Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Plano Planta: Entrega 02

Descargar como pdf o txt
Descargar como pdf o txt
Está en la página 1de 1

ENTREGA 02

EMPALME CON CANAL


PLANO PLANTA EXISTENTE BANDA BAJA
Esc: 1/5,000

N 0+668.38
196
0.2
06
BM-
CANALES EXISTENTES 0+600.00
62
1.0
7
ENTREGA 01
2725.0
CANAL BANDA ALTA 0.1
574
0
ULT
IVO
EMPALME CON CANAL EXISTENTE
CANAL BANDA BAJA TER
R ENO
SD
EC

BANDA ALTA
425 0
0.4
CANAL EL SALARIO 00.0
0+5
978
0.2
6 89
0.9
466
0.4 028
0.2
717
IVO
ULT
0.1 REN
OS
D EC

TER
0
0+400.0
776
0.5
872
0.2
53 0.1
0
.0

0
.0
0
587

50
0.5 715 30 659

27
0.7 1.4
.0 0 0+
2700
398

00
51

0
0.2 .30

2775.0
5 25 0
0+37 8.87

0.
0.5 .39
44
353

30
0
0.3
203 935 408 124 07
BM-

0+
.00
0.2 0.0 34 4 0.6 42 0.3
0.2 048 0.2
614 0.3

2700
313 0.2

A
0.3 21

00
AZ
844 296 .26 704

UM
0.2 955 779 0.1 0
0.8 876
0.1

0.
NT
4 0.4 0.5

CO
76 0.196 69 76 0+

20
9 9 09
0.3

O
0.1 2 0. 200

RI
258 944 942 848 0.2

0+
0.3 0.0 0.6 286 232 .00

00
0.5 0.4 0.2

5.
966

2
296 65 69 0.9

27
493 1.2 .29 1.4
525 0.5
0 845
0.1 1.4

00
56 45 46 3 41 405 54 39
599
7 0.2 0.2 9

0.
0.0 .95 .23 .79 0.2
0.5 0 0
956
0

10
568 0.1 35
0.1 703 0.1

0+
891 977 702 1.8 2 0+
293 0.0 0.6 379 0.3 0.225 10
121 0.2 0. 66 1 796 6 0.0
0.3 2 5
8 1.0 524 25 0.1 97 0
0.1 0.5 0.6 0.8
684 3 25
673 0.2
06
924 1.6 545 0.1
0.3 5 43 0.0 0.0
411 0.2
05
BM-
96 956 79 93 591
0.3
2 681 0.2 963 0.7 0.4 3 0.0
0.2

0.00
464 0.4 0.8 402 232 306 711
0.0 0.6 0.4 642 0+000.00

0
239 911 0.1 34 0.7 0.6 931

2775.0
84 0.6 0.4 .23 1.2

275
6 0
0.4 267
98 0.2 8
0.1 369 156 170
943 0.9 0.
1.2 355 0.1
829 1.0
138
62 305 436 173 63
0.5
0.6
661 831
0+000.00 1+
PARTIDOR - LA BANDA
0.1 4 0.7 0.3 0.2 0.5 214 166 0.0 - INICIO CANAL PROYECTADO BANDA BAJA
4 0.5 97 9 1.2 1.0 3 12 00
172 834 .71 371 0.4 0.0
0.9
0. 1 0.
834 925 0 - INICIO CANAL PROYECTADO BANDA ALTA
0.2
426 49 8 0.4 0.3
96
0.4 0.8
615
0.4
9 86 1+046.30
0.3 94 102
.08 0.6

A
2 0

AZ
085 544

UM
0.

T
0.3

ON
-C
58 083 974

/N
1 03 482

ES
0.3 0.6 0.4 0.7 103 0.0

LL
CA
18 0.5
0.2
521
317 .35
54
0.7
536
717 775
0.2
318 0.2
158 IMAGEN SATELITAL DEL AREA DEL EMBALSE LAS BOTIJAS
662 9504 408 28 0.3 0.3 389
0.1 53 9 1.5 0.2 0.7 0.6 0.3 82 6 924 0.2
0.6 0.7 0.4
015 27 7 159
573 1.5 86 0.3 0.4
0.2 263 0.5 53 699
0.5 0.4 0.8
468 914 221
9
227 0.7 0.0 0.
0.2 652

.00
795 0.6 82 0.3
3 3
0.8 51 912 253 711

50

0+800.00
4
0.4 0.2 072 0.4 0.2 0.6
074

27
12 0.6
0.6
1
143 0.2
08

0
704 393 1.7 .65

.0
0.7 1.8 29
0 0.4 335

75
049 0.7 134
0.2

27

0
19 72 0.4 1

.0
0.7
1 897 0.0
9 785 0.084 .24
42

00
1.8
84 0.2 0.1 0
703

28
095 976 0.0
259 832 068 0.4 0.2
8 0.7 0.4 862 0.5 846
0.943 1.4 512 23 0.1
654 1.4 0.4
0.3 486 052 474 993
6 1.0 0.6 1.0 0.2 541
11 5 0.3 537
0.1 038 34 0.6
0. 0.19 0+
8 78
202 0.3

ZA
453 775 60

A
UM
1.3 0.1 0.0 333

NT
008 0.

CO
038 0.6 0.1

N-
431 0

E S/
0.5 215 027 769

LL
1.0 804 0

CA
23 1.8 08 0.8 842 0.8 PARTIDOR - LAS BOTIJAS
701 .63 604 0.2 .20 0.1
0.7 0 0. 297 0
0.2 - INICIO CANAL PROYECTADO EL SALARIO

2800.00
073 157
8 6
1.4 0. 97 52
.34 0.2
76 567 0.1
67 0
0.3
131 - INICIO DE CANAL PROYECTADO LA BANDA
.22 188 1 0.9
609 .54
31 0 0.6 52 4 51 0
0.6 .54 278 0.2 .0
515
1
538
0 0 985 0. 0
518 0. 0.8 0.2
0.2 32
906 40

27
.97 57 036
0 0.2
581 1.3 0+
3

75
0.2 0.1 699
357 82

.00
1.1 0.1 929 0.2 28
0.0 2 2750 00
272 876 0.1
36 .00 .00
1.4 0.2

0+300.00
282 344 2725
0.3 32 254 821 891 0.3 .00
48 9 0.1 1.2 0+513.32

0.00
0.3
0.6
3
1+931.06 346
0.5 26
50 0+000.00

00.00
89 1. 277

TROCHA CARROZABLE
005 .00 TOMA - CANAL EXISTENTE EL

275
.92 546 5.00 0

.00
27
0 0.2
293 TINGO 4 0.3 .0

26
0

25
0.8 BM-

27
0
032 00

25
LE
OZAB
26
20

500
00

.00
0.4
CARR

0.
HA

438
TROC
0

ZA
.0
75

275
6 .0

26

MA
00

.00
0.4 43

0+4
0
25
.00

NTU
857 0.1 624 50 0+ .00 20

00

0
2775

CO
0.7 0.0 26 26

75

0.0
9

-
651

S/N
00.

.0

0+
0

1+000.0
50
0+
BM-
IVO
881

LLE
0.4

.00

0
RIO CONT ULT
892 .00 EC 2700.0

0
0.0

CA
UMAZA SD
86 0.4 63 RENO 0 2750.00
10
7 0 TER

.00
1+8
0.8 0.9
BM-
0 0
.0 5.0

0
953
-08 25

2725.0
0.1 62

00
00
BM 26 2
TROC

52
UBICACION
HA
CARR
6
0.5
OZAB O

0.
LE TIV
CUL

+2
DE

.00
OS

10
REN
TER
CAJA DE VALVULAS

QU

0
153

EB

0+
0+600.00

0
0.3

RA
27
0+000.00

1+
00

DA

0+40
.00

0
HU
2725.00

.0
20

AY
LE
255 TROCHA
CARROZAB

TA
0.00

1+600.00

2750.00
SUCIA
PASE AEREO -02

RI

.00
0.
03 2700.00

80

75.00
O

0.00
BM-

00
L= 8.00 m.

00
1+400.00
INICIO - CANAL DE ADUCCION

0+
DA AGUA

2775
E

AZ
A 26 ZA
BL

.
.00

280
RO

25
UM 75 AR

27
AC

ENTREGA 03
CH
.0

28
T IO TR
O

ON

2675
C 0 AY TAR
QUEBRA

.00
O HU
RI A
AD
EBR

2750
EMPALME CON CANAL EXISTENTE
David Leon QU
0
Areas colegio 00.0
EL:27
68.41 0+0
0+138.22
EL SALARIO
2700.0 275
0 0.0 0+100.00
PASE AEREO - 01 TRAMO CRITICO L=280 0
L= 45.00 m. POSIBLE ZONA DE INUNDACION

27
75
270
0.00 28

.00
0 00 0+050.00
2725.0 .0
AREAS PARA RIEGO CON VALVULA DE DISTRIBUCION 0 2
8.8
2575.00

CANAL EL TINGO. PARA CANAL EL TINGO 2725.00 0 +7400.00


0 2875.00
0+
2750.00

28
PRESA LAS BOTIJAS

0.00
2600.00

75
.00
2850

.00
00.0
5.00
-02 0+ 2825.00
287

0+60
BM 70 5.00
0

0
2800.00
2875.0

0+
0.

2825.00

0+5
2625.00

0+300.00

0+200.0
2850.00
2650.00
00 7 0
28 0.0

40
VO
LU 285
2850.00
TURA

2675.00
TRUC
M

0.0
ES

2800.00
0.6EN U

.00
66 TIL 2825.00

50

0
MM DE 0

27
TIV
O
C. L EM 0 .0
DE
CUL
80 2825.00
B

27
NO S
2800.00AL 2 0
2825.0
RE
TER
5.00
E
SE S

00
BAL
: DE
EM
282

.0
A

2725.00
ZON

SCAS
0

CA
28
01285

CIA
BM-

LE HA
25 28

2750.00
.0

OZAB
0 0.0 50
.00

CARR
O
EC
U LTIV 0

HA
O SD

TROC
REN
TER
UBICACION DE LA PRESA OS
DE
CUL
TIV
O
0+100.00
ULT
IVO REN .00
REN
OS
DEC TER
2875
TER

ORIO

.000
ERV
RES

22885500.0
.00 0+000.0
50 0
28

.00
LEYENDA

2850
AREA EMBALSE LAS BOTIJAS
RIOS Y QUEBRADAS
TROCHA CARROZABLE
ESTRUCTURAS CUADRO COORDENADAS HITOS
BMs
SISTEMA WGS - 84
CANAL DE ADUCCION A CAJA DE VALVULAS
HITO ESTE NORTE COTA
CANAL PROYECTADO DE EMPALME LAS BOTIJAS
BM-1 742860.54 9183998.89 2846.03
CANAL PROYECTADO EL SALARIO
CANAL PROYECTADO LA BANDA BM-2 742677.07 9184210.01 2845.41

CANAL PROYECTADO BANDA ALTA BM-3 742474.99 9184580.41 2751.62


CANAL PROYECTADO BANDA BAJA BM-4 742031.13 9184905.10 2754.67
EJE DEL CAUCE DEL EMBALSE LAS BOTIJAS BM-5 742749.44 9185281.68 2748.54 MINISTERIO DE AGRICULTURA Y RIEGO
CATASTRO CIUDAD DE CONTUMAZA
BM-6 743047.40 9185763.80 2726.73 PROYECTO ESPECIAL JEQUETEPEQUE ZAÑA
BM-7 742611.41 9185554.00 2689.06
PROYECTO:
BM-8 741505.51 9185016.40 2640.83 "CREACION DEL SERVICIO DE AGUA PARA LA REGULACION DEL RIEGO AGUAS ABAJO IJAS
DE LA ZONA LAS BOTIJAS, PROVINCIA DE CONTUMAZA, DEPARTAMENTO DES BOT
BM-9 741510.16 9185032.26 2645.72 LA
CAJAMARCA" LSE A
BM-10 741037.18 9185202.56 2561.07
E MB
DEL
SISTEMA HIDRAULICO DEL PROYECTO DE INVERSION
E
NOTAS: EJ
1. LAS DIMENSIONES Y ELEVACIONES ESTAN EN METROS.
L DEL
PLANO: A
2. SISTEMA DE COORDENADAS UTM, WGS-84, ZONA 17S.
DIN
PLANTA GENERAL
ITU

00
3. LAS CURVAS DE NIVEL ESTAN CADA 5.00 m.
N G

0
L LO Departamento:

.
0
0
0
Topografía: Escala: Fecha: Provincia: Distrito: Lamina:

.00
80.0
.
2
0
I

0
F

0+6
0
R

4 0
0

0+6
Ing. JORGE CHIROQUE C. INDICADA E
OCTUBRE 2017 CAJAMARCA CONTUMAZA CONTUMAZA

.
00
20.0
P

0
6

0+5
0

0+5
.
0
0

0+5
0
PG

00
60.0
.
0

0+5
0
Dibujo: Revisado: Aprobado: Director Ejecutivo:

0+5
8
.
0
0

4
0

0+4
.00
00.0
.
Ing. CESAR CARPIO B. Ing. TITO RIOJA M.

5.04
4

0+4
0
Ing. JORGE CHIROQUE C. Ing. MARCO. PALOMINO B.

.740
9.39
0+4
2
0
0

2
0

0+4
JEFE DE DIVISION DE PROYECTOS GERENTE DE ESTUDIOS (e)

40.0
.
.00

6
9
8

0+4
0

278
28540

6.8
9

9.95
0+3
6

278
JEFE DE ESTUDIO:

0
0

1.36
0+3
0
28 3Ing.

9
.00
80.0
.
0
28 20 VICTOR F. CORDOVA GONZALES

1.68
0
0+3
2
0

279
27
0

4.07
0+3
0

279
4 0
0
28 10

8.86
7
0

0+3

280
.
.00
20.0

0.23
0
6

0+2
8

280
2 00

.991
9.30
0+2

280
28

80.0

0+2
0

280
0

0+2

281
0+2

280
0+1

28 0

También podría gustarte