Presupuestoclienteresumen - 2021
Presupuestoclienteresumen - 2021
Presupuestoclienteresumen - 2021
Metrado
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01.05 DEMOLICIONES
01.02.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD glb 1.00
DURANTE EL TRABAJO
02 ESTRUCTURAS
02.01 EDIFICACIÓN N° 1 - INGRESO PRINCIPAL Y SALA DE PROFESORES
02.01.01 MOVIMIENTO DE TIERRAS
63,908.28
6,465.68
36.13 3,323.96
1,500.00 1,500.00
12.16 1,145.47
496.25 496.25
1,500.00
1,500.00 1,500.00
241.25
0.74 241.25
475.42
2.97 17.82
4.94 83.98
1.26 373.62
25,884.72
9.14 3,156.59
19.14 3,493.43
19.14 3,119.44
20.65 16,115.26
11,776.33
22.90 11,776.33
15,680.00
15,680.00 15,680.00
1,884.88
1.70 1,884.88
4,159.16
169.49 169.49
105.17 3,155.10
93.22 93.22
75.13 75.13
325.13 325.13
341.09 341.09
561,402.84
73,369.41
2,126.91
6.41 177.24
5.12 88.12
42.50 410.98
2.28 117.10
3.05 159.30
12.36 111.86
28.10 254.31
15.47 808.00
4,647.09
30.73 933.88
204.13 2,855.78
275.70 526.59
Item Descripción Und. Metrado Precio
S/.
02.01.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 8.14
02.01.03.01.02 ACERO CORRUGADO GRADO 60 Fy=4200 KG/CM2 PARA ZAPATAS kg 220.07 4.60
02.01.03.03 COLUMNAS
02.01.03.03.04 ACERO CORRUGADO GRADO 60 Fy=4200 KG/CM2 PARA COLUMNAS kg 1,226.42 4.60
02.01.03.03.05 CURADO DE CONCRETO PARA COLUMNAS m2 93.84 0.42
02.01.03.04 VIGAS
02.01.03.06.01 CONCRETO F'C= 210 KG/CM2 PARA ESCALERA DE CIRCULACIÓN m3 2.12 ###
02.01.03.06.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERA DE CIRCULACIÓN m2 12.69 ###
02.01.03.06.03 ACERO CORRUGADO GRADO 60 Fy=4200 Kg/cm2 PARA ESCALERA DE kg 132.65 4.60
02.01.03.06.04 CURADO DE CONCRETO PARA ESCALERA DE CIRCULACIÓN m2 12.69 0.42
02.01.05 COBERTURAS
02.01.06 VARIOS
02.01.06.01 GARGOLA
10.37
59,733.26
4,465.40
3,453.08
1,012.32
6,940.75
3,635.37
523.26
2,760.00
22.12
11,700.25
547.47
3,675.57
1,796.27
5,641.53
39.41
16,190.52
379.92
6,584.21
2,002.30
7,181.24
42.85
18,048.03
5,278.67
3,450.87
4,378.75
973.44
1,665.51
2,237.16
63.63
2,388.31
1,021.16
751.63
610.19
5.33
573.75
573.75
480.34
93.41
5,620.92
5,272.92
348.00
667.48
667.48
667.48
145,104.60
7,109.71
327.81
Item Descripción Und.
Metrado Precio S/. Parcial S/.
02.02.03.03 COLUMNAS
02.02.03.04 VIGAS
02.02.05 COBERTURAS
42.50 744.18
2.28 142.80
3.05 376.68
12.36 1,044.54
28.10 2,374.73
15.47 1,910.55
7,931.76
30.73 1,924.62
204.13 5,088.96
275.70 545.89
39.37 360.63
0.42 11.66
115,239.95
8,322.15
443.84 6,382.42
4.60 1,939.73
10,468.62
469.08 6,323.20
40.88 909.17
4.60 3,207.95
0.42 28.30
29,058.76
471.96 707.94
551.06 9,037.38
40.88 3,305.97
4.60 15,936.15
0.42 71.32
27,876.42
487.08 535.79
494.31 11,383.96
40.88 4,135.01
4.60 11,734.28
0.42 87.38
39,514.00
418.61 12,139.69
45.55 7,621.88
4.68 9,031.23
4.68 1,626.58
3.09 4,118.97
3.09 4,829.67
0.42 145.98
1,368.52
1,368.52
26.91 901.49
12.21 467.03
12,119.70
60.72 11,391.07
43.50 728.63
Item Descripción Und. Metr Precio S/.
ado
02.02.06 VARIOS
02.02.06.01 GARGOLA
02.03.02.02 CIMIENTO CORRIDO C:H = 1:10 + 30% P.G. (Tamaño máx. 6") m3 3.36 204.13
02.03.02.03 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTO m3 0.80 275.70
02.03.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 3.52 39.37
02.03.03.03 COLUMNAS
02.03.03.04 VIGAS
02.03.03.06.01 CONCRETO F'C= 210 KG/CM2 PARA ESCALERA DE CIRCULACIÓN m3 5.06 481.68
Parcial S/.
1,334.96
1,334.96
1,334.96
22,313.21
766.52
51.66
16.08
120.28
21.48
24.77
124.22
282.41
125.62
1,338.98
289.48
685.88
220.56
138.58
4.48
17,993.83
1,418.42
1,149.55
268.87
870.53
379.95
87.07
400.80
2.71
3,944.69
198.22
1,531.95
672.07
1,527.84
14.61
4,990.67
131.51
1,893.21
610.75
2,192.54
162.66
2,553.28
778.61
531.11
530.95
108.25
599.46
4.90
4,216.24
2,437.30
Item Descripción Und. Metrado Precio
S/.
02.03.03.06.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERA DE CIRCULACIÓN m2 22.24 59.23
02.03.03.06.03 ACERO CORRUGADO GRADO 60 Fy=4200 Kg/cm2 PARA ESCALERA DE CIRCULACIÓN kg 98.33 4.60
02.03.05 COBERTURAS
02.03.06 VARIOS
02.03.06.01 GARGOLA
02.04.01.08 BASE DE AFIRMADO H= 0,10M: PARA PISOS, PATIOS Y VEREDAS, m2 78.68 ###
02.04.02 OBRAS DE CONCRETO SIMPLE
02.04.03.01 ZAPATAS
02.04.03.01.02 ACERO CORRUGADO GRADO 60 Fy=4200 KG/CM2 PARA ZAPATAS kg 353.07 4.60
02.04.03.03 COLUMNAS
02.04.03.03.04 ACERO CORRUGADO GRADO 60 Fy=4200 KG/CM2 PARA COLUMNAS kg 3,677.17 4.60
02.04.03.03.05 CURADO DE CONCRETO PARA COLUMNAS m2 183.85 0.42
02.04.03.04 VIGAS
02.04.03.04.04 ACERO CORRUGADO GRADO 60 Fy=4200 Kg/cm2 PARA VIGAS kg 1,786.23 4.60
Parcial S/.
1,317.28
452.32
9.34
303.81
303.81
169.26
134.55
1,576.33
1,415.38
160.95
333.74
333.74
333.74
118,250.25
5,707.76
328.19
133.84
769.68
143.00
239.97
878.55
1,997.35
1,217.18
5,158.32
1,927.39
2,367.91
529.34
323.23
10.45
96,065.11
8,015.42
6,391.30
1,624.12
8,547.92
4,381.21
1,908.28
2,238.82
19.61
31,120.45
552.19
10,018.27
3,557.79
16,914.98
77.22
20,136.69
384.79
8,571.34
2,902.89
8,216.66
Item Descripción Und. Metrado
02.04.03.04.05 CURADO DE CONCRETO PARA VIGAS m2 145.26
02.04.05 COBERTURAS
02.04.06 VARIOS
02.04.06.01 GARGOLA
02.05.02.02 CIMIENTO CORRIDO C:H = 1:10 + 30% P.G. (Tamaño máx. 6") m3 7.72
02.05.02.03 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTO m3 0.86
02.05.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 4.73
02.05.03.01 ZAPATAS
02.05.03.02 COLUMNAS
02.05.03.03 VIGAS
28,244.63
418.61 8,656.85
45.55 5,574.41
4.68 6,950.83
4.68 594.27
3.09 2,811.90
3.09 3,581.31
0.42 75.06
1,066.67
1,066.67
26.91 744.33
12.21 322.34
9,251.17
60.72 8,649.56
43.50 601.61
1,001.22
1,001.22
333.74 1,001.22
13,595.56
1,018.60
6.41 24.61
5.12 44.65
42.50 75.23
2.28 25.72
3.05 53.50
12.36 159.94
28.10 363.61
15.47 271.34
2,123.22
30.73 118.00
204.13 1,575.88
275.70 237.10
39.37 186.22
0.42 6.02
3,429.29
910.49
443.84 767.84
4.60 142.65
1,137.26
471.96 382.29
40.88 183.96
4.60 567.23
0.42 3.78
1,381.54
487.08 521.18
40.88 238.74
4.60 616.72
0.42 4.90
Item Descripción Und. Metrado Precio
S/.
02.05.04 ESTRUCTURAS METALICAS
02.06.03.01.02 ACERO CORRUGADO GRADO 60 Fy=4200 KG/CM2 PARA ZAPATAS kg 15.96 4.60
02.06.03.02 COLUMNAS
02.06.03.03 VIGAS
02.06.03.03.04 ACERO CORRUGADO GRADO 60 Fy=4200 Kg/cm2 PARA VIGAS kg 74.11 4.60
02.06.03.03.05 CURADO DE CONCRETO PARA VIGAS m2 34.02 0.42
02.06.03.04 COBERTURAS
02.07.01.02 BASE DE AFIRMADO H= 0,10M: PARA PISOS, PATIOS Y VEREDAS, m2 1,108.29 ###
02.07.02 OBRAS DE CONCRETO SIMPLE
3,420.67
3,420.67
500.29
365.98
134.31
3,103.49
2,807.69
295.80
21,626.05
1,859.13
602.18
304.30
117.56
255.11
579.98
4,469.46
88.50
2,923.14
852.37
587.40
18.05
15,297.46
841.26
767.84
73.42
6,989.52
1,727.37
225.93
845.81
4,173.03
17.38
2,908.01
1,743.75
113.69
695.37
340.91
14.29
4,558.67
4,558.67
100,871.68
20,530.66
3,385.41
17,145.25
74,450.68
71,311.62
2,087.37
661.63
355.01
30.41
Item Descripción Und.
Metrado Precio S/. Parcial S/.
02.08.03.02 COLUMNAS
03 ARQUITECTURA
03.01 EDIFICACIÓN N° 1 - INGRESO PRINCIPAL Y SALA DE PROFESORES
03.01.03 CIELORRASOS
337.83 675.66
3,864.69
316.32
6.41 36.92
42.50 93.50
2.28 13.13
12.36 52.78
28.10 119.99
177.00
30.73 177.00
3,371.37
1,643.88
443.84 1,535.69
4.60 108.19
1,310.92
551.06 429.83
40.88 506.91
4.60 368.97
0.42 5.21
416.57
494.31 296.59
40.88 36.79
4.60 82.94
0.42 0.25
62,407.39
62,407.39 62,407.39
367,975.20
75,114.97
13,749.22
109.84 9,032.14
66.71 4,555.63
3.79 161.45
14,444.05
17.70 4,072.42
24.40 2,289.70
24.24 2,346.43
32.15 3,413.04
7.42 2,322.46
3,415.70
24.23 3,415.70
10,795.82
14.95 780.84
28.82 2,774.79
121.17 5,015.23
55.50 1,035.63
Item Descripción Und. Metrado
03.01.04.05 PISO DE CEMENTO FROTACHADO Y BRUÑADO (E=5CM) m2 41.44
03.02.01.01 MUROS DE LADRILLO KK TIPO IV (DE CABEZA) CON MEZCLA C:A=1:4, E=1,5cm m2 75.46
03.02.01.02 MUROS DE LADRILLO KK TIPO IV DE SOGA CON MEZCLA C:A=1:4, E=1,5cm m2 83.88
03.02.03 CIELORRASOS
03.02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO Y ARENA DE 1:5 m2 319.39
03.02.07.01 VENTANA DE FIERRO CON PERFIL DE 1" X 1/8" FIJA MARCO "T" DE 1" m2 52.22
03.02.08 CERRAJERIA
03.02.10 PINTURA
03.02.11 JUNTAS
03.03.01.01 MUROS DE LADRILLO KK TIPO IV (DE CABEZA) CON MEZCLA C:A=1:4, E=1,5cm m2 33.46
03.03.01.02 MUROS DE LADRILLO KK TIPO IV DE SOGA CON MEZCLA C:A=1:4, E=1,5cm m2 14.16
03.03.10 PINTURA
03.04.01.01 MUROS DE LADRILLO KK TIPO IV (DE CABEZA) CON MEZCLA C:A=1:4, E=1,5cm m2 49.05
03.04.01.02 MUROS DE LADRILLO KK TIPO IV DE SOGA CON MEZCLA C:A=1:4, E=1,5cm m2 46.30
03.04.03 CIELORRASOS
03.04.05.02 CONTRAZOCALO
03.04.07.01 VENTANA DE FIERRO CON PERFIL DE 1" X 1/8" FIJA MARCO "T" DE 1" m2 30.26
03.04.08 CERRAJERIA
03.05.01.01 MUROS DE LADRILLO KK TIPO IV DE SOGA CON MEZCLA C:A=1:4, E=1,5cm m2 50.62
03.05.01.02 MUROS DE LADRILLO KK TIPO IV DE CANTO CON MEZCLA 1:4 E=1.5 cm. m2 11.14
03.05.01.03 ACEROS DE AMARRE EN MUROS (Ø 1/4") kg 10.50
03.05.02 REVOQUES Y REVESTIMIENTOS
03.05.07 CERRAJERIA
03.05.09 PINTURA
03.06.04 CERRAJERIA
03.06.05 PINTURA
03.06.06 JUNTAS
3,958.28
1,486.95
69.81 1,486.95
2,471.33
9.01 273.99
39.16 1,818.20
12.48 379.14
4,550.40
434.86 3,470.18
212.09 744.44
147.27 335.78
16,783.85
19.26 442.02
95.36 1,077.57
1,086.41 11,439.90
204.84 3,824.36
953.41
13.81 345.25
75.68 454.08
51.36 154.08
459.84
4.31 254.46
68.46 205.38
5,730.17
8.73 2,008.60
8.73 819.22
8.73 845.06
8.73 1,230.67
11.21 178.46
13.96 160.40
13.96 31.83
10.74 113.09
10.74 200.52
4.68 142.32
274.23
8.26 274.23
101,558.02
14,055.85
109.84 8,288.53
66.71 5,595.63
3.79 171.69
19,490.24
17.70 2,820.32
24.40 4,143.12
24.24 4,768.25
32.15 5,781.86
7.42 1,976.69
7,738.82
24.23 7,738.82
22,675.02
14.95 1,798.78
28.82 6,888.84
55.50 13,266.17
28.70 721.23
1,999.73
1,999.73
9.01 564.03
12.48 1,435.70
11,061.82
434.86 5,661.88
147.27 485.99
183.25 956.57
177.78 3,957.38
10,696.74
204.84 10,696.74
785.52
13.81 331.44
75.68 454.08
674.47
4.31 674.47
8,996.24
8.73 1,286.80
8.73 1,482.35
8.73 1,717.28
8.73 2,788.27
11.21 302.45
13.96 181.76
13.96 46.07
12.28 337.45
10.74 560.84
4.68 292.97
545.16
8.26 545.16
2,838.41
147.68 2,838.41
13,642.24
4,649.42
109.84 3,675.25
66.71 944.61
3.79 29.56
3,442.26
17.70 842.87
24.40 848.88
24.24 690.84
25.31 456.09
32.15 453.32
7.42 150.26
564.80
24.23 564.80
345.27
14.95 118.25
28.70 227.02
95.51
95.51
9.01 95.51
941.18
434.86 821.89
147.27 119.29
1,785.97
19.26 577.80
95.36 945.97
204.84 262.20
130.92
13.81 55.24
75.68 75.68
25.39
4.31 25.39
1,661.52
8.73 415.72
8.73 303.72
8.73 248.81
8.73 203.50
12.80 230.66
11.21 158.06
13.96 26.38
13.96 11.31
10.74 13.75
4.68 49.61
77,075.08
8,602.53
109.84 5,387.65
66.71 3,088.67
3.79 126.21
15,766.51
17.70 1,687.70
24.40 4,485.94
24.24 3,604.25
32.15 3,984.03
7.42 2,004.59
5,331.57
24.23 5,331.57
20,181.14
14.95 1,176.27
28.82 4,540.01
121.17 9,554.25
55.50 4,366.74
28.70 543.87
3,227.89
718.17
43.03 718.17
2,509.72
9.01 478.61
39.16 1,505.70
12.48 525.41
9,091.20
434.86 6,092.39
147.27 485.99
177.78 384.00
177.78 718.23
131.34 1,410.59
6,198.46
204.84 6,198.46
864.50
13.81 359.06
75.68 454.08
51.36 51.36
624.91
4.31 624.91
6,770.07
8.73 796.35
8.73 1,576.03
8.73 1,202.03
8.73 1,920.95
11.21 180.26
13.96 195.58
13.96 46.07
12.28 76.14
12.28 131.89
10.74 324.99
6.02 319.78
416.30
8.26 416.30
19,335.84
4,035.60
66.71 3,376.86
55.56 618.94
3.79 39.80
3,475.97
17.70 895.97
24.40 197.64
24.24 282.88
32.15 1,570.21
7.42 529.27
2,365.36
57.91 1,045.85
57.91 1,181.36
60.59 138.15
1,741.19
14.95 262.22
28.82 505.50
55.50 973.47
2,176.73
2,030.77
69.81 2,030.77
145.96
9.01 145.96
3,817.56
434.86 1,913.38
212.09 992.58
147.27 911.60
633.00
13.81 276.20
75.68 151.36
51.36 205.44
75.21
4.31 75.21
1,015.22
8.73 441.91
8.73 78.57
8.73 101.88
11.21 82.17
13.96 213.17
6.02 97.52
19,572.10
12,673.98
73.70 12,402.24
3.79 271.74
1,240.42
24.40 415.78
24.24 824.64
4,392.10
563.09 4,392.10
75.68
75.68 75.68
1,141.06
7.50 417.83
3.80 639.46
10.74 83.77
48.86
2.31 48.86
29,327.42
Item Descripción Und.
Metrado Precio S/. Parcial S/.
03.07.02 JUNTAS
03.07.03 JARDINERIA
03.07.04 PINTURA
03.07.05 OTROS
03.08.02 PINTURA
04 INSTALACIONES SANITARIAS
04.01 EDIFICACIÓN N° 1 - INGRESO PRINCIPAL Y SALA DE PROFESORES
04.01.01 APARATOS SANITARIOS Y ACCESORIOS
04.01.01.01 INSTALACIÓN DE APARATOS SANITARIOS
17.33 537.92
0.77 177.80
347.27 2,083.62
14.65 14.65
0.77 4.62
869.70
4.13 869.70
11,396.99
43.04 11,396.99
1,594.19
5.28 1,594.19
559.79
559.79 559.79
202.10
158.60
24.40 114.68
24.40 43.92
43.50
7.50 43.50
32,147.43
32,147.43 32,147.43
50,775.37
4,973.35
2,161.39
1,970.38
356.91 1,070.73
245.26 245.26
218.13 654.39
191.01
41.32 123.96
22.35 67.05
1,483.84
326.27
46.61 326.27
818.32
21.19 34.33
33.22 783.99
239.86
6.15 153.75
7.45 37.25
6.98 48.86
99.39
33.13 99.39
1,310.42
557.94
45.79 274.74
56.64 283.20
281.06
Item Descripción Und. Metrado Precio
S/.
04.01.03.02.01 EXCAVACIÓN DE ZANJA PARA RED DE DERIVACIÓN m3 2.37 24.72
04.02.01.01.01 LAVATORIO DE ACERO INOXIDABLE INCLUIDO GRIFERIA TIPO CUELLO u 4.00 ###
04.02.02 SISTEMA DE AGUA FRIA
04.02.02.01.01 SALIDA DE AGUA FRIA - Ø1/2" PVC SAP pto 4.00 ###
04.02.02.02.02 RED DE DISTRIBUCIÓN: TUBERIA PVC - SAP CLASE 10 DE Ø1/2" m 18.40 ###
04.02.02.02.03 RED DE DISTRIBUCIÓN: TUBERIA PVC - SAP CLASE 10 DE Ø3/4" m 7.75 ###
04.03.02.01.01 SALIDA DE AGUA FRIA - Ø1/2" PVC SAP pto 1.00 ###
04.03.02.02.02 RED DE DISTRIBUCIÓN: TUBERIA PVC - SAP CLASE 10 DE Ø1/2" m 10.70 ###
23.53
198.94
393.84
393.84
77.58
77.58
17.70
17.70
2,744.95
743.72
743.72
743.72
1,229.41
186.44
186.44
883.77
22.89
611.25
249.63
126.07
26.60
49.20
22.35
27.92
33.13
33.13
555.29
183.16
183.16
372.13
48.70
178.00
145.43
196.92
196.92
19.61
19.61
1,216.95
396.95
396.95
396.95
533.09
46.61
46.61
427.92
72.47
355.45
25.43
18.45
Item Descripción Und. Metrado
04.03.02.03.02 TAPON PROVISIONAL: PVC-SAP, CLASE 10 DE Ø1/2" u 1.00
05.01.04.01 TUBERIA PVC SEL DE 20MM, P/ SALIDA DE LUZ E INTERRUPTOR (INTERIOR DE LOS m 45.88
AMBIENTES)
05.01.04.02 TUBERIA PVC SEL DE 20MM, P/ SALIDA DE LUZ E INTERRUPTOR (EXTERIOR DE LOS m 35.95
AMBIENTES)
05.01.04.03 TUBERIA PVC SEL DE 20MM, PARA TOMACORRIENTES ADOSADO EN LA PARED m 58.56
05.01.05 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
05.01.05.01 CONDUCTOR THW C/CABLE 1x2.5 MM2, PARA SALIDA DE LUZ E INTERRUPTOR (INT. m 45.88
DE LOS AMBIENTES)
05.01.05.02 CONDUCTOR THW C/CABLE 1x2.5 MM2, PARA SALIDA DE LUZ E INTERRUPTOR (EXT. m 35.95
DE LOS AMBIENTES)
05.01.05.03 CONDUCTOR THW C/CABLE 1x4 MM2, PARA TOMACORRIENTES ADOSADO EN m 58.56
PARED
Precio S/. Parcial S/.
6.98 6.98
33.13
33.13 33.13
277.01
45.79
45.79 45.79
34.30
13.72 34.30
196.92
196.92 196.92
9.90
0.75 9.90
7,106.24
4,343.63
4,171.59
356.91 2,855.28
372.33 372.33
247.25 494.50
224.74 449.48
172.04
41.32 82.64
22.35 89.40
1,673.12
326.27
46.61 326.27
1,040.60
24.72 443.97
33.22 596.63
206.86
6.15 98.40
7.45 59.60
6.98 48.86
99.39
33.13 99.39
1,076.02
1,024.30
45.79 457.90
56.64 566.40
51.72
25.86 51.72
13.47
0.75 13.47
32,285.86
3,693.26
186.44
46.61 186.44
1,234.82
21.19 105.95
131.20 436.90
33.22 691.97
2,139.48
24.72 373.77
110.26 370.47
33.22 1,395.24
132.52
33.13 132.52
23,862.28
24.72 832.57
427.72 5,402.10
33.35 3,744.20
0.42 62.87
139.32 13,820.54
4,550.04
3,959.28
24.72 491.19
131.20 1,738.40
83.56 1,729.69
590.76
196.92 590.76
180.28
0.75 15.62
0.88 164.66
2,448.02
2,448.02 2,448.02
43,357.73
7,838.06
1,008.56
36.02 612.34
36.02 144.08
36.02 252.14
241.17
16.00 96.00
18.81 37.62
21.17 84.68
22.87 22.87
350.64
19.48 350.64
1,109.08
7.90 362.45
7.90 284.01
7.90 4
6
2
.
6
3.63 166.542
5
3
3.63 130.508
.
3
4.12 241.271
Item Descripción Und. Metrado
05.01.06 TABLERO DE DISTRIBUCION
05.01.07.01 ARTEFACTO LED CON DOS LAMPARAS FLUORECENTES DE 9W (REJILLA ADOSADO u 11.00
O EMPOTRADO EN TECHO)
05.01.07.02 ARTEFACTO SPOT ADOSABLE ALPHA SPOT A 2x26W P-LC 840 JOSFEL PARA u 10.00
VOLADIZO DE LOS PABELLONES
05.01.07.03 ARTEFACTO PARA LUZ DE EMERGENCIA u 7.00
05.02.01.02 SALIDA PARA ALUMBRADO EXTERIOR EN LOS VOLADIZOS DE LAS pto 8.00
05.02.01.03 SALIDA DE LUZ DE EMERGENCIA pto 10.00
05.02.03.03 SALIDA DE TOMACORRIENTE BIPOLAR C/ PUESTA A TIERRA ADOSADA EN MESA DE pto 8.00
TRABAJO (LABORATORIO)
05.02.04.02 TUBERIA PVC SEL DE 20MM, P/ SALIDA DE LUZ E INTERRUPTOR (EXTERIOR DE LOS m 44.20
AMBIENTES)
05.02.04.03 TUBERIA PVC SEL DE 20MM, PARA TOMACORRIENTES ADOSADO EN LA PARED m 107.10
05.02.04.05 TUBERIA PVC SEL DE 20MM, PARA TOMACORRIENTES ADOSADO EN MESA DE m 21.30
TRABAJO
05.02.05.02 CONDUCTOR THW C/CABLE 1x2.5 MM2, PARA SALIDA DE LUZ E INTERRUPTOR (EXT. m 44.20
DE LOS AMBIENTES)
05.02.05.03 CONDUCTOR THW C/CABLE 1x4 MM2, PARA TOMACORRIENTES ADOSADO EN m 107.10
PARED
05.02.05.04 CONDUCTOR THW C/CABLE 1x4 MM2, PARA TOMACORRIENTES ADOSADO EN EL m 7.00
PISO
05.02.05.05 CONDUCTOR THW C/CABLE 1x4 MM2, PARA TOMACORRIENTES ADOSADO EN MESA m 21.30
DE TRABAJO
05.02.06 TABLERO DE DISTRIBUCION
716.12 1,432.24
3,158.06
92.46 1,017.06
50.09 500.90
234.30 1,640.10
12,038.11
1,476.82
36.02 828.46
36.02 288.16
36.02 360.20
252.20
16.00 32.00
21.17 105.85
22.87 114.35
857.22
19.48 662.32
19.49 38.98
19.49 155.92
2,099.50
7.90 724.75
7.90 349.18
7.90 846.09
7.90 55.30
5.83 124.18
1,049.83
3.63 333.02
3.63 160.45
4.12 441.25
4.12 28.84
4.05 86.27
1,432.24
716.12 1,432.24
4,870.30
92.46 2,126.58
50.09 400.72
234.30 2,343.00
2,544.20
324.18
36.02 180.10
Item Descripción Und.
Metrado Precio S/. Parcial S/.
05.03.01.02 SALIDA PARA ALUMBRADO EXTERIOR EN LOS VOLADIZOS DE LAS pto 2.00
EDIFICACIONES
05.03.01.03 SALIDA DE LUZ DE EMERGENCIA pto 2.00
05.03.04.02 TUBERIA PVC SEL DE 20MM, P/ SALIDA DE LUZ E INTERRUPTOR (EXTERIOR DE LOS m 7.80
AMBIENTES)
05.03.04.03 TUBERIA PVC SEL DE 20MM, PARA TOMACORRIENTES ADOSADO EN LA PARED m 7.00
05.03.05.02 CONDUCTOR THW C/CABLE 1x2.5 MM2, PARA SALIDA DE LUZ E INTERRUPTOR (EXT. m 7.80
DE LOS AMBIENTES)
05.03.05.03 CONDUCTOR THW C/CABLE 1x4 MM2, PARA TOMACORRIENTES ADOSADO EN m 7.00
PARED
05.03.07.01 ARTEFACTO LED CON DOS LAMPARAS FLUORECENTES DE 9W (REJILLA ADOSADO u 5.00
O EMPOTRADO EN TECHO)
05.03.07.02 ARTEFACTO SPOT ADOSABLE ALPHA SPOT A 2x26W P-LC 840 JOSFEL PARA u 2.00
VOLADIZO DE LOS PABELLONES
05.03.07.03 ARTEFACTO PARA LUZ DE EMERGENCIA u 2.00
05.04.04.02 TUBERIA PVC SEL DE 20MM, P/ SALIDA DE LUZ E INTERRUPTOR (EXTERIOR DE LOS m 34.80
AMBIENTES)
05.04.04.03 TUBERIA PVC SEL DE 20MM, PARA TOMACORRIENTES ADOSADO EN LA PARED m 69.05
05.04.05.02 CONDUCTOR THW C/CABLE 1x2.5 MM2, PARA SALIDA DE LUZ E INTERRUPTOR (EXT. m 34.80
DE LOS AMBIENTES)
05.04.05.03 CONDUCTOR THW C/CABLE 1x4 MM2, PARA TOMACORRIENTES ADOSADO EN m 69.05
PARED
36.02 72.04
61.74
16.00 16.00
22.87 45.74
58.44
19.48 58.44
268.60
7.90 151.68
7.90 61.62
7.90 55.30
126.85
3.63 69.70
3.63 28.31
4.12 28.84
673.31
673.31 673.31
1,031.08
92.46 462.30
50.09 100.18
234.30 468.60
7,967.87
1,044.58
36.02 612.34
36.02 216.12
36.02 216.12
139.48
16.00 48.00
22.87 91.48
409.08
19.48 409.08
1,307.22
7.90 486.80
7.90 274.92
7.90 545.50
634.49
3.63 223.68
3.63 126.32
4.12 284.49
1,432.24
716.12 1,432.24
Item Descripción Und.
Metrado Precio S/. Parcial S/.
05.04.07.02 ARTEFACTO SPOT ADOSABLE ALPHA SPOT A 2x26W P-LC 840 JOSFEL PARA u 6.00
VOLADIZO DE LOS PABELLONES
05.04.07.03 ARTEFACTO PARA LUZ DE EMERGENCIA u 6.00
05.05.01.02 SALIDA PARA ALUMBRADO EXTERIOR EN LOS VOLADIZOS DE LAS pto 2.00
05.05.02 SALIDAS PARA INTERRUPTORES
05.05.04.02 CONDUCTOR THW C/CABLE 1x2.5 MM2, PARA SALIDA DE LUZ E INTERRUPTOR (EXT. m 6.00
DE LOS AMBIENTES)
05.05.05 TABLERO DE DISTRIBUCION
05.06.02.01 SALIDA PARA ALUMBRADO EXTERIOR CON ARTEFACTO TIPO FAROLA u 4.00
05.06.02.02 SALIDA PARA REFLECTORES CON LAMPARA HALOGENA DE 400W u 8.00
06 MOBILIARIO Y EQUIPAMIENTO
3,000.78
92.46 1,294.44
50.09 300.54
234.30 1,405.80
1,621.50
144.08
36.02 72.04
36.02 72.04
37.62
18.81 37.62
173.80
7.90 126.40
7.90 47.40
79.86
3.63 58.08
3.63 21.78
716.12
716.12 716.12
470.02
92.46 369.84
50.09 100.18
11,034.02
50.81
50.81 50.81
6,644.16
799.44 3,197.76
430.80 3,446.40
37.62
18.81 37.62
790.00
7.90 790.00
363.00
3.63 363.00
597.00
597.00 597.00
673.31
673.31 673.31
678.12
113.02 678.12
1,200.00
1,200.00 1,200.00
313.97
313.97 313.97
68,215.67
Item Descripción Und. Metrado
06.01 EDIFICACIÓN N° 1 - INGRESO PRINCIPAL Y SALA DE PROFESORES
06.01.01 MOBILIARIO
06.01.02 EQUIPAMIENTO
06.01.02.01 COMPUTADORAS CORE I7 530 2.93 GHZ CON MONITORES LCD 17"- INC ACCESORIOS u 2.00
06.02.02 EQUIPAMIENTO
06.03.02 EQUIPAMIENTO
06.03.02.01 COMPUTADORAS CORE I7 530 2.93 GHZ CON MONITORES LCD 17"- INC u 1.00
06.03.02.02 TELEVISOR LED UHD DE 55" (INCL. RACK) u 1.00
COSTO DIRECTO
GASTOS GENERALES (13.4235%CD)
UTILIDAD (8%CD)
SUBTOTAL
3,793.27
160.00 160.00
95.00 570.00
170.00 340.00
296.61 593.22
250.00 1,000.00
550.85 550.85
16.50 33.00
18.50 55.50
35.00 67.20
35.00 423.50
8,477.46
3,220.34 6,440.68
1,355.93 1,355.93
550.85 550.85
65.00 130.00
13,427.56
9,385.70
160.00 160.00
55.00 3,465.00
78.50 2,433.50
850.00 850.00
550.85 550.85
16.50 99.00
35.00 682.15
35.00 1,145.20
4,041.86
1,355.93 2,711.86
1,200.00 1,200.00
65.00 130.00
27,489.80
9,332.61
160.00 1,600.00
85.00 2,040.00
170.00 170.00
28.00 1,008.00
296.61 296.61
180.00 3,960.00
16.50 33.00
75.00 225.00
5,101.19
3,220.34 3,220.34
1,200.00 1,200.00
550.85 550.85
65.00 130.00
13,056.00
1,295.00 1,295.00
920.00 920.00
320.00 320.00
1,377.00 1,377.00
9,144.00 9,144.00
74.00
74.00
18.50 74.00
7,747.66
4,187.66
120.00 240.00
65.00 65.00
42.37 254.22
42.37 254.22
42.37 254.22
520.00 3,120.00
3,560.00
60.00 60.00
3,500.00 3,500.00
850.00
850.00
850.00 850.00
6,355.92
6,355.92 6,355.92
14,983.36
133.78 14,983.36
2,430.71
1,200.00 1,200.00
1.11 1,230.71
17,065.40
437.78
437.78 437.78
939.18
939.18 939.18
1,178.78
1,178.78 1,178.78
14,509.66
11,372.78 11,372.78
3,136.88 3,136.88
1,194,273.72
160,313.64
95,541.90
....................
1,450,129.26
261,
023.
27
........
1,711,152.53
........
.
33,500.00
73,582.53
12,000.00
-----------------------
1,830,235.06