Sddsddssdsdds
Sddsddssdsdds
Sddsddssdsdds
PLANTAS CONCENTRADORAS
PLANTAS CONCENTRADORAS
PL
NC CONTRATO ABV.
PLANTAS CONCENTRADORAS
HH CONSUMIDAS EN EL PROYECTO
HH HH HH HH HH
MO (HH)
ESTRUCT. EQUIPOS CONCRETO MOV. TIERRAS PIPING
HH.EST.
HH HH EST. HH EST.
SEMI OTROS
ELÉC.&INS. LIVIANA PESADA
PESADA
PLA
METRAD
NC CONTRATO ABV.
PLANTAS CONCENTRADORAS
0.00
473.05
0.00
997.00
16,186.16
-963.05
EQUIPAMIENTO INSTALADO
ÁREA SECA
- Cant.= 01.
- Dim.= 23 x 31.5 ft
- 01 Faja de XX km.
- Cant.= 02.
- Dim.= 25 x 40 ft
- Cant.= 02.
- 01 Faja de XX km.
- Dim.= 25 x 40 ft
- Cant.= 02.
- 01 Faja de XX km.
- Dim.= 27 x 40 ft
- Cant.= 02.
- Dim.= 28 x 47.3 ft
ÁREA HÚMEDA
TOTAL
CONCRETO (m3) 216,498.06
MT (m3) 5,596,871.00
ESTRUCTURA (Ton) 29,730.48
MECÁNICA (Ton) 8,737.52
TUBERÍA (Km) 156.73
ELÉCTRICAS (Km) 1,571.02
HH Totales
TOTAL
52,542,640.89
CONCRETO HH 5,437,895.44
MT HH 1,788,814.80
ESTRUCTURA HH 2,229,033.61
MECÁNICA HH 1,922,096.88 12%
TUBERÍA HH 2,121,326.73
14% 36%
ELÉCTRICAS HH 1,774,131.90
15,273,299.36
13%
15% 12%
15%
1050 1060
CONCENTRADO
CONCENTRADO
RA LOS
RA LAS CASAS
MOLINOS
128,870.87 -
5,394,535.48 -
16,186.16 1,139.00
1,917.26 1,223.00
70.36 1.86
1,451.05 119.97
1050 1060
CONCENTRADO
CONCENTRADO
RA LOS
RA LAS CASAS
MOLINOS
3,027,562.66 -
1,318,651.74 -
881,857.52 417,318.22
1,142,655.53 140,623.74
1,167,257.78 51,144.57
1,592,772.61 181,359.29
9,130,757.83 790,445.82
12%
CONCRETO HH
36%
MT HH
ESTRUCTURA HH
MECÁNICA HH
12% TUBERÍA HH
15%
ELÉCTRICAS HH
15%
ELÉCTRICAS HH
RATIOS HISTÓRICOS - PARÁMETROS GEN
MONTAJE
1010 1020 1030 1040
CONCENTRAD CONCENTRAD CONCENTRAD
CONCENTRAD
ORA LA ORA PIEDRA ORA PUEBLO
ORA RIO ALTO
PODEROSA ALTA VIEJO
GENERAL GENERAL GENERAL GENERAL
TON MONTAJE - 8,378 - 9,625
HH/TON
MONTAJE ESTRUCTURAS
1010 1020 1030 1040
CONCENTRAD CONCENTRAD CONCENTRAD
CONCENTRAD
ORA LA ORA PIEDRA ORA PUEBLO
ORA RIO ALTO
PODEROSA ALTA VIEJO
GENERAL GENERAL GENERAL GENERAL
TON ESTRUCTURAS - 5,242 - 7,164
HH/TON -
MONTAJE MECÁNICO
1010 1020 1030 1040
CONCENTRAD CONCENTRAD CONCENTRAD
CONCENTRAD
ORA LA ORA PIEDRA ORA PUEBLO
ORA RIO ALTO
PODEROSA ALTA VIEJO
GENERAL GENERAL GENERAL GENERAL
TON MECÁNICA - 3,135.96 - 2,461.30
HH/TON -
CONCRETO
1010 1020 1030 1040
CONCENTRAD CONCENTRAD CONCENTRAD
CONCENTRAD
ORA LA ORA PIEDRA ORA PUEBLO
ORA RIO ALTO
PODEROSA ALTA VIEJO
GENERAL GENERAL GENERAL GENERAL
M3 CONCRETO 39,464 - 48,163 -
HH/M3
MOVIMIENTO DE TIERRAS
1050 1060
CONCENTRADO CONCENTRAD
RA LOS ORA LAS
MOLINOS CASAS
GENERAL GENERAL
18,103 2,362
1050 1060
CONCENTRADO CONCENTRAD
RA LOS ORA LAS
MOLINOS CASAS
GENERAL GENERAL
16,186 1,139
1050 1060
CONCENTRADO CONCENTRAD
RA LOS ORA LAS
MOLINOS CASAS
GENERAL GENERAL
16,186.16 1,139.00
1050 1060
CONCENTRADO CONCENTRAD
RA LOS ORA LAS
MOLINOS CASAS
GENERAL GENERAL
1,917.26 1,223.00
1050 1060
CONCENTRADO CONCENTRAD
RA LOS ORA LAS
MOLINOS CASAS
GENERAL GENERAL
128,871 -
1050 1060
CONCENTRADO CONCENTRAD
RA LOS ORA LAS
MOLINOS CASAS
GENERAL GENERAL
5,394,535 -