PRESUPUESTO DE OBRA A TODO COSTO FEBRERO 16 DE 2016
ITEM DESCRIPCION UND CANT. Vr/UNIT Vr/TOTAL
1 PRELIMINARES
1.5 Replanteo M2 540.00 $ 2,000.00 $ 1,080,000.00
1.7 Excavacion zapatas M3 54.00 $ 20,000.00 $ 1,080,000.00
1.7 Excavacion vigas cimentacion M3 13.44 $ 20,000.00 $ 268,800.00
1.8 Excavacion placa contrapiso M3 270.00 $ 20,000.00 $ 5,400,000.00
1.9 Excavacion tuberia desagues M3 6.00 $ 20,000.00 $ 120,000.00
1.9 Excavacion vigas equilibiro M3 3.36 $ 20,000.00 $ 67,200.00
1.9 Excavacion vigas contrapesos M3 12.00 $ 20,000.00 $ 240,000.00
1.10 Retiro y cargue material de excavacion M3 358.80 $ 35,000.00 $ 12,558,000.00
2 RELLENOS
2.1 Recebo compacto B-200 placa piso H = 0,40 mts. M3 216.00 $ 60,000.00 $ 12,960,000.00
3 ESTRUCTURA CONCRETO
3.1 Concreto solados M2 33.60 $ 20,000.00 $ 672,000.00
3.2 Concreto ciclopeo contrapesos M3 12.00 $ 450,000.00 $ 5,400,000.00
3.4 Concreto Vigas cimentacion M3 13.44 $ 650,000.00 $ 8,736,000.00
3.5 Concreto columnetas M3 1.44 $ 650,000.00 $ 936,000.00
3.6 Concreto placa entrepiso H = 0,07 mts. M2 100.00 $ 70,000.00 $ 7,000,000.00
3.7 Concreto 3000 psi placa contrapiso H = 0,10 mts. M2 540.00 $ 85,000.00 $ 45,900,000.00
3.8 Concreto placa tanque alto M2 0.00 $ 48,000.00 $ -
3.10 Concreto vigas corona M3 0.00 $ 680,000.00 $ -
3.11 Concreto escaleras M3 0.00 $ 650,000.00 $ -
5 INSTALACIONES HIDROSANITARIAS
5.1 Punto desague PVC 2" UN 3.00 $ 65,000.00 $ 195,000.00
5.2 Punto sifon PVC 2" UN 4.00 $ 65,000.00 $ 260,000.00
5.3 Punto desague PVC 4" UN 5.00 $ 70,000.00 $ 350,000.00
5.4 Punto PVCP 1/2" UN 8.00 $ 70,000.00 $ 560,000.00
5.5 Punto PVCP 3/4" UN 2.00 $ 70,000.00 $ 140,000.00
5.6 Punto PVCC 1/2" UN 0.00 $ 75,000.00 $ -
5.7 Punto PVCC 3/4" UN 0.00 $ 85,000.00 $ -
5.8 Registro R.W. 3/4" UN 3.00 $ 90,000.00 $ 270,000.00
5.9 Mezcladores ducha UN 1.00 $ 150,000.00 $ 150,000.00
5.10 Tuberia PVCC 3/4" Acometida ML 6.00 $ 20,000.00 $ 120,000.00
5.12 Tuberia PVCP 1" Recirculacion ML 0.00 $ 18,000.00 $ -
5.13 Lavadero UN 1.00 $ 120,000.00 $ 120,000.00
6 INSTSLACIONES ELECTRICAS
6.1 Acometida electrica Poste a Contador ML 6.00 $ 45,000.00 $ 270,000.00
6.2 Acometida parcial contador a tablero general ML 12.00 $ 30,000.00 $ 360,000.00
6.3 Instalacion Tablero de 12 circuitos UN 1.00 $ 200,000.00 $ 200,000.00
6.4 Salidas tomas monofasicas UN 12.00 $ 65,000.00 $ 780,000.00
6.5 Salidas tomas especiales UN 10.00 $ 75,000.00 $ 750,000.00
6.6 Salidas de alumbrado monofasico UN 10.00 $ 65,000.00 $ 650,000.00
6.7 Salidas telefonicas UN 5.00 $ 65,000.00 $ 325,000.00
6.9 Salidas de television UN 5.00 $ 65,000.00 $ 325,000.00
6.10 Salida timbre UN 1.00 $ 65,000.00 $ 65,000.00
6.13 Interruptor conmutable secncillo UN 2.00 $ 65,000.00 $ 130,000.00
6.15 Instalacion caja para Contador general UN 1.00 $ 850,000.00 $ 850,000.00
6.15 Salidas Alumbrado bodega UN 8.00 $ 850,000.00 $ 6,800,000.00
7 MAMPOSTERIA
7.1 Bloque No.5 M2 246.00 $ 30,000.00 $ 7,380,000.00
7.2 Dinteles en bloque y varilla ML 10.00 $ 10,000.00 $ 100,000.00
7.5 Meson concreto cocina ML 4.00 $ 100,000.00 $ 400,000.00
7.6 Poyos duchas ML 1.00 $ 35,000.00 $ 35,000.00
7.7 Poyo cocina ML 3.00 $ 35,000.00 $ 105,000.00
8 PAÑETES Y ENCHAPES
8.2 Pañete bajo placa 1:4 e= 1 cm. M2 200.00 $ 15,000.00 $ 3,000,000.00
8.3 Enchape baño y cocina 20 x 20 M2 15.00 $ 52,000.00 $ 780,000.00
9 PISOS
9.1 Afinado piso mortero 1:4 e= 3.0 cm. M2 100.00 $ 20,000.00 $ 2,000,000.00
9.2 Afinado pasos escaleras UN 0.00 $ 35,000.00 $ -
9.3 Instalacion polisec M2 540.00 $ 4,500.00 $ 2,430,000.00
10 CARPINTERIA METALICA
10.2 Ventanas lamina (1,5 x 1,2) UN 8.00 $ 150,000.00 $ 1,200,000.00
10.3 Puerta metalica (1 x 2,2) UN 2.00 $ 200,000.00 $ 400,000.00
10.4 Porton acceso bodega 4 x 4 M2 2.00 $ 3,000,000.00 $ 6,000,000.00
11 CUBIERTA
11.1 Teja liviana M2 540.00 $ 72,000.00 $ 38,880,000.00
12 OBRAS EXTERIORES
12.1 ML 0.00 $ 30,000.00 $ -
12.2 M2 0.00 $ 6,500.00 $ -
12.5 Anden lateral Concreto 1cm H= 0.10 mts. ML 66.00 $ 65,000.00 $ 4,290,000.00
14 ASEO
14.1 Aseo diario de obra DIA 60.00 $ 35,000.00 $ 2,100,000.00
M2 CONST. 540
V/r M2 $ 423,992.34
IMPUESTOS $ 16,026,910.48
MARIO - BODEGA BOSA
Total Materiales
Mano de Obra Bodega m2 540
VALOR TOTAL BODEGA
MEZANINE Y ESCALERA
20 Escalera metalica glb 1 0
21 Lamina Colaborante 91,4 x 6,1 (3 y 6 m) un 17 0
Cinturon perimetral a nivel de 6 mts. Perfil doble en
22 ml 84 7.97
"C" de 355 x 110 x 3.0 mm
Cinturon perimetral a nivel de 3 mts. Perfil doble en
23 ml 180 7.97
"C" de 355 x 110 x 3.0 mm
Total Materiales
Mano de Obra Mezanine m2 100
VALOR TOTAL MEZANINE
MARIO - BODEGA BOSA
0 0.00 $ 7,873.83 $ - $ -
0 $ 65,000.00 $ 3,900,000.00
0 $ 60,000.00 $ 2,400,000.00
0 $ 20,000.00 $ 500,000.00
0 $ 200,000.00 $ 4,000,000.00
0 0 $ 2,500,000.00 $ 2,500,000.00
0 0.00 $ 154,280.00 $ 2,634,562.84
2 RELLENOS
2.1 Recebo compacto B-200 placa piso H = 0,40 mts. M3 0.00 $ 60,000.00
3 ESTRUCTURA CONCRETO
3.1 Concreto solados M2 0.00 $ 20,000.00
3.2 Concreto ciclopeo contrapesos M3 0.00 $ 450,000.00
3.4 Concreto Vigas cimentacion M3 0.00 $ 650,000.00
3.5 Concreto columnetas M3 0.00 $ 650,000.00
3.6 Concreto placa entrepiso H = 0,07 mts. M2 0.00 $ 70,000.00
3.7 Concreto 3000 psi placa contrapiso H = 0,10 mts. M2 0.00 $ 85,000.00
5 INSTALACIONES HIDROSANITARIAS
5.1 Punto desague PVC 2" UN 0.00 $ 65,000.00
5.2 Punto sifon PVC 2" UN 0.00 $ 65,000.00
5.3 Punto desague PVC 4" UN 0.00 $ 70,000.00
5.4 Punto PVCP 1/2" UN 0.00 $ 70,000.00
5.5 Punto PVCP 3/4" UN 0.00 $ 70,000.00
5.6 Punto PVCC 1/2" UN 0.00 $ 75,000.00
5.7 Punto PVCC 3/4" UN 0.00 $ 85,000.00
5.8 Registro R.W. 3/4" UN 0.00 $ 90,000.00
5.9 Mezcladores ducha UN 0.00 $ 150,000.00
5.10 Tuberia PVCC 3/4" Acometida ML 0.00 $ 20,000.00
5.13 Lavadero UN 0.00 $ 120,000.00
6 INSTSLACIONES ELECTRICAS
6.1 Acometida electrica Poste a Contador ML 0.00 $ 45,000.00
6.2 Acometida parcial contador a tablero general ML 0.00 $ 30,000.00
6.3 Instalacion Tablero de 12 circuitos UN 0.00 $ 200,000.00
6.4 Salidas tomas monofasicas UN 0.00 $ 65,000.00
6.5 Salidas tomas especiales UN 0.00 $ 75,000.00
6.6 Salidas de alumbrado monofasico UN 0.00 $ 65,000.00
6.7 Salidas telefonicas UN 0.00 $ 65,000.00
6.9 Salidas de television UN 0.00 $ 65,000.00
6.10 Salida timbre UN 0.00 $ 65,000.00
6.13 Interruptor conmutable secncillo UN 0.00 $ 65,000.00
6.15 Instalacion caja para Contador general UN 0.00 $ 850,000.00
6.15 Salidas Alumbrado bodega UN 0.00 $ 850,000.00
7 MAMPOSTERIA
7.1 Bloque No.5 M2 0.00 $ 30,000.00
7.2 Dinteles en bloque y varilla ML 0.00 $ 10,000.00
7.5 Meson concreto cocina ML 0.00 $ 100,000.00
7.6 Poyos duchas ML 0.00 $ 35,000.00
7.7 Poyo cocina ML 0.00 $ 35,000.00
8 PAÑETES Y ENCHAPES
8.2 PañeteS e= 1 cm. M2 0.00 $ 15,000.00
8.3 Enchape baño y cocina 20 x 20 M2 0.00 $ 52,000.00
9 PISOS
9.1 Afinado piso mortero 1:4 e= 3.0 cm. M2 0.00 $ 20,000.00
9.3 Instalacion polisec M2 0.00 $ 4,500.00
10 CARPINTERIA METALICA
10.2 Ventanas lamina (1,5 x 1,2) UN 0.00 $ 150,000.00
10.3 Puerta metalica (1 x 2,2) UN 0.00 $ 200,000.00
10.4 Porton acceso bodega 4 x 4 M2 0.00 $ 3,000,000.00
11 CUBIERTA
11.1 Teja liviana M2 0.00 $ 72,000.00
12 OBRAS EXTERIORES
12.5 Anden lateral Concreto 1cm H= 0.10 mts. ML 0.00 $ 65,000.00
13 RED GAS NATURAL
13.1 Punto 1/2" Cu UN 0.00 $ 200,000.00
13.2 Registro 1/2" UN 0.00 $ 150,000.00
13.3 Tuberia Cu 1/2" tipo L ML 0.00 $ 65,000.00
14 ASEO
14.1 Aseo diario de obra DIA 0.00 $ 35,000.00
COSTOS DIRECTOS
ADMINISTRACION 10%
IMPREVISTOS 5%
UTILIDAD 5%
IVA / UTILIDAD 16%
COSTO TOTAL DE OBRA
FEBRERO 16 DE 2016
Vr/TOTAL
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ 207,000,000.00
$ 20,700,000.00
$ 10,350,000.00
$ 10,350,000.00
$ 1,656,000.00
$ 250,056,000.00
MARIO - BODEGA BOSA
Total Materiales
Mano de Obra Bodega m2 0
VALOR TOTAL BODEGA
MEZANINE Y ESCALERA
20 Escalera metalica glb 0 0
21 Lamina Colaborante 91,4 x 6,1 (3 y 6 m) un 0 0
Cinturon perimetral a nivel de 6 mts. Perfil doble en
22 ml 0 0
"C" de 355 x 110 x 3.0 mm
Cinturon perimetral a nivel de 3 mts. Perfil doble en
23 ml 0 0
"C" de 355 x 110 x 3.0 mm
Total Materiales
Mano de Obra Mezanine m2 0
VALOR TOTAL MEZANINE
MARIO - BODEGA BOSA
0 0.00 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
0 $ - $ -
0 0.00 $ - $ -
0 $ - $ -
0 $ - $ -
0 $ - $ -
0 $ - $ -
0 $ -
$ - $ -
$ -
0 0 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
0 0.00 $ - $ -
3 PISO
ALC HUESP 0.45 2.40 1.08 X-X
CLOSET 2.60 2.40 6.24
BAÑOS 0.45 2.40 1.08
BAÑOS 0.80 2.40 1.92
BAÑOS 1.65 2.40 3.96
ESCALERA 2.80 2.40 6.72 21.00
BAÑO 0.75 2.40 1.80 Y-Y
BAÑOS 2.40 2.40 5.76
JUEGOS 0.70 2.40 1.68
JUEGOS 0.75 2.40 1.80
BAÑO SOC 0.18 2.40 0.42
BAÑO SOC 1.10 2.40 2.64 14.10
35.10
TOTAL 246.44
LADRILLO A LA VISTA 2P DESCUENTOS
EJE B H AREA PUERTA VENTANA AREA NETA
ALC. 2 3.75 2.40 9.00 2.60 6.40
STAR TV 3.45 2.40 8.28 3.96 4.32
ANTEPECHO 2.85 0.90 2.57 2.57
LATER IZQ 15.90 2.40 38.16 1.17
0.30
2.60 34.09
ANTEP LAT 1.45 0.90 1.31 1.31
ANTEP LAT 1.25 0.90 1.13 1.13
STAR 3.75 2.40 9.00 0.64
0.64 7.72
VACIO 0.30 2.40 2.40 2.40
0.30 2.40 2.40 2.40
ALC PPAL 5.10 2.40 12.24 0.64
0.64 10.96
FACH. POST 7.50 2.40 18.00 3.96 2.40 11.64
ANTEP POST 6.30 0.90 5.67 5.67
90.60
ENCHAPE PLACA
PPAL 21.6
LAT IZQ 41.55
LAT DER 39.9
POST 22.5
TOTAL 125.55
6.1 Teja de barro M2
PISO AREA
3 42.68
CUB 54.15 96.83
SAL TIMBRE LAM TECHO SAL SONIDO COM SENC COM.DOBLE TV ALARMA
1
1
1 1
1 3
1
2
1
1
3 1
1 1 1 1
1 1 1 1
1
1 3 1
1
1 3 1 1 2
1 1 1 1
1 3 1 1
1
1
4 2 15 4 6 5 16
1 PISO VENTANAS
EJE DIMENSION AREA UBICACIÓN
B H M2
A (3-2) 1.45 1.30 1.89 ALCOBA SERVICIO
A (3-2) 0.60 0.50 0.30 BAÑO SERVICIO
3 (B-B') 0.72 1.20 1.73 ROPAS * 2
3 (C-D) 2.95 0.50 1.48 COCINA
3 (D-E) 3.45 1.50 5.18 COMEDOR
1' (B-B') 2.25 1.30 2.93 SALA RECIBO
1 (B'-C) 0.60 0.50 0.30 BAÑO ESCALERA
1 (C''-D) 1.95 1.50 2.93 ESTUDIO
1 (D-E) 3.45 1.50 5.18 SALA
2 PISO
A (3-2) 2.00 1.30 2.60 ALCOBA 2
3' (B-B') 0.90 1.30 1.17 ALCOBA 2
3' (B-C) 0.60 0.50 0.30 BAÑO ALCOBA 2
3' (C-D) 2.00 1.30 2.60 ALCOBA 3
1 (B'-B') 0.40 1.60 1.28 STAR TV *2
1' (C'-D) 1.95 2.40 4.68 VACIO
1 (D-E) 0.40 1.60 0.64 ALCOBA PRINCIPAL
E (3-2) 2.00 1.20 2.40 JACUZZI
3 PISO
B (2-1) 1.80 1.30 2.34 STAR SALA JUEGOS
A (3-2) 2.00 1.30 2.60 ALCOBA HUESPEDES
3' (B-B') 0.90 1.30 1.17 ALCOBA HUESPEDES
3' (B-C) 0.60 0.50 0.30 BAÑO ALCOBA HUESPEDES
1 (B-B') 0.40 1.60 1.28 STAR SALA DE JUEGOS*2
1 (B'-C') 1.90 5.10 9.69 ESCALERA 2 Y 3 P
38.15
OBRA: VIVIENDA UNIFAMILIAR
SAN FRANCISCO
BOGOTA - CUNDINAMARCA
PRESUPUESTO MANO DE OBRA JULIO 02 DE 2013
ITEM DESCRIPCION UND CANT. Vr/UNIT Vr/TOTAL
1 PRELIMINARES
1.1 Cerramiento lamina zinc H = 2 mts. ML 12.30 $ 4,500.00 $ 55,350.00
1.2 Campamento UN 1.00 $ 90,000.00 $ 90,000.00
1.3 Descapote manual M2 320.00 $ 2,700.00 $ 864,000.00
1.4 Letrina UN 1.00 $ 100,000.00 $ 100,000.00
1.5 Replanteo M2 498.00 $ 900.00 $ 448,200.00
1.6 Excavacion zapatas M3 32.00 $ 17,600.00 $ 563,200.00
1.7 Excavacion vigas cimentacion M3 6.00 $ 17,600.00 $ 105,600.00
1.8 Excavacion placa contrapiso M3 59.00 $ 17,600.00 $ 1,038,400.00
1.9 Excavacion tuberia desagues M3 3.00 $ 17,600.00 $ 52,800.00
1.10 Retiro y cargue material de excavacion M3 130.00 $ 7,000.00 $ 910,000.00
2 RELLENOS
2.1 Recebo compacto B-200 placa piso H = 0,40 mts. M3 18.00 $ 15,200.00 $ 273,600.00
3 ESTRUCTURA CONCRETO
3.1 Concreto solados M2 73.00 $ 4,200.00 $ 306,600.00
3.2 Concreto ciclopeo zapatas M3 32.00 $ 85,000.00 $ 2,720,000.00
3.3 Concreto zapatas M3 16.00 $ 125,000.00 $ 2,000,000.00
3.4 Concreto Vigas cimentacion M3 5.50 $ 135,000.00 $ 742,500.00
3.5 Concreto columnas M3 7.50 $ 181,000.00 $ 1,357,500.00
3.6 Concreto placa entrepiso H = 0,30 mts. M2 178.00 $ 32,200.00 $ 5,731,600.00
3.7 Concreto 2500 psi placa contrapiso H = 0,10 mts. M2 118.00 $ 10,000.00 $ 1,180,000.00
3.8 Concreto placa tanque alto h = 0,12 MTS. M2 9.00 $ 28,000.00 $ 252,000.00
3.9 Concreto viga aereas M3 3.62 $ 181,000.00 $ 655,220.00
3.10 Concreto vigas corona M3 1.60 $ 181,000.00 $ 289,600.00
3.11 Concreto escaleras M3 2.40 $ 243,000.00 $ 583,200.00
5 INSTALACIONES HIDROSANITARIAS
5.1 Punto desague PVC 2" UN 21.00 $ 25,000.00 $ 525,000.00
5.2 Punto sifon PVC 2" UN 9.00 $ 25,000.00 $ 225,000.00
5.3 Punto desague PVC 4" UN 7.00 $ 28,000.00 $ 196,000.00
5.4 Punto PVCP 1/2" UN 24.00 $ 23,000.00 $ 552,000.00
5.5 Punto PVCP 3/4" UN 1.00 $ 24,000.00 $ 24,000.00
5.6 Punto PVCC 1/2" UN 19.00 $ 23,000.00 $ 437,000.00
5.7 Punto PVCC 3/4" UN 1.00 $ 24,000.00 $ 24,000.00
5.8 Registro R.W. 3/4" UN 9.00 $ 15,000.00 $ 135,000.00
5.9 Mezcladores ducha UN 6.00 $ 45,000.00 $ 270,000.00
5.10 Tuberia PVCC 3/4" Acometida ML 11.00 $ 6,000.00 $ 66,000.00
5.11 Tuberia PVCP 1" Acometida ML 35.10 $ 8,000.00 $ 280,800.00
5.12 Tuberia PVCP 1" Recirculacion ML 15.00 $ 8,000.00 $ 120,000.00
5.13 Tuberia PVCP 1 1/2" Recirculacion ML 6.00 $ 9,500.00 $ 57,000.00
6 INSTSLACIONES ELECTRICAS
6.1 Acometida electrica Poste a Contador ML 10.00 $ 20,000.00 $ 200,000.00
6.2 Acometida parcial contador a tablero general ML 15.00 $ 12,000.00 $ 180,000.00
6.3 Instalacion Tablero de 36 circuitos UN 1.00 $ 120,000.00 $ 120,000.00
6.4 Salidas tomas monofasicas UN 60.00 $ 26,000.00 $ 1,560,000.00
6.5 Salidas tomas especiales UN 2.00 $ 26,000.00 $ 52,000.00
6.6 Salidas de alumbrado monofasico UN 95.00 $ 26,000.00 $ 2,470,000.00
6.7 Salidas telefonicas UN 10.00 $ 26,000.00 $ 260,000.00
6.8 Salida Citofono UN 4.00 $ 26,000.00 $ 104,000.00
6.9 Salidas de television UN 5.00 $ 26,000.00 $ 130,000.00
6.10 Salida timbre UN 4.00 $ 26,000.00 $ 104,000.00
6.11 Salida sonido UN 15.00 $ 26,000.00 $ 390,000.00
6.12 Salida alarma UN 16.00 $ 26,000.00 $ 416,000.00
6.13 Interruptor conmutable secncillo UN 4.00 $ 18,000.00 $ 72,000.00
6.14 Interruptor conmutable doble UN 6.00 $ 18,000.00 $ 108,000.00
6.15 Instalacion caja para Contador general UN 1.00 $ 350,000.00 $ 350,000.00
6.16 Instalacion de polo a tierra UN 1.00 $ 230,000.00 $ 230,000.00
7 MAMPOSTERIA
7.1 Bloque No.5 M2 250.00 $ 6,200.00 $ 1,550,000.00
7.2 Dinteles en bloque y varilla ML 66.00 $ 1,200.00 $ 79,200.00
7.3 Ladrillo prensado a la vista M2 170.00 $ 9,800.00 $ 1,666,000.00
7.4 Enchape placa hilada parada ML 130.00 $ 9,600.00 $ 1,248,000.00
7.5 Mamposteia muro patio M2 21.60 $ 9,800.00 $ 211,680.00
7.6 Poyos duchas ML 12.65 $ 3,000.00 $ 37,950.00
7.7 Poyo cocina ML 4.75 $ 3,500.00 $ 16,625.00
8 PAÑETES
8.1 Filos y dilataciones ML 240.00 $ 1,850.00 $ 444,000.00
8.2 Pañete bajo placa 1:4 e= 1 cm. M2 187.00 $ 7,800.00 $ 1,458,600.00
8.3 Pañete muros e= 1 cm. M2 681.00 $ 5,800.00 $ 3,949,800.00
8.4 Afinado marcos puertas UN 21.00 $ 24,000.00 $ 504,000.00
9 PISOS
9.1 Afinado piso mortero 1:4 e= 3.0 cm. M2 305.00 $ 6,000.00 $ 1,830,000.00
9.2 Afinado pasos escaleras UN 28.00 $ 6,500.00 $ 182,000.00
9.3 Instalacion polisec M2 118.00 $ 1,000.00 $ 118,000.00
10 ESTRUCTURA METALICA
10.1 Correa metalica ML 75.00 $ 6,500.00 $ 487,500.00
10.2 Canal en Lamina ML 19.05 $ 5,000.00 $ 95,250.00
10.3 Templetes ML 36.60 $ 1,200.00 $ 43,920.00
10.4 Baranda escalera h = 0,80 mts. ML 4.05 $ 15,000.00 $ 60,750.00
11 CUBIERTA
11.1 Teja de barro M2 97.00 $ 10,000.00 $ 970,000.00
11.2 Entramado con esterilla para teja de barro M2 97.00 $ 8,500.00 $ 824,500.00
11.3 Marquesina en vidrio M2 4.70 $ 25,000.00 $ 117,500.00
12 OBRAS EXTERIORES
12.1 Placa huella en concreto ML 16.00 $ 15,000.00 $ 240,000.00
12.2 Pradizacion Grama M2 170.00 $ 2,000.00 $ 340,000.00
12.3 Ceto cerca viva - Eugenias H = 1.8 mts. UN $ -
12.4 Tierra negra M3 $ -
12.5 Anden lateral Concreto 0.60 cm H= 0.10 mts. ML 41.60 $ 8,000.00 $ 332,800.00
14 ASEO
14.1 Aseo diario de obra DIA 90.00 $ 25,000.00 $ 2,250,000.00
14.2 Aseo general de obra GLB 1.00 $ 1,000,000.00 $ 1,000,000.00
m2 296
Vr/ M2 $ 179,077.94
EVALUACION PROYECTO SANTA LUCIA AGOSTO 26 2013
AREAS
AREA LOTE 270 M2
AREA UNIDAD VIVIENDA 51 M2
AREA BODEGA 270 M2
AREA LOCAL 15 M2
No. UNIDADES VIVIENDA 6 UND
GARAJES
TOTAL AREA VIVIENDA 306 M2
AREA URBANISMO 0 M2
TOTAL AREAL VENDIBLE 336 M2
VALOR M2 COSTRUCCION
COSTO M2 VIVIENDA $ 600,000.00 COSTO UNIDAD DE VIVIENDA $ 30,600,000.00
COSTO M2 LOCAL $ 600,000.00 VENTA UNIDAD DE VIVIENDA $ 76,500,000.00
COSTO M2 BODEGA $ 300,000.00
COSTO M2 URBANISMO $ -
VALOR M2 VENTAS
VALOR M2 VIVIENDA $ 1,500,000.00 VENTA VIVIENDAS $ 459,000,000.00
VALOR M2 BODEGA $ 1,000,000.00 VENTA LOCAL $ 45,000,000.00
VALOR M2 COMERCIO $ 3,000,000.00 VENTA BODEGA $ 270,000,000.00
TOTAL VENTAS $ 774,000,000.00
INVERSION CONSTRUCCION
VALOR LOTE $ 189,000,000.00
CONSTRUCCION VIVIENDAS $ 183,600,000.00
CONSTRUCCION LOCAL $ 9,000,000.00
CONSTRUCCION BODEGA $ 81,000,000.00
CONSTRUCCION URBANISMO $ - VALOR TOTAL CONSTRUCCION $ 462,600,000.00
OTROS COSTOS
INDIRECTOS $ 55,512,000.00
SERVICIOS $ 15,000,000.00
TOPOGRAFICO $ -
ESTUDIOS TECNICOS $ 7,000,000.00
PROPIEDAD HORIZONTAL $ 4,000,000.00
IMPUESTOS LICENCIA $ 8,400,000.00 VALOR OTROS COSTOS $ 89,912,000.00
INVERSION TOTAL $ 552,512,000.00
J PARA CONSTRUCCION M
RANGO J BOGOTA
De 0 a 100 m2 0.45 0.938
De 101 a 11000 m2 3,8/(0,12+(800/Q))
Mas de 11000 m2 2,2/(0,018+(800/Q))
REFORZAMIENTO ESTRUCTURAL Art. 122 Paragrafo 2 LICENCIAS DE CERRAMIENTO Art. 122 Parrafo 3
Corresponde al 30% del area a intervenir del Inmueble objeto de la solicitud En caso de solicitar el cerramiento junto con otra modalidad de licencia, a los metros cuadrados "Factor Q" de esta ultima se sumaran los metros del
mismo.
RADICACION DE SOLICITUDES DE LICENCIAS Atr. 120 LICENCIAS SIMULTANEAS DE URBANIZACION Y CONSTRUCCION Art. 123
Es condicion para la radicacion ante las curadurias urbanas de toda solicitud de licencia de Urbanismo y Construccion, o sus modalidades, el pago al Curador Urbano del cargo fijo, el cual no se
reintegrara en caso de que la solicitud sea negada o desistida.
Para las licencias simultaneas de Parcelacion, Urbanizacion y Construccion, las expensas se aplicaran individualmente por cada licencia.
DELINEACION 2.6%
VIVIENDA CV*M2*DELIN
E1-E2 $ 384,546 $ 2,099,621
E3 $ 568,819 $ 3,105,752
E4 $ 693,559 $ 3,786,832
E5 $ 897,634 $ 4,901,082
E6 $ 1,092,450 $ 5,964,777
INDUSTRIAL CV*M2*DELIN
$ 804,212 $ 4,390,998
VIS
CARGO UNICO + IVA
$ 113,970
$ 227,940
18 Paragrafo 1
Uso predominante
23
TOTAL
(CV*I*J*M)+IVA 16%
$ 37,177,196
$ 74,354,393
$ 111,531,589
$ 148,708,786
$ 185,885,982
A
TOTAL
(CV*I*J*M)+IVA 16%
$ 651,389
$ 718,774
$ 898,467
$ 898,467
APTO 401 APTO 402
MEZANINE
BODEGA
LOCAL