Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Planos Panteon Villa M.final-05

Descargar como pdf o txt
Descargar como pdf o txt
Está en la página 1de 1

AV

.M
AR
IA
N
O
M
AT
AM
O
RO
CA S
AN
RR

O
BA

AT
JU
OO

NA
AR

UA
AN

G
AV.
GU

L.
INT
ANJU

RO
ATO

QU

.P
OTE

T
.

E
AV

P
E
T
LA
P
NIA

A
OR
LIF
CA
JA
BA

N.T.N. (NIVEL DE TERRENO NATURAL)

MC. (MURO DE CONTENCION)

L.S. (LECHO SUPERIOR)

L.I. (LECHO INFERIOR)

C.F. A.D. (CARA FRONTAL ACERO ADICIONAL)

C.P. A.D. (CARA POSTERIOR ACERO ADICIONAL)

C.F. CORR. (CARA FRONTAL ACERO CORRIDO)

C.P. CORR. (CARA POSTERIOR ACERO CORRIDO)

0.30
0.40 N.T.F. (NIVEL DE TERRENO FINAL)
min

0.25
0.40
min 0.30 D.F. (NIVEL DE DESPLANTE)
0.15 0.40
min 0.65
0.25 0.30
0.15 REMATE

0.60
INDICA NIVEL

2.00
2.85 INDICA CORTE
1.85 2.2429

1.20
3.00
2.75 4.00
5.20
3.70
1.00
TRASLAPE
4.25
5.35

1.20
0.95
1.20

0.25 1.50
0.20
0.95 2.00
1.20
0.50 0.20 1.30
2.00 0.85
0.25 0.20
1.20

0.50 0.25 1.60


0.35
2.35 0.25

0.50
LONG DOBLEZ

0.70 0.30 1.80


2.80

2.00
1.85

3.20
0.40
0.30
min
0.40
0.30
0.65
0.30
0.30
min PANTEON MILPA ALTA
0.65
1.20
0.95
1.20
2.85 2.85
POBLADO: VILLA MILPA ALTA
0.25 4.00
0.20 4.00 3.70 1.00
3.70 1.00 TRASLAPE
5.20
TRASLAPE
5.20
0.50 0.20 1.30
2.00 2.00 LEVANTAMIENTO TOPOGRAFICO
0.85
1.20
2.00
0.35
0.50 0.25
0.85

A-1
LONG DOBLEZ
1.20 0.70 0.301.80
2.80
0.35 0.25
0.50 S/E METROS OCTUBRE 2021
LONG DOBLEZ
0.70 0.30
2.80 OCT/2018

1.80

GOBIERNO DE LA CIUDAD DE MEXICO


DRA. CLAUDIA SHEINBAUM PARDO

También podría gustarte