% - - 0.00% 11.00
656,350.03 160,909.75 - -
12,431.99 1,492.60 8,463.04 68.07% - - 0.00% 1,492.60
8,185.73 374.20 6,095.72 74.47% - - 0.00% 374.20
72,487.03 1,519.00 25,109.07 34.64% - - 0.00% 1,519.00
9,886.43 489.76 7,361.09 74.46% - - 0.00% 489.76
VALORIZACION MENSUAL DE OBRA
11,346.71 - - 0.00% - - 0.00% -
15,041.17 1,468.00 5,035.24 33.48% - - 0.00% 1,468.00
31,617.15 1,440.00 10,382.40 32.84% - - 0.00% 1,440.00
10,235.06 415.04 6,458.02 63.10% - - 0.00% 415.04
58,717.56 1,638.00 21,932.82 37.35% - - 0.00% 1,638.00
1,486.25 - - 0.00% - - 0.00% -
404.00 - - 0.00% - - 0.00% -
50,527.20 322.00 18,321.80 36.26% - - 0.00% 322.00
13,721.40 1.00 207.90 1.52% - - 0.00% 1.00
148,408.35 267.00 39,427.89 26.57% - - 0.00% 267.00
83,967.75 145.00 12,114.75 14.43% - - 0.00% 145.00
127,886.25 - - 0.00% - - 0.00% -
12,388.46 1,893.75 - -
2,128.35 11.34 919.45 43.20% - - 0.00% 11.34
10,260.11 1.30 974.30 9.50% - - 0.00% 1.30
10,611.93 2,078.36 - -
5,825.32 2,037.61 2,078.36 35.68% - - 0.00% 2,037.61
2,886.07 - - 0.00% - - 0.00% -
1,597.50 - - 0.00% - - 0.00% -
303.03 - - 0.00% - - 0.00% -
26,494.51 12,662.80 - -
4,273.92 420.10 882.21 20.64% - - 0.00% 420.10
12,040.00 20.00 1,600.00 13.29% - - 0.00% 20.00
10,180.59 111.85 10,180.59 100.00% - - 0.00% 111.85
2,075,914.58 844,664.41 -
3,280.61 995.01 -
3,280.61 1,776.80 995.01 30.33% - 0.00% 1,776.80
328,201.74 111,605.66 -
6,268.31 4,034.90 4,317.34 68.88% - 0.00% 4,034.90
14,586.99 3,847.50 9,580.28 65.68% - 0.00% 3,847.50
33,959.19 1,001.00 6,506.50 19.16% - 0.00% 1,001.00
224,423.47 2,170.02 77,903.72 34.71% - 0.00% 2,170.02
25,413.70 38.00 7,428.62 29.23% - 0.00% 38.00
23,550.08 1,460.00 5,869.20 24.92% - 0.00% 1,460.00
116,144.67 59,310.02 -
2,809.57 140.00 2,308.60 82.17% - 0.00% 140.00
4,830.09 150.00 2,473.50 51.21% - 0.00% 150.00
76,452.94 705.00 38,027.70 49.74% - 0.00% 705.00
8,553.02 7,142.00 5,213.66 60.96% - 0.00% 7,142.00
6,224.40 31.00 2,143.96 34.44% - 0.00% 31.00
10,508.40 92.00 7,161.28 68.15% - 0.00% 92.00
6,766.25 1,200.80 1,981.32 29.28% - 0.00% 1,200.80
292,651.75 98,606.31 -
46,729.63 217.00 3,487.19 7.46% - 0.00% 217.00
51,303.80 - - 0.00% - 0.00% -
12,743.10 - - 0.00% - 0.00% -
18,160.51 2,247.00 6,965.70 38.36% - 0.00% 2,247.00
40,538.95 2,170.40 15,019.17 37.05% - 0.00% 2,170.40
19,142.38 868.38 13,511.99 70.59% - 0.00% 868.38
24,914.74 1,744.73 24,914.74 100.00% - 0.00% 1,744.73
31,691.87 507.00 8,984.04 28.35% - 0.00% 507.00
VALORIZACION MENSUAL DE OBRA
9,953.96 - - 0.00% - 0.00% -
37,472.81 1,689.00 25,723.47 68.65% - 0.00% 1,689.00
232,881.94 188,403.40 -
201,533.06 177,170.72 -
156,069.99 4,892.00 145,537.00 93.25% - 0.00% 4,892.00
13,829.35 - - 0.00% - 0.00% -
14,371.09 182.49 14,371.09 100.00% - 0.00% 182.49
17,262.63 149.46 17,262.63 100.00% - 0.00% 149.46
6,334.24 2,365.61 -
6,334.24 364.50 2,365.61 37.35% - 0.00% 364.50
25,014.64 8,867.08 -
25,014.64 2,076.60 8,867.08 35.45% - 0.00% 2,076.60
438,677.60 142,136.58 -
213,142.32 41.24 122,090.29 57.28% - 0.00% 41.24
162,139.12 5.44 20,046.29 12.36% - 0.00% 5.44
63,396.16 - - 0.00% - 0.00% -
8,177.32 3,325.77 -
7,490.44 1,044.00 3,111.12 41.53% - 0.00% 1,044.00
686.88 5.00 214.65 31.25% - 0.00% 5.00
601,003.50 225,012.43 -
18,644.94 1,616.65 9,166.41 49.16% - 0.00% 1,616.65
9,267.71 537.34 8,753.27 94.45% - 0.00% 537.34
77,652.15 1,670.39 27,611.55 35.56% - 0.00% 1,670.39
25,163.83 603.45 9,069.85 36.04% - 0.00% 603.45
28,880.64 72.00 1,242.00 4.30% - 0.00% 72.00
16,112.94 1,630.00 5,590.90 34.70% - 0.00% 1,630.00
33,867.17 1,614.50 11,640.55 34.37% - 0.00% 1,614.50
12,328.56 488.80 7,126.70 57.81% - 0.00% 488.80
42,143.95 1,647.26 22,056.81 52.34% - 0.00% 1,647.26
303,372.80 242.00 106,092.80 34.97% - 0.00% 242.00
11,359.20 - - 0.00% - 0.00% -
11,971.20 22.00 10,973.60 91.67% - 0.00% 22.00
10,238.40 10.00 5,688.00 55.56% - 0.00% 10.00
31,344.48 8,450.12 -
25,541.88 1,938.10 8,450.12 33.08% - 0.00% 1,938.10
4,792.50 - - 0.00% - 0.00% -
1,010.10 - - 0.00% - 0.00% -
23,550.99 6,819.12 -
11,889.59 422.00 860.88 7.24% - 0.00% 422.00
2,343.20 10.00 800.00 34.14% - 0.00% 10.00
1,315.24 14.45 1,315.24 100.00% - 0.00% 14.45
8,002.96 2,100.00 3,843.00 48.02% - 0.00% 2,100.00
43,498.40 30,800.00 226.11
13,689.52 2,800.00 -
2,800.00 14.00 2,800.00 100.00% - 0.00% 14.00
10,889.52 - - 0.00% - 0.00% -
29,808.88 28,000.00 226.11
28,000.00 14.00 28,000.00 100.00% - - 0.00% 14.00
1,808.88 - - 0.00% 3.00 226.11 12.50% 3.00

3,788,909.92 1,395,501.05 36.83% 226.11 0.01%


VALORIZACION MENSUAL DE OBRA
363,480.45 133,874.22 36.83% 21.69 0.01%
87,856.09 32,358.45 36.83% 5.24 0.01%
15,712.96 - 0.00% - 0.00%
28,628.11 28,628.11 100.00% - 0.00%
4,284,587.53 1,590,361.83 37.12% 253.04 0.01%
RESUMEN DE VALORIZACION DE OBRA
ZACION ACTUAL S/. 226.11 0.01%
ZACION ACUMULADO S/. 1,395,727.16 36.84%

VALORIZACION ACUMULADO VALORIZACION SALDOS


VALORIZACION % METRADO VALORIZACION %
520,036.64 1,149,460.29
4,574.65 6,065.35
1,940.97 100.00% - - 0.00%
1,750.00 35.71% 9.00 3,150.00 64.29%
883.68 23.26% 5,205.99 2,915.35 76.74%
64,398.50 122,531.85
3,686.77 47.67% 3,549.98 4,046.98 52.33%
4,032.14 43.70% 3,819.18 5,194.08 56.30%
6,311.50 36.58% 1,683.32 10,941.58 63.42%
49,272.25 33.19% 2,763.19 99,198.66 66.81%
1,095.84 25.81% 23.00 3,150.54 74.19%
21,645.54 46,660.65
1,900.00 100.00% - - 0.00%

2,275.62 14.20% 834.07 13,753.81 85.80%


1,797.41 49.55% 111.00 1,830.39 50.45%
3,322.20 19.50% 809.00 13,712.55 80.50%
3,188.49 32.19% 9,200.18 6,716.13 67.81%
1,106.56 57.14% 12.00 829.92 42.86%
1,946.00 89.29% 3.00 233.52 10.71%
3,109.26 27.78% 4,899.59 8,084.32 72.22%
3,000.00 66.67% 1.00 1,500.00 33.33%
77,048.20 240,177.39
4,653.00 4.82% 5,436.10 91,978.81 95.18%
5,319.84 41.22% 3,357.19 7,587.25 58.78%
16,228.85 43.32% 3,237.19 21,235.97 56.68%
32,905.36 40.23% 3,413.24 48,877.60 59.77%
423.00 2.33% 1,047.00 17,715.24 97.67%
203.82 7.36% 993.89 2,564.24 92.64%
437.12 5.97% 1,008.89 6,890.72 94.03%
6,248.21 28.19% 1,023.08 15,919.19 71.81%
1,643.32 10.06% 964.99 14,696.80 89.94%
8,985.70 41.41% 834.64 12,711.57 58.59%
131,797.49 162,182.69
98,207.51 137,001.57
971.63 59.16% 83.53 670.75 40.84%
- 0.00% 48.30 771.83 100.00%
93,136.20 69.82% 1,647.46 40,263.92 30.18%
4,099.68 7.80% 638.14 48,447.59 92.20%
- 0.00% 380.75 46,847.48 100.00%
26,529.90 8,593.20
145.00 16.67% 5.00 725.00 83.33%
178.90 20.00% 4.00 715.60 80.00%
6,169.00 100.00% - - 0.00%
- 0.00% 2.00 630.00 100.00%
970.00 28.57% 5.00 2,425.00 71.43%
1,290.00 100.00% - - 0.00%
859.50 100.00% - - 0.00%
24.00 100.00% - - 0.00%
174.00 100.00% - - 0.00%
754.00 100.00% - - 0.00%
174.00 100.00% - - 0.00%
- 0.00% 3.00 993.00 100.00%
993.00 100.00% - - 0.00%
1,392.00 100.00% - - 0.00%
- 0.00% 1.00 441.00 100.00%
4,625.00 100.00% - - 0.00%
1,396.00 100.00% - - 0.00%
4,800.00 94.12% 1.00 300.00 5.88%
- 0.00% 1.00 352.00 100.00%
1,060.00 100.00% - - 0.00%
- 0.00% 4.00 764.00 100.00%
184.00 100.00% - - 0.00%
- 0.00% 2.00 94.00 100.00%
- 0.00% 2.00 253.00 100.00%
859.50 55.56% 4.00 687.60 44.44%
- 0.00% 1.00 160.00 100.00%
42.00 66.67% 1.00 21.00 33.33%
- 0.00% 1.00 32.00 100.00%
440.00 100.00% - - 0.00%
4,558.81 13,617.65
3,624.79 36.48% 3,627.89 6,312.53 63.52%
308.88 5.03% 1,018.89 5,828.05 94.97%
625.14 47.26% 77.00 697.62 52.74%
- 0.00% 35.00 779.45 100.00%
2,501.28 2,970.27
2,501.28 45.71% 57.00 2,970.27 54.29%
43,027.60 43,542.10
14,700.00 20,628.00
- 0.00% 6.00 2,400.00 100.00%
14,700.00 58.33% 20.00 10,500.00 41.67%
- 0.00% 3.00 4,968.00 100.00%
- 0.00% 1.00 2,760.00 100.00%
1,879.64 8,487.94
- 0.00% 6.00 1,686.06 100.00%
1,879.64 29.17% 34.00 4,564.84 70.83%
- 0.00% 4.00 2,237.04 100.00%
26,447.96 14,426.16
26,447.96 64.71% 6.00 14,426.16 35.29%
160,909.75 495,440.28
8,463.04 68.07% 699.99 3,968.94 31.93%
6,095.72 74.47% 128.30 2,090.01 25.53%
25,109.07 34.64% 2,866.18 47,377.96 65.36%
7,361.09 74.46% 168.02 2,525.34 25.54%
- 0.00% 657.78 11,346.71 100.00%
5,035.24 33.48% 2,917.18 10,005.93 66.52%
10,382.40 32.84% 2,945.18 21,234.75 67.16%
6,458.02 63.10% 242.74 3,777.03 36.90%
21,932.82 37.35% 2,747.18 36,784.74 62.65%
- 0.00% 41.00 1,486.25 100.00%
- 0.00% 10.00 404.00 100.00%
18,321.80 36.26% 566.00 32,205.40 63.74%
207.90 1.52% 65.00 13,513.50 98.48%
39,427.89 26.57% 738.00 108,980.46 73.43%
12,114.75 14.43% 860.00 71,853.00 85.57%
- 0.00% 1,005.00 127,886.25 100.00%
1,893.75 10,494.71
919.45 43.20% 14.91 1,208.90 56.80%
974.30 9.50% 12.39 9,285.81 90.50%
2,078.36 8,533.56
2,078.36 35.68% 3,673.49 3,746.96 64.32%
- 0.00% 1,072.89 2,886.07 100.00%
- 0.00% 45.00 1,597.50 100.00%
- 0.00% 9.00 303.03 100.00%
12,662.80 13,831.71
882.21 20.64% 1,615.10 3,391.71 79.36%
1,600.00 13.29% 130.50 10,440.00 86.71%
10,180.59 100.00% - - 0.00%
844,664.41 1,231,250.17
995.01 2,285.60
995.01 30.33% 4,081.43 2,285.60 69.67%
111,605.66 216,596.08
4,317.34 68.88% 1,823.33 1,950.96 31.12%
9,580.28 65.68% 2,010.73 5,006.72 34.32%
6,506.50 19.16% 4,223.49 27,452.69 80.84%
77,903.72 34.71% 4,081.33 146,519.75 65.29%
7,428.62 29.23% 92.00 17,985.08 70.77%
5,869.20 24.92% 4,398.23 17,680.88 75.08%
59,310.02 56,834.65
2,308.60 82.17% 30.38 500.97 17.83%
2,473.50 51.21% 142.91 2,356.59 48.79%
38,027.70 49.74% 712.37 38,425.24 50.26%
5,213.66 60.96% 4,574.46 3,339.36 39.04%
2,143.96 34.44% 59.00 4,080.44 65.56%
7,161.28 68.15% 43.00 3,347.12 31.85%
1,981.32 29.28% 2,899.96 4,784.93 70.72%
98,606.31 194,045.44
3,487.19 7.46% 2,690.88 43,242.44 92.54%
- 0.00% 2,554.97 51,303.80 100.00%
- 0.00% 395.38 12,743.10 100.00%
6,965.70 38.36% 3,611.23 11,194.81 61.64%
15,019.17 37.05% 3,687.83 25,519.78 62.95%
13,511.99 70.59% 361.85 5,630.39 29.41%
24,914.74 100.00% - - 0.00%
8,984.04 28.35% 1,281.48 22,707.83 71.65%
- 0.00% 316.30 9,953.96 100.00%
25,723.47 68.65% 771.46 11,749.34 31.35%
188,403.40 44,478.53
177,170.72 24,362.34
145,537.00 93.25% 354.05 10,532.99 6.75%
- 0.00% 280.23 13,829.35 100.00%
14,371.09 100.00% - - 0.00%
17,262.63 100.00% - - 0.00%
2,365.61 3,968.64
2,365.61 37.35% 611.50 3,968.64 62.65%
8,867.08 16,147.56
8,867.08 35.45% 3,781.63 16,147.56 64.55%
142,136.58 296,541.02
122,090.29 57.28% 30.76 91,052.03 42.72%
20,046.29 12.36% 38.56 142,092.83 87.64%
- 0.00% 16.00 63,396.16 100.00%
3,325.77 4,851.55
3,111.12 41.53% 1,469.57 4,379.32 58.47%
214.65 31.25% 11.00 472.23 68.75%
225,012.43 375,991.06
9,166.41 49.16% 1,671.70 9,478.54 50.84%
8,753.27 94.45% 31.58 514.44 5.55%
27,611.55 35.56% 3,027.26 50,040.61 64.44%
9,069.85 36.04% 1,070.79 16,093.97 63.96%
1,242.00 4.30% 1,602.24 27,638.64 95.70%
5,590.90 34.70% 3,067.65 10,522.04 65.30%
11,640.55 34.37% 3,082.75 22,226.63 65.63%
7,126.70 57.81% 356.78 5,201.85 42.19%
22,056.81 52.34% 1,500.16 20,087.14 47.66%
106,092.80 34.97% 450.00 197,280.00 65.03%
- 0.00% 24.00 11,359.20 100.00%
10,973.60 91.67% 2.00 997.60 8.33%
5,688.00 55.56% 8.00 4,550.40 44.44%
8,450.12 22,894.37
8,450.12 33.08% 3,920.13 17,091.77 66.92%
- 0.00% 135.00 4,792.50 100.00%
- 0.00% 30.00 1,010.10 100.00%
6,819.12 16,731.87
860.88 7.24% 5,406.23 11,028.71 92.76%
800.00 34.14% 19.29 1,543.20 65.86%
1,315.24 100.00% 0.00 0.00 0.00%
3,843.00 48.02% 2,273.20 4,159.96 51.98%
31,026.11 12,472.29
2,800.00 10,889.52
2,800.00 100.00% - - 0.00%
- 0.00% 24.00 10,889.52 100.00%
28,226.11 1,582.77
28,000.00 100.00% - - 0.00%
226.11 12.50% 21.00 1,582.77 87.50%

1,395,727.16 36.84% 2,393,182.75 63.16%


133,895.91 36.84% 229,584.54 63.16%
32,363.70 36.84% 55,492.39 63.16%
- 0.00% 15,712.96 100.00%
28,628.11 100.00% - 0.00%
1,590,614.88 37.12% 2,693,972.65 62.88%
VALORIZACION MENSUAL DE O
CORRESPONDIENTE AL MES DE MAR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

PRESUPUESTO DE OBRA VALORIZACION ANTERIOR VALORIZACION ACTUAL FEBRER


ITEM DESCRIPCION UNID
METRADO P.U PRESUPUESTO METRADO VALORIZACION % METRADOVALORIZACION
01 SISTEMA DE AGUA POTABLE 1,669,496.93 520,036.64 - -
01.01 OBRAS PROVISIONALES 10,640.00 4,574.65 - -
01.01.01 CARTEL DE OBRA und 3.00 646.99 1,940.97 3.00 1,940.97 100.00% - -
01.01.02 ALMACEN mes 14.00 350.00 4,900.00 5.00 1,750.00 35.71% - -
01.01.03 PUESTA EN OPERACION DEL SISTEMA ml 6,783.99 0.56 3,799.03 1,578.00 883.68 23.26% - -
01.02 TRABAJOS PRELIMINARES 186,930.35 64,398.50 - -
01.02.01 TRAZO NIVELACION Y REPLANTEO m 6,783.99 1.14 7,733.75 3,234.01 3,686.77 47.67% - -
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 6,783.99 1.36 9,226.23 2,964.81 4,032.14 43.70% - -
01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 2,654.32 6.50 17,253.08 971.00 6,311.50 36.58% - -
01.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 4,135.68 35.90 148,470.91 1,372.49 49,272.25 33.19% - -
01.02.05 PIQUES EN EMPALMES und 31.00 136.98 4,246.38 8.00 1,095.84 25.81% - -
01.03 SEGURIDAD Y SALUD 68,306.19 21,645.54 - -
01.03.01 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y GBL 1.00 1,900.00 1,900.00 1.00 1,900.00 100.00% - -
SALUD EN EL TRABAJO
01.03.02 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 972.07 16.49 16,029.43 138.00 2,275.62 14.20% - -
01.03.03 PROTECCION DE RED DE TELEFONIA m 220.00 16.49 3,627.80 109.00 1,797.41 49.55% - -
01.03.04 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE UND 1,005.00 16.95 17,034.75 196.00 3,322.20 19.50% - -
01.03.05 CINTA DE SEGURIDAD m 13,567.98 0.73 9,904.63 4,367.80 3,188.49 32.19% - -
01.03.06 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO und 28.00 69.16 1,936.48 16.00 1,106.56 57.14% - -
VEHICULAR
01.03.07 PUENTES PEATONALES PROVISIONALES und 28.00 77.84 2,179.52 25.00 1,946.00 89.29% - -
01.03.08 LIMPIEZA FINAL DE LA OBRA m2 6,783.99 1.65 11,193.58 1,884.40 3,109.26 27.78% - -
01.03.09 SERVICIOS HIGIENICOS PARA OBRA SISTEMA MODULAR und 3.00 1,500.00 4,500.00 2.00 3,000.00 66.67% - -
01.04 MOVIMIENTO DE TIERRAS 317,225.59 77,048.20 - -
01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA m 5,711.10 16.92 96,631.81 275.00 4,653.00 4.82% - -
110MM
01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") m 5,711.10 2.26 12,907.09 2,353.91 5,319.84 41.22% - -
- 110mm (4")
01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. M.L 5,711.10 6.56 37,464.82 2,473.91 16,228.85 43.32% - -
01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") m 5,711.10 14.32 81,782.96 2,297.86 32,905.36 40.23% - -
H=1.50M
01.04.05 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA m 1,072.00 16.92 18,138.24 25.00 423.00 2.33% - -
250MM
01.04.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 200mm a m 1,072.89 2.58 2,768.06 79.00 203.82 7.36% - -
250mm
01.04.07 CAMA DE APOYO P/TUB. 200mm a 250mm TERRENO NORMAL m 1,072.89 6.83 7,327.84 64.00 437.12 5.97% - -
01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,424.64 15.56 22,167.40 401.56 6,248.21 28.19% - -
01.04.09 RELLENO COMP.ZANJA TERR.NORMAL"C"P/TUB.8"-10" HASTA 1.50 M m 1,072.89 15.23 16,340.11 107.90 1,643.32 10.06% - -
01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 1,424.64 15.23 21,697.27 590.00 8,985.70 41.41% - -
01.05 TUBERIAS Y ACCESORIOS 293,980.18 131,797.49 - -
01.05.01 SUMINISTRO DE TUBERIAS 235,209.08 98,207.51 - -
01.05.01.01 TUBERIA PVC C-10 U.F. 63 mm ISO 1452 m 204.53 8.03 1,642.38 121.00 971.63 59.16% - -
01.05.01.02 TUBERIA PVC C-10 U.F. 90 mm ISO 1452 m 48.30 15.98 771.83 - - 0.00% - -
01.05.01.03 TUBERIA PVC C-10 U.F. 110mm ISO1452 m 5,458.27 24.44 133,400.12 3,810.81 93,136.20 69.82% - -
01.05.01.04 TUBERIA PVC C-10 U.F. 200mm ISO 1452 m 692.14 75.92 52,547.27 54.00 4,099.68 7.80% - -
01.05.01.05 TUBERIA PVC C-10 U.F. 250mm ISO 1452 m 380.75 123.04 46,847.48 - - 0.00% - -
01.05.02 SUMINISTRO DE ACCESORIOS 35,123.10 26,529.90 - -
01.05.02.01 UNION MECANICA DE AMPLIO RANGO 2"(50mm) DE RANGO (59.5-72 und 6.00 145.00 870.00 1.00 145.00 16.67% - -
mm)
01.05.02.02 UNION MECANICA DE AMPLIO RANGO 3"(80mm) DE RANGO (88.1- und 5.00 178.90 894.50 1.00 178.90 20.00% - -
102.4 mm)
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2- und 31.00 199.00 6,169.00 31.00 6,169.00 100.00% - -
127.8 mm)
01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2- und 2.00 315.00 630.00 - - 0.00% - -
181.86 mm)
01.05.02.05 UNION MECANICA DE AMPLIO RANGO 8"(200mm) DE RANGO (218.1- und 7.00 485.00 3,395.00 2.00 970.00 28.57% - -
235.0 mm)
01.05.02.06 UNION MECANICA DE AMPLIO RANGO 10"(250mm) DE RANGO (272- und 2.00 645.00 1,290.00 2.00 1,290.00 100.00% - -
289 mm)
01.05.02.07 UNION MECANICA DE AMPLIO RANGO 12"(300mm) DE RANGO (315- und 1.00 859.50 859.50 1.00 859.50 100.00% - -
332 mm)
01.05.02.08 CODO PVC C-10 P/AGUA 63mm x 45ª UF. und 1.00 24.00 24.00 1.00 24.00 100.00% - -
01.05.02.09 CODO PVC C-10 P/AGUA 110mm x22.5º UF und 3.00 58.00 174.00 3.00 174.00 100.00% - -
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 13.00 58.00 754.00 13.00 754.00 100.00% - -
01.05.02.11 CODO PVC C-10 P/AGUA 110mm x90º UF und 3.00 58.00 174.00 3.00 174.00 100.00% - -
01.05.02.12 CODO PVC C-10 P/AGUA 200mm x 22.5º UF und 3.00 331.00 993.00 - - 0.00% - -
01.05.02.13 CODO PVC C-10 P/AGUA 200mm x 90º UF und 3.00 331.00 993.00 3.00 993.00 100.00% - -
01.05.02.14 CURVA PVC C-10 P/AGUA 200mm x 90º UF und 2.00 696.00 1,392.00 2.00 1,392.00 100.00% - -
01.05.02.15 CODO PVC C-10 P/AGUA 250mm x 90º UF und 1.00 441.00 441.00 - - 0.00% - -
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 37.00 125.00 4,625.00 37.00 4,625.00 100.00% - -
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. und 4.00 349.00 1,396.00 4.00 1,396.00 100.00% - -
01.05.02.18 CRUZ DE PVC C-10 DE 110 mm U.F. und 17.00 300.00 5,100.00 16.00 4,800.00 94.12% - -
01.05.02.19 CRUZ DE PVC C-10 DE 160 mm U.F. und 1.00 352.00 352.00 - - 0.00% - -
01.05.02.20 CRUZ DE PVC C-10 DE 200 mm U.F. und 2.00 530.00 1,060.00 2.00 1,060.00 100.00% - -
01.05.02.21 REDUCCION PVC 110 mm. - 50mm U.F und 4.00 191.00 764.00 - - 0.00% - -
01.05.02.22 REDUCCION PVC 110 mm. - 63mm U.F und 4.00 46.00 184.00 4.00 184.00 100.00% - -
01.05.02.23 REDUCCION PVC 110 mm. - 90mm U.F und 2.00 47.00 94.00 - - 0.00% - -
01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F und 2.00 126.50 253.00 - - 0.00% - -
01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm und 9.00 171.90 1,547.10 5.00 859.50 55.56% - -
01.05.02.26 REDUCCIÓN PVC P/AGUA 300 mm x 250 mm und 1.00 160.00 160.00 - - 0.00% - -
01.05.02.27 TAPON DE PVC P/AGUA C-10 TUBERIA DE 63 mm U.F. und 3.00 21.00 63.00 2.00 42.00 66.67% - -
01.05.02.28 TAPON DE PVC P/AGUA C-10 TUBERIA DE 90 mm U.F. und 1.00 32.00 32.00 - - 0.00% - -
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 11.00 40.00 440.00 11.00 440.00 100.00% - -
01.05.03 INSTALACION TUBERIAS Y ACCESORIOS 18,176.45 4,558.81 - -
01.05.03.01 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m 5,711.10 1.74 9,937.31 2,083.21 3,624.79 36.48% - -
01.05.03.02 INSTALAC. TUBERIA PVC C-10 DE 200mm a 250mm m 1,072.89 5.72 6,136.93 54.00 308.88 5.03% - -
01.05.03.03 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A und 146.00 9.06 1,322.76 69.00 625.14 47.26% - -
110mm
01.05.03.04 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 200mm a und 35.00 22.27 779.45 - - 0.00% - -
250mm
01.05.04 ANCLAJES / DADOS DE CONCRETO 5,471.55 2,501.28 - -
01.05.04.01 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. und 105.00 52.11 5,471.55 48.00 2,501.28 45.71% - -
01.06 VALVULAS Y GRIFOS CONTRA INCENDIO 86,569.70 43,027.60 - -
01.06.01 SUMINISTRO DE VALVULAS 35,328.00 14,700.00 - -
01.06.01.01 VALVULA PURGA HIERRO DUCTIL ISO 7259 Ø 63mm und 6.00 400.00 2,400.00 - - 0.00% - -
01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm und 48.00 525.00 25,200.00 28.00 14,700.00 58.33% - -
01.06.01.03 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 200mm und 3.00 1,656.00 4,968.00 - - 0.00% - -
01.06.01.04 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 250mm und 1.00 2,760.00 2,760.00 - - 0.00% - -
01.06.02 INSTALACION DE VALVULAS 10,367.58 1,879.64 - -
01.06.02.01 INSTALACION DE VALVULA DE PURGA Ø 63mm und 6.00 281.01 1,686.06 - - 0.00% - -
01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm und 48.00 134.26 6,444.48 14.00 1,879.64 29.17% - -
01.06.02.03 INSTALACION DE VALVULA COMPUERTA Ø 200mm a 250mm und 4.00 559.26 2,237.04 - - 0.00% - -
01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO 40,874.12 26,447.96 - -
01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM und 17.00 2,404.36 40,874.12 11.00 26,447.96 64.71% - -
01.07 CONEXIONES DOMICILIARIAS DE AGUA 656,350.03 160,909.75 - -
01.07.01 TRAZO Y REPLANTEO m2 2,192.59 5.67 12,431.99 1,492.60 8,463.04 68.07% - -
01.07.02 DEMOLICION DE VEREDA m2 502.50 16.29 8,185.73 374.20 6,095.72 74.47% - -
01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,385.18 16.53 72,487.03 1,519.00 25,109.07 34.64% - -
01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO m3 657.78 15.03 9,886.43 489.76 7,361.09 74.46% - -
USANDO CARRETILLA)
01.07.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 657.78 17.25 11,346.71 - - 0.00% - -
01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 160 MM m 4,385.18 3.43 15,041.17 1,468.00 5,035.24 33.48% - -
01.07.07 CAMA DE APOYO m 4,385.18 7.21 31,617.15 1,440.00 10,382.40 32.84% - -
01.07.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 657.78 15.56 10,235.06 415.04 6,458.02 63.10% - -
01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M m 4,385.18 13.39 58,717.56 1,638.00 21,932.82 37.35% - -
01.07.10 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 41.00 36.25 1,486.25 - - 0.00% - -
P/CONEX AGUA 63MM x 1/2"
01.07.11 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 10.00 40.40 404.00 - - 0.00% - -
P/CONEZ AGUA 90MM x 1/2"
01.07.12 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 888.00 56.90 50,527.20 322.00 18,321.80 36.26% - -
P/CONEZ AGUA 110MM x 1/2"
01.07.13 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 und 66.00 207.90 13,721.40 1.00 207.90 1.52% - -
P/CONEZ AGUA 200MM x 1/2"
01.07.14 SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. und 1,005.00 147.67 148,408.35 267.00 39,427.89 26.57% - -
DOM.
01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES und 1,005.00 83.55 83,967.75 145.00 12,114.75 14.43% - -
01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) und 1,005.00 127.25 127,886.25 - - 0.00% - -
01.08 CAMARAS / CAJAS PARA VALVULAS 12,388.46 1,893.75 - -
01.08.01 EXCAVACION PARA CAJA DE VALVULA m3 26.25 81.08 2,128.35 11.34 919.45 43.20% - -
01.08.02 CONCRETO f'c 175 kg/cm² m3 13.69 749.46 10,260.11 1.30 974.30 9.50% - -
01.09 PRUEBAS DE CONTROL DE CALIDAD 10,611.93 2,078.36 - -
01.09.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m 5,711.10 1.02 5,825.32 2,037.61 2,078.36 35.68% - -
01.09.02 PRUEBA HIDRAULICA Y DESINFECCION TUB. HASTA 250MM m 1,072.89 2.69 2,886.07 - - 0.00% - -
01.09.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - und 45.00 35.50 1,597.50 - - 0.00% - -
DENSIDAD DE CAMPO)
01.09.04 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA und 9.00 33.67 303.03 - - 0.00% - -
COMPRESION)
01.10 MITIGACION DE IMPACTOS 26,494.51 12,662.80 - -
01.10.01 AGUA PARA HUMEDECER TERRENO M3. 2,035.20 2.10 4,273.92 420.10 882.21 20.64% - -
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 150.50 80.00 12,040.00 20.00 1,600.00 13.29% - -
01.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 111.85 91.02 10,180.59 111.85 10,180.59 100.00% - -
02 SISTEMA DE DESAGUE 2,075,914.58 855,682.61 - 11,018.20
02.01 OBRAS PROVISIONALES 3,280.61 995.01 - -
02.01.01 PUESTA EN OPERACION DEL SISTEMA M.L 5,858.23 0.56 3,280.61 1,776.80 995.01 30.33% - -
02.02 TRABAJOS PRELIMINARES 328,201.74 113,371.21 - 1,765.55
02.02.01 TRAZO NIVELACION Y REPLANTEO m 5,858.23 1.07 6,268.31 4,076.51 4,361.87 69.59% 41.61 44.52
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 5,858.23 2.49 14,586.99 3,889.11 9,683.88 66.39% 41.61 103.61
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 5,224.49 6.50 33,959.19 1,001.00 6,506.50 19.16% - -
02.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 6,251.35 35.90 224,423.47 2,208.60 79,288.74 35.33% 38.58 1,385.02
02.02.05 DEMOLICION DE BUZONES UND 130.00 195.49 25,413.70 38.00 7,428.62 29.23% - -
02.02.06 REMOCION DE TUB DE ALCANTARILLA CSN CON MAQUINARIA ML 5,858.23 4.02 23,550.08 1,517.81 6,101.60 25.91% 57.81 232.40
02.03 SEGURIDAD Y SALUD 116,144.67 62,000.92 - 2,690.90
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 170.38 16.49 2,809.57 140.00 2,308.60 82.17% - -
02.03.02 PROTECCION DE RED DE TELEFONIA m 292.91 16.49 4,830.09 150.00 2,473.50 51.21% - -
02.03.03 ENTIBADO Y APUNTALAMIENTO M.L 1,417.37 53.94 76,452.94 746.61 40,272.14 52.68% 41.61 2,244.44
02.03.04 CINTA DE SEGURIDAD m 11,716.46 0.73 8,553.02 7,350.85 5,366.12 62.74% 208.85 152.46
02.03.05 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO und 90.00 69.16 6,224.40 33.00 2,282.28 36.67% 2.00 138.32
VEHICULAR
02.03.06 PUENTES PEATONALES PROVISIONALES und 135.00 77.84 10,508.40 94.00 7,316.96 69.63% 2.00 155.68
02.03.07 LIMPIEZA FINAL DE LA OBRA m2 4,100.76 1.65 6,766.25 1,200.80 1,981.32 29.28% - -
02.04 MOVIMIENTO DE TIERRAS 292,651.75 100,456.75 - 1,850.45
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M m 2,907.88 16.07 46,729.63 258.61 4,155.86 8.89% 41.61 668.67
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M m 2,554.97 20.08 51,303.80 - - 0.00% - -
02.04.03 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=3.00 M m 395.38 32.23 12,743.10 - - 0.00% - -
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m 5,858.23 3.10 18,160.51 2,288.61 7,094.69 39.07% 41.61 128.99
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m 5,858.23 6.92 40,538.95 2,212.01 15,307.11 37.76% 41.61 287.94
02.04.06 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,230.23 15.56 19,142.38 877.12 13,647.99 71.30% 8.74 135.99
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 m 1,744.73 14.28 24,914.74 1,744.73 24,914.74 100.00% - -
M
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 m 1,788.48 17.72 31,691.87 507.00 8,984.04 28.35% - -
M
02.04.09 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 3.00 m 316.30 31.47 9,953.96 - - 0.00% - -
M
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 2,460.46 15.23 37,472.81 1,730.29 26,352.32 70.32% 41.29 628.85
02.05 TUBERIAS 232,881.94 189,864.41 - 1,461.00
02.05.01 SUMINISTRO 201,533.06 178,408.62 - 1,237.90
02.05.01.01 TUBERIA DE U.F.PVC ISO 4435 DN 200mm m 5,246.05 29.75 156,069.99 4,933.61 146,774.90 94.04% 41.61 1,237.90
02.05.01.02 TUBERIA DE U.F.PVC ISO 4435 DN 250mm m 280.23 49.35 13,829.35 - - 0.00% - -
02.05.01.03 TUBERIA DE U.F.PVC ISO 4435 DN 315mm m 182.49 78.75 14,371.09 182.49 14,371.09 100.00% - -
02.05.01.04 TUBERIA DE U.F.PVC ISO 4435 DN 355mm m 149.46 115.50 17,262.63 149.46 17,262.63 100.00% - -
02.05.02 TRANSPORTE DE TUBERIA 6,334.24 2,411.04 - 45.43
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -375mm MANUAL und 976.00 6.49 6,334.24 371.50 2,411.04 38.06% 7.00 45.43
02.05.03 INSTALACION DE TUBERIAS 25,014.64 9,044.76 - 177.67
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 375MM m 5,858.23 4.27 25,014.64 2,118.21 9,044.76 36.16% 41.61 177.67
02.06 BUZONES DE INSPECCION 438,677.60 142,136.58 - -
02.06.01 BUZON DE DESAGUE TIPO "A" D=1.20, H=1.50 M. und 72.00 2,960.31 213,142.32 41.24 122,090.29 57.28% - -
02.06.02 BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und 44.00 3,684.98 162,139.12 5.44 20,046.29 12.36% - -
02.06.03 BUZON DE DESAGUE TIPO "A" D=1.20, H=3.00 M. und 16.00 3,962.26 63,396.16 - - 0.00% - -
02.07 MANTENIMIENTO DE COLECTORES LATERALES 8,177.32 3,325.77 - -
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON m 2,513.57 2.98 7,490.44 1,044.00 3,111.12 41.53% - -
EQUIPO
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE und 16.00 42.93 686.88 5.00 214.65 31.25% - -
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE 601,003.50 228,255.14 - 3,242.71
02.08.01 TRAZO Y REPLANTEO m2 3,288.35 5.67 18,644.94 1,626.10 9,219.99 49.45% 9.45 53.58
02.08.02 DEMOLICION DE VEREDA m2 568.92 16.29 9,267.71 540.04 8,797.25 94.92% 2.70 43.98
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,697.65 16.53 77,652.15 1,686.59 27,879.33 35.90% 16.20 267.79
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO m3 1,674.24 15.03 25,163.83 620.46 9,325.51 37.06% 17.01 255.66
USANDO CARRETILLA)
02.08.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 1,674.24 17.25 28,880.64 76.05 1,311.86 4.54% 4.05 69.86
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 160MM m 4,697.65 3.43 16,112.94 1,643.50 5,637.21 34.99% 13.50 46.31
02.08.07 CAMA DE APOYO m 4,697.25 7.21 33,867.17 1,628.00 11,737.88 34.66% 13.50 97.34
02.08.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 845.58 14.58 12,328.56 491.23 7,162.13 58.09% 2.43 35.43
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 20MM" HASTA 1.50 M m 3,147.42 13.39 42,143.95 1,660.76 22,237.58 52.77% 13.50 180.77
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und 692.00 438.40 303,372.80 247.00 108,284.80 35.69% 5.00 2,192.00
02.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 160mm) und 24.00 473.30 11,359.20 - - 0.00% - -
02.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (300 -160mm) und 24.00 498.80 11,971.20 22.00 10,973.60 91.67% - -
02.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 160 mm) und 18.00 568.80 10,238.40 10.00 5,688.00 55.56% - -
02.09 PRUEBAS DE CONTROL DE CALIDAD 31,344.48 8,450.12 - -
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE m 5,858.23 4.36 25,541.88 1,938.10 8,450.12 33.08% - -
02.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - und 135.00 35.50 4,792.50 - - 0.00% - -
DENSIDAD DE CAMPO)
02.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00 33.67 1,010.10 - - 0.00% - -
02.10 MITIGACION DE IMPACTOS 23,550.99 6,826.71 - 7.59
02.10.01 AGUA PARA HUMEDECER TERRENO M3. 5,828.23 2.04 11,889.59 425.72 868.47 7.30% 3.72 7.59
02.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 29.29 80.00 2,343.20 10.00 800.00 34.14% - -
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 14.45 91.02 1,315.24 14.45 1,315.24 100.00% - -
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES m3 4,373.20 1.83 8,002.96 2,100.00 3,843.00 48.02% - -
EXCEDENTES
03 IMPACTO AMBIENTAL Y EDUCACION SANITARIA 43,498.40 30,800.00 - -
03.01 INFORMACION A LA POBLACION 13,689.52 2,800.00 - -
03.01.01 INFORMACION A LA POBLACION und 14.00 200.00 2,800.00 14.00 2,800.00 100.00% - -
03.01.02 LETREROS INFORMATIVOS und 24.00 453.73 10,889.52 - - 0.00% - -
03.02 EDUCACION SANITARIA 29,808.88 28,000.00 - -
03.02.01 EDUCACION SANITARIA A LA POBLACION GBL 14.00 2,000.00 28,000.00 14.00 28,000.00 100.00% - -
03.02.02 CONTENEDOR DE RESIDUOS SOLIDOS und 24.00 75.37 1,808.88 - - 0.00% - -

COSTO DIRECTO 3,788,909.92 1,406,519.25 37.12%


GASTOS GENERALES 363,480.45 134,931.22 37.12%
SUPERVISION 87,856.09 32,613.94 37.12%
LIQUIDACION 15,712.96 - 0.00%
EXPEDIENTE TECNICO 28,628.11 28,628.11 100.00%
PRESUPUESTO TOTAL 4,284,587.53 1,602,692.53 37.41%
ADICIONAL DE OBRA POR MAYORES METRADOS
CORRESPONDIENTE AL MES DE MAR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

PRESUPUESTO DE OBRA VALORIZACION ANTERIOR


ITEM DESCRIPCION UNID
METRADO P.U PRESUPUESTO METRADO VALORIZACION %
02 SISTEMA DE DESAGUE 22,045.64 3,982.87
02.04 MOVIMIENTO DE TIERRAS 18,656.96 594.19
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 m 1,306.51 14.28 18,656.96 41.61 594.19
M
02.10 MITIGACION DE IMPACTOS 3,388.67 3,388.67
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 37.23 91.02 3,388.67 37.23 3,388.67

COSTO DIRECTO 22,045.64 3,982.87 0.11%


SUAL DE OBRA
S DE MARZO DEL 2015
NTIAGO - CUSCO
RESUMEN DE VALORIZACION DE OBRA
VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULADO S/. 1,445,045.31 38.14%

ACTUAL FEBRERO VALORIZACION ACTUAL MARZO VALORIZACION ACUMULADO VALORIZACION SALDOS


TOTAL
% METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
- - - 520,036.64 1,149,460.29
- - 4,574.65 6,065.35
0.00% - - 0.00% 3.00 1,940.97 100.00% - - 0.00%
0.00% - - 0.00% 5.00 1,750.00 35.71% 9.00 3,150.00 64.29%
0.00% - - 0.00% 1,578.00 883.68 23.26% 5,205.99 2,915.35 76.74%
- - - 64,398.50 122,531.85
0.00% - - 0.00% 3,234.01 3,686.77 47.67% 3,549.98 4,046.98 52.33%
0.00% - - 0.00% 2,964.81 4,032.14 43.70% 3,819.18 5,194.08 56.30%
0.00% - - 0.00% 971.00 6,311.50 36.58% 1,683.32 10,941.58 63.42%
0.00% - - 0.00% 1,372.49 49,272.25 33.19% 2,763.19 99,198.66 66.81%
0.00% - - 0.00% 8.00 1,095.84 25.81% 23.00 3,150.54 74.19%
- - - 21,645.54 46,660.65
0.00% - - 0.00% 1.00 1,900.00 100.00% - - 0.00%

0.00% - - 0.00% 138.00 2,275.62 14.20% 834.07 13,753.81 85.80%


0.00% - - 0.00% 109.00 1,797.41 49.55% 111.00 1,830.39 50.45%
0.00% - - 0.00% 196.00 3,322.20 19.50% 809.00 13,712.55 80.50%
0.00% - - 0.00% 4,367.80 3,188.49 32.19% 9,200.18 6,716.13 67.81%
0.00% - - 0.00% 16.00 1,106.56 57.14% 12.00 829.92 42.86%
0.00% - - 0.00% 25.00 1,946.00 89.29% 3.00 233.52 10.71%
0.00% - - 0.00% 1,884.40 3,109.26 27.78% 4,899.59 8,084.32 72.22%
0.00% - - 0.00% 2.00 3,000.00 66.67% 1.00 1,500.00 33.33%
- - - 77,048.20 240,177.39
0.00% - - 0.00% 275.00 4,653.00 4.82% 5,436.10 91,978.81 95.18%
0.00% - - 0.00% 2,353.91 5,319.84 41.22% 3,357.19 7,587.25 58.78%
0.00% - - 0.00% 2,473.91 16,228.85 43.32% 3,237.19 21,235.97 56.68%
0.00% - - 0.00% 2,297.86 32,905.36 40.23% 3,413.24 48,877.60 59.77%
0.00% - - 0.00% 25.00 423.00 2.33% 1,047.00 17,715.24 97.67%
0.00% - - 0.00% 79.00 203.82 7.36% 993.89 2,564.24 92.64%
0.00% - - 0.00% 64.00 437.12 5.97% 1,008.89 6,890.72 94.03%
0.00% - - 0.00% 401.56 6,248.21 28.19% 1,023.08 15,919.19 71.81%
0.00% - - 0.00% 107.90 1,643.32 10.06% 964.99 14,696.80 89.94%
0.00% - - 0.00% 590.00 8,985.70 41.41% 834.64 12,711.57 58.59%
- - - 131,797.49 162,182.69
- - 98,207.51 137,001.57
0.00% - - 0.00% 121.00 971.63 59.16% 83.53 670.75 40.84%
0.00% - - 0.00% - - 0.00% 48.30 771.83 100.00%
0.00% - - 0.00% 3,810.81 93,136.20 69.82% 1,647.46 40,263.92 30.18%
0.00% - - 0.00% 54.00 4,099.68 7.80% 638.14 48,447.59 92.20%
0.00% - - 0.00% - - 0.00% 380.75 46,847.48 100.00%
- - 26,529.90 8,593.20
0.00% - - 0.00% 1.00 145.00 16.67% 5.00 725.00 83.33%
0.00% - - 0.00% 1.00 178.90 20.00% 4.00 715.60 80.00%
0.00% - - 0.00% 31.00 6,169.00 100.00% - - 0.00%
0.00% - - 0.00% - - 0.00% 2.00 630.00 100.00%
0.00% - - 0.00% 2.00 970.00 28.57% 5.00 2,425.00 71.43%
0.00% - - 0.00% 2.00 1,290.00 100.00% - - 0.00%
0.00% - - 0.00% 1.00 859.50 100.00% - - 0.00%
0.00% - - 0.00% 1.00 24.00 100.00% - - 0.00%
0.00% - - 0.00% 3.00 174.00 100.00% - - 0.00%
0.00% - - 0.00% 13.00 754.00 100.00% - - 0.00%
0.00% - - 0.00% 3.00 174.00 100.00% - - 0.00%
0.00% - - 0.00% - - 0.00% 3.00 993.00 100.00%
0.00% - - 0.00% 3.00 993.00 100.00% - - 0.00%
0.00% - - 0.00% 2.00 1,392.00 100.00% - - 0.00%
0.00% - - 0.00% - - 0.00% 1.00 441.00 100.00%
0.00% - - 0.00% 37.00 4,625.00 100.00% - - 0.00%
0.00% - - 0.00% 4.00 1,396.00 100.00% - - 0.00%
0.00% - - 0.00% 16.00 4,800.00 94.12% 1.00 300.00 5.88%
0.00% - - 0.00% - - 0.00% 1.00 352.00 100.00%
0.00% - - 0.00% 2.00 1,060.00 100.00% - - 0.00%
0.00% - - 0.00% - - 0.00% 4.00 764.00 100.00%
0.00% - - 0.00% 4.00 184.00 100.00% - - 0.00%
0.00% - - 0.00% - - 0.00% 2.00 94.00 100.00%
0.00% - - 0.00% - - 0.00% 2.00 253.00 100.00%
0.00% - - 0.00% 5.00 859.50 55.56% 4.00 687.60 44.44%
0.00% - - 0.00% - - 0.00% 1.00 160.00 100.00%
0.00% - - 0.00% 2.00 42.00 66.67% 1.00 21.00 33.33%
0.00% - - 0.00% - - 0.00% 1.00 32.00 100.00%
0.00% - - 0.00% 11.00 440.00 100.00% - - 0.00%
- - 4,558.81 13,617.65
0.00% - - 0.00% 2,083.21 3,624.79 36.48% 3,627.89 6,312.53 63.52%
0.00% - - 0.00% 54.00 308.88 5.03% 1,018.89 5,828.05 94.97%
0.00% - - 0.00% 69.00 625.14 47.26% 77.00 697.62 52.74%
0.00% - - 0.00% - - 0.00% 35.00 779.45 100.00%
- - 2,501.28 2,970.27
0.00% - - 0.00% 48.00 2,501.28 45.71% 57.00 2,970.27 54.29%
- - 43,027.60 43,542.10
- - 14,700.00 20,628.00
0.00% - - 0.00% - - 0.00% 6.00 2,400.00 100.00%
0.00% - - 0.00% 28.00 14,700.00 58.33% 20.00 10,500.00 41.67%
0.00% - - 0.00% - - 0.00% 3.00 4,968.00 100.00%
0.00% - - 0.00% - - 0.00% 1.00 2,760.00 100.00%
- - 1,879.64 8,487.94
0.00% - - 0.00% - - 0.00% 6.00 1,686.06 100.00%
0.00% - - 0.00% 14.00 1,879.64 29.17% 34.00 4,564.84 70.83%
0.00% - - 0.00% - - 0.00% 4.00 2,237.04 100.00%
- - 26,447.96 14,426.16
0.00% - - 0.00% 11.00 26,447.96 64.71% 6.00 14,426.16 35.29%
- - 160,909.75 495,440.28
0.00% - - 0.00% 1,492.60 8,463.04 68.07% 699.99 3,968.94 31.93%
0.00% - - 0.00% 374.20 6,095.72 74.47% 128.30 2,090.01 25.53%
0.00% - - 0.00% 1,519.00 25,109.07 34.64% 2,866.18 47,377.96 65.36%
0.00% - - 0.00% 489.76 7,361.09 74.46% 168.02 2,525.34 25.54%
0.00% - - 0.00% - - 0.00% 657.78 11,346.71 100.00%
0.00% - - 0.00% 1,468.00 5,035.24 33.48% 2,917.18 10,005.93 66.52%
0.00% - - 0.00% 1,440.00 10,382.40 32.84% 2,945.18 21,234.75 67.16%
0.00% - - 0.00% 415.04 6,458.02 63.10% 242.74 3,777.03 36.90%
0.00% - - 0.00% 1,638.00 21,932.82 37.35% 2,747.18 36,784.74 62.65%
0.00% - - 0.00% - - 0.00% 41.00 1,486.25 100.00%
0.00% - - 0.00% - - 0.00% 10.00 404.00 100.00%
0.00% - - 0.00% 322.00 18,321.80 36.26% 566.00 32,205.40 63.74%
0.00% - - 0.00% 1.00 207.90 1.52% 65.00 13,513.50 98.48%
0.00% - - 0.00% 267.00 39,427.89 26.57% 738.00 108,980.46 73.43%
0.00% - - 0.00% 145.00 12,114.75 14.43% 860.00 71,853.00 85.57%
0.00% - - 0.00% - - 0.00% 1,005.00 127,886.25 100.00%
- - 1,893.75 10,494.71
0.00% - - 0.00% 11.34 919.45 43.20% 14.91 1,208.90 56.80%
0.00% - - 0.00% 1.30 974.30 9.50% 12.39 9,285.81 90.50%
- - 2,078.36 8,533.56
0.00% - - 0.00% 2,037.61 2,078.36 35.68% 3,673.49 3,746.96 64.32%
0.00% - - 0.00% - - 0.00% 1,072.89 2,886.07 100.00%
0.00% - - 0.00% - - 0.00% 45.00 1,597.50 100.00%
0.00% - - 0.00% - - 0.00% 9.00 303.03 100.00%
- - 12,662.80 13,831.71
0.00% - - 0.00% 420.10 882.21 20.64% 1,615.10 3,391.71 79.36%
0.00% - - 0.00% 20.00 1,600.00 13.29% 130.50 10,440.00 86.71%
0.00% - - 0.00% 111.85 10,180.59 100.00% - - 0.00%
- 36,485.03 892,167.64 1,183,746.94
- 98.00 98.00 1,093.01 2,187.60
0.00% 175.00 98.00 2.99% 1,951.80 1,093.01 33.32% 3,906.43 2,187.60 66.68%
- 4,955.69 6,721.24 118,326.90 209,874.84
0.71% - - 0.00% 4,076.51 4,361.87 69.59% 1,781.72 1,906.44 30.41%
0.71% - - 0.00% 3,889.11 9,683.88 66.39% 1,969.12 4,903.11 33.61%
0.00% - - 0.00% 1,001.00 6,506.50 19.16% 4,223.49 27,452.69 80.84%
0.62% 113.00 4,056.70 1.81% 2,321.60 83,345.44 37.14% 3,929.75 141,078.03 62.86%
0.00% 1.00 195.49 0.77% 39.00 7,624.11 30.00% 91.00 17,789.59 70.00%
0.99% 175.00 703.50 2.99% 1,692.81 6,805.10 28.90% 4,165.42 16,744.99 71.10%
- 4,521.34 7,212.24 66,522.26 49,622.40
0.00% - - 0.00% 140.00 2,308.60 82.17% 30.38 500.97 17.83%
0.00% - - 0.00% 150.00 2,473.50 51.21% 142.91 2,356.59 48.79%
2.94% 71.00 3,829.74 5.01% 817.61 44,101.88 57.69% 599.76 32,351.06 42.31%
1.78% - - 0.00% 7,350.85 5,366.12 62.74% 4,365.61 3,186.90 37.26%
2.22% 10.00 691.60 11.11% 43.00 2,973.88 47.78% 47.00 3,250.52 52.22%
1.48% - - 0.00% 94.00 7,316.96 69.63% 41.00 3,191.44 30.37%
0.00% - - 0.00% 1,200.80 1,981.32 29.28% 2,899.96 4,784.93 70.72%
- 6,052.34 7,902.79 106,509.09 186,142.66
1.43% - - 0.00% 258.61 4,155.86 8.89% 2,649.27 42,573.77 91.11%
0.00% - - 0.00% - - 0.00% 2,554.97 51,303.80 100.00%
0.00% 76.00 2,449.48 19.22% 76.00 2,449.48 19.22% 319.38 10,293.62 80.78%
0.71% 76.00 235.60 1.30% 2,364.61 7,330.29 40.36% 3,493.62 10,830.22 59.64%
0.71% 75.00 519.00 1.28% 2,287.01 15,826.11 39.04% 3,571.22 24,712.84 60.96%
0.71% 96.50 1,501.54 7.84% 973.62 15,149.53 79.14% 256.61 3,992.85 20.86%
0.00% - - 0.00% 1,744.73 24,914.74 100.00% - - 0.00%
0.00% 76.00 1,346.72 4.25% 583.00 10,330.76 32.60% 1,205.48 21,361.11 67.40%
0.00% - - 0.00% - - 0.00% 316.30 9,953.96 100.00%
1.68% - - 0.00% 1,730.29 26,352.32 70.32% 730.17 11,120.49 29.68%
- 449.54 1,910.54 190,313.95 42,567.99
- - 178,408.62 23,124.44
0.79% - - 0.00% 4,933.61 146,774.90 94.04% 312.44 9,295.09 5.96%
0.00% - - 0.00% - - 0.00% 280.23 13,829.35 100.00%
0.00% - - 0.00% 182.49 14,371.09 100.00% - - 0.00%
0.00% - - 0.00% 149.46 17,262.63 100.00% - - 0.00%
- 90.86 2,501.90 3,832.35
0.72% 14.00 90.86 1.43% 385.50 2,501.90 39.50% 590.50 3,832.35 60.50%
- 358.68 9,403.44 15,611.21
0.71% 84.00 358.68 1.43% 2,202.21 9,403.44 37.59% 3,656.02 15,611.21 62.41%
- 3,684.98 3,684.98 145,821.56 292,856.04
0.00% - - 0.00% 41.24 122,090.29 57.28% 30.76 91,052.03 42.72%
0.00% 1.00 3,684.98 2.27% 6.44 23,731.27 14.64% 37.56 138,407.85 85.36%
0.00% - - 0.00% - - 0.00% 16.00 63,396.16 100.00%
- 621.70 3,947.47 4,229.85
0.00% 151.00 449.98 6.01% 1,195.00 3,561.10 47.54% 1,318.57 3,929.34 52.46%
0.00% 4.00 171.72 25.00% 9.00 386.37 56.25% 7.00 300.51 43.75%
- 15,991.64 19,234.35 244,246.78 356,756.71
0.29% 157.00 890.19 4.77% 1,783.10 10,110.18 54.22% 1,505.25 8,534.77 45.78%
0.47% - - 0.00% 540.04 8,797.25 94.92% 28.88 470.46 5.08%
0.34% 75.34 1,245.37 1.60% 1,761.93 29,124.70 37.51% 2,935.72 48,527.45 62.49%
1.02% - - 0.00% 620.46 9,325.51 37.06% 1,053.78 15,838.31 62.94%
0.24% 211.00 3,639.75 12.60% 287.05 4,951.61 17.15% 1,387.19 23,929.03 82.85%
0.29% 75.00 257.25 1.60% 1,718.50 5,894.46 36.58% 2,979.15 10,218.48 63.42%
0.29% 75.00 540.75 1.60% 1,703.00 12,278.63 36.26% 2,994.25 21,588.54 63.74%
0.29% 96.00 1,399.68 11.35% 587.23 8,561.81 69.45% 258.35 3,766.74 30.55%
0.43% 75.00 1,004.25 2.38% 1,735.76 23,241.83 55.15% 1,411.66 18,902.13 44.85%
0.72% 16.00 7,014.40 2.31% 263.00 115,299.20 38.01% 429.00 188,073.60 61.99%
0.00% - - 0.00% - - 0.00% 24.00 11,359.20 100.00%
0.00% - - 0.00% 22.00 10,973.60 91.67% 2.00 997.60 8.33%
0.00% - - 0.00% 10.00 5,688.00 55.56% 8.00 4,550.40 44.44%
- - - 8,450.12 22,894.37
0.00% - - 0.00% 1,938.10 8,450.12 33.08% 3,920.13 17,091.77 66.92%
0.00% - - 0.00% - - 0.00% 135.00 4,792.50 100.00%
0.00% - - 0.00% - - 0.00% 30.00 1,010.10 100.00%
- 109.80 7.59 6,936.51 16,614.48
0.06% - - 0.00% 425.72 868.47 7.30% 5,402.51 11,021.12 92.70%
0.00% - - 0.00% 10.00 800.00 34.14% 19.29 1,543.20 65.86%
0.00% - - 0.00% 14.45 1,315.24 100.00% 0.00 0.00 0.00%
0.00% 60.00 109.80 1.37% 2,160.00 3,952.80 49.39% 2,213.20 4,050.16 50.61%
- 2,041.03 32,841.03 10,657.37
- 1,814.92 4,614.92 9,074.60
0.00% - - 0.00% 14.00 2,800.00 100.00% - - 0.00%
0.00% 4.00 1,814.92 16.67% 4.00 1,814.92 16.67% 20.00 9,074.60 83.33%
- 226.11 28,226.11 1,582.77
0.00% - - 0.00% 14.00 28,000.00 100.00% - - 0.00%
0.00% 3.00 226.11 12.50% 3.00 226.11 12.50% 21.00 1,582.77 87.50%

38,526.06 1.02% 1,445,045.31 38.14% 2,343,864.61 61.86%


3,695.91 1.02% 138,627.13 38.14% 224,853.32 61.86%
893.33 1.02% 33,507.27 38.14% 54,348.82 61.86%
- 0.00% - 0.00% 15,712.96 100.00%
- 0.00% 28,628.11 100.00% - 0.00%
43,115.30 1.01% 1,645,807.83 38.41% 2,638,779.70 61.59%
38,526.06 1.82%
11,018.20 0.29%

49,544.26 2.11%
S DE MARZO DEL 2015
NTIAGO - CUSCO
RESUMEN DE VALORIZACION ADICIONAL DE OBRA
VALORIZACION ACTUAL S/. 0.00 0.00%
VALORIZACION ACUMULADO S/. 3,982.87 0.11%

VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS


METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
- 3,982.87 18,062.77
- - 594.19 18,062.77
- - 41.61 594.19 1,264.90 18,062.77
- - 3,388.67 -
- - 37.23 3,388.67 - -

- 0.00% 3,982.87 0.11% 18,062.77 0.48%


VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS
ITEM DESCRIPCION UNID
METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
01 SISTEMA DE AGUA POTABLE 868,075.91 - - 868,075.91 802,410.43
01.01 OBRAS PROVISIONALES 7,668.09 - - 7,668.09 2,971.91
01.01.01 CARTEL DE OBRA und 3.00 1,940.97 100.00% - - 0.00% 3.00 1,940.97 100.00% - - 0.00%
01.01.02 ALMACEN mes 12.00 4,200.00 85.71% - - 0.00% 12.00 4,200.00 85.71% 2.00 700.00 14.29%
01.01.03 PUESTA EN OPERACION DEL SISTEMA ml 2,727.00 1,527.12 40.20% - - 0.00% 2,727.00 1,527.12 40.20% 4,056.99 2,271.91 59.80%
01.02 TRABAJOS PRELIMINARES - 134,620.84 - - 134,620.84 52,309.51
01.02.01 TRAZO NIVELACION Y REPLANTEO m 5,394.22 6,149.41 79.51% - - 0.00% 5,394.22 6,149.41 79.51% 1,389.77 1,584.34 20.49%
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 4,547.02 6,183.95 67.03% - - 0.00% 4,547.02 6,183.95 67.03% 2,236.97 3,042.28 32.97%
01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 1,264.77 8,221.01 47.65% - - 0.00% 1,264.77 8,221.01 47.65% 1,389.55 9,032.07 52.35%
01.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 3,062.87 109,957.07 74.06% - - 0.00% 3,062.87 109,957.07 74.06% 1,072.81 38,513.84 25.94%
01.02.05 PIQUES EN EMPALMES und 30.00 4,109.40 96.77% - - 0.00% 30.00 4,109.40 96.77% 1.00 136.98 3.23%
01.03 SEGURIDAD Y SALUD - 45,463.49 - - 45,463.49 23,832.11
01.03.01 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GBL 1.00 1,900.00 100.00% - - 0.00% 1.00 1,900.00 100.00% - - 0.00%
01.03.02 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 618.00 10,190.82 63.58% - - 0.00% 618.00 10,190.82 63.58% 354.07 5,838.61 36.42%
01.03.03 PROTECCION DE RED DE TELEFONIA m 250.00 4,122.50 113.64% - - 0.00% 250.00 4,122.50 113.64% 30.00 494.70 13.64%
01.03.04 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE UND 236.00 4,000.20 23.48% - - 0.00% 236.00 4,000.20 23.48% 769.00 13,034.55 76.52%
01.03.05 CINTA DE SEGURIDAD m 7,736.80 5,647.86 57.02% - - 0.00% 7,736.80 5,647.86 57.02% 5,831.18 4,256.76 42.98%
01.03.06 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 25.00 1,729.00 89.29% - - 0.00% 25.00 1,729.00 89.29% 3.00 207.48 10.71%
01.03.07 PUENTES PEATONALES PROVISIONALES und 28.00 2,179.52 100.00% - - 0.00% 28.00 2,179.52 100.00% - - 0.00%
01.03.08 LIMPIEZA FINAL DE LA OBRA m2 6,783.99 11,193.58 100.00% - - 0.00% 6,783.99 11,193.58 100.00% - - 0.00%
01.03.09 SERVICIOS HIGIENICOS PARA OBRA SISTEMA MODULAR und 3.00 4,500.00 100.00% - - 0.00% 3.00 4,500.00 100.00% - - 0.00%
01.04 MOVIMIENTO DE TIERRAS - 163,535.57 - - 163,535.57 153,690.02
01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 110MM m 2,016.45 34,118.33 35.31% - - 0.00% 2,016.45 34,118.33 35.31% 3,694.65 62,513.48 64.69%
01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") - 110mm (4") m 4,002.16 9,044.88 70.08% - - 0.00% 4,002.16 9,044.88 70.08% 1,708.94 3,862.21 29.92%
01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. M.L 4,132.16 27,106.97 72.35% - - 0.00% 4,132.16 27,106.97 72.35% 1,578.94 10,357.85 27.65%
01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") H=1.50M m 4,111.61 58,878.26 71.99% - - 0.00% 4,111.61 58,878.26 71.99% 1,599.49 22,904.70 28.01%
01.04.05 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 250MM m 25.00 423.00 2.33% - - 0.00% 25.00 423.00 2.33% 1,047.00 17,715.24 97.67%
01.04.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 200mm a 250mm m 79.00 203.82 7.36% - - 0.00% 79.00 203.82 7.36% 993.89 2,564.24 92.64%
01.04.07 CAMA DE APOYO P/TUB. 200mm a 250mm TERRENO NORMAL m 64.00 437.12 5.97% - - 0.00% 64.00 437.12 5.97% 1,008.89 6,890.72 94.03%
01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 641.56 9,982.61 45.03% - - 0.00% 641.56 9,982.61 45.03% 783.08 12,184.79 54.97%
01.04.09 RELLENO COMP.ZANJA TERR.NORMAL"C"P/TUB.8"-10" HASTA 1.50 M m 107.90 1,643.32 10.06% - - 0.00% 107.90 1,643.32 10.06% 964.99 14,696.80 89.94%
01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 1,424.64 21,697.27 100.00% - - 0.00% 1,424.64 21,697.27 100.00% - - 0.00%
01.05 TUBERIAS Y ACCESORIOS - 178,095.97 - - 178,095.97 115,884.22
01.05.01 SUMINISTRO DE TUBERIAS - 133,547.75 - - 133,547.75 101,661.33
01.05.01.01 TUBERIA PVC C-10 U.F. 63 mm ISO 1452 m 121.00 971.63 59.16% - - 0.00% 121.00 971.63 59.16% 83.53 670.75 40.84%
01.05.01.02 TUBERIA PVC C-10 U.F. 90 mm ISO 1452 m - - 0.00% - - 0.00% - - 0.00% 48.30 771.83 100.00%
01.05.01.03 TUBERIA PVC C-10 U.F. 110mm ISO1452 m 5,256.81 128,476.44 96.31% - - 0.00% 5,256.81 128,476.44 96.31% 201.46 4,923.68 3.69%
01.05.01.04 TUBERIA PVC C-10 U.F. 200mm ISO 1452 m 54.00 4,099.68 7.80% - - 0.00% 54.00 4,099.68 7.80% 638.14 48,447.59 92.20%
01.05.01.05 TUBERIA PVC C-10 U.F. 250mm ISO 1452 m - - 0.00% - - 0.00% - - 0.00% 380.75 46,847.48 100.00%
01.05.02 SUMINISTRO DE ACCESORIOS - 32,856.60 - - 32,856.60 2,266.50
01.05.02.01 UNION MECANICA DE AMPLIO RANGO 2"(50mm) DE RANGO (59.5-72 mm) und 1.00 145.00 16.67% - - 0.00% 1.00 145.00 16.67% 5.00 725.00 83.33%
01.05.02.02 UNION MECANICA DE AMPLIO RANGO 3"(80mm) DE RANGO (88.1-102.4 mm) und 1.00 178.90 20.00% - - 0.00% 1.00 178.90 20.00% 4.00 715.60 80.00%
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2-127.8 mm) und 31.00 6,169.00 100.00% - - 0.00% 31.00 6,169.00 100.00% - - 0.00%
01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2-181.86 mm) und 2.00 630.00 100.00% - - 0.00% 2.00 630.00 100.00% - - 0.00%
01.05.02.05 UNION MECANICA DE AMPLIO RANGO 8"(200mm) DE RANGO (218.1-235.0 mm) und 7.00 3,395.00 100.00% - - 0.00% 7.00 3,395.00 100.00% - - 0.00%
01.05.02.06 UNION MECANICA DE AMPLIO RANGO 10"(250mm) DE RANGO (272-289 mm) und 2.00 1,290.00 100.00% - - 0.00% 2.00 1,290.00 100.00% - - 0.00%
01.05.02.07 UNION MECANICA DE AMPLIO RANGO 12"(300mm) DE RANGO (315-332 mm) und 1.00 859.50 100.00% - - 0.00% 1.00 859.50 100.00% - - 0.00%
01.05.02.08 CODO PVC C-10 P/AGUA 63mm x 45ª UF. und 1.00 24.00 100.00% - - 0.00% 1.00 24.00 100.00% - - 0.00%
01.05.02.09 CODO PVC C-10 P/AGUA 110mm x22.5º UF und 3.00 174.00 100.00% - - 0.00% 3.00 174.00 100.00% - - 0.00%
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 13.00 754.00 100.00% - - 0.00% 13.00 754.00 100.00% - - 0.00%
01.05.02.11 CODO PVC C-10 P/AGUA 110mm x90º UF und 3.00 174.00 100.00% - - 0.00% 3.00 174.00 100.00% - - 0.00%
01.05.02.12 CODO PVC C-10 P/AGUA 200mm x 22.5º UF und 3.00 993.00 100.00% - - 0.00% 3.00 993.00 100.00% - - 0.00%
01.05.02.13 CODO PVC C-10 P/AGUA 200mm x 90º UF und 3.00 993.00 100.00% - - 0.00% 3.00 993.00 100.00% - - 0.00%
01.05.02.14 CURVA PVC C-10 P/AGUA 200mm x 90º UF und 2.00 1,392.00 100.00% - - 0.00% 2.00 1,392.00 100.00% - - 0.00%
01.05.02.15 CODO PVC C-10 P/AGUA 250mm x 90º UF und - - 0.00% - - 0.00% - - 0.00% 1.00 441.00 100.00%
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 37.00 4,625.00 100.00% - - 0.00% 37.00 4,625.00 100.00% - - 0.00%
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. und 4.00 1,396.00 100.00% - - 0.00% 4.00 1,396.00 100.00% - - 0.00%
01.05.02.18 CRUZ DE PVC C-10 DE 110 mm U.F. und 17.00 5,100.00 100.00% - - 0.00% 17.00 5,100.00 100.00% - - 0.00%
01.05.02.19 CRUZ DE PVC C-10 DE 160 mm U.F. und 1.00 352.00 100.00% - - 0.00% 1.00 352.00 100.00% - - 0.00%
VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS
ITEM DESCRIPCION UNID
METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
01.05.02.20 CRUZ DE PVC C-10 DE 200 mm U.F. und 2.00 1,060.00 100.00% - - 0.00% 2.00 1,060.00 100.00% - - 0.00%
01.05.02.21 REDUCCION PVC 110 mm. - 50mm U.F und 4.00 764.00 100.00% - - 0.00% 4.00 764.00 100.00% - - 0.00%
01.05.02.22 REDUCCION PVC 110 mm. - 63mm U.F und 4.00 184.00 100.00% - - 0.00% 4.00 184.00 100.00% - - 0.00%
01.05.02.23 REDUCCION PVC 110 mm. - 90mm U.F und 2.00 94.00 100.00% - - 0.00% 2.00 94.00 100.00% - - 0.00%
01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F und 2.00 253.00 100.00% - - 0.00% 2.00 253.00 100.00% - - 0.00%
01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm und 8.00 1,375.20 88.89% - - 0.00% 8.00 1,375.20 88.89% 1.00 171.90 11.11%
01.05.02.26 REDUCCIÓN PVC P/AGUA 300 mm x 250 mm und - - 0.00% - - 0.00% - - 0.00% 1.00 160.00 100.00%
01.05.02.27 TAPON DE PVC P/AGUA C-10 TUBERIA DE 63 mm U.F. und 2.00 42.00 66.67% - - 0.00% 2.00 42.00 66.67% 1.00 21.00 33.33%
01.05.02.28 TAPON DE PVC P/AGUA C-10 TUBERIA DE 90 mm U.F. und - - 0.00% - - 0.00% - - 0.00% 1.00 32.00 100.00%
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 11.00 440.00 100.00% - - 0.00% 11.00 440.00 100.00% - - 0.00%
01.05.03 INSTALACION TUBERIAS Y ACCESORIOS - 7,294.58 - - 7,294.58 10,881.88
01.05.03.01 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m 3,593.01 6,251.84 62.91% - - 0.00% 3,593.01 6,251.84 62.91% 2,118.09 3,685.48 37.09%
01.05.03.02 INSTALAC. TUBERIA PVC C-10 DE 200mm a 250mm m 54.00 308.88 5.03% - - 0.00% 54.00 308.88 5.03% 1,018.89 5,828.05 94.97%
01.05.03.03 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A 110mm und 81.00 733.86 55.48% - - 0.00% 81.00 733.86 55.48% 65.00 588.90 44.52%
01.05.03.04 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 200mm a 250mm und - - 0.00% - - 0.00% - - 0.00% 35.00 779.45 100.00%
01.05.04 ANCLAJES / DADOS DE CONCRETO - 4,397.04 - - 4,397.04 1,074.51
01.05.04.01 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. und 84.38 4,397.04 80.36% - - 0.00% 84.38 4,397.04 80.36% 20.62 1,074.51 19.64%
01.06 VALVULAS Y GRIFOS CONTRA INCENDIO - 62,766.62 - - 62,766.62 23,803.08
01.06.01 SUMINISTRO DE VALVULAS - 24,675.00 - - 24,675.00 10,653.00
01.06.01.01 VALVULA PURGA HIERRO DUCTIL ISO 7259 Ø 63mm und - - 0.00% - - 0.00% - - 0.00% 6.00 2,400.00 100.00%
01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm und 47.00 24,675.00 97.92% - - 0.00% 47.00 24,675.00 97.92% 1.00 525.00 2.08%
01.06.01.03 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 200mm und - - 0.00% - - 0.00% - - 0.00% 3.00 4,968.00 100.00%
01.06.01.04 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 250mm und - - 0.00% - - 0.00% - - 0.00% 1.00 2,760.00 100.00%
01.06.02 INSTALACION DE VALVULAS - 4,430.58 - - 4,430.58 5,937.00
01.06.02.01 INSTALACION DE VALVULA DE PURGA Ø 63mm und - - 0.00% - - 0.00% - - 0.00% 6.00 1,686.06 100.00%
01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm und 33.00 4,430.58 68.75% - - 0.00% 33.00 4,430.58 68.75% 15.00 2,013.90 31.25%
01.06.02.03 INSTALACION DE VALVULA COMPUERTA Ø 200mm a 250mm und - - 0.00% - - 0.00% - - 0.00% 4.00 2,237.04 100.00%
01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO - 33,661.04 - - 33,661.04 7,213.08
01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM und 14.00 33,661.04 82.35% - - 0.00% 14.00 33,661.04 82.35% 3.00 7,213.08 17.65%
01.07 CONEXIONES DOMICILIARIAS DE AGUA - 253,170.69 - - 253,170.69 403,179.34
01.07.01 TRAZO Y REPLANTEO m2 2,066.27 11,715.75 94.24% - - 0.00% 2,066.27 11,715.75 94.24% 126.32 716.23 5.76%
01.07.02 DEMOLICION DE VEREDA m2 386.20 6,291.20 76.86% - - 0.00% 386.20 6,291.20 76.86% 116.30 1,894.53 23.14%
01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 2,448.37 40,471.56 55.83% - - 0.00% 2,448.37 40,471.56 55.83% 1,936.81 32,015.47 44.17%
01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 657.78 9,886.43 100.00% - - 0.00% 657.78 9,886.43 100.00% 0.00 0.00 0.00%
01.07.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 - - 0.00% - - 0.00% - - 0.00% 657.78 11,346.71 100.00%
01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 160 MM m 2,376.37 8,150.95 54.19% - - 0.00% 2,376.37 8,150.95 54.19% 2,008.81 6,890.22 45.81%
01.07.07 CAMA DE APOYO m 2,348.37 16,931.75 53.55% - - 0.00% 2,348.37 16,931.75 53.55% 2,036.81 14,685.40 46.45%
01.07.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 538.44 8,378.13 81.86% - - 0.00% 538.44 8,378.13 81.86% 119.34 1,856.93 18.14%
01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M m 2,567.37 34,377.08 58.55% - - 0.00% 2,567.37 34,377.08 58.55% 1,817.81 24,340.48 41.45%
01.07.10 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEX AGUA 63MM x 1/2" und - - 0.00% - - 0.00% - - 0.00% 41.00 1,486.25 100.00%
01.07.11 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 90MM x 1/2" und - - 0.00% - - 0.00% - - 0.00% 10.00 404.00 100.00%
01.07.12 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 110MM x 1/2" und 550.00 31,295.00 61.94% - - 0.00% 550.00 31,295.00 61.94% 338.00 19,232.20 38.06%
01.07.13 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 200MM x 1/2" und 1.00 207.90 1.52% - - 0.00% 1.00 207.90 1.52% 65.00 13,513.50 98.48%
01.07.14 SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. DOM. und 467.00 68,961.89 46.47% - - 0.00% 467.00 68,961.89 46.47% 538.00 79,446.46 53.53%
01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES und 196.00 16,375.80 19.50% - - 0.00% 196.00 16,375.80 19.50% 809.00 67,591.95 80.50%
01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) und 1.00 127.25 0.10% - - 0.00% 1.00 127.25 0.10% 1,004.00 127,759.00 99.90%
01.08 CAMARAS / CAJAS PARA VALVULAS - 6,425.99 - - 6,425.99 5,962.47
01.08.01 EXCAVACION PARA CAJA DE VALVULA m3 23.26 1,885.76 88.60% - - 0.00% 23.26 1,885.76 88.60% 2.99 242.59 11.40%
01.08.02 CONCRETO f'c 175 kg/cm² m3 6.06 4,540.23 44.25% - - 0.00% 6.06 4,540.23 44.25% 7.63 5,719.88 55.75%
01.09 PRUEBAS DE CONTROL DE CALIDAD - 3,485.33 - - 3,485.33 7,126.60
01.09.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m 3,416.99 3,485.33 59.83% - - 0.00% 3,416.99 3,485.33 59.83% 2,294.11 2,339.99 40.17%
01.09.02 PRUEBA HIDRAULICA Y DESINFECCION TUB. HASTA 250MM m - - 0.00% - - 0.00% - - 0.00% 1,072.89 2,886.07 100.00%
01.09.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und - - 0.00% - - 0.00% - - 0.00% 45.00 1,597.50 100.00%
01.09.04 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA COMPRESION) und - - 0.00% - - 0.00% - - 0.00% 9.00 303.03 100.00%
01.10 MITIGACION DE IMPACTOS - 12,843.33 - - 12,843.33 13,651.17
01.10.01 AGUA PARA HUMEDECER TERRENO M3. 506.07 1,062.75 24.87% - - 0.00% 506.07 1,062.75 24.87% 1,529.13 3,211.17 75.13%
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 20.00 1,600.00 13.29% - - 0.00% 20.00 1,600.00 13.29% 130.50 10,440.00 86.71%
01.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 111.85 10,180.59 100.00% - - 0.00% 111.85 10,180.59 100.00% - - 0.00%
VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS
ITEM DESCRIPCION UNID
METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %

02 SISTEMA DE DESAGUE - 1,381,519.94 - 36,485.03 1,418,004.97 657,909.61


02.01 OBRAS PROVISIONALES - 1,809.93 - 98.00 1,907.93 1,372.68
02.01.01 PUESTA EN OPERACION DEL SISTEMA M.L 3,232.01 1,809.93 55.17% 175.00 98.00 2.99% 3,407.01 1,907.93 58.16% 2,451.22 1,372.68 41.84%
02.02 TRABAJOS PRELIMINARES - 195,918.63 - 4,955.69 200,874.32 127,327.42
02.02.01 TRAZO NIVELACION Y REPLANTEO m 5,858.23 6,268.31 100.00% - - 0.00% 5,858.23 6,268.31 100.00% 0.00 0.00 0.00%
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 5,858.23 14,586.99 100.00% - - 0.00% 5,858.23 14,586.99 100.00% 0.00 0.00 0.00%
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 1,337.77 8,695.51 25.61% - - 0.00% 1,337.77 8,695.51 25.61% 3,886.72 25,263.68 74.39%
02.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 4,075.22 146,300.22 65.19% 113.00 4,056.70 1.81% 4,188.22 150,356.92 67.00% 2,063.14 74,066.55 33.00%
02.02.05 DEMOLICION DE BUZONES UND 61.00 11,924.89 46.92% 1.00 195.49 0.77% 62.00 12,120.38 47.69% 68.00 13,293.32 52.31%
02.02.06 REMOCION DE TUB DE ALCANTARILLA CSN CON MAQUINARIA ML 2,025.55 8,142.71 34.58% 175.00 703.50 2.99% 2,200.55 8,846.21 37.56% 3,657.68 14,703.87 62.44%
02.03 SEGURIDAD Y SALUD - 106,920.16 - 4,521.34 111,441.50 4,703.17
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 170.38 2,809.57 100.00% - - 0.00% 170.38 2,809.57 100.00% - - 0.00%
02.03.02 PROTECCION DE RED DE TELEFONIA m 292.91 4,830.09 100.00% - - 0.00% 292.91 4,830.09 100.00% - - 0.00%
02.03.03 ENTIBADO Y APUNTALAMIENTO M.L 1,278.41 68,957.44 90.20% 71.00 3,829.74 5.01% 1,349.41 72,787.18 95.21% 67.96 3,665.77 4.79%
02.03.04 CINTA DE SEGURIDAD m 11,716.46 8,553.02 100.00% - - 0.00% 11,716.46 8,553.02 100.00% 0.00 0.00 0.00%
02.03.05 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 65.00 4,495.40 72.22% 10.00 691.60 11.11% 75.00 5,187.00 83.33% 15.00 1,037.40 16.67%
02.03.06 PUENTES PEATONALES PROVISIONALES und 135.00 10,508.40 100.00% - - 0.00% 135.00 10,508.40 100.00% 0.00 0.00 0.00%
02.03.07 LIMPIEZA FINAL DE LA OBRA m2 4,100.76 6,766.25 100.00% - - 0.00% 4,100.76 6,766.25 100.00% 0.00 0.00 0.00%
02.04 MOVIMIENTO DE TIERRAS - 176,975.67 - 6,052.34 183,028.01 109,623.74
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M m 1,563.31 25,122.39 53.76% - - 0.00% 1,563.31 25,122.39 53.76% 1,344.57 21,607.24 46.24%
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M m 500.86 10,057.27 19.60% - - 0.00% 500.86 10,057.27 19.60% 2,054.11 41,246.53 80.40%
02.04.03 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=3.00 M m 36.62 1,180.26 9.26% 76.00 2,449.48 19.22% 112.62 3,629.74 28.48% 282.76 9,113.35 71.52%
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m 3,957.16 12,267.20 67.55% 76.00 235.60 1.30% 4,033.16 12,502.80 68.85% 1,825.07 5,657.72 31.15%
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m 3,916.56 27,102.60 66.86% 75.00 519.00 1.28% 3,991.56 27,621.60 68.14% 1,866.67 12,917.36 31.86%
02.04.06 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,230.23 19,142.38 100.00% 96.50 1,501.54 7.84% 1,326.73 20,643.92 107.84% -96.50 -1,501.54 -7.84%
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 M m 1,744.73 24,914.74 100.00% - - 0.00% 1,744.73 24,914.74 100.00% - - 0.00%
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M m 957.85 16,973.10 53.56% 76.00 1,346.72 4.25% 1,033.85 18,319.82 57.81% 754.63 13,372.04 42.19%
02.04.09 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 3.00 M m 87.16 2,742.93 27.56% - - 0.00% 87.16 2,742.93 27.56% 229.14 7,211.04 72.44%
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 2,460.46 37,472.81 100.00% - - 0.00% 2,460.46 37,472.81 100.00% - - 0.00%
02.05 TUBERIAS - 207,953.62 - 449.54 208,403.16 24,478.78
02.05.01 SUMINISTRO - 187,703.71 - - 187,703.71 13,829.35
02.05.01.01 TUBERIA DE U.F.PVC ISO 4435 DN 200mm m 5,246.05 156,069.99 100.00% - - 0.00% 5,246.05 156,069.99 100.00% - - 0.00%
02.05.01.02 TUBERIA DE U.F.PVC ISO 4435 DN 250mm m - - 0.00% - - 0.00% - - 0.00% 280.23 13,829.35 100.00%
02.05.01.03 TUBERIA DE U.F.PVC ISO 4435 DN 315mm m 182.49 14,371.09 100.00% - - 0.00% 182.49 14,371.09 100.00% - - 0.00%
02.05.01.04 TUBERIA DE U.F.PVC ISO 4435 DN 355mm m 149.46 17,262.63 100.00% - - 0.00% 149.46 17,262.63 100.00% - - 0.00%
02.05.02 TRANSPORTE DE TUBERIA - 4,208.77 - 90.86 4,299.63 2,034.62
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -375mm MANUAL und 648.50 4,208.77 66.44% 14.00 90.86 1.43% 662.50 4,299.63 67.88% 313.50 2,034.62 32.12%
02.05.03 INSTALACION DE TUBERIAS - 16,041.15 - 358.68 16,399.83 8,614.81
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 375MM m 3,756.71 16,041.15 64.13% 84.00 358.68 1.43% 3,840.71 16,399.83 65.56% 2,017.52 8,614.81 34.44%
02.06 BUZONES DE INSPECCION - 270,676.30 - 3,684.98 274,361.28 164,316.32
02.06.01 BUZON DE DESAGUE TIPO "A" D=1.20, H=1.50 M. und 69.24 204,978.97 96.17% - - 0.00% 69.24 204,978.97 96.17% 3 8,163.35 3.83%
02.06.02 BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und 13.85 51,036.97 31.48% 1.00 3,684.98 2.27% 14.85 54,721.95 33.75% 29.15 107,417.17 66.25%
02.06.03 BUZON DE DESAGUE TIPO "A" D=1.20, H=3.00 M. und 3.70 14,660.36 23.13% - - 0.00% 3.70 14,660.36 23.13% 12.30 48,735.80 76.88%
02.07 MANTENIMIENTO DE COLECTORES LATERALES - 5,410.17 - 621.70 6,031.87 2,145.45
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON EQUIPO m 1,642.62 4,895.01 65.35% 151.00 449.98 6.01% 1,793.62 5,344.99 71.36% 719.95 2,145.45 28.64%
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE und 12.00 515.16 75.00% 4.00 171.72 25.00% 16.00 686.88 100.00% - - 0.00%
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE - 392,887.68 - 15,991.64 408,879.32 192,124.17
02.08.01 TRAZO Y REPLANTEO m2 2,611.18 14,805.39 79.41% 157.00 890.19 4.77% 2,768.18 15,695.58 84.18% 520.17 2,949.36 15.82%
02.08.02 DEMOLICION DE VEREDA m2 568.92 9,267.71 100.00% - - 0.00% 568.92 9,267.71 100.00% - - 0.00%
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 2,824.12 46,682.70 60.12% 75.34 1,245.37 1.60% 2,899.46 47,928.07 61.72% 1,798.19 29,724.08 38.28%
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 1,128.12 16,955.64 67.38% - - 0.00% 1,128.12 16,955.64 67.38% 546.12 8,208.18 32.62%
02.08.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 76.05 1,311.86 4.54% 211.00 3,639.75 12.60% 287.05 4,951.61 17.15% 1,387.19 23,929.03 82.85%
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 160MM m 2,727.80 9,356.35 58.07% 75.00 257.25 1.60% 2,802.80 9,613.60 59.66% 1,894.85 6,499.34 40.34%
02.08.07 CAMA DE APOYO m 2,717.30 19,591.73 57.85% 75.00 540.75 1.60% 2,792.30 20,132.48 59.45% 1,904.95 13,734.69 40.55%
02.08.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 641.23 9,349.13 75.83% 96.00 1,399.68 11.35% 737.23 10,748.81 87.19% 108.35 1,579.74 12.81%
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 20MM" HASTA 1.50 M m 2,676.86 35,843.16 85.05% 75.00 1,004.25 2.38% 2,751.86 36,847.41 87.43% 395.56 5,296.55 12.57%
VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS
ITEM DESCRIPCION UNID
METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und 486.00 213,062.40 70.23% 16.00 7,014.40 2.31% 502.00 220,076.80 72.54% 190.00 83,296.00 27.46%
02.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 160mm) und - - 0.00% - - 0.00% - - 0.00% 24.00 11,359.20 100.00%
02.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (300 -160mm) und 22.00 10,973.60 91.67% - - 0.00% 22.00 10,973.60 91.67% 2.00 997.60 8.33%
02.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 160 mm) und 10.00 5,688.00 55.56% - - 0.00% 10.00 5,688.00 55.56% 8.00 4,550.40 44.44%
02.09 PRUEBAS DE CONTROL DE CALIDAD - 15,361.33 - - 15,361.33 15,983.16
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE m 3,523.24 15,361.33 60.14% - - 0.00% 3,523.24 15,361.33 60.14% 2,334.99 10,180.56 39.86%
02.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und - - 0.00% - - 0.00% - - 0.00% 135.00 4,792.50 100.00%
02.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und - - 0.00% - - 0.00% - - 0.00% 30.00 1,010.10 100.00%
02.10 MITIGACION DE IMPACTOS - 7,606.46 - 109.80 7,716.26 15,834.73
02.10.01 AGUA PARA HUMEDECER TERRENO M3. 514.61 1,049.81 8.83% - - 0.00% 514.61 1,049.81 8.83% 5,313.62 10,839.78 91.17%
02.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 10.00 800.00 34.14% - - 0.00% 10.00 800.00 34.14% 19.29 1,543.20 65.86%
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 14.45 1,315.24 100.00% - - 0.00% 14.45 1,315.24 100.00% 0.00 0.00 0.00%
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES m3 2,427.00 4,441.41 55.50% 60.00 109.80 1.37% 2,487.00 4,551.21 56.87% 1,886.20 3,451.75 43.13%

03 IMPACTO AMBIENTAL Y EDUCACION SANITARIA - 41,457.37 - 2,041.03 43,498.40 -


03.01 INFORMACION A LA POBLACION - 11,874.60 - 1,814.92 13,689.52 -
03.01.01 INFORMACION A LA POBLACION und 14.00 2,800.00 100.00% - - 0.00% 14.00 2,800.00 100.00% - - 0.00%
03.01.02 LETREROS INFORMATIVOS und 20.00 9,074.60 83.33% 4.00 1,814.92 16.67% 24.00 10,889.52 100.00% - - 0.00%
03.02 EDUCACION SANITARIA - 29,582.77 - 226.11 29,808.88 -
03.02.01 EDUCACION SANITARIA A LA POBLACION GBL 14.00 28,000.00 100.00% - - 0.00% 14.00 28,000.00 100.00% - - 0.00%
03.02.02 CONTENEDOR DE RESIDUOS SOLIDOS und 21.00 1,582.77 87.50% 3.00 226.11 12.50% 24.00 1,808.88 100.00% - - 0.00%

COSTO DIRECTO 2,291,053.22 60.47% 38,526.06 1.02% 2,329,579.28 61.48% 1,460,320.04 38.54%

ADICIONAL DE OBRA POR PARTIDAS NUEVAS


CORRESPONDIENTE AL MES DE OCTUBRE 2018
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO RESUMEN DE VALORIZACION ADICIONAL DE OBRA
VALORIZACION ACTUAL S/. 17,613.38 0.46%
RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE VALORIZACION ACUMULADO S/. 195,812.60 5.17%
SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS


ITEM DESCRIPCION UNID
METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
1 SISTEMA DE AGUA 75,415.83 - - 75,415.83 -
1.01 MITIGACION DE IMPACTOS REPOSICION DE PAVIMENTO 70,921.83 - - 70,921.83 -
1.01.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 707.26 1,860.09 - - 707.26 1,860.09 - -
1.01.02 EMPEDRADO DE PISO E=15 M2 707.26 34,486.00 - - 707.26 34,486.00 - -
1.01.03 CONCRETO F'C=210 KG/CM2 M3 76.71 34,179.67 - - 76.71 34,179.67 - -
1.01.04 CURADO DE CONCRETO M2 707.26 396.07 - - 707.26 396.07 - -
1.02 SUMINISTRO DE ACCESORIOS 4,494.00 - 4,494.00 -
1.02.01 UNION MECANICA AMPLIO RANGO MAXITEX 199MMX235MM FUMOS 4.00 2,580.00 - - 4.00 2,580.00 - -
1.02.02 UNION DE REPACION PVC SAP 110MM INC/ANILLO 33.00 1,914.00 - - 33.00 1,914.00 - -
2 SISTEMA DE DESAGUE - 102,783.39 - 17,613.38 - 120,396.77 - 49,222.12
2.01 MITIGACION DE IMPACTOS REPOSICION DE PAVIMENTO 102,783.39 17,613.38 120,396.77 49,222.12
2.01.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 1,053.23 2,769.99 - - 1,053.23 2,769.99 - -
2.01.02 EMPEDRADO DE PISO E=15 M2 1,053.23 51,355.49 - - 1,053.23 51,355.49 - -
2.01.03 CONCRETO F'C=210 KG/CM2 M3 107.88 48,068.09 - - 107.88 48,068.09 - -
2.01.04 CURADO DE CONCRETO M2 1,053.23 589.81 - - 1,053.23 589.81 - -
2.01.05 CONCRETO F'C=175KG/CM2 M3 - - 39.53 17,613.38 0.46% 39.53 17,613.38 110.47 49,222.12

COSTO DIRECTO 178,199.22 4.70% 17,613.38 0.46% 195,812.60 5.17% 49,222.12 1.30%
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
01 SISTEMA DE AGUA POTABLE
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA und 3.00 646.99
01.01.02 ALMACEN mes 14.00 350.00
01.01.03 PUESTA EN OPERACION DEL SISTEMA ml 6,783.99 0.56
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELACION Y REPLANTEO m 6,783.99 1.14
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 6,783.99 1.36
01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 2,654.32 6.50
01.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 4,135.68 35.90
01.02.05 PIQUES EN EMPALMES und 31.00 136.98
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GBL 1.00 1,900.00
01.03.02 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 972.07 16.49
01.03.03 PROTECCION DE RED DE TELEFONIA m 220.00 16.49
01.03.04 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE UND 1,005.00 16.95
01.03.05 CINTA DE SEGURIDAD m 13,567.98 0.73
01.03.06 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 28.00 69.16
01.03.07 PUENTES PEATONALES PROVISIONALES und 28.00 77.84
01.03.08 LIMPIEZA FINAL DE LA OBRA m2 6,783.99 1.65
01.03.09 SERVICIOS HIGIENICOS PARA OBRA SISTEMA MODULAR und 3.00 1,500.00
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 110MM m 5,711.10 16.92
01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") - 110mm (4") m 5,711.10 2.26
01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. M.L 5,711.10 6.56
01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") H=1.50M m 5,711.10 14.32
01.04.05 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 250MM m 1,072.00 16.92
01.04.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 200mm a 250mm m 1,072.89 2.58
01.04.07 CAMA DE APOYO P/TUB. 200mm a 250mm TERRENO NORMAL m 1,072.89 6.83
01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,424.64 15.56
01.04.09 RELLENO COMP.ZANJA TERR.NORMAL"C"P/TUB.8"-10" HASTA 1.50 M m 1,072.89 15.23
01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 1,424.64 15.23
01.05 TUBERIAS Y ACCESORIOS
01.05.01 SUMINISTRO DE TUBERIAS
01.05.01.01 TUBERIA PVC C-10 U.F. 63 mm ISO 1452 m 204.53 8.03
01.05.01.02 TUBERIA PVC C-10 U.F. 90 mm ISO 1452 m 48.30 15.98
01.05.01.03 TUBERIA PVC C-10 U.F. 110mm ISO1452 m 5,458.27 24.44
01.05.01.04 TUBERIA PVC C-10 U.F. 200mm ISO 1452 m 692.14 75.92
01.05.01.05 TUBERIA PVC C-10 U.F. 250mm ISO 1452 m 380.75 123.04
01.05.02 SUMINISTRO DE ACCESORIOS
01.05.02.01 UNION MECANICA DE AMPLIO RANGO 2"(50mm) DE RANGO (59.5-72 mm) und 6.00 145.00
01.05.02.02 UNION MECANICA DE AMPLIO RANGO 3"(80mm) DE RANGO (88.1-102.4 mm) und 5.00 178.90
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2-127.8 mm) und 31.00 199.00
01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2-181.86 mm) und 2.00 315.00
01.05.02.05 UNION MECANICA DE AMPLIO RANGO 8"(200mm) DE RANGO (218.1-235.0 mm) und 7.00 485.00
01.05.02.06 UNION MECANICA DE AMPLIO RANGO 10"(250mm) DE RANGO (272-289 mm) und 2.00 645.00
01.05.02.07 UNION MECANICA DE AMPLIO RANGO 12"(300mm) DE RANGO (315-332 mm) und 1.00 859.50
01.05.02.08 CODO PVC C-10 P/AGUA 63mm x 45ª UF. und 1.00 24.00
01.05.02.09 CODO PVC C-10 P/AGUA 110mm x22.5º UF und 3.00 58.00
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 13.00 58.00
01.05.02.11 CODO PVC C-10 P/AGUA 110mm x90º UF und 3.00 58.00
01.05.02.12 CODO PVC C-10 P/AGUA 200mm x 22.5º UF und 3.00 331.00
01.05.02.13 CODO PVC C-10 P/AGUA 200mm x 90º UF und 3.00 331.00
01.05.02.14 CURVA PVC C-10 P/AGUA 200mm x 90º UF und 2.00 696.00
01.05.02.15 CODO PVC C-10 P/AGUA 250mm x 90º UF und 1.00 441.00
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 37.00 125.00
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. und 4.00 349.00
01.05.02.18 CRUZ DE PVC C-10 DE 110 mm U.F. und 17.00 300.00
01.05.02.19 CRUZ DE PVC C-10 DE 160 mm U.F. und 1.00 352.00
01.05.02.20 CRUZ DE PVC C-10 DE 200 mm U.F. und 2.00 530.00
01.05.02.21 REDUCCION PVC 110 mm. - 50mm U.F und 4.00 191.00
01.05.02.22 REDUCCION PVC 110 mm. - 63mm U.F und 4.00 46.00
01.05.02.23 REDUCCION PVC 110 mm. - 90mm U.F und 2.00 47.00
01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F und 2.00 126.50
01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm und 9.00 171.90
01.05.02.26 REDUCCIÓN PVC P/AGUA 300 mm x 250 mm und 1.00 160.00
01.05.02.27 TAPON DE PVC P/AGUA C-10 TUBERIA DE 63 mm U.F. und 3.00 21.00
01.05.02.28 TAPON DE PVC P/AGUA C-10 TUBERIA DE 90 mm U.F. und 1.00 32.00
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 11.00 40.00
01.05.03 INSTALACION TUBERIAS Y ACCESORIOS
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
01.05.03.01 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m 5,711.10 1.74
01.05.03.02 INSTALAC. TUBERIA PVC C-10 DE 200mm a 250mm m 1,072.89 5.72
01.05.03.03 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A 110mm und 146.00 9.06
01.05.03.04 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 200mm a 250mm und 35.00 22.27
01.05.04 ANCLAJES / DADOS DE CONCRETO
01.05.04.01 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. und 105.00 52.11
01.06 VALVULAS Y GRIFOS CONTRA INCENDIO
01.06.01 SUMINISTRO DE VALVULAS
01.06.01.01 VALVULA PURGA HIERRO DUCTIL ISO 7259 Ø 63mm und 6.00 400.00
01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm und 48.00 525.00
01.06.01.03 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 200mm und 3.00 1,656.00
01.06.01.04 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 250mm und 1.00 2,760.00
01.06.02 INSTALACION DE VALVULAS
01.06.02.01 INSTALACION DE VALVULA DE PURGA Ø 63mm und 6.00 281.01
01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm und 48.00 134.26
01.06.02.03 INSTALACION DE VALVULA COMPUERTA Ø 200mm a 250mm und 4.00 559.26
01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO
01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM und 17.00 2,404.36
01.07 CONEXIONES DOMICILIARIAS DE AGUA
01.07.01 TRAZO Y REPLANTEO m2 2,192.59 5.67
01.07.02 DEMOLICION DE VEREDA m2 502.50 16.29
01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,385.18 16.53
01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 657.78 15.03
01.07.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 657.78 17.25
01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 160 MM m 4,385.18 3.43
01.07.07 CAMA DE APOYO m 4,385.18 7.21
01.07.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 657.78 15.56
01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M m 4,385.18 13.39
01.07.10 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEX AGUA 63MM x 1/2" und 41.00 36.25
01.07.11 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 90MM x 1/2" und 10.00 40.40
01.07.12 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 110MM x 1/2" und 888.00 56.90
01.07.13 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 200MM x 1/2" und 66.00 207.90
01.07.14 SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. DOM. und 1,005.00 147.67
01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES und 1,005.00 83.55
01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) und 1,005.00 127.25
01.08 CAMARAS / CAJAS PARA VALVULAS
01.08.01 EXCAVACION PARA CAJA DE VALVULA m3 26.25 81.08
01.08.02 CONCRETO f'c 175 kg/cm² m3 13.69 749.46
01.09 PRUEBAS DE CONTROL DE CALIDAD
01.09.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m 5,711.10 1.02
01.09.02 PRUEBA HIDRAULICA Y DESINFECCION TUB. HASTA 250MM m 1,072.89 2.69
01.09.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 45.00 35.50
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
01.09.04 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA COMPRESION) und 9.00 33.67
01.10 MITIGACION DE IMPACTOS
01.10.01 AGUA PARA HUMEDECER TERRENO M3. 2,035.20 2.10
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 150.50 80.00
01.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 111.85 91.02
02 SISTEMA DE DESAGUE
02.01 OBRAS PROVISIONALES
02.01.01 PUESTA EN OPERACION DEL SISTEMA M.L 5,858.23 0.56
02.02 TRABAJOS PRELIMINARES
02.02.01 TRAZO NIVELACION Y REPLANTEO m 5,858.23 1.07
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 5,858.23 2.49
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 5,224.49 6.50
02.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 6,251.35 35.90
02.02.05 DEMOLICION DE BUZONES UND 130.00 195.49
02.02.06 REMOCION DE TUB DE ALCANTARILLA CSN CON MAQUINARIA ML 5,858.23 4.02
02.03 SEGURIDAD Y SALUD
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 170.38 16.49
02.03.02 PROTECCION DE RED DE TELEFONIA m 292.91 16.49
02.03.03 ENTIBADO Y APUNTALAMIENTO M.L 1,417.37 53.94
02.03.04 CINTA DE SEGURIDAD m 11,716.46 0.73
02.03.05 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 90.00 69.16
02.03.06 PUENTES PEATONALES PROVISIONALES und 135.00 77.84
02.03.07 LIMPIEZA FINAL DE LA OBRA m2 4,100.76 1.65
02.04 MOVIMIENTO DE TIERRAS
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M m 2,907.88 16.07
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M m 2,554.97 20.08
02.04.03 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=3.00 M m 395.38 32.23
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m 5,858.23 3.10
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m 5,858.23 6.92
02.04.06 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,230.23 15.56
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 M m 1,744.73 14.28
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M m 1,788.48 17.72
02.04.09 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 3.00 M m 316.30 31.47
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 2,460.46 15.23
02.05 TUBERIAS
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
02.05.01 SUMINISTRO
02.05.01.01 TUBERIA DE U.F.PVC ISO 4435 DN 200mm m 5,246.05 29.75
02.05.01.02 TUBERIA DE U.F.PVC ISO 4435 DN 250mm m 280.23 49.35
02.05.01.03 TUBERIA DE U.F.PVC ISO 4435 DN 315mm m 182.49 78.75
02.05.01.04 TUBERIA DE U.F.PVC ISO 4435 DN 355mm m 149.46 115.50
02.05.02 TRANSPORTE DE TUBERIA
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -375mm MANUAL und 976.00 6.49
02.05.03 INSTALACION DE TUBERIAS
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 375MM m 5,858.23 4.27
02.06 BUZONES DE INSPECCION
02.06.01 BUZON DE DESAGUE TIPO "A" D=1.20, H=1.50 M. und 72.00 2,960.31
02.06.02 BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und 44.00 3,684.98
02.06.03 BUZON DE DESAGUE TIPO "A" D=1.20, H=3.00 M. und 16.00 3,962.26
02.07 MANTENIMIENTO DE COLECTORES LATERALES
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON EQUIPO m 2,513.57 2.98
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE und 16.00 42.93
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE
02.08.01 TRAZO Y REPLANTEO m2 3,288.35 5.67
02.08.02 DEMOLICION DE VEREDA m2 568.92 16.29
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,697.65 16.53
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 1,674.24 15.03
02.08.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 1,674.24 17.25
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 160MM m 4,697.65 3.43
02.08.07 CAMA DE APOYO m 4,697.25 7.21
02.08.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 845.58 14.58
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 20MM" HASTA 1.50 M m 3,147.42 13.39
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und 692.00 438.40
02.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 160mm) und 24.00 473.30
02.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (300 -160mm) und 24.00 498.80
02.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 160 mm) und 18.00 568.80
02.09 PRUEBAS DE CONTROL DE CALIDAD
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE m 5,858.23 4.36
02.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 135.00 35.50
02.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00 33.67
02.10 MITIGACION DE IMPACTOS
02.10.01 AGUA PARA HUMEDECER TERRENO M3. 5,828.23 2.04
02.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 29.29 80.00
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 14.45 91.02
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES m3 4,373.20 1.83
03 IMPACTO AMBIENTAL Y EDUCACION SANITARIA
03.01 INFORMACION A LA POBLACION
03.01.01 INFORMACION A LA POBLACION und 14.00 200.00
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
03.01.02 LETREROS INFORMATIVOS und 24.00 453.73
03.02 EDUCACION SANITARIA
03.02.01 EDUCACION SANITARIA A LA POBLACION GBL 14.00 2,000.00
03.02.02 CONTENEDOR DE RESIDUOS SOLIDOS und 24.00 75.37

COSTO DIRECTO
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U

ADICIONAL DE OBRA POR MAYORES ME


CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
01 SISTEMA DE AGUA POTABLE
01.05.02 SUMINISTRO DE ACCESORIOS
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2-127.8 mm) UNID 20.00 199.00
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF UNID 25.00 58.00
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. UNID 30.00 125.00
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. UNID 2.00 349.00
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. UNID 11.00 40.00
02 SISTEMA DE DESAGUE
02.04 MOVIMIENTO DE TIERRAS
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 M M 1,306.51 14.28
02.10 MITIGACION DE IMPACTOS
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" M2 37.23 91.02

COSTO DIRECTO

ADICIONAL DE OBRA POR PARTIDAS N


CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
1 SISTEMA DE AGUA
1.01 MITIGACION DE IMPACTOS REPOSICION DE PAVIMENTO
1.01.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 707.26 2.63
1.01.02 EMPEDRADO DE PISO E=15 M2 707.26 48.76
1.01.03 CONCRETO F'C=210 KG/CM2 M3 76.71 445.57
1.01.04 CURADO DE CONCRETO M2 707.26 0.56
VALORIZACION MENSUAL DE OBR
CORRESPONDIENTE AL MES DE NOVIEMBR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE E
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA:

PRESUPUESTO DE
ITEM DESCRIPCION UNID
METRADO P.U
1.02 SUMINISTRO DE ACCESORIOS
1.02.01 UNION MECANICA AMPLIO RANGO MAXITEX 199MMX235MM FUMOS 4.00 645.00
1.02.02 UNION DE REPACION PVC SAP 110MM INC/ANILLO 33.00 58.00
2 SISTEMA DE DESAGUE -
2.01 MITIGACION DE IMPACTOS REPOSICION DE PAVIMENTO
2.01.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 1,053.23 2.63
2.01.02 EMPEDRADO DE PISO E=15 M2 1,053.23 48.76
2.01.03 CONCRETO F'C=210 KG/CM2 M3 107.88 445.57
2.01.04 CURADO DE CONCRETO M2 1,053.23 0.56

COSTO DIRECTO
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
1,669,496.93 745,709.09
10,640.00 5,589.82
1,940.97### 3.00 1,940.97 100.00%
4,900.00### 7.00 2,450.00 50.00%
3,799.03### 2,140.81 1,198.85 31.56%
186,930.35 127,880.60
7,733.75### 4,352.92 4,962.33 64.16%
9,226.23### 4,083.72 5,553.86 60.20%
17,253.08### 971.00 6,311.50 36.58%
148,470.91### 3,062.87 109,957.07 74.06%
4,246.38### 8.00 1,095.84 25.81%
68,306.19 30,397.80
1,900.00### 1.00 1,900.00 100.00%
16,029.43### 138.00 2,275.62 14.20%
3,627.80### 109.00 1,797.41 49.55%
17,034.75### 196.00 3,322.20 19.50%
9,904.63### 6,185.80 4,515.63 45.59%
1,936.48### 16.00 1,106.56 57.14%
2,179.52### 25.00 1,946.00 89.29%
11,193.58### 6,384.47 10,534.38 94.11%
4,500.00### 2.00 3,000.00 66.67%
317,225.59 132,332.61
96,631.81### 1,307.45 22,122.05 22.89%
12,907.09### 3,386.36 7,653.17 59.29%
37,464.82### 3,506.36 23,001.72 61.40%
81,782.96### 3,330.31 47,690.04 58.31%
18,138.24### 25.00 423.00 2.33%
2,768.06### 79.00 203.82 7.36%
7,327.84### 64.00 437.12 5.97%
22,167.40### 514.56 8,006.49 36.12%
16,340.11### 107.90 1,643.32 10.06%
21,697.27### 1,388.83 21,151.88 97.49%
293,980.18 155,956.25
235,209.08 118,089.45
1,642.38### 121.00 971.63 59.16%
771.83### - - 0.00%
133,400.12### 4,624.31 113,018.14 84.72%
52,547.27### 54.00 4,099.68 7.80%
46,847.48### - - 0.00%
35,123.10 28,898.60
870.00### 1.00 145.00 16.67%
894.50### 1.00 178.90 20.00%
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
6,169.00### 31.00 6,169.00 100.00%
630.00### 2.00 630.00 100.00%
3,395.00### 4.00 1,940.00 57.14%
1,290.00### 2.00 1,290.00 100.00%
859.50### 1.00 859.50 100.00%
24.00### 1.00 24.00 100.00%
174.00### 3.00 174.00 100.00%
754.00### 13.00 754.00 100.00%
174.00### 3.00 174.00 100.00%
993.00### - - 0.00%
993.00### 3.00 993.00 100.00%
1,392.00### 2.00 1,392.00 100.00%
441.00### - - 0.00%
4,625.00### 37.00 4,625.00 100.00%
1,396.00### 4.00 1,396.00 100.00%
5,100.00### 16.00 4,800.00 94.12%
352.00### - - 0.00%
1,060.00### 2.00 1,060.00 100.00%
764.00### - - 0.00%
184.00### 4.00 184.00 100.00%
94.00### - - 0.00%
253.00### 2.00 253.00 100.00%
1,547.10### 8.00 1,375.20 88.89%
160.00### - - 0.00%
63.00### 2.00 42.00 66.67%
32.00### - - 0.00%
440.00### 11.00 440.00 100.00%
18,176.45 6,226.60
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
9,937.31### 3,041.71 5,292.58 53.26%
6,136.93### 54.00 308.88 5.03%
1,322.76### 69.00 625.14 47.26%
779.45### - - 0.00%
5,471.55 2,741.61
5,471.55### 52.61 2,741.61 50.11%
86,569.70 53,769.66
35,328.00 19,425.00
2,400.00### - - 0.00%
25,200.00### 37.00 19,425.00 77.08%
4,968.00### - - 0.00%
2,760.00### - - 0.00%
10,367.58 3,087.98
1,686.06### - - 0.00%
6,444.48### 23.00 3,087.98 47.92%
2,237.04### - - 0.00%
40,874.12 31,256.68
40,874.12### 13.00 31,256.68 76.47%
656,350.03 221,427.96
12,431.99### 1,814.25 10,286.80 82.74%
8,185.73### 374.20 6,095.72 74.47%
72,487.03### 2,056.50 33,993.95 46.90%
9,886.43### 606.66 9,118.10 92.23%
11,346.71### - - 0.00%
15,041.17### 2,005.50 6,878.87 45.73%
31,617.15### 1,977.50 14,257.78 45.10%
10,235.06### 480.94 7,483.43 73.12%
58,717.56### 2,175.50 29,129.95 49.61%
1,486.25### - - 0.00%
404.00### - - 0.00%
50,527.20### 472.00 26,856.80 53.15%
13,721.40### 1.00 207.90 1.52%
148,408.35### 417.00 61,578.39 41.49%
83,967.75### 186.00 15,540.30 18.51%
127,886.25### - - 0.00%
12,388.46 2,641.23
2,128.35### 12.24 992.42 46.63%
10,260.11### 2.20 1,648.81 16.07%
10,611.93 3,025.64
5,825.32### 2,966.31 3,025.64 51.94%
2,886.07### - - 0.00%
1,597.50### - - 0.00%
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
303.03### - - 0.00%
26,494.51 12,687.51
4,273.92### 431.87 906.93 21.22%
12,040.00### 20.00 1,600.00 13.29%
10,180.59### 111.85 10,180.59 100.00%
2,075,914.58 1,231,698.46
3,280.61 1,696.46
3,280.61### 3,029.39 1,696.46 51.71%
328,201.74 188,234.59
6,268.31### 5,394.84 5,772.48 92.09%
14,586.99### 5,207.44 12,966.53 88.89%
33,959.19### 1,004.60 6,529.90 19.23%
224,423.47### 4,061.88 145,821.31 64.98%
25,413.70### 49.00 9,579.01 37.69%
23,550.08### 1,881.93 7,565.36 32.12%
116,144.67 97,637.52
2,809.57### 140.00 2,308.60 82.17%
4,830.09### 150.00 2,473.50 51.21%
76,452.94### 1,197.41 64,588.30 84.48%
8,553.02### 10,605.85 7,742.27 90.52%
6,224.40### 59.00 4,080.44 65.56%
10,508.40### 122.00 9,496.48 90.37%
6,766.25### 4,210.87 6,947.94 102.69%
292,651.75 157,552.95
46,729.63### 1,201.81 19,313.09 41.33%
51,303.80### 205.85 4,133.47 8.06%
12,743.10### 76.00 2,449.48 19.22%
18,160.51### 3,473.66 10,768.35 59.30%
40,538.95### 3,396.06 23,500.74 57.97%
19,142.38### 1,210.42 18,834.14 98.39%
24,914.74### 1,744.73 24,914.74 100.00%
31,691.87### 847.85 15,023.90 47.41%
9,953.96### - - 0.00%
37,472.81### 2,535.46 38,615.06 103.05%
232,881.94 205,290.46
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
201,533.06 187,703.71
156,069.99### 5,246.05 156,069.99 100.00%
13,829.35### - - 0.00%
14,371.09### 182.49 14,371.09 100.00%
17,262.63### 149.46 17,262.63 100.00%
6,334.24 3,657.12
6,334.24### 563.50 3,657.12 57.74%
25,014.64 13,929.64
25,014.64### 3,262.21 13,929.64 55.69%
438,677.60 210,886.75
213,142.32### 58.24 172,415.56 80.89%
162,139.12### 10.44 38,471.19 23.73%
63,396.16### - - 0.00%
8,177.32 4,033.33
7,490.44### 1,195.00 3,561.10 47.54%
686.88### 11.00 472.23 68.75%
601,003.50 346,207.74
18,644.94### 2,182.91 12,377.10 66.38%
9,267.71### 568.92 9,267.71 100.00%
77,652.15### 2,477.33 40,950.26 52.74%
25,163.83### 1,028.02 15,451.14 61.40%
28,880.64### 287.05 4,951.61 17.15%
16,112.94### 2,354.80 8,076.96 50.13%
33,867.17### 2,339.30 16,866.35 49.80%
12,328.56### 685.23 9,990.65 81.04%
42,143.95### 2,380.16 31,870.34 75.62%
303,372.80### 410.00 179,744.00 59.25%
11,359.20### - - 0.00%
11,971.20### 22.00 10,973.60 91.67%
10,238.40### 10.00 5,688.00 55.56%
31,344.48 13,021.40
25,541.88### 2,986.56 13,021.40 50.98%
4,792.50### - - 0.00%
1,010.10### - - 0.00%
23,550.99 7,137.26
11,889.59### 438.01 893.55 7.52%
2,343.20### 10.00 800.00 34.14%
1,315.24### 14.45 1,315.24 100.00%
8,002.96### 2,256.00 4,128.48 51.59%
43,498.40 32,841.03
13,689.52 4,614.92
2,800.00### 14.00 2,800.00 100.00%
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
10,889.52### 4.00 1,814.92 16.67%
29,808.88 28,226.11
28,000.00### 14.00 28,000.00 100.00%
1,808.88### 3.00 226.11 12.50%

3,788,909.92### 2,010,248.58 53.06%


DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %

RES METRADOS
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO
RESUMEN DE VALORIZACION ADICIONAL DE OBRA
VALORIZACION ACTUAL S/. 0.00
VALORIZACION ACUMULADO S/. 23,785.42

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
10,318.00 6,902.00
10,318.00 6,902.00
3,980.00 11.00 2,189.00
1,450.00 25.00 1,450.00
3,750.00 17.00 2,125.00
698.00 2.00 698.00
440.00 11.00 440.00
22,045.64 16,883.42
18,656.96 13,494.74
18,656.96 945.01 13,494.74
3,388.67 3,388.67
3,388.67 37.23 3,388.67

32,363.64### 23,785.42 0.63%

TIDAS NUEVAS
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO
RESUMEN DE VALORIZACION ADICIONAL DE OBRA
VALORIZACION ACTUAL S/. 0.00
VALORIZACION ACUMULADO S/. 128,244.55

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
75,415.83 50,681.49
70,921.83 46,883.49
1,860.09 461.12 1,212.75
34,486.00 461.12 22,484.21
34,179.67 51.46 22,929.03
396.07 459.82 257.50
DE OBRA
VIEMBRE DEL 2015
DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

RESUMEN DE VALORIZACION DE OBRA


VALORIZACION ACTUAL S/. 38,526.06 1.02%
VALORIZACION ACUMULAD S/. 2,010,248.58 53.06%

UESTO DE OBRA
VALORIZACION ACTUAL VALORIZACION ACUMULADO
PRESUPUESTO % METRADO VALORIZACION %
4,494.00 3,798.00
2,580.00 4.00 2,580.00
1,914.00 21.00 1,218.00
102,783.39 - 77,563.06
102,783.39 77,563.06
2,769.99 794.79 2,090.30
51,355.49 794.79 38,753.96
48,068.09 81.42 36,278.31
589.81 786.59 440.49

178,199.22### 128,244.55 3.38%


PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J

01 SISTEMA DE AGUA POTABLE


01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA und 3.00
01.01.02 ALMACEN mes 14.00 1.00
01.01.03 PUESTA EN OPERACION DEL SISTEMA ml 6,783.99
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELACION Y REPLANTEO m 6,783.99
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 6,783.99
01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 2,654.32
01.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 4,135.68
01.02.05 PIQUES EN EMPALMES und 31.00
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00
01.03.02 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 972.07
01.03.03 PROTECCION DE RED DE TELEFONIA m 220.00
01.03.04 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE und 1,005.00
01.03.05 CINTA DE SEGURIDAD m 13,567.98
01.03.06 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 28.00
01.03.07 PUENTES PEATONALES PROVISIONALES und 28.00
01.03.08 LIMPIEZA FINAL DE LA OBRA m2 6,783.99
01.03.09 SERVICIOS HIGIENICOS PARA OBRA SISTEMA MODULAR und 3.00
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 110MM m 5,711.10
01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") - 110mm (4") m 5,711.10
01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. ml 5,711.10
01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") H=1.50M m 5,711.10
01.04.05 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 250MM m 1,072.00
01.04.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 200mm a 250mm m 1,072.89
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
01.04.07 CAMA DE APOYO P/TUB. 200mm a 250mm TERRENO NORMAL m 1,072.89
01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,424.64
01.04.09 RELLENO COMP.ZANJA TERR.NORMAL"C"P/TUB.8"-10" HASTA 1.50 M m 1,072.89
01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 1,424.64
01.05 TUBERIAS Y ACCESORIOS
01.05.01 SUMINISTRO DE TUBERIAS
01.05.01.01 TUBERIA PVC C-10 U.F. 63 mm ISO 1452 m 204.53
01.05.01.02 TUBERIA PVC C-10 U.F. 90 mm ISO 1452 m 48.30
01.05.01.03 TUBERIA PVC C-10 U.F. 110mm ISO1452 m 5,458.27
01.05.01.04 TUBERIA PVC C-10 U.F. 200mm ISO 1452 m 692.14
01.05.01.05 TUBERIA PVC C-10 U.F. 250mm ISO 1452 m 380.75
01.05.02 SUMINISTRO DE ACCESORIOS
01.05.02.01 UNION MECANICA DE AMPLIO RANGO 2"(50mm) DE RANGO (59.5-72 mm) und 6.00
01.05.02.02 UNION MECANICA DE AMPLIO RANGO 3"(80mm) DE RANGO (88.1-102.4 mm) und 5.00
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2-127.8 mm) und 31.00
01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2-181.86 mm) und 2.00
01.05.02.05 UNION MECANICA DE AMPLIO RANGO 8"(200mm) DE RANGO (218.1-235.0 mm) und 7.00
01.05.02.06 UNION MECANICA DE AMPLIO RANGO 10"(250mm) DE RANGO (272-289 mm) und 2.00
01.05.02.07 UNION MECANICA DE AMPLIO RANGO 12"(300mm) DE RANGO (315-332 mm) und 1.00
01.05.02.08 CODO PVC C-10 P/AGUA 63mm x 45ª UF. und 1.00
01.05.02.09 CODO PVC C-10 P/AGUA 110mm x22.5º UF und 3.00
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 13.00
01.05.02.11 CODO PVC C-10 P/AGUA 110mm x90º UF und 3.00
01.05.02.12 CODO PVC C-10 P/AGUA 200mm x 22.5º UF und 3.00
01.05.02.13 CODO PVC C-10 P/AGUA 200mm x 90º UF und 3.00
01.05.02.14 CURVA PVC C-10 P/AGUA 200mm x 90º UF und 2.00
01.05.02.15 CODO PVC C-10 P/AGUA 250mm x 90º UF und 1.00
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 37.00
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. und 4.00
01.05.02.18 CRUZ DE PVC C-10 DE 110 mm U.F. und 17.00
01.05.02.19 CRUZ DE PVC C-10 DE 160 mm U.F. und 1.00
01.05.02.20 CRUZ DE PVC C-10 DE 200 mm U.F. und 2.00
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
01.05.02.21 REDUCCION PVC 110 mm. - 50mm U.F und 4.00
01.05.02.22 REDUCCION PVC 110 mm. - 63mm U.F und 4.00
01.05.02.23 REDUCCION PVC 110 mm. - 90mm U.F und 2.00
01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F und 2.00
01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm und 9.00
01.05.02.26 REDUCCIÓN PVC P/AGUA 300 mm x 250 mm und 1.00
01.05.02.27 TAPON DE PVC P/AGUA C-10 TUBERIA DE 63 mm U.F. und 3.00
01.05.02.28 TAPON DE PVC P/AGUA C-10 TUBERIA DE 90 mm U.F. und 1.00
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 11.00
01.05.03 INSTALACION TUBERIAS Y ACCESORIOS
01.05.03.01 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m 5,711.10
01.05.03.02 INSTALAC. TUBERIA PVC C-10 DE 200mm a 250mm m 1,072.89
01.05.03.03 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A 110mm und 146.00
01.05.03.04 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 200mm a 250mm und 35.00
01.05.04 ANCLAJES / DADOS DE CONCRETO
01.05.04.01 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. und 105.00
01.06 VALVULAS Y GRIFOS CONTRA INCENDIO
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
01.06.01 SUMINISTRO DE VALVULAS
01.06.01.01 VALVULA PURGA HIERRO DUCTIL ISO 7259 Ø 63mm und 6.00
01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm und 48.00
01.06.01.03 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 200mm und 3.00
01.06.01.04 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 250mm und 1.00
01.06.02 INSTALACION DE VALVULAS
01.06.02.01 INSTALACION DE VALVULA DE PURGA Ø 63mm und 6.00
01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm und 48.00
01.06.02.03 INSTALACION DE VALVULA COMPUERTA Ø 200mm a 250mm und 4.00
01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO
01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM und 17.00
01.07 CONEXIONES DOMICILIARIAS DE AGUA
01.07.01 TRAZO Y REPLANTEO m2 2,192.59
01.07.02 DEMOLICION DE VEREDA m2 502.50
01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,385.18
01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 657.78
01.07.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 657.78
01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 160 MM m 4,385.18
01.07.07 CAMA DE APOYO m 4,385.18
01.07.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 657.78
01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M m 4,385.18
01.07.10 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEX AGUA 63MM x 1/2" und 41.00
01.07.11 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 90MM x 1/2" und 10.00
01.07.12 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 110MM x 1/2" und 888.00
01.07.13 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 200MM x 1/2" und 66.00
01.07.14 SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. DOM. und 1,005.00
01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES und 1,005.00
01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) und 1,005.00
01.08 CAMARAS / CAJAS PARA VALVULAS
01.08.01 EXCAVACION PARA CAJA DE VALVULA m3 26.25
01.08.02 CONCRETO f'c 175 kg/cm² m3 13.69
01.09 PRUEBAS DE CONTROL DE CALIDAD
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
01.09.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m 5,711.10
01.09.02 PRUEBA HIDRAULICA Y DESINFECCION TUB. HASTA 250MM m 1,072.89
01.09.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 45.00
01.09.04 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA COMPRESION) und 9.00
01.10 MITIGACION DE IMPACTOS
01.10.01 AGUA PARA HUMEDECER TERRENO m3 2,035.20
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 150.50
01.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 111.85

02 SISTEMA DE DESAGUE -
02.01 OBRAS PROVISIONALES
02.01.01 PUESTA EN OPERACION DEL SISTEMA ml 5,858.23
02.02 TRABAJOS PRELIMINARES
02.02.01 TRAZO NIVELACION Y REPLANTEO m 5,858.23
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 5,858.23
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 5,224.49
02.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 6,251.35 113.00
02.02.05 DEMOLICION DE BUZONES und 130.00 1.00
02.02.06 REMOCION DE TUB DE ALCANTARILLA CSN CON MAQUINARIA ml 5,858.23
02.03 SEGURIDAD Y SALUD
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 170.38
02.03.02 PROTECCION DE RED DE TELEFONIA m 292.91
02.03.03 ENTIBADO Y APUNTALAMIENTO ml 1,417.37
02.03.04 CINTA DE SEGURIDAD m 11,716.46
02.03.05 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 90.00 2.00
02.03.06 PUENTES PEATONALES PROVISIONALES und 135.00
02.03.07 LIMPIEZA FINAL DE LA OBRA m2 4,100.76
02.04 MOVIMIENTO DE TIERRAS
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M m 2,907.88
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M m 2,554.97
02.04.03 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=3.00 M m 395.38 10.00
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m 5,858.23
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m 5,858.23
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
02.04.06 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,230.23 12.00
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 M m 1,744.73
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M m 1,788.48
02.04.09 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 3.00 M m 316.30
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 2,460.46
02.05 TUBERIAS
02.05.01 SUMINISTRO
02.05.01.01 TUBERIA DE U.F.PVC ISO 4435 DN 200mm m 5,246.05
02.05.01.02 TUBERIA DE U.F.PVC ISO 4435 DN 250mm m 280.23
02.05.01.03 TUBERIA DE U.F.PVC ISO 4435 DN 315mm m 182.49
02.05.01.04 TUBERIA DE U.F.PVC ISO 4435 DN 355mm m 149.46
02.05.02 TRANSPORTE DE TUBERIA
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -375mm MANUAL und 976.00
02.05.03 INSTALACION DE TUBERIAS
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 375MM m 5,858.23
02.06 BUZONES DE INSPECCION
02.06.01 BUZON DE DESAGUE TIPO "A" D=1.20, H=1.50 M. und 72.00
02.06.02 BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und 44.00
02.06.03 BUZON DE DESAGUE TIPO "A" D=1.20, H=3.00 M. und 16.00
02.07 MANTENIMIENTO DE COLECTORES LATERALES
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON EQUIPO m 2,513.57
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE und 16.00 1.00
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE
02.08.01 TRAZO Y REPLANTEO m2 3,288.35 34.00 54.00
02.08.02 DEMOLICION DE VEREDA m2 568.92
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,697.65 12.34 14.00 10.00
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 1,674.24
02.08.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 1,674.24
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 160MM m 4,697.65 10.00 11.00
02.08.07 CAMA DE APOYO m 4,697.25 21.00
02.08.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 845.58 10.00
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 200MM" HASTA 1.50 M m 3,147.42
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und 692.00
02.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 160mm) und 24.00
02.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (300 -160mm) und 24.00
02.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 160 mm) und 18.00
02.09 PRUEBAS DE CONTROL DE CALIDAD
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE m 5,858.23
02.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 135.00
02.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00
02.10 MITIGACION DE IMPACTOS
02.10.01 AGUA PARA HUMEDECER TERRENO m3 5,828.23
02.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 29.29
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 14.45
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES m3 4,373.20 15.00

03 IMPACTO AMBIENTAL Y EDUCACION SANITARIA


PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
03.01 INFORMACION A LA POBLACION
03.01.01 INFORMACION A LA POBLACION und 14.00
03.01.02 LETREROS INFORMATIVOS und 24.00 1.00
03.02 EDUCACION SANITARIA
03.02.01 EDUCACION SANITARIA A LA POBLACION glb 14.00
03.02.02 CONTENEDOR DE RESIDUOS SOLIDOS und 24.00 1.00

CONTR
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA:
FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J

1 SISTEMA DE AGUA -
1.01 MITIGACION DE IMPACTOS REPOSICION DE PAVIMENTO
1.01.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 707.26
1.01.02 EMPEDRADO DE PISO E=15 M2 707.26
1.01.03 CONCRETO F'C=210 KG/CM2 M3 76.71
1.01.04 CURADO DE CONCRETO M2 707.26
1.02 SUMINISTRO DE ACCESORIOS
1.02.01 UNION MECANICA AMPLIO RANGO MAXITEX 199MMX235MM FUMOS und 4.00
1.02.02 UNION DE REPACION PVC SAP 110MM INC/ANILLO und 33.00
2 SISTEMA DE DESAGUE -
2.01 MITIGACION DE IMPACTOS REPOSICION DE PAVIMENTO
2.01.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 1,053.23
2.01.02 EMPEDRADO DE PISO E=15 M2 1,053.23
PROGRAMADO
ITEM PARTIDA 1 2 3 4 5 6
UNID METRADO S D L M M J
2.01.03 CONCRETO F'C=210 KG/CM2 M3 107.88
2.01.04 CURADO DE CONCRETO M2 1,053.23
2.01.05 CONCRETO F'C=175 KG/CM2 M3 150.00 0.99 7.9
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M

23.00 34.00 45.00 73.00

20.00 21.00 20.00 10.00

2.00 2.00 2.00

10.00 8.00 15.00 10.00 11.00 12.00


28.00 25.00 23.00
10.00 20.00 15.00 10.00 12.00 8.00
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
10.00 6.00 13.50 12.00 10.00 12.00 13.00 8.00

14.50 15.00 14.50 10.00 10.00 12.00

12.00 2.00
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
72.00 12.00

1.00

66.00
2.00

69.00

12.00 14.00 10.00 3.00

37.00
12.00 15.00 14.00 8.00 5.00
27.00 27.00
15.00 5.00 10.00 11.00 7.00 14.00 6.00 18.00
27.00 10.00 15.00 12.00 11.00
2.00 5.00 4.00 5.00

15.00 15.00
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M

1.00 1.00 1.00

1.00 1.00

NTROL DE METRADOS DIARIO DE OBRA (ADICIONAL DE OBRA POR PARTIDAS NUEVAS)


SCO

CONTROL DE METRADO DIARIO-AGOSTO-2016


7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M
CONTROL DE METRADO DIARIO-DICIEMBRE-2018
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
V S D L M M J V S D L M M J V S D L M

0.68 0.68 8.8 2.71 6.43 0.68 9.14


26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L

- 3.00 3.00 -
- 12.00 12.00 2.00
- 2,727.00 2,727.00 4,056.99
-
- 5,394.22 5,394.22 1,389.77
- 4,547.02 4,547.02 2,236.97
- 1,264.77 1,264.77 1,389.55
- 3,062.87 3,062.87 1,072.81
- 30.00 30.00 1.00
- - - -
- 1.00 1.00 -
- 618.00 618.00 354.07
- 250.00 250.00 30.00
- 236.00 236.00 769.00
- 7,736.80 7,736.80 5,831.18
- 25.00 25.00 3.00
- 28.00 28.00 -
- 6,783.99 6,783.99 -
- 3.00 3.00 -
-
- 2,016.45 2,016.45 3,694.65
- 4,002.16 4,002.16 1,708.94
- 4,132.16 4,132.16 1,578.94
- 4,111.61 4,111.61 1,599.49
- 25.00 25.00 1,047.00
- 79.00 79.00 993.89
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
- 64.00 64.00 1,008.89
- 641.56 641.56 783.08
- 107.90 107.90 964.99
- 1,424.64 1,424.64 -
- - - -
- - - -
- 121.00 121.00 83.53
- - - 48.30
- 5,256.81 5,256.81 201.46
- 54.00 54.00 638.14
- - - 380.75
- - - -
- 1.00 1.00 5.00
- 1.00 1.00 4.00
- 31.00 31.00 -
- 2.00 2.00 -
- 7.00 7.00 -
- 2.00 2.00 -
- 1.00 1.00 -
- 1.00 1.00 -
- 3.00 3.00 -
- 13.00 13.00 -
- 3.00 3.00 -
- 3.00 3.00 -
- 3.00 3.00 -
- 2.00 2.00 -
- - - 1.00
- 37.00 37.00 -
- 4.00 4.00 -
- 17.00 17.00 -
- 1.00 1.00 -
- 2.00 2.00 -
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
- 4.00 4.00 -
- 4.00 4.00 -
- 2.00 2.00 -
- 2.00 2.00 -
- 8.00 8.00 1.00
- - - 1.00
- 2.00 2.00 1.00
- - - 1.00
- 11.00 11.00 -
-
- 3,593.01 3,593.01 2,118.09
- 54.00 54.00 1,018.89
- 81.00 81.00 65.00
- - - 35.00
-
- 84.38 84.38 20.62
- - - -
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
- - - -
- - - 6.00
- 47.00 47.00 1.00
- - - 3.00
- - - 1.00
-
- - - 6.00
- 33.00 33.00 15.00
- - - 4.00
-
- 14.00 14.00 3.00
-
- 2,066.27 2,066.27 126.32
- 386.20 386.20 116.30
- 2,448.37 2,448.37 1,936.81
- 657.78 657.78 0.00
- - - 657.78
- 2,376.37 2,376.37 2,008.81
- 2,348.37 2,348.37 2,036.81
- 538.44 538.44 119.34
- 2,567.37 2,567.37 1,817.81
- - - 41.00
- - - 10.00
- 550.00 550.00 338.00
- 1.00 1.00 65.00
- 467.00 467.00 538.00
- 196.00 196.00 809.00
- 1.00 1.00 1,004.00
- - - -
- 23.26 23.26 2.99
- 6.06 6.06 7.63
- - - -
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
- 3,416.99 3,416.99 2,294.11
- - - 1,072.89
- - - 45.00
- - - 9.00
- - - -
- 506.07 506.07 1,529.13
- 20.00 20.00 130.50
- 111.85 111.85 -

- - - -
175 175.00 3,232.01 3,407.01 2,451.22
- - - -
- 5,858.23 5,858.23 0.00
- 5,858.23 5,858.23 0.00
- 1,337.77 1,337.77 3,886.72
113.00 4,075.22 4,188.22 2,063.14
1.00 61.00 62.00 68.00
175.00 2,025.55 2,200.55 3,657.68
- - - -
- 170.38 170.38 -
- 292.91 292.91 -
71.00 1,278.41 1,349.41 67.96
- 11,716.46 11,716.46 0.00
2.00 10.00 65.00 75.00 15.00
- 135.00 135.00 0.00
- 4,100.76 4,100.76 0.00
- - - -
- 1,563.31 1,563.31 1,344.57
- 500.86 500.86 2,054.11
76.00 36.62 112.62 282.76
76.00 3,957.16 4,033.16 1,825.07
75.00 3,916.56 3,991.56 1,866.67
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
96.50 1,230.23 1,326.73 -96.50
- 1,744.73 1,744.73 -
76.00 957.85 1,033.85 754.63
- 87.16 87.16 229.14
- 2,460.46 2,460.46 -
- - - -
- - - -
- 5,246.05 5,246.05 -
- - - 280.23
- 182.49 182.49 -
- 149.46 149.46 -
- - - -
14.00 648.50 662.50 313.50
- - - -
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
84.00 3,756.71 3,840.71 2,017.52
- - - -
- 69.24 69.24 2.76
1.00 13.85 14.85 29.15
- 3.70 3.70 12.30
- - - -
65.00 20.00 151.00 1,642.62 1,793.62 719.95
1.00 4.00 12.00 16.00 -
- - - -
157.00 2,611.18 2,768.18 520.17
- 568.92 568.92 -
75.34 2,824.12 2,899.46 1,798.19
- 1,128.12 1,128.12 546.12
36.00 36.00 35.00 28.50 38.5 211.00 76.05 287.05 1,387.19
75.00 2,727.80 2,802.80 1,894.85
75.00 2,717.30 2,792.30 1,904.95
96.00 641.23 737.23 108.35
75.00 2,676.86 2,751.86 395.56
16.00 486.00 502.00 190.00
- - - 24.00
- 22.00 22.00 2.00
- 10.00 10.00 8.00
- - - -
- 3,523.24 3,523.24 2,334.99
- - - 135.00
- - - 30.00
- - - -
- 514.61 514.61 5,313.62
- 10.00 10.00 19.29
- 14.45 14.45 0.00
15.00 60.00 2,427.00 2,487.00 1,886.20
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
- - - -
- 14.00 14.00 -
4.00 20.00 24.00 -
- - - -
- 14.00 14.00 -
3.00 21.00 24.00 -

REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L

- 707.26 707.26 -
- 707.26 707.26 -
- 76.71 76.71 -
- 707.26 707.26 -

- 4.00 4.00 -
- 33.00 33.00 -

- 1,053.23 1,053.23 -
- 1,053.23 1,053.23 -
26 27 28 29 30 31 ANTERIOR ACUMULADO SALDO
TOTAL
CANTIDAD CANTIDAD CANTIDAD
M J V S D L
- 107.88 107.88 -
- 1,053.23 1,053.23 -
1.52 39.53 - 39.53 110.47
MUNICIPALIDAD DISTRITAL DE SANTIAGO
GERENCIA DE INFRAESTRUCTURA
JEFATURA DE LA DIVISIÓN DE OBRA

OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES CO


SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO -

RECURSOS UTILIZADOS MES DE DICIEMBRE DEL 2018


PERSONAL DE OBRA
PERSONAL DE OBRA 2018
CATEGORÍA JULIO AGOSTO
PROFESIONAL:
Supervisor de obra 1 1
Residente de Obra 1 1
Residente parte Eléctrica
Residente parte Sanitarias
Residente parte Arquitectura
TECNICO:
Asistente Técnico 1 1
Maestro de Obra 1 1
Arqueóloga
Asistente de Seguridad
Topógrafo 1 1
ADMINISTRATIVO:
Técnico Administrativo 3 1 1
Técnico Administrativo 2 2
Técnico Administrativo 1 3 1
OBRERO:
Operadores de Maquinaria 1
Obrero A 5
Obrero B 6 7
Obrero C 3 10
Obrero D 1 1

EQUIPO MECÁNICO (HM)


UNIDAD 2018
DESCRIPCION JULIO AGOSTO
MAQUINARIA PESADA
CARGADOR FRONTAL CAT - 938G 16.50
RETRO EXCAVADORA JBC 3XC 6.00
CAMIÓN PLATAFORMA VOLVO X1B-993 12.00 2.50
MINICARGADOR CAT
VEHÍCULOS
CAMIONETA TOYOTA GI-925
CAMIONETA NISSAN
CAMIONETA TOYOTA HILUX OI-6990
CAMIÓN VOLQUETE VOLVO WZ-5585
CAMIÓN VOLQUETE MERCEDES BENZ EGA-351
CAMIÓN VOLQUETE MERCEDES BENZ EGA-352
VOLQUETE VOLVO XO-8336
VOLQUETE VOLVO XO-8337
CAMIÓN VOLQUETE NISAN ATLAS 2000 WZ- 7499 1.00
CAMIÓN CISTERNA CHEVROLLET EG-522
CANTER SERLIPS
CANTER VIAS
TOTAL VALORIZADO MAQUINARIA S/. 2,200.00 S/. 2,880.00
MAQUINARIA LIVIANA
MEZCLADORA DE CONCRETO 5.50
VIBRADORA PARA CONCRETO 3.00
GENERADOR ELECTRICO
PISON NEUMATICO 49.00
CORTADORA DE CONCRETO
EQUIPO DE TOPOGRAFÍA
NIVEL DE INGENIERO 22.00 25.00
ESTACION TOTAL
Total Acumulado
TOTAL VALORIZADO MAQUINARIA LIVIANA S/. 220.00 S/. 1,088.50
TRITAL DE SANTIAGO
FRAESTRUCTURA
DIVISIÓN DE OBRA

BUCION DE AGUA Y LAS REDES COLECTORAS


RBANO DISTRITO DE SANTIAGO - CUSCO

ES DE DICIEMBRE DEL 2018

2018
SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

1 1 1 1
1 1 1 1

1 1 1 1
1 1

1 1 1 1

1 1
6 3 1
7 3 3
10 5 7

2018
SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

5.00 4.00 13.50


2.00
2.00

1.50
1.50
1.50

S/. 860.00 S/. 557.50 S/. 1,845.00

3.00
2.00

14.50 27.00 39.00


7.00 21.00

10.00

S/. 235.00 S/. 405.00 S/. 665.00


OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA
DESAGUE DEL CASCO URBANO DISTRITO DE S

RESUMEN DE VALORIZACION

AVANCE ANTERIOR AVANCE ACTUAL


PRESUPUESTO
DESCRIPCION: VALORIZADO COSTO % VALORIZADO COSTO %
EXPEDIENTE TÉCNICO DIRECTO DIRECTO
COMPONENTE N° 01: 1,669,496.93 868,075.91 -
MEJORAMIENTO DEL SISTEMA DE AGUA

COMPONENTE N° 02: 2,075,914.58 1,381,519.94 36,485.03


MEJORAMIENTO DEL SISTEMA DE DESAGUE

COMPONENTE N° 03: 43,498.40 41,457.37 2,041.03


SENSIBILIZACION A LA POBLACION

COSTO DIRECTO TOTAL 3,788,909.92 2,291,053.22 60.47% 38,526.06 1.02%


N DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE
TRITO DE SANTIAGO - CUSCO-CUSCO

RIZACION POR COMPONENTES

AVANCE VALORIZADO
AVANCE VALORIZADO AVANCE VALORIZADO TOTAL ACUMULADO
ACUMULADO % ADICIONALES DE % CTO % SALDO EN C. D. %
COSTO DIRECTO OBRA ACUMULADO DIRECTO+ADICIONALE
S
868,075.91 91,803.99 959,879.90 709,617.04 42.50%

1,418,004.97 124,829.03 1,542,834.00 533,080.58 25.68%

43,498.40 43,498.40 - 0.00%

2,329,579.28 61.48% 216,633.02 5.72% 2,546,212.30 67.20% 1,242,697.62 32.80%


OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA
SECUNDARIAS DE DESAGUE DEL CASCO URBANO DISTRITO DE S

FECHA: DICIEMBRE - 2018

RESUMEN GENERAL DE OBR

ITEM DESCRIPCION:

1.00 COMPONENTE N° 01: MEJORAMIENTO DEL SISTEMA DE AGUA


2.00 COMPONENTE N° 02: MEJORAMIENTO DEL SISTEMA DE DESAGUE

3.00 COMPONENTE N° 03: SENSIBILIZACION A LA POBLACION


COSTO DIRECTO TOTAL
GASTOS GENERALES
GASTOS DE SUPERVICION
ELABORACION DE EXPEDIENT TECNICO
LIQUIDACION DE OBRA
COSTO TOTAL
ISTRIBUCION DE AGUA Y LAS REDES COLECTORAS
RBANO DISTRITO DE SANTIAGO - CUSCO-CUSCO

ICIEMBRE - 2018

EN GENERAL DE OBRA
AVANCE VALORIZADO TOTAL
PRESUPUESTO ACUMULADO CTO AVANCE PORCENTUAL
EXPEDIENTE TÉCNICO DIRECTO+ADICIONALES

1,669,496.93 959,879.90
57.50%
2,075,914.58 1,542,834.00
74.32%
43,498.40 43,498.40
100.00%
3,788,909.92 2,546,212.30 67.20%
363,480.45 249,808.69
87,856.09 52,946.82
28,628.11 28,628.11
15,712.96 -
4,284,587.53 2,877,595.92 67.23%
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M

01 SISTEMA DE AGUA POTABLE


01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA und 3.00
01.01.02 ALMACEN mes 14.00
01.01.03 PUESTA EN OPERACION DEL SISTEMA ml 6,783.99
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELACION Y REPLANTEO m 6,783.99
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 6,783.99
01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 2,654.32
01.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 4,135.68
01.02.05 PIQUES EN EMPALMES und 31.00
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00

01.03.02 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 972.07


01.03.03 PROTECCION DE RED DE TELEFONIA m 220.00
01.03.04 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE und 1,005.00
01.03.05 CINTA DE SEGURIDAD m 13,567.98 50
01.03.06 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 28.00
01.03.07 PUENTES PEATONALES PROVISIONALES und 28.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.03.08 LIMPIEZA FINAL DE LA OBRA m2 6,783.99
01.03.09 SERVICIOS HIGIENICOS PARA OBRA SISTEMA MODULAR und 3.00
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 110MM m 5,711.10 24
01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") - 110mm (4") m 5,711.10
01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. ml 5,711.10
01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") H=1.50M m 5,711.10
01.04.05 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 250MM m 1,072.00
01.04.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 200mm a 250mm m 1,072.89
01.04.07 CAMA DE APOYO P/TUB. 200mm a 250mm TERRENO NORMAL m 1,072.89
01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,424.64
01.04.09 RELLENO COMP.ZANJA TERR.NORMAL"C"P/TUB.8"-10" HASTA 1.50 M m 1,072.89
01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 1,424.64 18 32
01.05 TUBERIAS Y ACCESORIOS
01.05.01 SUMINISTRO DE TUBERIAS
01.05.01.01 TUBERIA PVC C-10 U.F. 63 mm ISO 1452 m 204.53
01.05.01.02 TUBERIA PVC C-10 U.F. 90 mm ISO 1452 m 48.30
01.05.01.03 TUBERIA PVC C-10 U.F. 110mm ISO1452 m 5,458.27
01.05.01.04 TUBERIA PVC C-10 U.F. 200mm ISO 1452 m 692.14
01.05.01.05 TUBERIA PVC C-10 U.F. 250mm ISO 1452 m 380.75
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.05.02 SUMINISTRO DE ACCESORIOS
01.05.02.01 UNION MECANICA DE AMPLIO RANGO 2"(50mm) DE RANGO (59.5-72 mm) und 6.00
01.05.02.02 UNION MECANICA DE AMPLIO RANGO 3"(80mm) DE RANGO (88.1-102.4 mm) und 5.00
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2-127.8 mm) und 31.00
01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2-181.86 mm) und 2.00
01.05.02.05 UNION MECANICA DE AMPLIO RANGO 8"(200mm) DE RANGO (218.1-235.0 mm) und 7.00
01.05.02.06 UNION MECANICA DE AMPLIO RANGO 10"(250mm) DE RANGO (272-289 mm) und 2.00
01.05.02.07 UNION MECANICA DE AMPLIO RANGO 12"(300mm) DE RANGO (315-332 mm) und 1.00
01.05.02.08 CODO PVC C-10 P/AGUA 63mm x 45ª UF. und 1.00
01.05.02.09 CODO PVC C-10 P/AGUA 110mm x22.5º UF und 3.00
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 13.00
01.05.02.11 CODO PVC C-10 P/AGUA 110mm x90º UF und 3.00
01.05.02.12 CODO PVC C-10 P/AGUA 200mm x 22.5º UF und 3.00
01.05.02.13 CODO PVC C-10 P/AGUA 200mm x 90º UF und 3.00
01.05.02.14 CURVA PVC C-10 P/AGUA 200mm x 90º UF und 2.00
01.05.02.15 CODO PVC C-10 P/AGUA 250mm x 90º UF und 1.00
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 37.00
01.05.02.17 TEE PVC C-10 DE 200 mm x 200mm U.F. und 4.00
01.05.02.18 CRUZ DE PVC C-10 DE 110 mm U.F. und 17.00
01.05.02.19 CRUZ DE PVC C-10 DE 160 mm U.F. und 1.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.05.02.20 CRUZ DE PVC C-10 DE 200 mm U.F. und 2.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.05.02.21 REDUCCION PVC 110 mm. - 50mm U.F und 4.00
01.05.02.22 REDUCCION PVC 110 mm. - 63mm U.F und 4.00
01.05.02.23 REDUCCION PVC 110 mm. - 90mm U.F und 2.00
01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F und 2.00
01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm und 9.00
01.05.02.26 REDUCCIÓN PVC P/AGUA 300 mm x 250 mm und 1.00
01.05.02.27 TAPON DE PVC P/AGUA C-10 TUBERIA DE 63 mm U.F. und 3.00
01.05.02.28 TAPON DE PVC P/AGUA C-10 TUBERIA DE 90 mm U.F. und 1.00
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 11.00
01.05.03 INSTALACION TUBERIAS Y ACCESORIOS
01.05.03.01 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m 5,711.10
01.05.03.02 INSTALAC. TUBERIA PVC C-10 DE 200mm a 250mm m 1,072.89
01.05.03.03 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A 110mm und 146.00
01.05.03.04 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 200mm a 250mm und 35.00
01.05.04 ANCLAJES / DADOS DE CONCRETO
01.05.04.01 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. und 105.00
01.06 VALVULAS Y GRIFOS CONTRA INCENDIO
01.06.01 SUMINISTRO DE VALVULAS
01.06.01.01 VALVULA PURGA HIERRO DUCTIL ISO 7259 Ø 63mm und 6.00
01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm und 48.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.06.01.03 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 200mm und 3.00
01.06.01.04 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 250mm und 1.00
01.06.02 INSTALACION DE VALVULAS
01.06.02.01 INSTALACION DE VALVULA DE PURGA Ø 63mm und 6.00
01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm und 48.00
01.06.02.03 INSTALACION DE VALVULA COMPUERTA Ø 200mm a 250mm und 4.00
01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO
01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM und 17.00
01.07 CONEXIONES DOMICILIARIAS DE AGUA
01.07.01 TRAZO Y REPLANTEO m2 2,192.59 18
01.07.02 DEMOLICION DE VEREDA m2 502.50
01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,385.18 30
01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 657.78
01.07.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 657.78
01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 160 MM m 4,385.18 30
01.07.07 CAMA DE APOYO m 4,385.18 30
01.07.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 657.78 3
01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M m 4,385.18 30
01.07.10 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEX AGUA 63MM x 1/2" und 41.00
01.07.11 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 90MM x 1/2" und 10.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.07.12 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 110MM x 1/2" und 888.00 13
01.07.13 SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 200MM x 1/2" und 66.00
01.07.14 SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. DOM. und 1,005.00 13
01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES und 1,005.00
01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) und 1,005.00
01.08 CAMARAS / CAJAS PARA VALVULAS
01.08.01 EXCAVACION PARA CAJA DE VALVULA m3 26.25
01.08.02 CONCRETO f'c 175 kg/cm² m3 13.69
01.09 PRUEBAS DE CONTROL DE CALIDAD
01.09.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m 5,711.10
01.09.02 PRUEBA HIDRAULICA Y DESINFECCION TUB. HASTA 250MM m 1,072.89
01.09.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 45.00
01.09.04 PRUEBA DE CALIDAD DEL CONCRETO (RESISTENCIA A LA COMPRESION) und 9.00
01.10 MITIGACION DE IMPACTOS
01.10.01 AGUA PARA HUMEDECER TERRENO m3 2,035.20 0.84
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 150.50
01.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 111.85
02 SISTEMA DE DESAGUE
02.01 OBRAS PROVISIONALES
02.01.01 PUESTA EN OPERACION DEL SISTEMA ml 5,858.23
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
02.02 TRABAJOS PRELIMINARES
02.02.01 TRAZO NIVELACION Y REPLANTEO m 5,858.23
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m 5,858.23
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 5,224.49
02.02.04 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 6,251.35
02.02.05 DEMOLICION DE BUZONES und 130.00
02.02.06 REMOCION DE TUB DE ALCANTARILLA CSN CON MAQUINARIA ml 5,858.23
02.03 SEGURIDAD Y SALUD
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION m 170.38
02.03.02 PROTECCION DE RED DE TELEFONIA m 292.91
02.03.03 ENTIBADO Y APUNTALAMIENTO ml 1,417.37 24
02.03.04 CINTA DE SEGURIDAD m 11,716.46 50
02.03.05 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 90.00 1
02.03.06 PUENTES PEATONALES PROVISIONALES und 135.00 2
02.03.07 LIMPIEZA FINAL DE LA OBRA m2 4,100.76
02.04 MOVIMIENTO DE TIERRAS
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M m 2,907.88 24
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M m 2,554.97
02.04.03 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=3.00 M m 395.38
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m 5,858.23 24
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m 5,858.23 24
02.04.06 ZARANDEADO DE MATERIAL SELECCIONADO m3 1,230.23 6
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 M m 1,744.73
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M m 1,788.48
02.04.09 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 3.00 M m 316.30
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3 2,460.46
02.05 TUBERIAS
02.05.01 SUMINISTRO
02.05.01.01 TUBERIA DE U.F.PVC ISO 4435 DN 200mm m 5,246.05
02.05.01.02 TUBERIA DE U.F.PVC ISO 4435 DN 250mm m 280.23
02.05.01.03 TUBERIA DE U.F.PVC ISO 4435 DN 315mm m 182.49
02.05.01.04 TUBERIA DE U.F.PVC ISO 4435 DN 355mm m 149.46
02.05.02 TRANSPORTE DE TUBERIA
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -375mm MANUAL und 976.00
02.05.03 INSTALACION DE TUBERIAS
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 375MM m 5,858.23
02.06 BUZONES DE INSPECCION
02.06.01 BUZON DE DESAGUE TIPO "A" D=1.20, H=1.50 M. und 72.00
02.06.02 BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und 44.00
02.06.03 BUZON DE DESAGUE TIPO "A" D=1.20, H=3.00 M. und 16.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
02.07 MANTENIMIENTO DE COLECTORES LATERALES
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON EQUIPO m 2,513.57
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE und 16.00
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE
02.08.01 TRAZO Y REPLANTEO m2 3,288.35 12.6
02.08.02 DEMOLICION DE VEREDA m2 568.92
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA m 4,697.65 21
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 1,674.24
02.08.05 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. m3 1,674.24
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 160MM m 4,697.65 21
02.08.07 CAMA DE APOYO m 4,697.25 21
02.08.08 ZARANDEADO DE MATERIAL SELECCIONADO m3 845.58 3
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 20MM" HASTA 1.50 M m 3,147.42 21
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und 692.00
02.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 160mm) und 24.00
02.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (300 -160mm) und 24.00
02.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 160 mm) und 18.00
02.09 PRUEBAS DE CONTROL DE CALIDAD
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE m 5,858.23
02.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 135.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
02.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00
02.10 MITIGACION DE IMPACTOS
02.10.01 AGUA PARA HUMEDECER TERRENO m3 5,828.23 1.05
02.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 29.29
02.10.03 REPOSICION DE PAVIMENTO DE CONCRETO DE 8" m2 14.45
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES m3 4,373.20
03 IMPACTO AMBIENTAL Y EDUCACION SANITARIA
03.01 INFORMACION A LA POBLACION
03.01.01 INFORMACION A LA POBLACION und 14.00
03.01.02 LETREROS INFORMATIVOS und 24.00
03.02 EDUCACION SANITARIA
03.02.01 EDUCACION SANITARIA A LA POBLACION glb 14.00
03.02.02 CONTENEDOR DE RESIDUOS SOLIDOS und 24.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M

C
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA:
FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
01.05 SISTEMA DE AGUA POTABLE
01.05 TUBERIAS Y ACCESORIOS
01.05.02 SUMINISTRO DE ACCESORIOS
01.05.02.03 UNION MECANICA DE AMPLIO RANGO 4"(100mm) DE RANGO (107.2-127.8 mm) und 4.00
01.05.02.10 CODO PVC C-10 P/AGUA 110mm x45º UF und 4.00
01.05.02.16 TEE DE PVC AGUA DE 110 mm x 110 mm U.F. und 1.00
01.05.02.29 TAPON DE PVC P/AGUA TUBERIA DE 110 mm U.F. und 1.00
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
02 SISTEMA DE DESAGUE
02.04 MOVIMIENTO DE TIERRAS
02.04.07 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 1.50 M m 512.61 24

OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

01.02.04

PRESUPUESTO DE OBRA:
FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M

1 SISTEMA DE AGUA -
1.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 1,983.96 42
1.02 EMPEDRADO DE PISO E=15 M2 1,983.96 42
1.03 CONCRETO F'C=210 KG/CM2 M3 198.40
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO

MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

PRESUPUESTO DE OBRA: S/. 4,284,587.53


FECHA DE INICIO DE OBRA:

PROGRAMADO
ITEM PARTIDA 1 2
UNID METRADO L M
1.04 CURADO DE CONCRETO M2 1,983.96
2 SISTEMA DE DESAGUE -
2.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 2,617.66 63
2.02 EMPEDRADO DE PISO E=15 M2 2,617.66 63
2.03 CONCRETO F'C=210 KG/CM2 M3 261.77
2.04 CURADO DE CONCRETO M2 2,617.66
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

224.2

70
70

5.4 24

50 50 50
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D
50 160 150 120

25
24 25
24 25
24 25

3 3

18 19 32 18 18 90 12

24
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

2
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

24
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

14.4 6.3 4.2 1.8

24 10.5 7 3
12

24 10.5 7 3
24 10.5 7 3
3 2
24 10.5 7 3
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D
3 2

3 2
7 6 10

0.25 0.19 0.29 0.1

67.89
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

70
70

5.4 24
1
25

50 50 50
1
2
50 160 150 120

25

25
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D
25
3

90

4 4

24 24

1 1
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

14.4 12.6 8.4 8.4 3.6

24 21 14 14 6
12 12 12 6 15 6 8

24 21 14 14 6
24 21 14 14 6
3 2 2 3 2
24 21 14 14 6
6 4 4 2

67.89
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

0.32 0.24 0.36 0.13


CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

CONTROL DE METRADOS DIARIO DE OBRA (ADICIONAL DE OBRA POR MAYORES METRADOS)


CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

2
2
1
1
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

25

CONTROL DE METRADOS DIARIO DE OBRA (ADICIONAL DE OBRA POR PARTIDAS NUEVAS)


CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D

12.6 9.6 14.4 5.1 12.6


12.6 24 5.1 12.6
4.2 1.26 0.61 0.36 3.3 1.5
CONTROL DE METRADOS DIARIO DE OBRA EJECUTADOS (PROGRAMADOS)
CUSCO

CONTROL DE METRADO DIARIO-JUNIO-2015


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M J V S D L M M J V S D L M M J V S D
42 12.6 29.1 12.6

18.9 14.4 21.6 7.65 18.9


18.9 36 7.65 18.9
6.3 1.89 0.97 0.54 4.62 2.1
63 18.9 43.65 18.9
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M

- - - -
- - - -
- 3.00 3.00 -
- 5.00 5.00 9.00
224.20 1,578.00 1,802.20 4,981.79
- - - -
50 120.00 3,675.01 3,795.01 2,988.98
50 120.00 3,405.81 3,525.81 3,258.18
- 971.00 971.00 1,683.32
60 7.2 96.60 1,619.81 1,716.41 2,419.27
- 8.00 8.00 23.00
- - - -
- 1.00 1.00 -

- 138.00 138.00 834.07


- 109.00 109.00 111.00
- 196.00 196.00 809.00
100 120 420.00 4,827.80 5,247.80 8,320.18
- 16.00 16.00 12.00
- 25.00 25.00 3.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
130 610.00 2,374.47 2,984.47 3,799.52
- 2.00 2.00 1.00
- - - -
50 99.00 680.50 779.50 4,931.60
50 99.00 2,759.41 2,858.41 2,852.69
50 99.00 2,879.41 2,978.41 2,732.69
50 99.00 2,703.36 2,802.36 2,908.74
- 25.00 25.00 1,047.00
- 79.00 79.00 993.89
- 64.00 64.00 1,008.89
4 10.00 447.56 457.56 967.08
- 107.90 107.90 964.99
257.00 668.00 925.00 499.64
- - - -
- - - -
- 121.00 121.00 83.53
- - - 48.30
48 72.00 4,217.31 4,289.31 1,168.96
- 54.00 54.00 638.14
- - - 380.75
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - -
- 1.00 1.00 5.00
- 1.00 1.00 4.00
- 31.00 31.00 -
- - - 2.00
2.00 2.00 4.00 3.00
- 2.00 2.00 -
- 1.00 1.00 -
- 1.00 1.00 -
- 3.00 3.00 -
- 13.00 13.00 -
- 3.00 3.00 -
- - - 3.00
- 3.00 3.00 -
- 2.00 2.00 -
- - - 1.00
- 37.00 37.00 -
- 4.00 4.00 -
- 16.00 16.00 1.00
- - - 1.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- 2.00 2.00 -
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - 4.00
- 4.00 4.00 -
- - - 2.00
- - - 2.00
1.00 5.00 6.00 3.00
- - - 1.00
- 2.00 2.00 1.00
- - - 1.00
- 11.00 11.00 -
- - - -
48 72.00 2,489.71 2,561.71 3,149.39
- 54.00 54.00 1,018.89
- 69.00 69.00 77.00
- - - 35.00
- - - -
- 52.00 52.00 53.00
- - - -
- - - -
- - - 6.00
- 32.00 32.00 16.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - 3.00
- - - 1.00
- - - -
- - - 6.00
- 18.00 18.00 30.00
- - - 4.00
- - - -
- 12.00 12.00 5.00
- - - -
7.2 25.2 77.10 1,606.12 1,683.22 509.37
- 374.20 374.20 128.30
12 42 128.50 1,708.20 1,836.70 2,548.48
6 5 23.00 540.66 563.66 94.12
- - - 657.78
12 42 128.50 1,657.20 1,785.70 2,599.48
12 42 128.50 1,629.20 1,757.70 2,627.48
3 11.00 449.94 460.94 196.84
12 42 128.50 1,827.20 1,955.70 2,429.48
- - - 41.00
- - - 10.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
15 33.00 388.00 421.00 467.00
- 1.00 1.00 65.00
15 33.00 333.00 366.00 639.00
23.00 155.00 178.00 827.00
- - - 1,005.00
- - - -
- 11.63 11.63 14.62
- 1.59 1.59 12.10
- - - -
- 2,381.82 2,381.82 3,329.28
- - - 1,072.89
- - - 45.00
- - - 9.00
- - - -
1.67 420.10 421.77 1,613.43
- 20.00 20.00 130.50
- 111.85 111.85 -
- - - -
- - - -
69.59 137.48 2,222.62 2,360.10 3,498.13
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - -
50 120.00 4,610.51 4,730.51 1,127.72
50 120.00 4,423.11 4,543.11 1,315.12
- 1,004.60 1,004.60 4,219.89
60 7.2 96.60 2,546.39 2,642.99 3,608.36
1 2.00 40.00 42.00 88.00
50 75.00 1,631.93 1,706.93 4,151.30
- - - -
- 140.00 140.00 30.38
- 150.00 150.00 142.91
50 74.00 1,052.41 1,126.41 290.96
100 120 420.00 9,335.85 9,755.85 1,960.61
1 1 4.00 37.00 41.00 49.00
4 8.00 108.00 116.00 19.00
130 610.00 1,730.87 2,340.87 1,759.89
- - - -
50 99.00 670.41 769.41 2,138.47
- - - 2,554.97
- - - 395.38
50 99.00 2,692.41 2,791.41 3,066.82
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
50 99.00 2,615.81 2,714.81 3,143.42
3 12.00 950.12 962.12 268.11
- 1,744.73 1,744.73 -
- 566.00 566.00 1,222.48
- - - 316.30
90.00 2,092.29 2,182.29 278.17
- - - -
- - - -
- 5,246.05 5,246.05 -
- - - 280.23
- 182.49 182.49 -
- 149.46 149.46 -
- - - -
8 16.00 440.50 456.50 519.50
- - - -
48 96.00 2,524.21 2,620.21 3,238.02
- - - -
2.00 50.24 52.24 19.76
- 5.44 5.44 38.56
- - - 16.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - -
- 1,044.00 1,044.00 1,469.57
- 7.00 7.00 9.00
- - - -
10.6 28.8 99.40 1,738.44 1,837.84 1,450.51
- 568.92 568.92 -
17.5 48 165.50 1,915.29 2,080.79 2,616.86
8 6 6 6 97.00 742.02 839.02 835.22
- 76.05 76.05 1,598.19
17.5 48 165.50 1,793.10 1,958.60 2,739.05
17.5 48 165.50 1,777.60 1,943.10 2,754.15
5 20.00 514.23 534.23 311.35
17.5 48 165.50 1,818.46 1,983.96 1,163.46
17 33.00 301.00 334.00 358.00
- - - 24.00
- 22.00 22.00 2.00
- 10.00 10.00 8.00
- - - -
69.59 137.48 2,318.42 2,455.90 3,402.33
- - - 135.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - 30.00
- - - -
2.09 425.72 427.81 5,400.42
- 10.00 10.00 19.29
- 14.45 14.45 0.00
18 18.00 2,118.00 2,136.00 2,237.20
- - - -
- - - -
- 14.00 14.00 -
- - - 24.00
- - - -
- 14.00 14.00 -
- - - 24.00
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M

REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - -
- - - -
- - - -
2.00 - 2.00 2.00
2.00 - 2.00 2.00
1.00 - 1.00 -
1.00 - 1.00 -
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
- - - -
- - - -
50 99.00 413.61 512.61 -

REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M

- - - -
96.30 122.86 219.16 1,764.80
96.30 122.86 219.16 1,764.80
11.23 15.07 26.30 172.10
REGION: CUSCO
DEPARTAMENTO: CUSCO
PROVINCIA: SANTAGO
DISTRITO: SANTIAGO
LOCALIDAD: SANTIAGO

22 23 24 25 26 27 28 29 30 ANTERIOR ACUMULADO SALDO


TOTAL
CANTIDAD CANTIDAD CANTIDAD
L M M J V S D L M
96.30 122.86 219.16 1,764.80
- - - -
144.45 184.30 328.75 2,288.91
144.45 184.30 328.75 2,288.91
16.42 21.84 38.26 223.51
144.45 184.30 328.75 2,288.91
PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTR
SECUNDARIAS DE DESAGÜE DEL CASCO
ENTIDAD :

FECHA: JULIO-2015.
PARTIDA
01
01.01
01.01.03

01.02
01.02.01

01.02.02

01.02.04

01.03

01.03.05

01.03.08

01.04

01.04.01

01.04.02

01.04.03

01.04.04

01.04.08

01.05
01.05.01
01.05.01.03
PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTR
SECUNDARIAS DE DESAGÜE DEL CASCO
ENTIDAD :

FECHA: JULIO-2015.
PARTIDA
01.05.03
01.05.03.01

01.05.04
01.05.04.01

01.06
01.06.01
01.06.01.02

01.06.02
01.06.02.02

01.07
01.07.01

01.07.03

01.07.04

01.07.06

01.07.07

01.07.08

01.07.09

01.07.12

01.07.14

01.07.15
PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTR
SECUNDARIAS DE DESAGÜE DEL CASCO
ENTIDAD :

FECHA: JULIO-2015.
PARTIDA

01.08
01.08.01

01.08.02

01.09

01.09.01

01.10

01.10.01
PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTR
SECUNDARIAS DE DESAGÜE DEL CASCO
ENTIDAD :

FECHA: JULIO-2015.
PARTIDA
02
02.01
02.01.01

02.01
02.02.01

02.02.02

02.02.04

02.02.05

02.03.04

02.03.05

02.03.06

02.03.07

02.04

02.04.02

02.04.04

02.04.05

02.04.06

01.04.08

02.04.10
PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTR
SECUNDARIAS DE DESAGÜE DEL CASCO
ENTIDAD :

FECHA: JULIO-2015.
PARTIDA

02.05.02
02.05.02.01

02.05.03
02.05.03.01

02.06
02.06.02

02.08
02.08.01

02.08.03

02.08.04

02.08.06

02.08.07

02.08.08

02.08.09

02.08.10

02.09
02.09.01

02.10
02.10.01

02.10.04
HOJA DE METRADOS

O:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES COLECTORA


SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE SANTIAGO-CUSCO-CUS
MUNICIPALIDAD DISTRITAL DE SANTIAGO

ULIO-2015.
DESCRIPCION UNID.
SISTEMA DE AGUA POTABLE
OBRAS PROVICIONALES
PUESTA EN OPERACION DEL SISTEMA m

TRABAJOS PRELIMINARES m
TRAZO NIVELACION Y REPLANTEO m

TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m

DEMOLICION MANUAL DE PAVIMENTO DE CONCRETO DE 8" m2


CALLE BELLAVISTA

SEGURIDAD Y SALUD

CINTA DE SEGURIDAD m

LIMPIEZA FINAL DE LA OBRA m2

MOVIMIENTO DE TIERRAS

EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 110MM m


CALLE BELLAVISTA

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") - 110mm (4") m

CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. m

RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") H=1.50M m

ZARANDEADO DE MATERIAL SELECCIONADO m3


EXCAVACION MENOS RELLENO(1.50)

TUBERIAS Y ACCESORIOS
SUMINISTRO DE TUBERIAS
TUBERIA PVC C-10 U.F. 110mm ISO1452 m
CALLE BELLAVISTA
HOJA DE METRADOS

O:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES COLECTORA


SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE SANTIAGO-CUSCO-CUS
MUNICIPALIDAD DISTRITAL DE SANTIAGO

ULIO-2015.
DESCRIPCION UNID.
INSTALACION TUBERIAS Y ACCESORIOS
INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm m
CALLE BELLAVISTA

ANCLAJES / DADOS DE CONCRETO


MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. m3
CALLE BELLAVISTA

VALVULAS Y GRIFOS CONTRA INCENDIO


SUMINISTRO DE VALVULAS
VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm Unid
CALLE BELLAVISTA

INSTALACION DE VALVULA COMPUERTA Ø 110mm


INSTALACION DE VALVULA COMPUERTA Ø 110mm Unid
CALLE BELLAVISTA

CONEXIONES DOMICILIARIAS DE AGUA


TRAZO Y REPLANTEO m2
CALLE BELLAVISTA

EXCAVACION MANUAL EN TIERRA COMPACTA m


CALLE BELLAVISTA

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 110MM m

CAMA DE APOYO m

MATERIAL SARANDEADO PROPIO E=0.30M (recubrimiento de tuberia) m3

RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M Unid

SUMINISTRO E INST. ABRAZADERA TELESCOPICA NTP 399.137 P/CONEZ AGUA 110MM x 1/2" Unid

SUMINISTRO E INST. TUBERIA Y ACCESORIOS D= 1/2" PARA CONEX. DOM. Unid

INSTALACION DE TAPA Y CAJA PARA MEDIDORES Unid


HOJA DE METRADOS

O:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES COLECTORA


SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE SANTIAGO-CUSCO-CUS
MUNICIPALIDAD DISTRITAL DE SANTIAGO

ULIO-2015.
DESCRIPCION UNID.

CAMARAS / CAJAS PARA VALVULAS


EXCAVACION PARA CAJA DE VALVULA m3

CONCRETO f'c 175 kg/cm² m3

PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm

PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm m

MITIGACION DE IMPACTOS

AGUA PARA HUMEDECER TERRENO m3


HOJA DE METRADOS

O:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES COLECTORA


SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE SANTIAGO-CUSCO-CUS
MUNICIPALIDAD DISTRITAL DE SANTIAGO

ULIO-2015.
DESCRIPCION UNID.
SISTEMA DE DESAGUE
OBRAS PROVISIONALES
PUESTA EN OPERACION DEL SISTEMA m

TRABAJOS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO m

TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION m

DEMOLICION MANUAL DE PAVIMENTO DE CONCRETO DE 8"


CALLE BELLAVISTA

DEMOLICION DE BUZONES
CALLE BELLAVISTA und

CINTA DE SEGURIDAD m

TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR m

PUENTES PEATONALES PROVISIONALES und

LIMPIEZA FINAL DE LA OBRA m2

MOVIMIENTO DE TIERRAS

EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M


CALLE BELLAVISTA m

REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM m

CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. m

MATERIAL SARANDEADO PROPIO E=0.30M (recubrimiento de tuberia) m3

RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M m

ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE m3


EXCAVACION MENOS RELLENO(1.50)
HOJA DE METRADOS

O:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES COLECTORA


SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE SANTIAGO-CUSCO-CUS
MUNICIPALIDAD DISTRITAL DE SANTIAGO

ULIO-2015.
DESCRIPCION UNID.

TRANSPORTE DE TUBERIA
TRANSPORTE DE TUBERIA PVC Ø 200 mm -355mm MANUAL und

INSTALACION DE TUBERIAS
INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 355MM m

BUZONES DE INSPECCION
BUZON DE DESAGUE TIPO "A" D=1.20, H=2.00 M. und

CONEXIONES DOMICILIARIAS DE DESAGUE


TRAZO Y REPLANTEO m2
CALLE BELLAVISTA

EXCAVACION MANUAL EN TIERRA COMPACTA m


CALLE BELLAVISTA

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3

REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 110MM m

CAMA DE APOYO m

MATERIAL SARANDEADO PROPIO E=0.30M (recubrimiento de tuberia) m3

RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 110MM" HASTA 1.50 M m

CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 160 mm) und


CALLE BELLAVISTA

PRUEBAS DE CONTROL DE CALIDAD


PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE
CALLE BELLAVISTA m

MITIGACION DE IMPACTOS
AGUA PARA HUMEDECER TERRENO m3

ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES m3


TRADOS

REDES COLECTORAS
ANTIAGO-CUSCO-CUSCO

VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL

1 0.00 0.00 0.00

1
1 0.00 0.00 0.00

1 0.00 0.00 0.00

322.01
1 173.85 1.30 226.01
1 160.00 0.60 96.00

2 174.00 348.00 348.00

1 0.00 0.00

1 0.00 0.00 0.00

1 0.00 0.00 0.00

1 0.00 0.00 0.00

1 0.00 0.00 0.00

0.00
0.00

0.00
1 0.00 0.00
TRADOS

REDES COLECTORAS
ANTIAGO-CUSCO-CUSCO

VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL

0.00
1 0.00 0.00

0.12
0.12

1.00
1 1.00 1.00

1.00
1 1.00 1.00

0.00
78.20 0.6 46.92

1 0.00 0.00 0.00

0.00 0.00

1 0.00 0.00 0.00

1 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
TRADOS

REDES COLECTORAS
ANTIAGO-CUSCO-CUSCO

VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL

1 0.12 0.12

1 0.12 0.12

0.00

1 0.00 0.00

0.00

1 0.00
TRADOS

REDES COLECTORAS
ANTIAGO-CUSCO-CUSCO

VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL

1 175.00 175.00

1 0.00 0.00 0.00

1 0.00 0.00 0.00

322.01
1 173.85 1.30 226.01
1 160.00 0.60 96.00

2.00
2 2.00

2 195.00 390.00 390.00

10.00 10.00 10.00

- 0.00 0.00

1.00 0.00 0.00

0.00
1 0.00 0.00

1 76.00 76.00 76.00

1 76.00 76.00 76.00

1 96.50 96.50

1 76.00 76.00 76.00

1 0.00
0.00
TRADOS

REDES COLECTORAS
ANTIAGO-CUSCO-CUSCO

VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL

1 14.00 14.00

1 84.00 84.00 84.00

1.00 1.00 1.00

45.20
75.34 0.6 45.20

1 75.34 75.34 75.34

0.00 0.00

1 75.00 75.00 75.00

1 75.00 75.00 75.00

1 16.00 16.00

1 75.00 75.00 75.00

16.00
16.00 16.00

0.00 0.00

0.00 0.00

60.00 60.00
RESUMEN HOJA DE METRADOS EJECUTADOS

PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES


COLECTORAS SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE
SANTIAGO-CUSCO-CUSCO

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTIAGO


JULIO-2018.

PARTIDA DESCRIPCION UNID. METRADO


01.00 SISTEMA DE AGUA POTABLE

01.01 OBRAS PROVICIONALES

01.01.03 PUESTA EN OPERACION DEL SISTEMA M -

01.02 TRABAJOS PRELIMINARES

01.02.01 TRAZO NIVELACION Y REPLANTEO M -

01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION M -

01.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" M2 -

01.03.01 SEGURIDAD Y SALUD

01.03.05 ELABORACION, IMPLEMENTACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GLB -

01.03.07 PROTECCION DE RED DE TELEFONIA M -

01.03.08 MANTENIMIENTO DEL SERVICIO DE AGUA POTABLE UNID -

01.04.01 PUENTES PEATONALES PROVISIONALES UNID -

01.04 MOVIMIENTO DE TIERRAS

01.04.01 EXCAVACION C/MAQ. TERR. NORMAL ANCHO 0.50M H=1.50 HASTA 110MM M -

01.04.02 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB. 63mm (2") - 110mm (4") M -

01.04.03 CAMA DE APOYO CON ARENA GRUESA P/TUB. DE 63 - 110mm T.N. M -

01.04.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm(2") a 110mm (4") H=1.50M M -

01.04.08 ZARANDEADO DE MATERIAL SELECCIONADO M3 -

01.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE M3 -

01.05 TUBERIAS Y ACCESORIOS

01.05.01 SUMINISTRO DE TUBERIAS

01.05 TUBERIA PVC C-10 U.F. 110mm ISO1452 M -

01.05.02 SUMINISTRO DE ACCESORIOS

01.05.02.04 UNION MECANICA DE AMPLIO RANGO 6"(150mm) DE RANGO (158.2-181.86 mm) UNID -

01.05.02.24 REDUCCION PVC 160 mm. - 110mm U.F UNID -

01.05.02.25 REDUCCIÓN PVC P/AGUA 200 mm x 110 mm UNID -

01.05.01 INSTALACION TUBERIAS Y ACCESORIOS

01.05.01.03 INSTALAC.TUBERIA PVC UF CLASE A-10 DE 63mm A 110mm M -

01.05.04 ANCLAJES / DADOS DE CONCRETO

01.05.02.05 MACIZO DE ANCLAJE F´c= 140 Kg/cm2 0.40x0.4x0.40 m. M3 -

01.06 VALVULAS Y GRIFOS CONTRA INCENDIO

01.06.01 SUMINISTRO DE VALVULAS

01.06.01.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm UNID -


RESUMEN HOJA DE METRADOS EJECUTADOS

PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES


COLECTORAS SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE
SANTIAGO-CUSCO-CUSCO

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTIAGO


JULIO-2018.

PARTIDA DESCRIPCION UNID. METRADO

01.06.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm

01.06.02.02 INSTALACION DE VALVULA COMPUERTA Ø 110mm UNID -

01.06.03 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO

01.06.03.01 GRIFO CONTRA INCENDIO TIPO POSTE DN 110MM UNID -

01.07 CONEXIONES DOMICILIARIAS DE AGUA

01.07.01 TRAZO Y REPLANTEO M2 -

01.07.03 EXCAVACION MANUAL EN TIERRA COMPACTA M -

01.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) M3 -

01.07.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 110MM M -

01.07.07 CAMA DE APOYO M -

01.07.08 MATERIAL SARANDEADO PROPIO E=0.30M (recubrimiento de tuberia) M3 -

01.07.09 RELLENO COMP.ZANJA TERR.NORMAL TUB 20MM" HASTA 1.50 M UNID -

01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES UNID -

01.07.16 SUMINISTRO E INST. MEDIDORES DE 1/2" (15mm) UNID -

01.08 CAMARAS / CAJAS PARA VALVULAS UNID

01.08.01 EXCAVACION PARA CAJA DE VALVULA UNID -

01.08.02 CONCRETO f'c 175 kg/cm² UNID -

01.07.15 INSTALACION DE TAPA Y CAJA PARA MEDIDORES UNID -

01.09 PRUEBAS DE CONTROL DE CALIDAD

01.10.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA HASTA 110 mm M -

01.10 MITIGACION DE IMPACTOS

01.10.01 AGUA PARA HUMEDECER TERRENO M -


02.00 SISTEMA DE DESAGUE
02.01 OBRAS PROVISIONALES
02.01.01 PUESTA EN OPERACION DEL SISTEMA M 175.00
02.02 TRABAJOS PRELIMINARES
02.02.01 TRAZO NIVELACION Y REPLANTEO M -
02.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION M -
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" M2 -
02.02.03 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" M2 -
02.02.05 DEMOLICION DE BUZONES UNID 1.00
02.03 SEGURIDAD Y SALUD
02.03.01 PROTECCION DE CABLE ELECTRICO DE ALTA Y BAJA TENSION M -
02.03.02 PROTECCION DE RED DE TELEFONIA M -
02.03.04 CINTA DE SEGURIDAD M -
RESUMEN HOJA DE METRADOS EJECUTADOS

PROYECTO:MEJORAMIENTO DE LAS REDES DE DISTRIBUCIÓN DE AGUA Y DE LAS REDES


COLECTORAS SECUNDARIAS DE DESAGÜE DEL CASCO URBANO DEL DISTRITO DE
SANTIAGO-CUSCO-CUSCO

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTIAGO


JULIO-2018.

PARTIDA DESCRIPCION UNID. METRADO


02.04 MOVIMIENTO DE TIERRAS
02.04.01 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=1.50 M M -
02.04.02 EXCAV. ZANJA CON MAQ. T.N./P/TUB 8"-12" H=2.00 M M -
02.04.04 REFINE Y NIVELACION ZANJA TN PARA TUB. 200 - 315 MM M 76.00
02.04.05 CAMA DE APOYO E=0.10 P/TUB 200 MM A 315 MM T.N. M 76.00
02.04.06 MATERIAL SARANDEADO PROPIO E=0.30M (recubrimiento de tuberia) M3 96.50
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M M 76.00
02.04.08 RELLENO COMP.ZANJA CON MAT PROPIO. P/TUB.8"-12" HASTA 2.00 M M 76.00
02.04.10 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE M3 -
02.05 TUBERIAS
02.05.02 TRANSPORTE DE TUBERIA
02.05.02.01 TRANSPORTE DE TUBERIA PVC Ø 200 mm -355mm MANUAL UNID 14.00
02.05.03 INSTALACION DE TUBERIAS
02.05.03.01 INSTALAC. TUBERIA PVC DESAGUE DE 200 MM A 355MM M 84.00
02.07 MANTENIMIENTO DE COLECTORES LATERALES
02.07.01 LIMPIEZA DE COLECTORES EXISTENTES DE DESAGUE CON EQUIPO M 151.00
02.07.02 EMPALME DE TUBERIA A BUZON EXISTENTE UNID 4.00
02.08 CONEXIONES DOMICILIARIAS DE DESAGUE
02.08.01 TRAZO Y REPLANTEO M2 157.00
02.08.03 EXCAVACION MANUAL EN TIERRA COMPACTA M 75.34
02.08.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) M3 -
02.08.06 REFINE Y NIVELACION ZANJA TERR.NORMAL PARA TUB 110MM M 75.00
02.08.07 CAMA DE APOYO M 75.00
02.08.08 MATERIAL SARANDEADO PROPIO E=0.30M (recubrimiento de tuberia) M3 96.00
02.08.09 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 110MM" HASTA 1.50 M M 75.00
02.08.10 CONEXIONES DOMICILIARIOS TUB PVC Ø (200 - 110 mm) UNID 16.00
01.08.11 CONEXIONES DOMICILIARIOS TUB PVC Ø (250 - 110 mm) und 1.00
01.08.12 CONEXIONES DOMICILIARIOS TUB PVC Ø (315 - 110 mm) und 1.00
01.08.13 CONEXIONES DOMICILIARIOS TUB PVC Ø (355 - 110 mm) und 1.00
01.09 PRUEBAS DE CONTROL DE CALIDAD
01.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 355 MM P/DESAGUE m 1.00
01.09.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO - DENSIDAD DE CAMPO) und 1.00
01.09.03 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 1.00
02.09 PRUEBAS DE CONTROL DE CALIDAD
02.09.01 PRUEBA HIDRAULICA DE TUB-200 MM - 375 MM P/DESAGUE M -
02.10 MITIGACION DE IMPACTOS
02.10.01 AGUA PARA HUMEDECER TERRENO M3 -
02.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M3 60.00
01.10.02 REPOSICION DE PAVIMENTO DE ASFALTO DE 2" m2 1.00
01.10.04 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES m3 1
ADICIONAL DE OBRA POR PARTIDAS NUEVAS
CORRESPONDIENTE AL MES DE ABRIL DEL 2015
OBRA: MEJORAMIENTO DE LAS REDES DE DISTRIBUCION DE AGUA Y LAS REDES COLECTORAS SECUNDARIAS DE DESAGUE EN EL CASCO URBANO DISTRITO DE SANTIAGO - CUSCO
MUNICIPALIDAD DISTRITAL DE SANTIAGO-CUSCO

RESIDENTE DE OBRA: AUGUSTO MASIAS QUISPE


SUPERVISOR DE OBRA: STEVE LUNA GUTIERREZ

PRESUPUESTO DE OBRA VALORIZACION ANTERIOR VALORIZACIO


ITEM DESCRIPCION UNID
METRADO P.U PRESUPUESTO METRADO VALORIZACION % METRADO
1 SISTEMA DE AGUA - 1,663,228.82 - -
1.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 3,181.70 2.63 8,367.87 - - 22.80
1.02 EMPEDRADO DE PISO E=15 M2 3,181.70 48.76 155,139.69 - - 22.80
1.03 CONCRETO F'C=210 KG/CM2 M3 3,361.85 445.57 1,497,939.50 - - 2.28
1.04 CURADO DE CONCRETO M2 3,181.70 0.56 1,781.75 - - 22.80
2 SISTEMA DE DESAGUE - 181,329.41 - - -
2.01 PERFILADO Y COMPACTADO CON MATERIAL PROPIO EN ZANJA M2 1,878.93 2.63 4,941.57 - - 34.20
2.02 EMPEDRADO DE PISO E=15 M2 1,878.93 48.76 91,616.38 - - 34.20
2.03 CONCRETO F'C=210 KG/CM2 M3 187.89 445.57 83,719.26 - - 3.42
2.04 CURADO DE CONCRETO M2 1,878.93 0.56 1,052.20 - - 34.20

COSTO DIRECTO 1,844,558.23 - 0.00%


NUEVAS
L DEL 2015
NTIAGO - CUSCO
RESUMEN DE VALORIZACION ADICIONAL DE OBRA
VALORIZACION ACTUAL S/. 5,500.90 0.15%
VALORIZACION ACUMULADO S/. 5,500.90 0.15%

VALORIZACION ACTUAL VALORIZACION ACUMULADO VALORIZACION SALDOS


VALORIZACION % METRADO VALORIZACION % METRADO VALORIZACION %
2,200.36 2,200.36 1,661,028.46
59.96 22.80 59.96 3,158.90 8,307.91
1,111.73 22.80 1,111.73 3,158.90 154,027.96
1,015.90 2.28 1,015.90 3,359.57 1,496,923.60
12.77 22.80 12.77 3,158.90 1,768.98
3,300.54 - 3,300.54 - 178,028.88
89.95 34.20 89.95 1,844.73 4,851.63
1,667.59 34.20 1,667.59 1,844.73 89,948.79
1,523.85 3.42 1,523.85 184.47 82,195.41
19.15 34.20 19.15 1,844.73 1,033.05

5,500.90 0.15% 5,500.90 0.15% 1,839,057.34 48.54%


DESCRIPCION UNID CANTIDAD P.U TOTAL
tubo pvc sap de 6" unid 1 220 220
cable NLT 2X12 AWG mt 30 3.75 112.5
focos unid 5 7.5 37.5
anillos de jebe para tuberia de 110mm unid 30 5 150
pegamento oatey gln 1 95 95
codo pvc sap de 22.5x110mm unid 3 45 135
carbon para rotomartillo unid 2 70 140
papel bond millar 2 24 48
archivadores unid 5 6.4 32
disco de corte de concreto de 7" unid 4 25 100
reparacion y mantenimiento de vibrapizon unid 1 250 250
reparacion y mantenimiento de rotomartillo unid 1 180 180
TOTAL 1500

DESCRIPCION FECHA CANTIDAD


TEE 8/1/2016 3
8/3/2016 7 10

CODO DE 22.5 8/2/2016 3


8/4/2016 4 7

CODO DE 110X90 8/4/2016 2 2

CRUZ DE 110 8/3/2016 2


8/4/2016 3 5

UNION MECANICA MAXIFIT 8/3/2016 6 6

UNION DE REPARACION 110 8/1/2016 2


8/3/2016 7
8/4/2016 3 12

REDUCCION DE 160-110 8/4/2016 2 2