METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 DESBROCE Y LIMPIEZA DEL TERRENO m2 316.82

1 21.70 14.60 316.82


01.01.0102 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 316.82
1 21.70 14.60 316.82
01.01.02.02 MOVIMIENTO DE TIERRAS
01.01.02.02.01 EXCAVACIONES
01.01.02.02.01.01 EXCAVACION DE ZAPATAS DE 2.00 m de Prof. m3 254.29
Z-1 1 2.80 2.80 2.45 19.21
Z-2 1 2.80 2.60 2.45 17.84
Z-3 5 2.50 2.50 2.45 76.56
Z-4 6 2.20 2.20 2.45 71.15
Z-5 1 3.00 2.50 2.45 18.38
Z-6 4 1.80 1.80 2.45 31.75
Z-7 2 1.80 2.20 2.45 19.40
-
01.01.02.02.01.02 EXCAVACION DE CIMIENTOS CORRIDOS DE 1.00a 1.50m m3 - 55.98
EJE A-A 1 1.00 0.60 1.50 0.90
1 1.80 0.60 1.50 1.62
1 1.80 0.60 1.50 1.62
1 1.10 0.60 1.50 0.99
1 1.85 0.60 1.50 1.67
EJE C-C 1 4.87 0.80 1.50 5.84
1 1.45 0.60 1.50 1.31
1 0.80 0.60 1.50 0.72
1 1.98 0.60 1.50 1.78
EJE D-D 1 1.00 0.60 1.50 0.90
1 1.80 0.60 1.50 1.62
1 1.80 0.60 1.50 1.62
1 1.10 0.60 1.50 0.99
1 1.85 0.60 1.50 1.67
EJE B-B 1 4.78 0.60 1.50 4.30
1 4.90 0.60 1.50 4.41
EJE 1-1 1 2.00 0.60 1.50 1.80
1 1.75 0.60 1.50 1.58
1 1.85 0.60 1.50 1.67
EJE 3-3 1 1.85 0.60 1.50 1.67
1 1.25 0.60 1.50 1.13
1 1.90 0.60 1.50 1.71
EJE 4-4 1 1.90 0.60 1.50 1.71
EJE 5-5 1 3.13 0.60 1.50 2.81
1 2.73 0.60 1.50 2.45
1 1.85 0.60 1.50 1.67
EJE 6-6 1 2.00 0.60 1.40 1.68
1 1.75 0.45 1.40 1.10
1 1.35 0.45 1.40 0.85
INTERIORES -
ENTRE EJE 4-4 Y 5-5 1 2.33 0.40 0.60 0.56
1 0.60 0.40 0.60 0.14
2 0.70 0.40 0.60 0.34
ENTRE EJE 5-5 Y 6-6 1 2.76 0.40 0.60 0.66
1 1.40 0.40 0.60 0.34
1 0.73 0.40 0.60 0.18
-
01.01.02.02.02 RELLENOS -
01.01.02.02.02.01 RELLENO Y COMPACTADO C/EQUIPO LIVIANO CON MATERIAL PROPIO m3 - 177.97
Relleno en Zapatas -
Z-1 1 2.80 2.80 1.65 12.94
C3 Menos -1 0.45 0.30 1.65 - 0.22
Z-2 1 2.80 2.60 1.65 12.01
C3 Menos -1 0.45 0.30 1.65 - 0.22
Z-3 5 2.50 2.50 1.65 51.56
C1 Menos -5 0.50 0.30 1.65 - 1.24
Z-4 6 2.20 2.20 1.65 47.92
C1 Menos -6 0.50 0.30 1.65 - 1.49
Z-5 1 3.00 2.50 1.65 12.38
C1 Menos -1 0.50 0.30 1.65 - 0.25
Z-6 4 1.80 1.80 1.65 21.38
C2 Menos -4 0.30 0.30 1.65 - 0.59
Z-7 2 1.80 2.20 1.65 13.07
C2 Menos -2 0.30 0.30 1.65 - 0.30

Página 1
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
Cimientos -
EJE A-A 1 1.00 0.30 0.60 0.18
1 1.80 0.30 0.60 0.32
1 1.80 0.30 0.60 0.32
1 1.10 0.30 0.60 0.20
1 1.85 0.30 0.60 0.33
EJE C-C 1 4.87 0.30 0.60 0.88
1 1.45 0.30 0.60 0.26
1 0.80 0.30 0.60 0.14
1 1.98 0.30 0.60 0.36
EJE D-D 1 1.00 0.30 0.60 0.18
1 1.80 0.30 0.60 0.32
1 1.80 0.30 0.60 0.32
1 1.10 0.30 0.60 0.20
1 1.85 0.30 0.60 0.33
EJE B-B 1 4.78 0.30 0.60 0.86
1 4.90 0.30 0.60 0.88
EJE 1-1 1 2.00 0.30 0.60 0.36
1 1.75 0.30 0.60 0.32
1 1.85 0.30 0.60 0.33
EJE 3-3 1 1.85 0.30 0.60 0.33
1 1.25 0.30 0.60 0.23
1 1.90 0.30 0.60 0.34
EJE 4-4 1 1.90 0.30 0.60 0.34
EJE 5-5 1 3.13 0.30 0.60 0.56
1 2.73 0.30 0.60 0.49
1 1.85 0.30 0.60 0.33
EJE 6-6 1 2.00 0.30 0.60 0.36
1 1.75 0.30 0.60 0.32
1 1.35 0.30 0.60 0.24
INTERIORES -
ENTRE EJE 4-4 Y 5-5 1 2.33 0.40 0.10 0.09
1 0.60 0.40 0.10 0.02
2 0.70 0.40 0.10 0.06
ENTRE EJE 5-5 Y 6-6 1 2.76 0.40 0.10 0.11
1 1.40 0.40 0.10 0.06
1 0.73 0.40 0.10 0.03
-
01.01.02.02.03 NIVELACIÓN INTERIOR Y APISONADO -
01.01.02.02.04 NIVELACION INTERIOR, PERFILADO Y COMPACTADO C/EQUIPO m2 - 237.89
SUB GERENCIA 1 7.61 4.36 33.18 33.18
1 7.61 4.30 32.72 32.72
1 7.61 4.10 31.20 31.20
1 11.60 8.54 99.06 99.06
SS.HH 1 7.76 3.34 25.92 25.92
ESCALERA 1 3.70 4.27 15.80 15.80
-
01.01.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE -
01.01.02.02.05.01 ELIMINACION DE MATERIAL EXCEDENTE D<15 KM m3 - 0.00
(Excav. Para cimientos y zapatas - relleno)*1.25 -
-
01.01.02.03 OBRAS DE CONCRETO SIMPLE -
01.01.02.03.01 SOLADO -
01.01.02.03.01.01 SOLADO PARA ZAPATAS DE 4" MECLA 1:12 m3 - 20.76
Z-1 1 2.80 2.80 0.20 1.57
Z-2 1 2.80 2.60 0.20 1.46
Z-3 5 2.50 2.50 0.20 6.25
Z-4 6 2.20 2.20 0.20 5.81
Z-5 1 3.00 2.50 0.20 1.50
Z-6 4 1.80 1.80 0.20 2.59
Z-7 2 1.80 2.20 0.20 1.58
-
01.01.02.03.02 CIMIENTOS -
01.01.02.03.02.01 CIMIENTO CORRIDO, MEZCLA 1:10 CEMENTO - HORMIGON 30 % PIEDRA m3 - 43.39
EJE A-A 1 3.20 0.60 0.60 1.15
1 3.70 0.60 0.60 1.33
1 3.70 0.60 0.60 1.33
1 3.00 0.60 0.60 1.08
1 4.15 0.60 0.60 1.49
EJE C-C 1 6.90 0.60 0.60 2.48
1 3.70 0.60 0.60 1.33
1 3.00 0.60 0.60 1.08
1 4.15 0.60 0.60 1.49

Página 2
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
EJE D-D 1 3.20 0.60 0.60 1.15
1 3.70 0.60 0.60 1.33
1 3.70 0.60 0.60 1.33
1 3.00 0.60 0.60 1.08
1 4.15 0.60 0.60 1.49
EJE B-B 1 6.90 0.60 0.60 2.48
1 6.08 0.40 0.60 1.46
EJE 1-1 1 3.85 0.60 0.60 1.39
1 4.05 0.60 0.60 1.46
1 3.60 0.60 0.60 1.30
EJE 3-3 1 3.85 0.60 0.60 1.39
1 4.05 0.60 0.60 1.46
1 3.60 0.60 0.60 1.30
EJE 4-4 1 3.60 0.60 0.60 1.30
EJE 5-5 1 8.00 0.60 0.60 2.88
1 3.60 0.60 0.60 1.30
EJE 6-6 1 3.85 0.60 0.60 1.39
1 4.05 0.60 0.60 1.46
1 3.60 0.60 0.60 1.30
INTERIORES -
ENTRE EJE 4-4 Y 5-5 1 2.33 0.40 0.60 0.56
1 0.60 0.40 0.60 0.14
2 0.70 0.40 0.60 0.34
ENTRE EJE 5-5 Y 6-6 1 2.76 0.40 0.60 0.66
1 1.40 0.40 0.60 0.34
1 0.73 0.40 0.60 0.18
1 0.73 0.40 0.60 0.18
-
01.01.02.03.03 SOBRECIMIENTOS -
01.01.02.03.03.01 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 - 8.25
EJE A-A 1 3.20 0.13 0.70 0.29
1 3.70 0.13 0.70 0.34
1 1.70 0.13 0.70 0.15
1 3.00 0.13 0.70 0.27
1 4.15 0.13 0.70 0.38
EJE C-C 1 3.30 0.13 0.70 0.30
1 4.15 0.13 0.70 0.38
EJE D-D 1 3.20 0.13 0.70 0.29
1 3.70 0.13 0.70 0.34
1 2.70 0.13 0.70 0.25
1 3.00 0.13 0.70 0.27
1 4.15 0.13 0.70 0.38
EJE B-B 1 6.90 0.13 0.70 0.63
1 5.94 0.13 0.70 0.54
EJE 1-1 1 3.85 0.13 0.70 0.35
1 4.05 0.13 0.70 0.37
1 3.60 0.13 0.70 0.33
EJE 3-3 1 3.60 0.13 0.70 0.33
EJE 4-4 1 3.60 0.13 0.70 0.33
EJE 6-6 1 3.85 0.13 0.70 0.35
1 4.05 0.13 0.70 0.37
1 2.51 0.13 0.70 0.23
INTERIORES -
ENTRE EJE 4-4 Y 5-5 1 2.78 0.13 0.55 0.20
1 0.60 0.13 0.55 0.04
1 0.83 0.13 0.55 0.06
ENTRE EJE 5-5 Y 6-6 1 2.78 0.13 0.55 0.20
1 1.40 0.13 0.55 0.10
1 2.01 0.13 0.55 0.14
1 0.73 0.13 0.55 0.05

01.01.02.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 168.47


EJE A-A 2 3.20 0.70 4.48
1 0.13 0.70 0.09
2 3.70 0.70 5.18
1 0.13 0.70 0.09
2 1.70 0.70 2.38
1 0.13 0.70 0.09
2 3.00 0.70 4.20
1 0.13 0.70 0.09
2 4.15 0.70 5.81
1 0.13 0.70 0.09

Página 3
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
EJE C-C 2 3.30 0.70 4.62
1 0.13 0.70 0.09
2 3.30 0.70 4.62
1 0.13 0.70 0.09
2 4.15 0.70 5.81
1 0.13 0.70 0.09
2 4.15 0.70 5.81
1 0.13 0.70 0.09
EJE D-D 2 3.20 0.70 4.48
1 0.13 0.70 0.09
2 3.20 0.70 4.48
1 0.13 0.70 0.09
2 3.70 0.70 5.18
1 0.13 0.70 0.09
2 3.70 0.70 5.18
1 0.13 0.70 0.09
2 2.70 0.70 3.78
1 0.13 0.70 0.09
2 2.70 0.70 3.78
1 0.13 0.70 0.09
2 3.00 0.70 4.20
1 0.13 0.70 0.09
2 3.00 0.70 4.20
1 0.13 0.70 0.09
2 4.15 0.70 5.81
1 0.13 0.70 0.09
2 4.15 0.70 5.81
1 0.13 0.70 0.09
EJE B-B 2 6.90 0.70 9.66
1 6.90 0.13 0.90
2 5.94 0.70 8.32
1 5.94 0.13 0.77
EJE 1-1 2 3.85 0.70 5.39
1 3.85 0.13 0.50
2 4.05 0.70 5.67
1 4.05 0.13 0.53
2 3.60 0.70 5.04
1 3.60 0.13 0.47
EJE 3-3 2 3.60 0.70 5.04
1 3.60 0.13 0.47
EJE 4-4 2 3.60 0.70 5.04
1 3.60 0.13 0.47
EJE 6-6 2 3.85 0.70 5.39
1 3.85 0.13 0.50
2 4.05 0.70 5.67
1 4.05 0.13 0.53
2 2.51 0.70 3.51
1 2.51 0.13 0.33
INTERIORES -
ENTRE EJE 4-4 Y 5-5 2 2.78 0.55 3.06
1 0.13 0.55 0.07
2 0.60 0.55 0.66
1 0.13 0.55 0.07
2 0.83 0.55 0.91
1 0.13 0.55 0.07
ENTRE EJE 5-5 Y 6-6 2 2.78 0.55 3.06
1 0.13 0.55 0.07
2 1.40 0.55 1.54
1 0.13 0.55 0.07
2 2.01 0.55 2.21
1 0.13 0.55 0.07
2 0.73 0.55 0.80
1 0.13 0.55 0.07
01.01.02.03.03.03 ACERO EN SOBRECIMIENTO FY=4200KG/CM2 kg 391.74
Largo gancho Fac. Ø
Acero en Zapata Ø3/8'' _______Vertical 181 1 0.90 162.54 0.56 91.02
Acero en Zapata Ø3/8'' _______Horizontal 3 1 179.00 537.00 0.56 300.72

01.01.02.03.04 FALSO PISO


01.01.02.03.04.01 CONCRETO EN FALSO PISO DE 4" m2 237.89
SUB GERENCIAS 1 7.61 4.36 33.18

Página 4
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
1 7.61 4.30 32.72
1 7.61 4.10 31.20
1 11.60 8.54 99.06
SS.HH 1 7.76 3.34 25.92
ESCALERA 1 3.70 4.27 15.80

01.01.02.04 OBRAS DE CONCRETO ARMADO


01.01.02.04.01 ZAPATA
01.01.02.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 24.55
Z-1 1 2.80 2.80 0.60 4.70
Z-2 1 2.80 2.60 0.60 4.37
Z-3 5 2.50 2.50 0.60 3.75
Z-4 6 2.20 2.20 0.60 2.90
Z-5 1 3.00 2.50 0.60 4.50
Z-6 4 1.80 1.80 0.60 1.94
Z-7 2 1.80 2.20 0.60 2.38

01.01.02.04.01.02 ACERO EN ZAPATAS FY=4200KG/CM2 kg 1493.93


Z-1 Largo gancho Fac. Ø
Acero en Zapata Ø5/8'' _______Vertical 14 1 2.65 37.10 1.56 57.88
Acero en Zapata Ø5/8'' _______Horizontal 14 1 2.65 37.10 1.56 57.88
Z-2
Acero en Zapata Ø5/8'' _______Vertical 14 1 2.45 34.30 1.56 53.51
Acero en Zapata Ø5/8'' _______Horizontal 13 1 2.70 35.10 1.56 54.76
Z-3
Acero en Zapata Ø5/8'' _______Vertical 12 5 2.35 141.00 1.56 219.96
Acero en Zapata Ø5/8'' _______Horizontal 12 5 2.35 141.00 1.56 219.96
Z-4
Acero en Zapata Ø5/8'' _______Vertical 11 6 2.05 135.30 1.56 211.07
Acero en Zapata Ø5/8'' _______Horizontal 11 6 2.05 135.30 1.56 211.07
Z-5
Acero en Zapata Ø5/8'' _______Vertical 12 1 2.85 34.20 1.56 53.35
Acero en Zapata Ø5/8'' _______Horizontal 15 1 2.35 35.25 1.56 54.99
Z-6
Acero en Zapata Ø5/8'' _______Vertical 9 4 1.65 59.40 1.56 92.66
Acero en Zapata Ø5/8'' _______Horizontal 9 4 1.65 59.40 1.56 92.66
Z-7
Acero en Zapata Ø5/8'' _______Vertical 11 2 1.65 36.30 1.56 56.63
Acero en Zapata Ø5/8'' _______Horizontal 9 2 2.05 36.90 1.56 57.56

01.01.02.04.02 VIGAS DE CIMENTACION


01.01.02.04.02.01 CONCRETO VIGAS DE CIMENTACION F'C=210 KG/CM2 m3 20.27
EJE A-A 1 3.20 0.30 0.60 0.58
1 3.70 0.30 0.60 0.67
1 3.70 0.30 0.60 0.67
1 3.00 0.30 0.60 0.54
1 4.15 0.30 0.60 0.75
EJE C-C 1 6.90 0.30 0.70 1.45
1 3.70 0.30 0.60 0.67
1 3.00 0.30 0.60 0.54
1 4.15 0.30 0.60 0.75
EJE D-D 1 3.20 0.30 0.60 0.58
1 3.70 0.30 0.60 0.67
1 3.70 0.30 0.60 0.67
1 3.00 0.30 0.60 0.54
1 4.15 0.30 0.60 0.75
EJE B-B 1 6.90 0.30 0.70 1.45
EJE 1-1 1 3.85 0.30 0.60 0.69
1 4.05 0.30 0.60 0.73
1 3.60 0.30 0.60 0.65
EJE 3-3 1 3.85 0.30 0.60 0.69
1 4.05 0.30 0.60 0.73
1 3.60 0.30 0.60 0.65
EJE 4-4 1 3.60 0.30 0.45 0.49
EJE 5-5 1 8.00 0.30 0.70 1.68
1 3.60 0.30 0.60 0.65
EJE 6-6 1 3.85 0.30 0.60 0.69
1 4.05 0.30 0.60 0.73
1 3.60 0.30 0.60 0.65

01.01.02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION m2 135.10


EJE A-A 2 3.20 0.60 3.84
2 3.70 0.60 4.44

Página 5
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
2 3.70 0.60 4.44
2 3.00 0.60 3.60
2 4.15 0.60 4.98
EJE C-C 2 6.90 0.70 9.66
2 3.70 0.60 4.44
2 3.00 0.60 3.60
2 4.15 0.60 4.98
EJE D-D 2 3.20 0.60 3.84
2 3.70 0.60 4.44
2 3.70 0.60 4.44
2 3.00 0.60 3.60
2 4.15 0.60 4.98
EJE B-B 2 6.90 0.70 9.66
EJE 1-1 2 3.85 0.60 4.62
2 4.05 0.60 4.86
2 3.60 0.60 4.32
EJE 3-3 2 3.85 0.60 4.62
2 4.05 0.60 4.86
2 3.60 0.60 4.32
EJE 4-4 2 3.60 0.45 3.24
EJE 5-5 2 8.00 0.70 11.20
2 3.60 0.60 4.32
EJE 6-6 2 3.85 0.60 4.62
2 4.05 0.60 4.86
2 3.60 0.60 4.32

01.01.02.04.02.03 ACERO GRADO 60 EN VIGAS DE CIMENTACION FY=4200 KG/CM2 kg 3009.44


Largo gancho Fac. Ø
EJE A-A
6 1 19.50 0.80 121.80 2.24 272.83
2 1 19.50 0.80 40.60 2.24 90.94
Estribo : de Ø3/8'' 113 1 2.00 226.00 0.56 126.56
EJE B-B -
6 1 6.90 0.30 43.20 2.24 96.77
2 1 6.90 0.30 14.40 2.24 32.26
Estribo : de Ø3/8'' 40 1 2.20 88.00 0.56 49.28
EJE D-D -
6 1 19.50 0.80 121.80 2.24 272.83
2 1 19.50 0.80 40.60 2.24 90.94
Estribo : de Ø3/8'' 113 1 2.00 226.00 0.56 126.56
EJE C-C -
6 1 19.50 0.80 121.80 2.24 272.83
2 1 19.50 0.80 40.60 2.24 90.94
Estribo : de Ø3/8'' 113 1 2.00 226.00 0.56 126.56
-
EJE 1-1 -
6 1 12.90 0.80 82.20 2.24 184.13
2 1 12.90 0.80 27.40 2.24 61.38
Estribo : de Ø3/8'' 86 1 2.00 172.00 0.56 96.32
EJE 3-3 -
6 1 12.90 0.80 82.20 2.24 184.13
2 1 12.90 0.80 27.40 2.24 61.38
Estribo : de Ø3/8'' 86 1 2.00 172.00 0.56 96.32
EJE 5-5 -
6 1 12.90 0.60 81.00 2.24 181.44
2 1 12.90 0.60 27.00 2.24 60.48
Estribo : de Ø3/8'' 86 1 2.00 172.00 0.56 96.32
EJE 6-6 -
6 1 12.90 0.60 81.00 2.24 181.44
2 1 12.90 0.60 27.00 2.24 60.48
Estribo : de Ø3/8'' 86 1 2.00 172.00 0.56 96.32

01.01.02.04.03 COLUMNAS
01.01.02.04.03.01 CONCRETO EN COLUMNAS F'C=210KG/CM2 m3 9.89
PRIMER PISO
C-1 5 0.30 0.50 5.15 3.86
-
C-2 7 0.30 0.30 5.15 3.24
-
C-3 4 0.30 0.45 5.15 2.78

01.01.02.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 115.36

Página 6
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
PRIMER PISO PERIMETRO
C-1 5 1.60 5.15 41.20
-
C-2 7 1.20 5.15 43.26
-
C-3 4 1.50 5.15 30.90

01.01.02.04.03.03 ACERO EN COLUMNAS FY=4200 KG/CM2 GRADO 60 kg Largo gancho Fac. Ø 1902.10
PRIMER PISO
C-1 8 Ø3/4'' 8 5 6.30 0.60 276.00 2.24 618.24
Estribo : de Ø3/8'' 40 5 1.65 0.15 360.00 0.56 201.60
C-2 6 Ø5/8'' 6 7 6.30 0.60 289.80 1.56 452.09
Estribo : de Ø3/8'' 40 7 1.25 0.15 392.00 0.56 219.52
C-3 6 Ø5/8'' 6 4 6.30 0.60 165.60 1.56 258.34
Estribo : de Ø3/8'' 40 4 1.55 0.15 272.00 0.56 152.32

01.01.02.04.04 COLUMNETAS
01.01.02.04.04.01 CONCRETO EN COLUMNETAS F'C=175KG/CM2 m3 4.85
PRIMER PISO
EJE C-C 10 0.25 0.13 3.55 1.15
EJE E-E 10 0.25 0.13 3.55 1.15
EJE 1-1 2 0.25 0.13 3.55 0.23
EJE 2-2 2 0.25 0.13 3.55 0.23
EJE 4-4 2 0.25 0.13 3.55 0.23
EJE 5-5 2 0.25 0.13 3.55 0.23
EJE 6-6 5 0.25 0.13 3.55 0.58
INTERIORES 9 0.25 0.13 3.55 1.04

01.01.02.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 74.55


PRIMER PISO
EJE C-C 10 2 0.25 3.55 17.75
EJE E-E 10 2 0.25 3.55 17.75
EJE 1-1 2 2 0.25 3.55 3.55
EJE 2-2 2 2 0.25 3.55 3.55
EJE 4-4 2 2 0.25 3.55 3.55
EJE 5-5 2 2 0.25 3.55 3.55
EJE 6-6 5 2 0.25 3.55 8.88
INTERIORES 9 2 0.25 3.55 15.98

01.01.02.04.04.03 ACERO EN COLUMNETAS FY=4200 KG/CM2 GRADO 60 kg Largo gancho Fac. Ø 439.40
PRIMER PISO
4 Ø3/8'' 42 4 3.60 0.20 638.40 0.56 357.50
Estribo : de Ø1/4'' 42 12 0.65 327.60 0.25 81.90

01.01.02.04.05 PLACAS
01.01.02.04.05.01 CONCRETO EN PLACAS F'C=175KG/CM2 m3 9.41
AREA
PL-1 2 0.27 5.15 2.78
-
PL-2 2 0.29 5.15 3.03
-
PL-3 1 0.35 5.15 1.79
-
PL-4 1 0.35 5.15 1.81

01.01.02.04.05.02 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 110.21


PRIMER PISO PERIMETRO
PL-1 2 3.20 5.15 32.96
-
PL-2 2 3.50 5.15 36.05
-
PL-3 1 3.90 5.15 20.09
-
PL-4 1 4.10 5.15 21.12

01.01.02.04.05.03 ACERO EN PLACAS FY=4200 KG/CM2 GRADO 60 kg Largo gancho Fac. Ø 1482.36
PRIMER PISO
PL-1
8 Ø3/4'' 8 2 6.30 0.20 104.00 2.24 232.96
4 Ø5/8'' 4 2 6.30 0.20 52.00 1.56 81.12
4 Ø1/2'' 4 2 6.30 0.20 52.00 0.99 51.48
Estribo : de Ø3/8'' 40 2 3.10 248.00 0.56 138.88
PL-2 -
8 Ø5/8'' 8 2 6.30 0.20 104.00 1.56 162.24
8 Ø1/2'' 8 2 6.30 0.20 104.00 0.99 102.96
Estribo : de Ø3/8'' 40 2 3.10 248.00 0.56 138.88
PL-3 -
8 Ø3/4'' 8 1 6.30 0.20 52.00 2.24 116.48
4 Ø5/8'' 4 1 6.30 0.20 26.00 1.56 40.56

Página 7
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
8 Ø1/2'' 8 1 6.30 0.20 52.00 0.99 51.48
Estribo : de Ø3/8'' 40 1 3.10 124.00 0.56 69.44
PL-4 -
8 Ø3/4'' 8 1 6.30 0.20 52.00 2.24 116.48
4 Ø5/8'' 4 1 6.30 0.20 26.00 1.56 40.56
8 Ø1/2'' 8 1 6.30 0.20 52.00 0.99 51.48
Estribo : de Ø3/8'' 40 1 3.90 156.00 0.56 87.36

01.01.02.04.06 VIGAS
01.01.02.04.06.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 16.69
PRIMER PISO
VIGA PRINCIPAL (30x70)
EJE 4-4 1 8.00 0.30 0.70 1.68
EJE 5-5 1 8.00 0.30 0.70 1.68
VIGA PRINCIPAL (30x60) -
EJE B-B 1 6.90 0.30 0.60 1.24
EJE C-C 1 6.90 0.30 0.60 1.24
-
VIGA SECUNDARIA 30X40 -
EJE A-A 1 3.20 0.30 0.40 0.38
1 3.70 0.30 0.40 0.44
1 3.70 0.30 0.40 0.44
1 3.00 0.30 0.40 0.36
1 4.15 0.30 0.40 0.50
EJE C-C 1 3.70 0.30 0.40 0.44
1 3.00 0.30 0.40 0.36
1 4.15 0.30 0.40 0.50
EJE D-D 1 3.20 0.30 0.40 0.38
1 3.70 0.30 0.40 0.44
1 3.70 0.30 0.40 0.44
1 3.00 0.30 0.40 0.36
1 4.15 0.30 0.40 0.50
EJE 1-1 1 3.85 0.30 0.40 0.46
1 4.05 0.30 0.40 0.49
1 3.60 0.30 0.40 0.43
EJE 3-3 1 3.85 0.30 0.40 0.46
1 4.05 0.30 0.40 0.49
1 3.60 0.30 0.40 0.43
EJE 4-4 1 3.60 0.30 0.40 0.43
EJE 5-5 1 3.60 0.30 0.40 0.43
EJE 6-6 1 3.85 0.30 0.40 0.46
1 4.05 0.30 0.40 0.49
1 3.60 0.30 0.40 0.43
VIGA CHATA -
7 1.00 0.20 0.20 0.28

01.01.02.04.06.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 132.69


PRIMER PISO
VIGA PRINCIPAL (30x70)
EJE 4-4 2 8.00 0.50 8.00
1 8.00 0.30 2.40
EJE 5-5 2 8.00 0.50 8.00
1 8.00 0.30 2.40
VIGA PRINCIPAL (30x60) -
EJE B-B 2 6.90 0.30 4.14
1 6.90 0.30 2.07
EJE C-C 2 6.90 0.30 4.14
1 6.90 0.30 2.07
-
VIGA SECUNDARIA 30X40 -
EJE A-A 2 3.20 0.40 2.56
1 3.20 0.30 0.96
2 3.70 0.40 2.96
1 3.70 0.30 1.11
2 3.70 0.40 2.96
1 3.70 0.30 1.11
2 3.00 0.40 2.40
1 3.00 0.30 0.90
2 4.15 0.40 3.32
1 4.15 0.30 1.25
EJE C-C 2 3.70 0.40 2.96
1 3.70 0.30 1.11
2 3.00 0.40 2.40
1 3.00 0.30 0.90
2 4.15 0.40 3.32
1 4.15 0.30 1.25
EJE D-D 2 3.20 0.40 2.56
1 3.20 0.30 0.96
2 3.70 0.40 2.96
1 3.70 0.30 1.11

Página 8
METRADOS VIVIENDA 9X16

MEDIDAS METRADO

Veces
Elem.
Simil.

Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
01. ESTRUCTURA
01.01 ESTRUCTURA 1ER NIVEL
2 3.70 0.40 2.96
1 3.70 0.30 1.11
2 3.00 0.40 2.40
1 3.00 0.30 0.90
2 4.15 0.40 3.32
1 4.15 0.30 1.25
EJE 1-1 2 3.85 0.40 3.08
1 3.85 0.30 1.16
2 4.05 0.40 3.24
1 4.05 0.30 1.22
2 3.60 0.40 2.88
1 3.60 0.30 1.08
EJE 3-3 2 3.85 0.40 3.08
1 3.85 0.30 1.16
2 4.05 0.40 3.24
1 4.05 0.30 1.22
2 3.60 0.40 2.88
1 3.60 0.30 1.08
EJE 4-4 2 3.60 0.40 2.88
1 3.60 0.30 1.08
EJE 5-5 2 3.60 0.40 2.88
1 3.60 0.30 1.08
EJE 6-6 2 3.85 0.40 3.08
1 3.85 0.30 1.16
2 4.05 0.40 3.24
2 4.05 0.30 2.43
2 3.60 0.40 2.88
1 3.60 0.30 1.08
VIGA CHATA -
7 1.00 0.20 1.40
7 1.00 0.20 1.40

01.01.02.04.06.03 ACERO EN VIGAS FY=4200 KG/CM2 kg 2157.69


PRIMER PISO
VIGA PRINCIPAL
VP(0.30X0.70) 2 Ø3/4'' 2 2 8.95 0.60 38.20 2.24 85.57
4 Ø5/8'' 2 2 8.95 0.60 38.20 1.56 59.59
2 Ø1/2'' 2 2 8.95 0.60 38.20 0.99 37.82
2 2 4.55 18.20 1.56 28.39
2 2 2.65 10.60 1.56 16.54
1 2 3.95 7.90 1.56 12.32
Estribo : de Ø3/8'' 50 2 2.10 210.00 0.56 117.60
VIGA PRINCIPAL -
VP(0.30X0.60) 2 Ø3/4'' 2 2 7.75 0.60 33.40 2.24 74.82
4 Ø5/8'' 2 2 7.75 0.60 33.40 1.56 52.10
2 Ø1/2'' 2 2 7.75 0.60 33.40 0.99 33.07
2 2 4.55 18.20 1.56 28.39
2 2 2.65 10.60 1.56 16.54
1 2 4.00 8.00 1.56 12.48
Estribo : de Ø3/8'' 44 2 2.10 184.80 0.56 103.49

VIGA SECUNDARIA
VS (0.30X0.40) 4 Ø5/8'' 4 2 19.60 0.60 161.60 1.56 252.10
1Ø5/8'' 4 2 2.70 0.60 26.40 1.56 41.18
1Ø5/8'' 1 2 1.85 3.70 1.56 5.77
1Ø5/8'' 1 2 2.10 4.20 1.56 6.55
Estribo : de Ø3/8'' -
26 2 1.45 75.40 0.56 42.22
29 2 1.45 84.10 0.56 47.10
30 2 1.45 87.00 0.56 48.72
26 2 1.45 75.40 0.56 42.22
29 2 1.45 84.10 0.56 47.10
-
VS (0.30X0.40) 4 Ø5/8'' 4 1 11.80 0.60 49.60 1.56 77.38
1Ø5/8'' 2 1 2.70 0.60 6.60 1.56 10.30
1Ø5/8'' 1 1 1.85 1.85 1.56 2.89
1Ø5/8'' 1 1 2.10 2.10 1.56 3.28
Estribo : de Ø3/8'' -
30 1 1.45 43.50 0.56 24.36
26 1 1.45 37.70 0.56 21.11
29 1 1.45 42.05 0.56 23.55
-
VS (0.30X0.40) 4 Ø5/8'' 4 3 12.90 0.60 162.00 1.56 252.72
1Ø5/8'' 2 3 2.70 0.60 19.80 1.56 30.89

Página 9