Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Metodo de Hunter

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 3

HOJA DE CÁLCULO PARA TUBERIAS RAMIFICADAS POR EL MÉTODO DE HUNTER

Q D D A V L
Tramo UDG (L/s) (Pulg) (m) (m )
2
(m/s) e/D Re f (m)
2-WC 3.00 0.20 1/2 1.2700E-02 1.2668E-04 1.5788 0.0400 19951.2602 0.0650 1.2500
2-LM 0.75 0.20 1/2 1.2700E-02 1.2668E-04 1.5788 0.0400 19951.2602 0.0650 0.6000
1-2 3.75 0.26 1/2 1.2700E-02 1.2668E-04 2.0525 0.0400 25936.6382 0.0650 2.0000
1-F 2.00 0.20 1/2 1.2700E-02 1.2668E-04 1.5788 0.0400 19951.2602 0.0650 0.6000
E-1 5.75 0.42 1/2 1.2700E-02 1.2668E-04 3.3155 0.0400 41897.6464 0.0650 10.0000
POR EL MÉTODO DE HUNTER

Le LT hl Dz Hequipos HT HT acum.
(m) (m) (m) (m) (m) (m) (m)
0.7500 2.0000 1.3005 0.5000 2.0000 3.8005 3.8005
0.5000 1.1000 0.7153 0.6000 2.0000 3.3153 3.3153
0.5000 2.5000 2.7473 0.0000 0.0000 2.7473 6.5478
0.5000 1.1000 0.7153 0.6000 2.0000 3.3153 3.3153
0.0600 10.0600 28.8478 0.0000 0.0000 28.8478 35.3956
Caudal
Unidades de Probable
Gasto (UDG) (L/s)
3 0.2
4 0.26
5 0.38
6 0.42
7 0.46
8 0.49
9 0.53
10 0.57
12 0.63
14 0.7
16 0.76
18 0.83
20 0.89
22 0.96
24 1.04
26 1.11
28 1.19
30 1.26
32 1.31
34 1.36
36 1.42
38 1.46
40 1.52
42 1.58
44 1.63
46 1.69
48 1.74
50 1.8
55 1.94
60 2.08

También podría gustarte