VALOR REFERENCIAL (VR)
SUPERVISIÓN NUMERO DE DECIMALES
EXPEDIENTE TÉCNICO MODALIDAD DE E. ADMINISTRACION DIRECTA
LIQUIDACIÓN IMPUESTO (IGV) 18.00%
PIE DEL PRESUPUESTO:
DESCRIPCION VALOR TIPO
GASTOS GENERALES 10.00 % COSTO DIRECTO
UTILIDAD 5.00 % COSTO DIRECTO
SUBTOTAL (ST) SUBTOTAL
IMPUESTO (IGV) 18.00 % SUBTOTAL
VALOR REFERENCIAL (VR) VALOR REFERENCIAL OTRAS OPCIONES
OTRAS OPCIONES
Factor costo mano de obra 1
Jornada laboral 8h Factor para rendimiento 1
CONTRATA
ADMINISTRACION DIRECTA
1
2 6
3 5
4
5
6
SI
NO
MO y EQ
TODOS 1
COLOR CODIGO
Amarillo 6 CALENDARIO PIE DEL PRESUPUESTO
Anaranjado 46 Lunes Laborable VALOR FIJO
Azulino 5 Martes Laborable % COSTO DIRECTO
Azul 11 Miercoles Laborable SUBTOTAL
Celeste 8 Jueves Laborable % SUBTOTAL
Ladrillo 22 Viernes Laborable VALOR REFERENCIAL
Magenta 7 Sábado Laborable % VALOR REFERENCIAL
Marrón 9 Domingo No laborable
Morado 13
Negro 1
Rojo 3 Feriados
Verde 10 Comienzo Fin Descripcion
Verde botella 14
Verde claro 4
SUPUESTO
FERENCIAL
DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO
INSUMOS
ORIGEN - DESTINO Prec. U.
MATERIALES HUARAZ- HUARI 0.15
AGREGADOS 0.00
TUBERIAS 0.00
8097
7150
6005 5900
5850
3450 3000
7100
7050
3577 3400 7001
1004 3350 5950
8097 101 8097
102
MONEDAS
0 Soles
SOLO TUBERIA Factor
Peso Codigo CU
espesor Específica
unitario Long. (m) Ø ext. (mm)
(mm) de Gastos
del insumo Adm. Directa
(kg) partida
0 0 0 0 20.1
0 0 0 0 16.5
0 0 0 0 14.84
0 0 0 0 20.1
0 0 0 0 4.99
0 0 0 0 21.5
0 0 0 0 27.02
0 0 0 0 4.6
0 0 0 0 3.42
0 0 0 0 5.9
0 0 0 0 165.2
0 0 0 0 44.84
0 0 0 0 25.37
0 0 0 0 165.2
0 0 0 0 118
0 0 0 0 33.76
0 0 0 0 2.95
0 0 0 0 1
0 0 0 0 165.2
0 0 0 0 177
0 0 0 0 53.1
0 0 0 0 29.5
0 0 0 0 76.7
0 0 0 0 4.96
0 0 0 0 4.96
0 0 0 0 5.31
0 0 0 0 4.96
0 0 0 0 70.8
0 0 0 0 224.2
0 0 0 0 1.77
0 0 0 0 98.51
0 0 0 0 0.94
0 0 0 0 1.42
0 0 0 0 0.94
0 0 0 0 1.77
0 0 0 0 2.66
0 0 0 0 153.4
0 0 0 0 0.77
0 0 0 0 4.96
0 0 0 0 0.45
0 0 0 0 15.93
0 0 0 0 57.23
0 0 0 0 65.02
0 0 0 0 37.76
0 0 0 0 413
0 0 0 0 10.03
0 0 0 0 15.93
0 0 0 0 3.54
0 0 0 0 3.54
0 0 0 0 5.31
0 0 0 0 21.83
0 0 0 0 6.49
0 0 0 0 4.48
0 0 0 0 6.49
0 0 0 0 1345.2
0 0 0 0 112.1
0 0 0 0 10.03
0 0 0 0 2.6
0 0 0 0 8
0 0 0 0 100.3
0 0 0 0 129.8
0 0 0 0 100.3
0 0 0 0 11.8
0 0 0 0 14.16
0 0 0 0 11.21
0 0 0 0 23.6
0 0 0 0 4960.39
0 0 0 0 2950
0 0 0 0 2478
0 0 0 0 2360
0 0 0 0 2596
0 0 0 0 2242
0 0 0 0 1770
0 0 0 0 1416
0 0 0 0 1888
0 0 0 0 1329.68
0 0 0 0 679.15
0 0 0 0 1241.42
0 0 0 0 1499.6
0 0 0 0 675.02
0 0 0 0 924.94
0 0 0 0 675.02
0 0 0 0 2696.42
0 0 0 0 5148.58
0 0 0 0 5054.77
0 0 0 0 2730.76
MONEDAS
Soles Dólares
118.00% 3.22 118.00%
10001r
10002 ACABADO Y PULIDO EN TAPA 40 m2 6.98 0 4
10002C
10002r
10003 ACERO CORRUGADO Fy=4200 KG/CM2 GRADO 60 250 kg 6.2 0 5
10003C
10003r
10004 ACERO FY= 4200 KG/CM2 - GRADO 60 250 kg 5.08 0 5
10004C
10004r
10005 CAJA DE REGISTRO DE DESAGUE 12" X 24" 15 und 89.32 0 8
10005C
10005r
10006 CIMIENTO CORRIDO MEZCLA C: 1:10 + 30% P.G. SIN M 20 m3 357.5 0 8
10006C
10006r
10007 COBERTURA CON TEJA ANDINA 40 m2 60.15 0 6
10007C
10007r
10008 CONCRETO F'C= 210 KG/CM2 SIN MEZCLADORA 12 m3 541.9 0 7
10008C
10008r
10009 CONCRETO FC=175 KG/CM2 - SIN MEZCLADORA 10 m3 521.17 9.44 9
10009C
10009r
10010 CONCRETO SOBRECIMIENTO 1:8 C:H +25% P.M SIN ME 16 m3 361.81 5.9 9
10010C
10010r
10011 CONTRAZOCALO DE CEMENTO PULIDO 22 m2 17.55 0 7
10011C
10011r
10012 CORREAS DE MADERA TORNILLO DE 2" X 2" 35 und 16.71 0 4
10012C
10012r
10013 DUCHA CROMADA 1 LLAVE INC./ ACCESORIOS 12 und 96.67 0 4
10013C
10013r
10014 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M (A 10 m3 12.23 0 2
10014C
10014r
10015 ENCOFRADO Y DESENCOFRADO DE MUROS 18 m2 50.78 0 7
10015C
10015r
10016 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 16 m2 39.69 0 6
10016C
10016r
10017 ENCOFRADO Y DESENCOFRADO NORMAL 16 m2 39.69 0 6
10017C
10017r
10018 EXCAVACION EN TERRENO NORMAL 4 m3 31.16 0 2
10018C
10018r
10019 EXCAVACION MASIVA MANUAL 3.5 m3 34.94 0 2
10019C
10019r
10020 FALSO PISO E=4" - F-C= 100 KG/CM2 70 m2 38.51 0 7
10020C
10020r
10021 FILTRO DE GRAVA 6 m3 93.7 0 3
10021C
10021r
10022 INODORO TANQUE BAJO BLANCO 4 und 265.61 0 3
10022C
10022r
10023 INSTALACION DE TUBERIA PVC SAP 1/2" 30 pto 14.97 0 9
10023C
10023r
10024 LAVATORIO CPN PEDESTAL BLANCO INC./ACCESORIOS 8 und 174.51 0 3
10024C
10024r
10025 LIMPIEZA MANUAL DE TERRENO 150 m2 0.81 0 2
10025C
10025r
10026 MURO DE LADRILLO KK DE ARCILLA DE SOGA CON MORT16 m2 61.26 0 9
10026C
10026r
10027 MURO DE SOGA LADRILLO KING-KONG 18 m2 45.2 0 8
10027C
10027r
10028 PUERTA METALICA CON PLANCHA DE ACERO 10 und 518.27 0 8
10028C
10028r
10029 REFINE, NIVELACION Y COMPACTACION 80 m2 2.97 1.42 3
10029C
10029r
10030 REGISTRO DE BRONCE 2" 20 und 18.31 0 3
10030C
10030r
10031 REGISTRO DE BRONCE 4" 20 und 24.37 0 3
10031C
10031r
10032 RELLENO Y APISONADO CON MATERIAL PROPIO 8 m3 17.69 0 3
10032C
10032r
10033 SALIDA DE DESAGUE PVC SAL DE 2" 24 pto 28.75 0 6
10033C
10033r
10034 SALIDA DE DESAGUE PVC SAL DE 4" 20 pto 37.6 0 5
10034C
10034r
10035 SUMIDERO CROMADO PARA DESAGUE 2" 30 und 25.56 0 4
10035C
10035r
10036 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 5 und 1391.4 0 4
10036C
10036r
10037 SUMINISTRO E INSTALACION DE TUBERIA PVC - SAL DE 50 m 11.23 0 4
10037C
10037r
10038 TAPA SANITARIA METALICA DE 0.80x0.80m 8 und 148.09 0 4
10038C
10038r
10039 TARRAJEO DE MUROS INTERIORES 13 m2 26.86 0 8
10039C
10039r
10040 TRAZO DURANTE LA EJECUCION DE LA OBRA 500 m2 1.48 0.56 7
10040C
10040r
10042 VENTANA METALICA DE (0.60x0.50m) INCLUIDO MARCO, 5 und 170.26 0 8
10042C
10042r
10043 VEREDA DE CONCRETO FC=140 KG/CM2 80 m2 55.56 0 8
10043C
10043r
10044 VIGAS DE MADERA TORNILLO DE 2" X 4" X 3.60 m.l. 30 und 48.91 0 5
10044C
10044r
10045 MITIGACION Y CONTROL AMBIENTAL 1 GLB 17700 0 8
10045C
10045r
10046 TALLERES DE CAPACITACION DE LAS JASS 1 GLB 7024.8 0 7
10046C
10046r
10047 TALLERES DE EDUCACION SANITARIA 1 GLB 15631 0 4
10047C
10047r
###
40
40
250
250
15
20
40
12
10
16
22
35
12
10
18
16
16
3.5
70
6
4
30
150
16
18
10
80
20
20
8
24
20
30
50
13
500
80
30
1
1
### #N/A #N/A #N/A #N/A #N/A
### 1011 #N/A
###
### OBRA POR ADMINISTRACION DIRECTA MO MA
### En Soles 0.00 #N/A
Insumos Und Cuad./cant. Cantidad
### 3501 MADERA TORNILLO P2 #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
#N/A #N/A
###
#N/A #N/A ###
EQ TOTAL
0.00 #N/A
P.U. Parcial
#N/A #N/A
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
RW7+
RELACION DE INSUMOS DEL PROYECTO
Proyecto BIODIGESTORES
Lugar
Elab. Por
Fecha
PRESUPUESTO GENER
Proyecto BIODIGESTORES
Lugar
Elab. Por
Fecha
P.U. PARCIAL
453 933.14
309 302.83
1 602.09
1.48 1 035.41
0.81 566.68
3 911.14
34.94 2 370.33
2.97 503.71
12.23 1 037.10
70 357.20
357.50 24 252.80
361.81 6 168.86
39.69 9 024.32
38.51 6 735.40
55.56 24 175.82
39 048.16
541.90 13 092.30
50.78 16 357.76
5.08 9 598.10
54 335.17
61.26 54 335.17
6 558.06
26.86 3 523.49
17.55 3 034.57
36 492.09
170.26 9 023.78
518.27 27 468.31
40 855.49
48.91 7 776.69
16.71 4 428.15
60.15 28 650.65
22 722.16
37.60 3 985.60
28.75 6 095.00
89.32 9 467.92
14.97 3 173.64
33 421.27
265.61 14 077.33
174.51 9 249.03
96.67 5 123.51
25.56 2 709.36
24.37 1 291.61
18.31 970.43
92 266.89
1.48 113.74
0.81 62.25
31.16 6 688.49
17.69 1 361.42
12.23 1 683.95
45.20 598.90
6.43 163.58
148.09 7 848.77
1 391.43 73 745.79
52 363.42
1.48 392.20
0.81 214.65
31.16 9 661.16
17.69 1 054.85
12.23 3 828.36
93.70 3 575.59
521.17 7 457.94
39.69 3 786.43
6.20 1 840.16
6.98 665.89
45.20 18 398.21
11.23 1 487.98
40 355.36
17 700.00 17 700.00
15 630.53 15 630.53
7 024.83 7 024.83
494 288.50
RW7+
DETERMINACION DE LA FORMULA POLINOMICA
Proyecto : BIODIGESTORES
Lugar :
:
Fecha :
AGRUPACION PRELIMINAR
COEF. AGR.
N° IU ELEMENTO PARCIAL % INCID. AGR. 1
ACUM.1 2
1 47 Mano de obra (incluido leyes sociales) 113691.07 20.00% 2 0.200 J
2 05 Agregado grueso 334221.97 58.80% 1 0.588 A
3 30 Dólar mas inflación mercado USA 41415.07 7.29% 4 0.073 D
4 39 74143.28 13.04% 3 0.139 G
37 Herramienta manual 4960.39 0.87% 3
TOTAL 568431.78 100.00% 1.000
CONFORMACION DE MONOMIOS
INCID. SIMB. % COEF.
N°M N° IU IU ELEMENTO ELEM. AGR. IM MON.
1 1 47 Mano de obra (incluido leyes sociales) 0.200 J 100.00% 0.200
2 2 05 Agregado grueso 0.588 A 100.00% 0.588
3 3 30 Dólar mas inflación mercado USA 0.073 D 100.00% 0.073
4 4 39 0.139 G 100.00% 0.139
TOTAL 1.000 1.000
FORMULA POLINOMICA:
Jr Ar Dr Gr
K= 0.200 ---------- + 0.588 ---------- + 0.073 ---------- + 0.139 ----------
Jo Ao Do Go
COEF. Orden
ACUM.2 Mon.
0.200 1
0.588 2
0.073 3
0.139 4
1.000
Area
Geogr.
3
MAYORES GASTOS GENERALES VARIABLES POR AMPLIACIÓN DE PLAZO
PROYECTO:
CONTRATISTA:
SUPERVISOR:
Mes de
N° Descripción Plazo GGV Días AP
Pto. Base
01 Ampliación de plazo N° 01 120 100 000.00 20 Jan-2021
02 Ampliación de plazo N° 01 120 100 000.00 20 Jan-2021
CIÓN DE PLAZO
Mes inicio de
IU39o IU39r MGGV IGV=18.00% TOTAL
paralización
1.00 Jan-2022 1.00 16 666.67 3 000.00 19 666.67
1.00 Apr-2022 1.00 16 666.67 3 000.00 19 666.67
TOTAL 39 333.34
CUADRO RESUMEN DE LIQUIDACION FINAL DE OBRA
OBRA
LUGAR
MONTOS MONTOS
CONCEPTO
RECALCULADOS PAGADOS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00