Item Descripción Und. Metrado
Item Descripción Und. Metrado
Item Descripción Und. Metrado
Metrado
01 OBRAS E INSTALACIONES PROVISIONALES
04 PERGOLAS
04.01 CONCRETO SIMPLE
04.01.01 CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% P.G. DOSIFICADO m3 1.82
04.01.02 SOLADO PARA ZAPATAS f'c=65 kg/cm2,e=4" m2 2.46
Item Descripción Und. Metrado
04.02 CONCRETO ARMADO
04.02.01 ZAPATAS
04.02.01.01 CONCRETO EN ZAPATA f'c=210 kg/cm2 m3 1.11
04.02.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 19.88
04.02.02 VIGA DE CIMENTACION
04.02.03 SOBRECIMIENTOS
04.02.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS m2 23.94
04.02.05 VIGAS
04.02.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 14.85
04.02.05.02 CONCRETO f´c: 210 kG/CM2 EN VIGAS m3 0.57
04.05 PINTURAS
04.05.01 PINTURA LATEX EN COLUMNAS MUROS INTERIORES Y EXTERIORES m2 68.80
04.06 ESTRUCTURA METALICA
05 MOBILIARIO URBANO
05.01 OBELISCO
05.01.01 ADQUISICION E INSTALACION DE MONUMENTO DE PARQUE MOCCE und 1.00
05.02 BANCAS DE CONCRETO
08 INSTALACIONES SANITARIAS
08.01 LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJA CONCRETO F'C 175 S/D und 6.00
08.02 TUBERIA DE PVC C-10 3/4" m 119.23
09.01 FAROLA JP250 LAMPARA NA70W INCL.POSTE MERTALICO H=3.00 MC/BASE DE und 15.00
CONCRETO
09.02
MURETE PARA SUMINISTRO ELECTRICO und 1.00
09.03
TAB.AUT.1-3x100A,3-2x32A und 1.00
09.04
ALIMENTADOR NYY 2x10 mm2 m 185.77
09.05
TUBERIA PVC -P 25 mm m 185.77
09.06
POZO DE TIERRA und 1.00
09.07
EXCAVACION PARA REDES ELECTRICAS m3 72.45
09.08
RELLENO CON MATERIAL PROPIO DE CORTE m3 72.45
10
OTROS
10.01
PLACA RECORDATORIA und 1.00
10.02
SUMINISTRO E INSTALACION DE RUEDA GIRATORIA(MUNDO INFANTIL PARQUE) und 1.00
10.03
SUMINISTRO E INSTALACION DE COLUMPIO DE 4 ASIENTOS und 1.00
10.04
SUMINISTRO E INSTALACION DE MODULO VILLA SOL und 1.00
10.05
SUMINISTRO E INSTALACION DE PASAMANOS und 1.00
10.06
SUMINISTRO E INSTALACION DE SUBE Y BAJA DE METAL DE 3 ASIENTOS und 1.00
10.07
LIMPIEZA FINAL DE OBRA m2 1,394.26
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
IGV
Item
Descripción Und. Metrado
VALOR REFERENCIAL
EXPEDIENTE TECNICO
SUPERVISION(5%)
8,277.78
810.22 810.22
61.67 3,700.20
413.83 413.83
1,850.00 1,850.00
1,503.53 1,503.53
2,049.56
1.47 2,049.56
59,876.63
16,203.51
29.05 13,919.31
3.70 2,284.20
25,128.47
13.07 7,514.99
23.07 17,613.48
18,544.65
9.13 6,841.47
14.81 9,142.95
9.00 2,560.23
82,396.29
4,077.73
33.44 490.90
49.61 2,646.20
292.12 940.63
13,357.00
23.51 215.82
47.01 13,141.18
213.39
23.51 50.78
45.17 162.61
28,839.66
36.66 9,812.42
312.79 18,316.98
3.81 393.42
9.05 316.84
5,107.29
36.66 1,025.38
312.79 4,081.91
30,768.68
11,435.69
40.20 11,435.69
19,332.99
69.16 19,332.99
32.54
0.61 32.54
18,572.34
534.05
261.21 475.40
23.84 58.65
Precio S/. Parcial S/.
5,498.86
422.94
312.79 347.20
3.81 75.74
694.90
36.66 138.57
302.24 172.28
3.81 384.05
1,505.40
36.66 877.64
289.22 535.06
3.81 92.70
1,813.27
36.66 667.95
312.79 290.89
3.81 854.43
1,062.35
36.66 544.40
312.79 178.29
3.81 339.66
758.42
63.84 758.42
1,735.82
25.23 1,735.82
728.59
10.59 728.59
2,500.00
2,500.00 2,500.00
6,816.60
210.00 6,816.60
25,036.72
3,000.00
3,000.00 3,000.00
7,872.40
3,195.79
69.22 1,632.90
326.08 1,095.63
3.92 467.26
899.90
69.22 527.46
326.08 231.52
3.92 140.92
3,776.71
69.22 2,303.64
326.08 505.42
3.92 967.65
14,164.32
1,770.54 14,164.32
20,336.57
4,239.42
Precio S/. Parcial S/.
4,239.42
48.34 4,239.42
16,097.15
13.92 8,138.75
18.00 216.00
15.00 495.00
15.00 225.00
39.90 7,022.40
30,679.15
3,898.80
23.31 651.98
23.31 1,458.74
27.41 1,427.51
39.58 360.57
1,239.61
3.03 699.48
12.57 540.13
25,540.74
2,062.16 4,124.32
1,190.22 17,853.30
3,563.12 3,563.12
3,154.40
264.69 1,588.14
5.50 655.77
29.05 554.27
18.67 356.22
24,251.33
994.23 14,913.45
282.65 282.65
1,061.92 1,061.92
8.56 1,590.19
11.70 2,173.51
772.30 772.30
29.05 2,104.67
18.67 1,352.64
22,523.98
491.53 491.53
2,966.11 2,966.11
1,601.69 1,601.69
12,711.86 12,711.86
1,029.66 1,029.66
2,203.39 2,203.39
1.09 1,519.74
297,154.75
20,800.83
23,772.38
------- -
341,727.96
61,511.03
Precio S/. Parcial S/.
--------
403,238.99
24,500.00
20,161.95
447,900.94