Biodigestores en RW7+

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 42

PROYECTO BIODIGESTORES

GASTOS GENERALES UBICACIÓN


UTILIDAD CLIENTE
SUBTOTAL (ST) FECHA
IMPUESTO (IGV) MONEDA

LOGO RW7+
VALOR REFERENCIAL (VR)
SUPERVISIÓN NUMERO DE DECIMALES
EXPEDIENTE TÉCNICO MODALIDAD DE E. ADMINISTRACION DIRECTA
LIQUIDACIÓN IMPUESTO (IGV) 18.00%
PIE DEL PRESUPUESTO:
DESCRIPCION VALOR TIPO
GASTOS GENERALES 10.00 % COSTO DIRECTO
UTILIDAD 5.00 % COSTO DIRECTO
SUBTOTAL (ST) SUBTOTAL
IMPUESTO (IGV) 18.00 % SUBTOTAL
VALOR REFERENCIAL (VR) VALOR REFERENCIAL OTRAS OPCIONES

COLOR DE TEXTOS: Título Rojo


Sub título de orden 1 Anaranjado
Sub título de orden 2 Azulino
Sub título de orden 3 Morado
Sub título de orden 4 Azul
Sub título de orden 5 Verde botella
Sub título de orden 6 Ladrillo
Sub título de orden 7 Magenta
Sub título de orden 8 Verde claro
Sub título de orden 9 Celeste
MONEDA

Procesar el presupuesto utilizando la moneda en Soles


NUMERO DE DECIMALES PARA REDONDEO
Parciales de las partidas en la hoja del presupuesto 2
Total de los metrados en cada partida 2

Parcial de los insumos en los APUs 2


Cantidad de MO y EQ en los APUs 4

Precio de los insumos 2

OTRAS OPCIONES
Factor costo mano de obra 1
Jornada laboral 8h Factor para rendimiento 1

Igualar el monto total de relación de insumos al CD SI

Gráfico de utilización de recursos de MO y EQ

Al generar E.T. en Word usar IDEM en partidas repetidas SI

Al generar E. T. en Word procesar UNIDAD SI

Al generar E.T. en Word procesar FORMA DE PAGO SI

Calend. de Adq. de Ins. con MO en Jornal y EQ en Día SI

Diagrama de Gantt con ruta crítica SI


Soles S/
Dólares $

CONTRATA
ADMINISTRACION DIRECTA
1
2 6
3 5
4
5
6
SI
NO

MO y EQ
TODOS 1
COLOR CODIGO
Amarillo 6 CALENDARIO PIE DEL PRESUPUESTO
Anaranjado 46 Lunes Laborable VALOR FIJO
Azulino 5 Martes Laborable % COSTO DIRECTO
Azul 11 Miercoles Laborable SUBTOTAL
Celeste 8 Jueves Laborable % SUBTOTAL
Ladrillo 22 Viernes Laborable VALOR REFERENCIAL
Magenta 7 Sábado Laborable % VALOR REFERENCIAL
Marrón 9 Domingo No laborable
Morado 13
Negro 1
Rojo 3 Feriados
Verde 10 Comienzo Fin Descripcion
Verde botella 14
Verde claro 4
SUPUESTO

FERENCIAL
DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO
INSUMOS
ORIGEN - DESTINO Prec. U.
MATERIALES HUARAZ- HUARI 0.15
AGREGADOS 0.00
TUBERIAS 0.00
8097
7150
6005 5900
5850
3450 3000
7100
7050
3577 3400 7001
1004 3350 5950
8097 101 8097
102

Cod. IU Tipo Insumo Und Soles

1001 47 MO1 OPERARIO HH 20.1


1002 47 MO1 OFICIAL HH 16.5
1003 47 MO1 PEON HH 14.84
1004 47 MO1 TOPOGRAFO 20.1
3501 5 MA MADERA TORNILLO P2 4.99
3502 5 MA CEMENTO PORTLAND TIPO I (42.5KG) BLS 21.5
3503 5 MA CEMENTO PORTLAND TIPO MS (42.5 KG) BOL 27.02
3504 5 MA ALAMBRE NEGRO RECOCIDO # 16 KG 4.6
3505 5 MA ACERO DE REFUERZO FY=4200 KG/CM2 - GRADO 60 KG 3.42
3506 5 MA AGUA M3 5.9
3507 5 MA ARENA FINA M3 165.2
3508 5 MA CAJA DE REGISTRO DE 12" X 24" UND 44.84
3509 5 MA TAPA DE CONCRETO PREFABRICADA UND 25.37
3510 5 MA HORMIGON M3 165.2
3511 5 MA PIEDRA MEDIANA DE 4" M3 118
3512 5 MA TEJA ANDINA (1.16 X 0.70 M) PLN 33.76
3513 5 MA TIRAFON DE 1/4 X 2 1/2 UND 2.95
3514 5 MA CAPUCHON PARA TIRAFON UND 1
3515 5 MA ARENA GRUESA M3 165.2
3516 5 MA PIEDRA CHANCADA DE 1/2" M3 177
3517 5 MA DUCHA PZA 53.1
3518 5 MA LLAVE DE DUCHA UND 29.5
3519 5 MA TRIPLAY DE 4´ * 8´ * 10 MM PLN 76.7
3520 5 MA ALAMBRE NEGRO RECOCIDO # 8 KG 4.96
3521 5 MA CLAVOS PARA MADERA C/C 3" KG 4.96
3522 5 MA MADERA PARA ENCOFRADO P2 5.31
3523 5 MA CLAVOS PARA MADERA C/C 2 1/2" KG 4.96
3524 5 MA FILTRO DE GRAVA M3 70.8
3525 5 MA INODORO TANQUE BAJO PZA 224.2
3526 5 MA CINTA TEFLON UND 1.77
3527 5 MA PEGAMENTO PLASTICO PVC GLN 98.51
3528 5 MA ADAPTADOR PVC S/P 1/2" UND 0.94
3529 5 MA CODO F° G°C1/2" C/R UND 1.42
3530 5 MA CODO PVC 1/2" X 90° S/P UND 0.94
3531 5 MA TEE PVC 1/2" S/P UND 1.77
3532 5 MA TUBERIA PVC C-10, Ø=1/2" M 2.66
3533 5 MA LAVATORIO 23"X18" PEDESTAL G.M 4" B C/N UND 153.4
3534 5 MA LADRILLO KK 18 HCOS. 9X14X24CM UND 0.77
3535 5 MA CLAVOS PARA MADERA C/C 2" KG 4.96
3536 5 MA LADRILLO DE ARCILLA KK CORRIENTE UND 0.45
3537 5 MA THINER GLN 15.93
3538 5 MA PINTURA ESMALTE GLN 57.23
3539 5 MA CHAPA DE 02 GOLPES UND 65.02
3540 5 MA PINTURA ANTICORROSIVA GLN 37.76
3541 5 MA PUERTA METALICA CON PLANCHA ACANALADA UND 413
3542 5 MA REGISTRO DE BRONCE DE 2" UND 10.03
3543 5 MA REGISTRO DE BRONCE DE 4" UND 15.93
3544 5 MA YEE PVC SAL SIMPLE DE 2" UND 3.54
3545 5 MA CODO PVC SAL DE 2"X90 UND 3.54
3546 5 MA TUBERIA PVC SAL 2" M 5.31
3547 5 MA TUBERIA PVC SAL 4" X 3" MTS UND 21.83
3548 5 MA YEE PVC SAL 4" A 4" UND 6.49
3549 5 MA CODO PVC 2" X 90° UND 4.48
3550 5 MA SUMIDERO DE BRONCE DE 2" UND 6.49
3551 5 MA BIODIGESTOR DE 600 LTS UND 1345.2
3552 5 MA TAPA SANITARIA METALICA DE 0.40X0.40M UND 112.1
3553 5 MA YESO EN BOLSAS DE 25 KG. BOL 10.03
3554 5 MA ESTACAS DE MADERA P2 2.6
3555 5 MA VIDRIO IMPORTADO INCOLORO 4MM P2 8
3556 5 MA VENTANA METALICA DE 0.60 X 0.55M UND 100.3
3557 5 MA GRAVA 1/2" - 3/4" M3 129.8
3577 5 MA REGLA DE ALUMINIO 1" X 4" X 8" UND 100.3
6001 30 EQ1 VIBRADOR DE CONCRETO 4 HP 1.25" HM 11.8
6003 30 EQ1 COMPACTADOR VIBR. TIPO PLANCHA 4HP HM 14.16
6004 30 EQ1 MIRAS Y JALONES HM 11.21
6005 30 EQ1 ESTACION TOTAL HM 23.6
7001 37 EQ %HERRAMIENTAS MANUALES %MO 4960.39
8079 30 SERVPROGRAMA DE ABANDONO GLB 2950
8080 30 SERVPROGRAMA DE CIERRE GLB 2478
8081 30 SERVPROGRAMA DE CONTINGENCIAS GLB 2360
8082 30 SERVPROGRAMA DE INVERSIONES GLB 2596
8083 30 SERVPROGRAMA DE MANEJO DE RESIDUOS SOLIDOS GLB 2242
8084 30 SERVPROGRAMA DE MONITOREO GLB 1770
8085 30 SERVPROGRAMA DE PARTICIPACION CIUDADANA GLB 1416
8086 30 SERVPROGRAMA DE MITIGACION GLB 1888
8087 30 SERVTALLERE 1: ESTATUTOS Y REGLAMENTOS GLB 1329.68
8088 30 SERVTALLERE 2: ADMINISTRACION CONTABILIDAD Y ALMACEN GLB 679.15
8089 30 SERVTALLERE 3: PARTES DEL SISTEMA GLB 1241.42
8090 30 SERVTALLERE 4: GASFITERIA Y REPARACIONES GLB 1499.6
8091 30 SERVTALLERE 5: OPERACION Y MANTENIMIENTO GLB 675.02
8092 30 SERVTALLERE 6: CLORACION Y DESINFECCION GLB 924.94
8093 30 SERVTALLERE 7: HABITOS DE HIGIENE Y SALUD GLB 675.02
8094 30 SERVTALLERE 1: PRACTICAS SALUDABES GLB 2696.42
8095 30 SERVTALLERE 2: VALORACION Y CONSERVACION DE LOS SERVICI GLB 5148.58
8096 30 SERVTALLERE 3: IDENTIFICACION Y PREVENCION DE ENFERMEDA GLB 5054.77
8097 30 SERVTALLERE 4: CULTURA DE PAGO Y SOSTENIBILIDAD DE LOS S GLB 2730.76
ULO DE FLETES
FLETE CON ACEMILA Y PEON
ORIGEN - DESTINO Prec. U. p.u.Cemento
HUARI - OBRA(YUPAN) 0.06 2.5
HUARI - OBRA(YUPAN) 1.20 L A H
0.00 6 2.2 1.5

MONEDAS
0 Soles
SOLO TUBERIA Factor
Peso Codigo CU
espesor Específica
unitario Long. (m) Ø ext. (mm)
(mm) de Gastos
del insumo Adm. Directa
(kg) partida
0 0 0 0 20.1
0 0 0 0 16.5
0 0 0 0 14.84
0 0 0 0 20.1
0 0 0 0 4.99
0 0 0 0 21.5
0 0 0 0 27.02
0 0 0 0 4.6
0 0 0 0 3.42
0 0 0 0 5.9
0 0 0 0 165.2
0 0 0 0 44.84
0 0 0 0 25.37
0 0 0 0 165.2
0 0 0 0 118
0 0 0 0 33.76
0 0 0 0 2.95
0 0 0 0 1
0 0 0 0 165.2
0 0 0 0 177
0 0 0 0 53.1
0 0 0 0 29.5
0 0 0 0 76.7
0 0 0 0 4.96
0 0 0 0 4.96
0 0 0 0 5.31
0 0 0 0 4.96
0 0 0 0 70.8
0 0 0 0 224.2
0 0 0 0 1.77
0 0 0 0 98.51
0 0 0 0 0.94
0 0 0 0 1.42
0 0 0 0 0.94
0 0 0 0 1.77
0 0 0 0 2.66
0 0 0 0 153.4
0 0 0 0 0.77
0 0 0 0 4.96
0 0 0 0 0.45
0 0 0 0 15.93
0 0 0 0 57.23
0 0 0 0 65.02
0 0 0 0 37.76
0 0 0 0 413
0 0 0 0 10.03
0 0 0 0 15.93
0 0 0 0 3.54
0 0 0 0 3.54
0 0 0 0 5.31
0 0 0 0 21.83
0 0 0 0 6.49
0 0 0 0 4.48
0 0 0 0 6.49
0 0 0 0 1345.2
0 0 0 0 112.1
0 0 0 0 10.03
0 0 0 0 2.6
0 0 0 0 8
0 0 0 0 100.3
0 0 0 0 129.8
0 0 0 0 100.3
0 0 0 0 11.8
0 0 0 0 14.16
0 0 0 0 11.21
0 0 0 0 23.6
0 0 0 0 4960.39
0 0 0 0 2950
0 0 0 0 2478
0 0 0 0 2360
0 0 0 0 2596
0 0 0 0 2242
0 0 0 0 1770
0 0 0 0 1416
0 0 0 0 1888
0 0 0 0 1329.68
0 0 0 0 679.15
0 0 0 0 1241.42
0 0 0 0 1499.6
0 0 0 0 675.02
0 0 0 0 924.94
0 0 0 0 675.02
0 0 0 0 2696.42
0 0 0 0 5148.58
0 0 0 0 5054.77
0 0 0 0 2730.76
MONEDAS
Soles Dólares
118.00% 3.22 118.00%

Contrata Adm. Directa Contrata

20.1 6.24 6.24


16.5 5.12 5.12
14.84 4.61 4.61
20.1 6.24 6.24
4.23 1.55 1.31
18.22 6.68 5.66
22.9 8.39 7.11
3.9 1.43 1.21
2.9 1.06 0.9
5 1.83 1.55
140 51.3 43.47
38 13.93 11.81
21.5 7.88 6.68
140 51.3 43.47
100 36.65 31.06
28.61 10.48 8.88
2.5 0.92 0.78
0.85 0.31 0.26
140 51.3 43.47
150 54.97 46.58
45 16.49 13.97
25 9.16 7.76
65 23.82 20.19
4.2 1.54 1.31
4.2 1.54 1.31
4.5 1.65 1.4
4.2 1.54 1.31
60 21.99 18.64
190 69.63 59.01
1.5 0.55 0.47
83.48 30.59 25.92
0.8 0.29 0.25
1.2 0.44 0.37
0.8 0.29 0.25
1.5 0.55 0.47
2.25 0.83 0.7
130 47.64 40.37
0.65 0.24 0.2
4.2 1.54 1.31
0.38 0.14 0.12
13.5 4.95 4.19
48.5 17.77 15.06
55.1 20.19 17.11
32 11.73 9.94
350 128.26 108.69
8.5 3.11 2.64
13.5 4.95 4.19
3 1.1 0.93
3 1.1 0.93
4.5 1.65 1.4
18.5 6.78 5.75
5.5 2.02 1.71
3.8 1.39 1.18
5.5 2.02 1.71
1140 417.76 354.03
95 34.81 29.5
8.5 3.11 2.64
2.2 0.81 0.69
6.78 2.48 2.1
85 31.15 26.4
110 40.31 34.16
85 31.15 26.4
10 3.66 3.1
12 4.4 3.73
9.5 3.48 2.95
20 7.33 6.21
4203.72 1540.49 1305.5
2500 916.15 776.4
2100 769.57 652.18
2000 732.92 621.12
2200 806.21 683.23
1900 696.27 590.06
1500 549.69 465.84
1200 439.75 372.67
1600 586.34 496.9
1126.85 412.94 349.95
575.55 210.92 178.75
1052.05 385.53 326.72
1270.85 465.71 394.67
572.05 209.63 177.65
783.85 287.25 243.43
572.05 209.63 177.65
2285.1 837.4 709.66
4363.2 1598.94 1355.03
4283.7 1569.8 1330.34
2314.2 848.06 718.69
1011 #N/A 8
235 46
10048 Cifra de redondeo decimal del parcial 4
Cod Denominación Rto UND
10001 ACABADO Y PULIDO EN CAJA DE LODOS 40 m2 6.43 0 4
10001C

10001r
10002 ACABADO Y PULIDO EN TAPA 40 m2 6.98 0 4
10002C

10002r
10003 ACERO CORRUGADO Fy=4200 KG/CM2 GRADO 60 250 kg 6.2 0 5
10003C

10003r
10004 ACERO FY= 4200 KG/CM2 - GRADO 60 250 kg 5.08 0 5
10004C

10004r
10005 CAJA DE REGISTRO DE DESAGUE 12" X 24" 15 und 89.32 0 8
10005C

10005r
10006 CIMIENTO CORRIDO MEZCLA C: 1:10 + 30% P.G. SIN M 20 m3 357.5 0 8
10006C

10006r
10007 COBERTURA CON TEJA ANDINA 40 m2 60.15 0 6
10007C

10007r
10008 CONCRETO F'C= 210 KG/CM2 SIN MEZCLADORA 12 m3 541.9 0 7
10008C

10008r
10009 CONCRETO FC=175 KG/CM2 - SIN MEZCLADORA 10 m3 521.17 9.44 9
10009C

10009r
10010 CONCRETO SOBRECIMIENTO 1:8 C:H +25% P.M SIN ME 16 m3 361.81 5.9 9
10010C

10010r
10011 CONTRAZOCALO DE CEMENTO PULIDO 22 m2 17.55 0 7
10011C

10011r
10012 CORREAS DE MADERA TORNILLO DE 2" X 2" 35 und 16.71 0 4
10012C

10012r
10013 DUCHA CROMADA 1 LLAVE INC./ ACCESORIOS 12 und 96.67 0 4
10013C

10013r
10014 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M (A 10 m3 12.23 0 2
10014C

10014r
10015 ENCOFRADO Y DESENCOFRADO DE MUROS 18 m2 50.78 0 7
10015C

10015r
10016 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 16 m2 39.69 0 6
10016C

10016r
10017 ENCOFRADO Y DESENCOFRADO NORMAL 16 m2 39.69 0 6
10017C

10017r
10018 EXCAVACION EN TERRENO NORMAL 4 m3 31.16 0 2
10018C

10018r
10019 EXCAVACION MASIVA MANUAL 3.5 m3 34.94 0 2
10019C

10019r
10020 FALSO PISO E=4" - F-C= 100 KG/CM2 70 m2 38.51 0 7
10020C

10020r
10021 FILTRO DE GRAVA 6 m3 93.7 0 3
10021C
10021r
10022 INODORO TANQUE BAJO BLANCO 4 und 265.61 0 3
10022C

10022r
10023 INSTALACION DE TUBERIA PVC SAP 1/2" 30 pto 14.97 0 9
10023C

10023r
10024 LAVATORIO CPN PEDESTAL BLANCO INC./ACCESORIOS 8 und 174.51 0 3
10024C

10024r
10025 LIMPIEZA MANUAL DE TERRENO 150 m2 0.81 0 2
10025C

10025r
10026 MURO DE LADRILLO KK DE ARCILLA DE SOGA CON MORT16 m2 61.26 0 9
10026C

10026r
10027 MURO DE SOGA LADRILLO KING-KONG 18 m2 45.2 0 8
10027C

10027r
10028 PUERTA METALICA CON PLANCHA DE ACERO 10 und 518.27 0 8
10028C

10028r
10029 REFINE, NIVELACION Y COMPACTACION 80 m2 2.97 1.42 3
10029C

10029r
10030 REGISTRO DE BRONCE 2" 20 und 18.31 0 3
10030C

10030r
10031 REGISTRO DE BRONCE 4" 20 und 24.37 0 3
10031C

10031r
10032 RELLENO Y APISONADO CON MATERIAL PROPIO 8 m3 17.69 0 3
10032C
10032r
10033 SALIDA DE DESAGUE PVC SAL DE 2" 24 pto 28.75 0 6
10033C

10033r
10034 SALIDA DE DESAGUE PVC SAL DE 4" 20 pto 37.6 0 5
10034C

10034r
10035 SUMIDERO CROMADO PARA DESAGUE 2" 30 und 25.56 0 4
10035C

10035r
10036 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 5 und 1391.4 0 4
10036C

10036r
10037 SUMINISTRO E INSTALACION DE TUBERIA PVC - SAL DE 50 m 11.23 0 4
10037C

10037r
10038 TAPA SANITARIA METALICA DE 0.80x0.80m 8 und 148.09 0 4
10038C

10038r
10039 TARRAJEO DE MUROS INTERIORES 13 m2 26.86 0 8
10039C

10039r
10040 TRAZO DURANTE LA EJECUCION DE LA OBRA 500 m2 1.48 0.56 7
10040C

10040r
10042 VENTANA METALICA DE (0.60x0.50m) INCLUIDO MARCO, 5 und 170.26 0 8
10042C

10042r
10043 VEREDA DE CONCRETO FC=140 KG/CM2 80 m2 55.56 0 8
10043C

10043r
10044 VIGAS DE MADERA TORNILLO DE 2" X 4" X 3.60 m.l. 30 und 48.91 0 5
10044C
10044r
10045 MITIGACION Y CONTROL AMBIENTAL 1 GLB 17700 0 8
10045C

10045r
10046 TALLERES DE CAPACITACION DE LAS JASS 1 GLB 7024.8 0 7
10046C

10046r
10047 TALLERES DE EDUCACION SANITARIA 1 GLB 15631 0 4
10047C

10047r
###

40

40

250

250

15

20

40

12

10

16
22

35

12

10

18

16

16

3.5

70

6
4

30

150

16

18

10

80

20

20

8
24

20

30

50

13

500

80

30
1

1
### #N/A #N/A #N/A #N/A #N/A
### 1011 #N/A
###
### OBRA POR ADMINISTRACION DIRECTA MO MA
### En Soles 0.00 #N/A
Insumos Und Cuad./cant. Cantidad
### 3501 MADERA TORNILLO P2 #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
### #N/A #N/A #N/A #N/A #N/A
#N/A #N/A
###
#N/A #N/A ###

EQ TOTAL
0.00 #N/A
P.U. Parcial
#N/A #N/A
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
#N/A #N/A
###
RW7+
RELACION DE INSUMOS DEL PROYECTO

Proyecto BIODIGESTORES
Lugar
Elab. Por
Fecha

Cod. IU Descripción Unidad


MANO DE OBRA
1002 47 OFICIAL HH
1001 47 OPERARIO HH
1003 47 PEON HH
1004 47 TOPOGRAFO
MATERIALES
3505 05 ACERO DE REFUERZO FY=4200 KG/CM2 - GRADO 60 KG
3528 05 ADAPTADOR PVC S/P 1/2" UND
3506 05 AGUA M3
3504 05 ALAMBRE NEGRO RECOCIDO # 16 KG
3520 05 ALAMBRE NEGRO RECOCIDO # 8 KG
3507 05 ARENA FINA M3
3515 05 ARENA GRUESA M3
3551 05 BIODIGESTOR DE 600 LTS UND
3508 05 CAJA DE REGISTRO DE 12" X 24" UND
3514 05 CAPUCHON PARA TIRAFON UND
3502 05 CEMENTO PORTLAND TIPO I (42.5KG) BLS
3503 05 CEMENTO PORTLAND TIPO MS (42.5 KG) BOL
3539 05 CHAPA DE 02 GOLPES UND
3526 05 CINTA TEFLON UND
3523 05 CLAVOS PARA MADERA C/C 2 1/2" KG
3535 05 CLAVOS PARA MADERA C/C 2" KG
3521 05 CLAVOS PARA MADERA C/C 3" KG
3529 05 CODO F° G°C1/2" C/R UND
3530 05 CODO PVC 1/2" X 90° S/P UND
3549 05 CODO PVC 2" X 90° UND
3545 05 CODO PVC SAL DE 2"X90 UND
3517 05 DUCHA PZA
3554 05 ESTACAS DE MADERA P2
3524 05 FILTRO DE GRAVA M3
3557 05 GRAVA 1/2" - 3/4" M3
3510 05 HORMIGON M3
3525 05 INODORO TANQUE BAJO PZA
3536 05 LADRILLO DE ARCILLA KK CORRIENTE UND
3534 05 LADRILLO KK 18 HCOS. 9X14X24CM UND
3533 05 LAVATORIO 23"X18" PEDESTAL G.M 4" B C/N UND
3518 05 LLAVE DE DUCHA UND
3522 05 MADERA PARA ENCOFRADO P2
3501 05 MADERA TORNILLO P2
3527 05 PEGAMENTO PLASTICO PVC GLN
3516 05 PIEDRA CHANCADA DE 1/2" M3
3511 05 PIEDRA MEDIANA DE 4" M3
3540 05 PINTURA ANTICORROSIVA GLN
3538 05 PINTURA ESMALTE GLN
3541 05 PUERTA METALICA CON PLANCHA ACANALADA UND
3542 05 REGISTRO DE BRONCE DE 2" UND
3543 05 REGISTRO DE BRONCE DE 4" UND
3577 05 REGLA DE ALUMINIO 1" X 4" X 8" UND
3550 05 SUMIDERO DE BRONCE DE 2" UND
3509 05 TAPA DE CONCRETO PREFABRICADA UND
3552 05 TAPA SANITARIA METALICA DE 0.40X0.40M UND
3531 05 TEE PVC 1/2" S/P UND
3512 05 TEJA ANDINA (1.16 X 0.70 M) PLN
3537 05 THINER GLN
3513 05 TIRAFON DE 1/4 X 2 1/2 UND
3519 05 TRIPLAY DE 4´ * 8´ * 10 MM PLN
3532 05 TUBERIA PVC C-10, Ø=1/2" M
3547 05 TUBERIA PVC SAL 4" X 3" MTS UND
3546 05 TUBERIA PVC SAL 2" M
3556 05 VENTANA METALICA DE 0.60 X 0.55M UND
3555 05 VIDRIO IMPORTADO INCOLORO 4MM P2
3548 05 YEE PVC SAL 4" A 4" UND
3544 05 YEE PVC SAL SIMPLE DE 2" UND
3553 05 YESO EN BOLSAS DE 25 KG. BOL
EQUIPOS
6003 30 COMPACTADOR VIBR. TIPO PLANCHA 4HP HM
6005 30 ESTACION TOTAL HM
7001 37 HERRAMIENTAS MANUALES %MO
6004 30 MIRAS Y JALONES HM
6001 30 VIBRADOR DE CONCRETO 4 HP 1.25" HM
SERVICIOS
8079 30 PROGRAMA DE ABANDONO GLB
8080 30 PROGRAMA DE CIERRE GLB
8081 30 PROGRAMA DE CONTINGENCIAS GLB
8082 30 PROGRAMA DE INVERSIONES GLB
8083 30 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS GLB
8086 30 PROGRAMA DE MITIGACION GLB
8084 30 PROGRAMA DE MONITOREO GLB
8085 30 PROGRAMA DE PARTICIPACION CIUDADANA GLB
8087 30 TALLERE 1: ESTATUTOS Y REGLAMENTOS GLB
8094 30 TALLERE 1: PRACTICAS SALUDABES GLB
8088 30 TALLERE 2: ADMINISTRACION CONTABILIDAD Y ALMACEN GLB
8095 30 TALLERE 2: VALORACION Y CONSERVACION DE LOS SERVICIOS DE GLB
8096 30 TALLERE 3: IDENTIFICACION Y PREVENCION DE ENFERMEDADES R GLB
8089 30 TALLERE 3: PARTES DEL SISTEMA GLB
8097 30 TALLERE 4: CULTURA DE PAGO Y SOSTENIBILIDAD DE LOS SISTEM GLB
8090 30 TALLERE 4: GASFITERIA Y REPARACIONES GLB
8091 30 TALLERE 5: OPERACION Y MANTENIMIENTO GLB
8092 30 TALLERE 6: CLORACION Y DESINFECCION GLB
8093 30 TALLERE 7: HABITOS DE HIGIENE Y SALUD GLB
DEL PROYECTO

Cantidad Precio Parcial


113 691.07
724.78 16.50 11 958.87
2 347.66 20.10 47 187.97
3 653.03 14.84 54 210.97
16.58 20.10 333.26
334 221.97
2 294.86 3.42 7 848.42
212.00 0.94 199.28
46.73 5.90 275.71
204.05 4.60 938.63
32.47 4.96 161.05
7.69 165.20 1 270.39
102.15 165.20 16 875.18
53.00 1 345.20 71 295.60
106.00 44.84 4 753.04
952.64 1.00 952.64
1 118.85 21.50 24 055.28
269.36 27.02 7 278.11
53.00 65.02 3 446.06
212.00 1.77 375.24
42.09 4.96 208.77
8.78 4.96 43.55
73.47 4.96 364.41
212.00 1.42 301.04
106.00 0.94 99.64
318.00 4.48 1 424.64
67.67 3.54 239.55
53.00 53.10 2 814.30
4.01 2.60 10.43
39.30 70.80 2 782.44
39.15 129.80 5 081.67
90.66 165.20 14 977.03
53.00 224.20 11 882.60
15 971.02 0.45 7 186.96
34 591.44 0.77 26 635.41
53.00 153.40 8 130.20
53.00 29.50 1 563.50
215.97 5.31 1 146.80
3 491.14 4.99 17 420.79
4.52 98.51 445.27
25.01 177.00 4 426.77
41.08 118.00 4 847.44
6.62 37.76 249.97
6.62 57.23 378.86
53.00 413.00 21 889.00
53.00 10.03 531.59
53.00 15.93 844.29
1.00 100.30 100.30
106.00 6.49 687.94
106.00 25.37 2 689.22
53.00 112.10 5 941.30
212.00 1.77 375.24
628.70 33.76 21 224.91
13.24 15.93 210.91
952.64 2.95 2 810.29
122.43 76.70 9 390.38
169.76 2.66 451.56
106.00 21.83 2 313.98
783.27 5.31 4 159.16
53.00 100.30 5 315.90
169.60 8.00 1 356.80
106.00 6.49 687.94
212.00 3.54 750.48
10.38 10.03 104.11
6 020.10
17.01 14.16 240.86
16.77 23.60 395.77
4 960.39 4 960.39
16.72 11.21 187.43
19.97 11.80 235.65
40 355.36
1.00 2 950.00 2 950.00
1.00 2 478.00 2 478.00
1.00 2 360.00 2 360.00
1.00 2 596.00 2 596.00
1.00 2 242.00 2 242.00
1.00 1 888.00 1 888.00
1.00 1 770.00 1 770.00
1.00 1 416.00 1 416.00
1.00 1 329.68 1 329.68
1.00 2 696.42 2 696.42
1.00 679.15 679.15
1.00 5 148.58 5 148.58
1.00 5 054.77 5 054.77
1.00 1 241.42 1 241.42
1.00 2 730.76 2 730.76
1.00 1 499.60 1 499.60
1.00 675.02 675.02
1.00 924.94 924.94
1.00 675.02 675.02
TOTAL 494 288.50
RW7+

PRESUPUESTO GENER
Proyecto BIODIGESTORES
Lugar
Elab. Por
Fecha

PARTIDAS UND METRADO


01 UNIDAD BASICA DE SANEAMIENTO (UBS) - 53 UNS
01.01 UBS CON ARRASTRE HIDRAULICO
01.01.01 OBRAS PRELIMINARES
01.01.01.01 TRAZO DURANTE LA EJECUCION DE LA OBRA m2 699.6
01.01.01.02 LIMPIEZA MANUAL DE TERRENO m2 699.6
01.01.02 MOVIMIENTO DE TIERRA
01.01.02.01 EXCAVACION MASIVA MANUAL m3 67.84
01.01.02.02 REFINE, NIVELACION Y COMPACTACION m2 169.6
01.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M (A MANO m3 84.8
01.01.03 CONCRETO SIMPLE
01.01.03.01 CIMIENTO CORRIDO MEZCLA C: 1:10 + 30% P.G. SIN MEZCLAD m3 67.84
01.01.03.02 CONCRETO SOBRECIMIENTO 1:8 C:H +25% P.M SIN MEZCLAD m3 17.05
01.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 227.37
01.01.03.04 FALSO PISO E=4" - F-C= 100 KG/CM2 m2 174.9
01.01.03.05 VEREDA DE CONCRETO FC=140 KG/CM2 m2 435.13
01.01.04 CONCRETO ARMADO (COLUMNAS Y VIGAS)
01.01.04.01 CONCRETO F'C= 210 KG/CM2 SIN MEZCLADORA m3 24.16
01.01.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 322.13
01.01.04.03 ACERO FY= 4200 KG/CM2 - GRADO 60 kg 1889.39
01.01.05 ALBAÑILERIA
01.01.05.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA CON MORTERO 1:
m2 886.96
01.01.06 REVOQUES, ENLUCIDOS Y MOLDURAS
01.01.06.01 TARRAJEO DE MUROS INTERIORES m2 131.18
01.01.06.02 CONTRAZOCALO DE CEMENTO PULIDO m2 172.91
01.01.07 CARPINTERIA METALICA
01.01.07.01 VENTANA METALICA DE (0.60x0.50m) INCLUIDO MARCO, VIDRI und 53
01.01.07.02 PUERTA METALICA CON PLANCHA DE ACERO und 53
01.01.08 COBERTURAS
01.01.08.01 VIGAS DE MADERA TORNILLO DE 2" X 4" X 3.60 m.l. und 159
01.01.08.02 CORREAS DE MADERA TORNILLO DE 2" X 2" und 265
01.01.08.03 COBERTURA CON TEJA ANDINA m2 476.32
01.01.09 INSTALACIONES SANITARIAS
01.01.09.01 SALIDA DE DESAGUE PVC SAL DE 4" pto 106
01.01.09.02 SALIDA DE DESAGUE PVC SAL DE 2" pto 212
01.01.09.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 106
01.01.09.04 INSTALACION DE TUBERIA PVC SAP 1/2" pto 212
01.01.10 APARATOS Y ACCESORIOS SANITARIOS
01.01.10.01 INODORO TANQUE BAJO BLANCO und 53
01.01.10.02 LAVATORIO CPN PEDESTAL BLANCO INC./ACCESORIOS und 53
01.01.10.03 DUCHA CROMADA 1 LLAVE INC./ ACCESORIOS und 53
01.01.10.04 SUMIDERO CROMADO PARA DESAGUE 2" und 106
01.01.10.05 REGISTRO DE BRONCE 4" und 53
01.01.10.06 REGISTRO DE BRONCE 2" und 53
01.02 BIODIGESTOR AUTOLIMPIABLE
01.02.01 TRAZO DURANTE LA EJECUCION DE LA OBRA m2 76.85
01.02.02 LIMPIEZA MANUAL DE TERRENO m2 76.85
01.02.03 EXCAVACION EN TERRENO NORMAL m3 214.65
01.02.04 RELLENO Y APISONADO CON MATERIAL PROPIO m3 76.96
01.02.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M (A MANO USA m3 137.69
01.02.06 MURO DE SOGA LADRILLO KING-KONG m2 13.25
01.02.07 ACABADO Y PULIDO EN CAJA DE LODOS m2 25.44
01.02.08 TAPA SANITARIA METALICA DE 0.80x0.80m und 53
01.02.09 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 LTS und 53
01.03 POZO DE PERCOLACION
01.03.01 TRAZO DURANTE LA EJECUCION DE LA OBRA m2 265
01.03.02 LIMPIEZA MANUAL DE TERRENO m2 265
01.03.03 EXCAVACION EN TERRENO NORMAL m3 310.05
01.03.04 RELLENO Y APISONADO CON MATERIAL PROPIO m3 59.63
01.03.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M (A MANO USA m3 313.03
01.03.06 FILTRO DE GRAVA m3 38.16
01.03.07 CONCRETO FC=175 KG/CM2 - SIN MEZCLADORA m3 14.31
01.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 95.4
01.03.09 ACERO CORRUGADO Fy=4200 KG/CM2 GRADO 60 kg 296.8
01.03.10 ACABADO Y PULIDO EN TAPA m2 95.4
01.03.11 MURO DE SOGA LADRILLO KING-KONG m2 407.04
01.03.12 SUMINISTRO E INSTALACION DE TUBERIA PVC - SAL DE 2" m 132.5
02 MITIGACION AMBIENTAL, EDUCACIÓN SANITARIA Y CAPACITACION DE JASS
02.01 MITIGACION Y CONTROL AMBIENTAL GLB 1
02.02 TALLERES DE EDUCACION SANITARIA GLB 1
02.03 TALLERES DE CAPACITACION DE LAS JASS GLB 1
COSTO DIRECTO
UESTO GENERAL DEL PROYECTO

P.U. PARCIAL
453 933.14
309 302.83
1 602.09
1.48 1 035.41
0.81 566.68
3 911.14
34.94 2 370.33
2.97 503.71
12.23 1 037.10
70 357.20
357.50 24 252.80
361.81 6 168.86
39.69 9 024.32
38.51 6 735.40
55.56 24 175.82
39 048.16
541.90 13 092.30
50.78 16 357.76
5.08 9 598.10
54 335.17
61.26 54 335.17
6 558.06
26.86 3 523.49
17.55 3 034.57
36 492.09
170.26 9 023.78
518.27 27 468.31
40 855.49
48.91 7 776.69
16.71 4 428.15
60.15 28 650.65
22 722.16
37.60 3 985.60
28.75 6 095.00
89.32 9 467.92
14.97 3 173.64
33 421.27
265.61 14 077.33
174.51 9 249.03
96.67 5 123.51
25.56 2 709.36
24.37 1 291.61
18.31 970.43
92 266.89
1.48 113.74
0.81 62.25
31.16 6 688.49
17.69 1 361.42
12.23 1 683.95
45.20 598.90
6.43 163.58
148.09 7 848.77
1 391.43 73 745.79
52 363.42
1.48 392.20
0.81 214.65
31.16 9 661.16
17.69 1 054.85
12.23 3 828.36
93.70 3 575.59
521.17 7 457.94
39.69 3 786.43
6.20 1 840.16
6.98 665.89
45.20 18 398.21
11.23 1 487.98
40 355.36
17 700.00 17 700.00
15 630.53 15 630.53
7 024.83 7 024.83
494 288.50
RW7+
DETERMINACION DE LA FORMULA POLINOMICA
Proyecto : BIODIGESTORES
Lugar :
:
Fecha :
AGRUPACION PRELIMINAR
COEF. AGR.
N° IU ELEMENTO PARCIAL % INCID. AGR. 1
ACUM.1 2
1 47 Mano de obra (incluido leyes sociales) 113691.07 20.00% 2 0.200 J
2 05 Agregado grueso 334221.97 58.80% 1 0.588 A
3 30 Dólar mas inflación mercado USA 41415.07 7.29% 4 0.073 D
4 39 74143.28 13.04% 3 0.139 G
37 Herramienta manual 4960.39 0.87% 3
TOTAL 568431.78 100.00% 1.000

CONFORMACION DE MONOMIOS
INCID. SIMB. % COEF.
N°M N° IU IU ELEMENTO ELEM. AGR. IM MON.
1 1 47 Mano de obra (incluido leyes sociales) 0.200 J 100.00% 0.200
2 2 05 Agregado grueso 0.588 A 100.00% 0.588
3 3 30 Dólar mas inflación mercado USA 0.073 D 100.00% 0.073
4 4 39 0.139 G 100.00% 0.139
TOTAL 1.000 1.000

FORMULA POLINOMICA:

Jr Ar Dr Gr
K= 0.200 ---------- + 0.588 ---------- + 0.073 ---------- + 0.139 ----------
Jo Ao Do Go
COEF. Orden
ACUM.2 Mon.
0.200 1
0.588 2
0.073 3
0.139 4

1.000

Area
Geogr.

3
MAYORES GASTOS GENERALES VARIABLES POR AMPLIACIÓN DE PLAZO
PROYECTO:
CONTRATISTA:
SUPERVISOR:

MGGV = Días AP * ( GGV / Plazo) * ( IU39r / IU39o)


Donde:
MGGV = Mayores gastos generales variables Plazo = Plazo contractual en días calenda
Días AP = Número de días de ampliación de plazo IU39r = Índice unificado de código 39 del
GGV = Gastos generales variables del contrato IU39o = Índice unificado de código 39 del

Mes de
N° Descripción Plazo GGV Días AP
Pto. Base
01 Ampliación de plazo N° 01 120 100 000.00 20 Jan-2021
02 Ampliación de plazo N° 01 120 100 000.00 20 Jan-2021
CIÓN DE PLAZO

o contractual en días calendarios


e unificado de código 39 del mes de inicio de la paralización
ce unificado de código 39 del mes de presupuesto base

Mes inicio de
IU39o IU39r MGGV IGV=18.00% TOTAL
paralización
1.00 Jan-2022 1.00 16 666.67 3 000.00 19 666.67
1.00 Apr-2022 1.00 16 666.67 3 000.00 19 666.67
TOTAL 39 333.34
CUADRO RESUMEN DE LIQUIDACION FINAL DE OBRA

OBRA
LUGAR

MONTOS MONTOS
CONCEPTO
RECALCULADOS PAGADOS

1. MONTO DE VALORIZACIÓN 0.00 0.00


VALORIZACIÓN SIN REAJUSTE
POR ADICIONALES

2. REAJUSTE DE LA VALORIZACIÓN 0.00 0.00


POR OBRA PRINCIPAL
POR ADICIONALES
RETENCIÓN POR RETRASO DE OBRA
- En Obra Principal
- En Adicionales
REINTEGROS (Otros)

3. MONTO BRUTO VALORIZ. REAJUSTADO (1+2) 0.00 0.00

4. DEDUCCIÓN DEL REAJUSTE 0.00 0.00


POR ADELANTO DIRECTO
POR ADELANTO PARA MATERIALES

5. MONTO NETO VALORIZ. REAJUSTADO (3+4) 0.00 0.00

6. AMORTIZACIÓN DE ADELANTOS 0.00 0.00


ADELANTO DIRECTO
ADELANTO PARA MATERIALES

7. OTROS 0.00 0.00


MAYORES GASTOS GENERALES AMPL. DE PLAZO
INTERES POR MORA EN PAGOS
OTROS CONCEPTOS

8. MONTO NETO FACTURABLE SIN I.G.V. (5+6+7) 0.00 0.00

9. MONTO RETENIDO 0.00 0.00


GARANTIA DE FIEL CUMPLIMIENTO
OTROS

10. MULTAS Y OBLIGACIONES VARIAS 0.00 0.00


MULTA POR ATRASO EN LA ENTREGA DE OBRA
OTROS

11. MONTO LIQUIDO A PAGAR (8+9+10) 0.00 0.00

12. IMPUESTO GENERAL A LAS VENTAS (I.G.V.) 0.00 0.00


DEL MONTO NETO FACTURABLE (18%)
POR ADELANTOS OTORGADOS

13 MONTO A CANCELAR FACTURABLE (11+12) 0.00 0.00

14 COSTO FINAL DE OBRA (5+7+12) 0.00


SALDOS POR
PAGAR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

También podría gustarte