Metas 2018 SMVL

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 7

TIPO DE TOTAL DIAS VOLUMEN

SEMANAS DIAS FESTIVOS M3 ESPESOR


INTERVENCION HABILES TOTAL

CL 52 6 18 294 21 6,174 0.18


PA 52 6 18 294 84 24,696 0.18
RH 13 3,810 0.12
CC 106 31,132 0.12

Decreto 52 6 18 294 84 24,696 0.18


TOTAL 287 84,334
119

NOTA ESTAS CANTIDADES SON ESTIMADAS Y SE TOMAAN DE LA CAPACIDAD EINSTALADA DE PRODUCCION QUE CORREPOND
DANDO CUMPLIMIENTO A SU SOLICITUD QUE SE AJUSTAN A LAS METAS DE LA ENTIDAD

CONVENCIONAL 76,334
GCR 8,000
ERR 274,400
ERL 232,947
FE 8,255 RH
RAJON 1,016
BASE TIPO A 1,486
BASE TIPO C 610
SUBBASE 2,095
CONCRETO 6,174

Material de sello: rendimie
nto una caneca de 15kg
cada 200ml

rendimiento maquinaria: se
sellan 300 ml promedio día

prom 3 civ diarios


22.5 kg diarios
2250
AREA DE Area 2018
m2 ene-jul km ene-jul valor m2 VALOR TOTAL
INTERVENCIÓN Programada KM/CARRIL

34,300 8,585 3.83 15.3 324,038 11,114,503,400


137,200 26,385 40 208.0 116,033 15,919,727,600
25,399 8.795 0.219875 8.5 255,914 6,500,000,000
207,548 69.2 130,000 26,981,247,590

137,200 25,349 106.79 578.0 116,033 15,919,727,600


404,447 300.9 76,435,206,190
65,000,000,000

ODUCCION QUE CORREPONDE A DIURNO NOCTURNO Y CONCRETO Y DEPENDE DEL LISTADO DE PRIORIZACION QUE SE AJUSTE A LAS CAN
AREA CIV
INCIDENCIA TOTAL CIV
PROMEDIO

17% 3,267
24%
10% 360 71
42% 360 577

24%
118%
1

RIZACION QUE SE AJUSTE A LAS CANTIDADES


META KM/CARRIL 2018 POR TIPO DE INTERVENCIÓN SMVL-GI
TIPO DE TOTAL DIAS VOLUMEN ESPESOR AREA DE 2018 PRESUPUESTO INCIDENCIA
SEMANAS DIAS FESTIVOS HABILES M3 DÍA m2 ene-jul km ene-jul valor m2 KM/CARRIL
INTERVENCION TOTAL INTERVENCIÓN KM/CARRIL TOTAL

CL 52 6 18 294 21 6,174 0.18 45,000 15.0 324,038 14,581,710,000 5%


PA-SV 52 6 18 294 60 17,640 0.18 98,000 490,000 163 163.3 145,185 14,228,130,000 54%
RH 13 3,825 0.12 25,500 8.5 255,914 6,525,807,000 3%
CC 173 50,940 0.12 339,600 113.2 152,200 51,687,120,000 38%

Decreto 52 6 18 294 84 6,300 0.18 35,000 175,000 58 10.0 145,185 5,081,475,000 100%
TOTAL 330 78,705 508,100 300 92,104,242,000

CONVENCIONAL 78,705
GCR 8,000 No. Segmentos se divide por 0,16km/carril
ERR 133,000
ERL 365,100
RAJON 1,785
BASE TIPO A 1,492

BASE TIPO C 765


SUBBASE 2,257

CONCRETO 6,174
ARENA DE PEÑA
MATERIAL FILTRANTE
MATERIAL FILTRANTE
RECEBO COMUN
MATERIAL UND CANTIDAD
CONVENCIONAL m3 78,705
GCR m3 8,000
ERR lt 133,000
ERL lt 365,100
RAJON m3 1,785
BASE TIPO A m3 1,492
BASE TIPO B m3 149
BASE TIPO C m3 765
SUBBASE TIPO A m3 2,257
SUBBASE TIPO B m3 113
SUBBASE TIPO C m3 179
CONCRETO m3 6,174
ARENA DE PEÑA m3 100
MATERIAL FILTRANTE 1" m3 100
MATERIAL FILTRANTE 3" m3 100
RECEBO COMUN m3 100
MISIONALIDAD
2018 CANTIDAD DE
AREA DE
TIPO DE INTERVENCION KM/CARRIL SEGMENTOS
INTERVENCIÓN
IMPACTO VIALES
CONCRETO RIGIDO 45,000 15.0 94
PARCHEO 98,000 163.3 1021
REHABILITACION 25,500 8.5 54
CAMBIO DE CARPETA 339,600 113.2 708
TOTAL 508,100 300 1877

APOYO INTERINSTITUCIONAL
2018 CANTIDAD DE
AREA DE
TIPO DE INTERVENCION KM/CARRIL CORREDORES
INTERVENCIÓN
IMPACTO VIALES
PARCHEO DECRETO 064 35,000 10.0 10
Clasificación
Segmento Familia Clase
UNSPSC
11 (Material Mineral, Textil y
111116 Vegetal y Animal No 11 (Tierra y piedra) 16 (Piedra)
Comestible)

11 (Material Mineral, Textil y


111117 Vegetal y Animal No 11 (Tierra y piedra) 17 (Arena)
Comestible)

30 (Componentes y
Suministros para Estructuras, 11 (Hormigón, cemento y
301118 18 (Agregados)
Edificación, Construcción y yeso)
Obras Civiles)