Avaluo #02 - 160915
Avaluo #02 - 160915
Avaluo #02 - 160915
1 Costo total Mejoramiento de Barrio C$ 25,662,641.91 36.0887% 17.4694% 18.6193% C$ 4,483,104.15 C$ 9,261,312.18 C$ 16,401,329.73
2 Costo Directo Obras C$ 21,396,897.26 36.0887% 17.4694% 18.6193% C$ 3,737,905.05 C$ 7,721,860.67 C$ 13,675,036.59
2.1 Costo Directo Urbanización C$ 0.00 0.0000% 0.0000% 0.0000% C$ 0.00 C$ 0.00 C$ 0.00
2.2 Costo Directo de Intervenciones C$ 21,396,897.26 36.0887% 17.4694% 18.6193% C$ 3,737,905.05 C$ 7,721,860.67 C$ 13,675,036.59
2.2.1 ALCANTARILLADO SANITARIO
2.2.2 PRELIMINARES C$ 119,947.310 82.0889% 10.4788% 71.6101% C$ 12,569.010 C$ 98,463.411 C$ 21,483.899
2.2.3 RED DE ALCANTARILLADO C$ 1,379,528.200 62.8780% 29.7180% 33.1600% C$ 409,968.463 C$ 867,420.036 C$ 512,108.164
2.2.4 CONEXIONES DOMICILIARES C$ 1,530,600.620 90.0000% 20.3195% 69.6805% C$ 311,010.206 C$ 1,377,540.558 C$ 153,060.062
5 Costo total del Proyecto C$ 25,662,641.91 36.0887% 17.4694% 18.6193% C$ 4,483,104.15 C$ 9,261,312.18 C$ 16,401,329.73
C$ 0.00
ADELANTO 0.00%
Amortización Acumulada C$ 0.00
Saldo de Amortización C$ 0.00
S EN MEJORAMIENTOS DE BARRIOS
LUO N° 02 02
Amortizacion C$ 0.00
NETO A PAGAR C$ 4,483,104.15
APORTES
TOTAL
FOSOVI EA
1 ALCANTARILLADO SANITARIO C$ 4,056,202.77 C$ 3,047,017.73 C$ 749,987.68 C$ 2,297,030.05 C$ 1,009,185.04 75.12% 18.49% 56.63% 24.88%
2 PRELIMINARES C$ 119,947.31 C$ 98,463.41 C$ 12,569.01 C$ 85,894.40 C$ 21,483.90 82.09% 10.48% 71.61% 17.91%
3 Replanteo Topográfico GLB 1.00 C$ 83,793.40 C$ 83,793.40 0.84 0.15 0.69 0.16 C$ 70,386.46 C$ 12,569.01 C$ 57,817.45 C$ 13,406.94 84.00% 15.00% 69.00% 16.00%
4 Movilización y Desmovilización GLB 1.00 C$ 16,153.91 C$ 16,153.91 0.50 0.00 0.50 0.50 C$ 8,076.96 C$ - C$ 8,076.96 C$ 8,076.96 50.00% 0.00% 50.00% 50.00%
5 Instalaciones temporales (oficinas, bodega, comunicación, etc) GLB 1.00 C$ 20,000.00 C$ 20,000.00 1.00 0.00 1.00 0.00 C$ 20,000.00 C$ - C$ 20,000.00 C$ - 100.00% 0.00% 100.00% 0.00%
6 RED DE ALCANTARILLADO C$ 1,379,528.20 C$ 867,420.04 C$ 409,968.46 C$ 457,451.57 C$ 512,108.16 62.88% 29.72% 33.16% 37.12%
7 Excavación para instalación de tubería de PVC de 6" M3 2,587.20 C$ 105.85 C$ 273,849.78 1390.55 672.13 718.42 1196.65 C$ 147,186.85 C$ 71,143.57 C$ 76,043.27 C$ 126,662.93 53.75% 25.98% 27.77% 46.25%
8 Instalación de tubería de PVC de 6" SDR-41, con sus bloques de reac. m 2,156.00 C$ 354.08 C$ 763,403.77 1482.36 612.80 869.56 673.64 C$ 524,879.04 C$ 216,982.30 C$ 307,896.75 C$ 238,524.73 68.76% 28.42% 40.33% 31.24%
9 Acarreo de Material Selecto, comprado y cargado en el bco. Materales M3 672.67 C$ 225.03 C$ 151,374.21 485.14 306.89 178.25 187.53 C$ 109,173.42 C$ 69,060.95 C$ 40,112.47 C$ 42,200.79 72.12% 45.62% 26.50% 27.88%
10 Relleno y compact de las zanjas para la inst. de tuberías de red sant 6"(1 ) M3 2,716.56 C$ 32.39 C$ 87,989.78 1363.50 660.28 703.22 1353.06 C$ 44,163.97 C$ 21,386.57 C$ 22,777.40 C$ 43,825.81 50.19% 24.31% 25.89% 49.81%
11 Desalojo de material sobrante de excavación M3 504.50 C$ 74.49 C$ 37,578.13 485.14 342.54 142.60 19.36 C$ 36,136.08 C$ 25,514.40 C$ 10,621.69 C$ 1,442.05 96.16% 67.90% 28.27% 3.84%
12 Pruebas de compactación C/U 43.00 C$ 540.14 C$ 23,225.85 0.00 0.00 0.00 43.00 C$ - C$ - C$ - C$ 23,225.85 0.00% 0.00% 0.00% 100.00%
13 Pruebas de exfiltración (incluye tubería de domiciliares) M 2,156.00 C$ 19.53 C$ 42,106.68 301.11 301.11 0.00 1854.89 C$ 5,880.68 C$ 5,880.68 C$ - C$ 36,226.00 13.97% 13.97% 0.00% 86.03%
14 CONEXIONES DOMICILIARES C$ 1,530,600.62 C$ 1,377,540.56 C$ 311,010.21 C$ 1,066,530.35 C$ 153,060.06 90.00% 20.32% 69.68% 10.00%
Conexiones domiciliares (cortas y largas, incluye excavación, tubería y accesorios,
C/U 250.00 C$ 3,326.74 C$ 831,685.62 225.00 75.00 150.00 25.00 C$ 748,517.06 C$ 249,505.69 C$ 499,011.37 C$ 83,168.56 90.00% 30.00% 60.00% 10.00%
15 relleno y compactación y silletas (2)
16 Cajas de Registro según plano C/U 250.00 C$ 2,795.66 C$ 698,915.00 225.00 22.00 203.00 25.00 C$ 629,023.50 C$ 61,504.52 C$ 567,518.98 C$ 69,891.50 90.00% 8.80% 81.20% 10.00%
CONSTRUCCIÓN DE PVS C$ 916,526.64 C$ 641,121.72 C$ 0.00 C$ 641,121.72 C$ 275,404.92 69.95% 0.00% 69.95% 30.05%
17
18 Construcción de PVS de h<=3.70m C/U 30.00 C$ 18,747.82 C$ 562,434.60 30.00 0.00 30.00 0.00 C$ 562,434.60 C$ - C$ 562,434.60 C$ - 100.00% 0.00% 100.00% 0.00%
19 Construcción de PVS de h > 3.70m C/U 9.00 C$ 39,343.56 C$ 354,092.04 2.00 0.00 2.00 7.00 C$ 78,687.12 C$ - C$ 78,687.12 C$ 275,404.92 22.22% 0.00% 22.22% 77.78%
20 MEDIDAS DE MITIGACION AMBIENTAL C$ 109,600.00 C$ 62,472.00 C$ 16,440.00 C$ 46,032.00 C$ 47,128.00 57.00% 15.00% 42.00% 43.00%
21 Medidas de Mitigación Ambiental GLB 1.00 C$ 59,750.00 C$ 59,750.00 0.57 0.15 0.42 0.43 C$ 34,057.50 C$ 8,962.50 C$ 25,095.00 C$ 25,692.50 57.00% 15.00% 42.00% 43.00%
22 Señales Preventivas GLB 1.00 C$ 49,850.00 C$ 49,850.00 0.57 0.15 0.42 0.43 C$ 28,414.50 C$ 7,477.50 C$ 20,937.00 C$ 21,435.50 57.00% 15.00% 42.00% 43.00%
23 AGUA POTABLE C$ 1,687,768.63 C$ 538,506.46 C$ 223,775.29 C$ 314,731.17 C$ 1,149,262.17 31.91% 13.26% 18.65% 68.09%
24 PRELIMINARES C$ 119,947.31 C$ 76,969.97 C$ 23,754.99 C$ 53,214.98 C$ 42,977.34 64.17% 19.80% 44.37% 35.83%
25 Replanteo Topográfico GLB 1.00 C$ 83,793.40 C$ 83,793.40 0.57 0.27 0.30 0.43 C$ 47,762.24 C$ 22,624.22 C$ 25,138.02 C$ 36,031.16 57.00% 27.00% 30.00% 43.00%
26 Movilización y Desmovilización GLB 1.00 C$ 16,153.91 C$ 16,153.91 0.57 0.07 0.50 0.43 C$ 9,207.73 C$ 1,130.77 C$ 8,076.96 C$ 6,946.18 57.00% 7.00% 50.00% 43.00%
27 Instalaciones temporales (oficinas, bodega, comunicación, etc) GLB 1.00 C$ 20,000.00 C$ 20,000.00 1.00 0.00 1.00 0.00 C$ 20,000.00 C$ - C$ 20,000.00 C$ - 100.00% 0.00% 100.00% 0.00%
28 LINEA DE DISTRIBUCIÓN C$ 934,225.15 C$ 393,314.36 C$ 153,119.62 C$ 240,194.73 C$ 540,910.79 42.10% 16.39% 25.71% 57.90%
29 Excavación para instalación de tubería de 2",3" y 4" M3 1,345.43 C$ 105.85 C$ 142,410.99 800.89 332.13 468.76 544.54 C$ 84,772.55 C$ 35,155.28 C$ 49,617.28 C$ 57,638.44 59.53% 24.69% 34.84% 40.47%
30 Botar material sobrante de excavación M3 437.26 C$ 74.49 C$ 32,569.69 253.21 136.01 117.20 184.05 C$ 18,860.27 C$ 10,130.52 C$ 8,729.74 C$ 13,709.42 57.91% 31.10% 26.80% 42.09%
Acarreo, compra y carga de material selecto, en banco de materiales según estudio
437.26 C$ 225.03 C$ 98,398.75 253.21 136.01 117.20 184.05 C$ 56,980.18 C$ 30,606.09 C$ 26,374.09 C$ 41,418.57 57.91% 31.10% 26.80% 42.09%
31 geotécnico M3
32 Relleno y Compactación de zanjas (3) M3 1,412.70 C$ 32.39 C$ 45,757.56 564.25 332.13 232.12 848.45 C$ 18,276.14 C$ 10,757.74 C$ 7,518.40 C$ 27,481.42 39.94% 23.51% 16.43% 60.06%
Instalación de tubería PVC de 2" SDR 26, con accesorios y bloques de reacción. M 196.00 C$ 130.24 C$ 25,527.40 143.00 90.00 53.00 53.00 C$ 18,624.58 C$ 11,721.77 C$ 6,902.82 C$ 6,902.82 72.96% 45.92% 27.04% 27.04%
33
Instalación de tubería PVC de 3" SDR 26, con accesorios y bloques de reacción. M 860.65 C$ 194.21 C$ 167,148.14 524.40 281.90 242.50 336.25 C$ 101,844.52 C$ 54,748.23 C$ 47,096.29 C$ 65,303.62 60.93% 32.75% 28.18% 39.07%
34
Instalación de tubería PVC de 4" SDR 26, con accesorios y bloques de reacción. M 812.00 C$ 297.33 C$ 241,431.53 316.00 0.00 316.00 496.00 C$ 93,956.11 C$ - C$ 93,956.11 C$ 147,475.42 38.92% 0.00% 38.92% 61.08%
35
Suministro e instalación de válvula de pase de 4", incluye caja protectora de 3 piezas C/U 2.00 C$ 7,755.70 C$ 15,511.40 0.00 0.00 0.00 2.00 C$ - C$ - C$ - C$ 15,511.40 0.00% 0.00% 0.00% 100.00%
36
Suministro e instalación de válvula de limpieza de 2", incluye caja protectora de 3
C/U 3.00 C$ 5,568.61 C$ 16,705.83 0.00 0.00 0.00 3.00 C$ - C$ - C$ - C$ 16,705.83 0.00% 0.00% 0.00% 100.00%
37 piezas
Suministro e instalación de válvula de aire y vacío de 3/ 4" C/U 2.00 C$ 685.21 C$ 1,370.42 0.00 0.00 0.00 2.00 C$ - C$ - C$ - C$ 1,370.42 0.00% 0.00% 0.00% 100.00%
38
39 Prueba de compactación C/U 65.00 C$ 540.14 C$ 35,108.84 0.00 0.00 0.00 65.00 C$ - C$ - C$ - C$ 35,108.84 0.00% 0.00% 0.00% 100.00%
40 Hidrante diámetro de 4 pulgadas, uno en cada barrio, con accesorios C/U 1.00 C$ 112,284.60 C$ 112,284.60 0.00 0.00 0.00 1.00 C$ - C$ - C$ - C$ 112,284.60 0.00% 0.00% 0.00% 100.00%
41 CONEXIONES DOMICILIARES C$ 533,043.01 C$ 62,872.13 C$ 41,550.67 C$ 21,321.46 C$ 470,170.88 11.79% 7.79% 4.00% 88.21%
42 Excavación para instalar conexiones domiciliares M3 990.00 C$ 105.85 C$ 104,789.46 170.42 112.54 57.88 819.58 C$ 18,038.61 C$ 11,912.13 C$ 6,126.48 C$ 86,750.85 17.21% 11.37% 5.85% 82.79%
43 Botar material sobrante de excavación M3 321.75 C$ 74.49 C$ 23,965.83 51.09 33.74 17.35 270.66 C$ 3,805.48 C$ 2,513.15 C$ 1,292.33 C$ 20,160.35 15.88% 10.49% 5.39% 84.12%
ING. LEONEL ZACARIAS COREA AGUILAR ING.GUILLERMO ANTONIO GÓMEZ ARAGON ARQ. RAFAEL RIZO BUCARDO ING. JAIRO MATUS ING. FERNANDO PALMA BLANCO
REPRESENTANTE LEGAL DE MASTER CONSTRUCTION S.A. INGENIERO SUPERVISOR INVUR DIRECTOR GENERAL DE URBANISMO SUPERVISOR ALCALDIA MANAGUA DIRECTOR GENERAL DE PROYECTOS
MASTER CONSTRUCTION S.A. INVUR REPRESENTANTE LEGAL DE LA ENTIDAD AUXILIAR
PRESIIDENTE ADMINISTRATIVO
PARA: LIC. GUILLERMO ARANA CAMPOS FOSOVI
Código de Elegibilida
REPRESENTANTE LEGAL
DE: ING. FERNANDO PALMA BLANCO ENTIDAD AUXILIAR
FECHA: 21-sep-15
Estimados Señores:
Conforme los requerimientos descritos en el Manual de Procedimientos de INVUR, para el
Seguimiento y Control de la Ejecución de Proyectos, referido específicamente a la Solicitud de
Desembolso por Avalúos (Sección IV.2.1), solicítoles por este medio se proceda a la tramitación del
AVALUO N° 02 por valor de: C$ 4,483,104.15 Cuatro Millones Cuatroc
Tres
Tres Mil Ciento Cuatro Córdobas con Quince Centavos de Córdobas
El avance físico del proyecto a la fecha: 21-sep-15 es del: 36.09%
Se Adjunta para los efectos del correspondiente trámite, lo siguiente:
Documentación Soporte
MATRIZ "MF-2/1"
MATRIZ "MF-2/2"
MATRIZ "MF-2/3"
Observaciones
REPRESENTANTE
LEGAL ENTIDAD
AUXILIAR
REPRESENTANTE
ING. FERNANDO PALMA BLANCO
LEGAL ENTIDAD
AUXILIAR
Nombre Firma
02
Documentación Soporte
ü
ü
ü
Observaciones
Firma