Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Metodo de Hunter

Descargar como pdf o txt
Descargar como pdf o txt
Está en la página 1de 2

INSTALACIONES HIDROSANITARIAS

MARTINEZ SANTIAGO EDWIN RICARDO


ANALISIS DE UNA PLANTA
TRAMO UNIDADES MUEBLE VELOCIDAD MM PULG
1 1 0.33 13mm 1/2"
2 1 0.33 13mm 1/2"
3 2 0.33 13mm 1/2"
4 2 0.33 13mm 1/2"
5 4 0.33 13mm 1/2"
6 2 0.33 13mm 1/2"
7 6 0.71 19mm 3/4"
8 2 0.33 13mm 1/2"
9 8 0.71 19mm 3/4"
10 2 0.33 13mm 1/2"
11 10 0.71 19mm 3/4"
12 1 0.33 13mm 1/2"
13 11 0.71 19mm 3/4"
14 1 0.33 13mm 1/2"
15 12 0.71 19mm 3/4"
16 1 0.33 13mm 1/2"
17 1 0.33 13mm 1/2"
18 2 0.33 13mm 1/2"
19 2 0.33 13mm 1/2"
20 4 0.33 13mm 1/2"
21 2 0.33 13mm 1/2"
22 6 0.71 19mm 3/4"
23 2 0.33 13mm 1/2"
24 8 0.71 19mm 3/4"
25 2 0.33 13mm 1/2"
26 10 0.71 19mm 3/4"
27 1 0.33 13mm 1/2"
28 11 0.71 19mm 3/4"
29 1 0.33 13mm 1/2"
30 12 0.71 19mm 3/4"
31 24 1.23 25mm 1"
ANALISIS POR PLANTA
de una planta son 24 unidades mueble
PLANTA UNIDADES MUEBLE
VELOCIDAD MM PULG
PLANTA BAJA 24 1.23 25mm 1"
PRIMER PISO 48 2.01 32mm 1 1/4"
SEGUNDO PISO 72 2.84 38mm 1 1/2"
TERCER PISO 96 2.84 38mm 2 1/2"
CUARTO PISO 120 4.91 51mm 2"

ANALISIS POR TORRES


Por torre son 120 unidades mueble
NO.TORRE UNIDADES MUEBLE
VELOCIDAD
MM PULG
tercer torre 120 4.91 51mm 2"
segunda torre 240 4.91 51mm 2"
primer torre 360 8.04 64mm 2 1/2"

DISEÑO DE HIDRONEUMATICO
TOTAL DE SALIDAS PORCENTAJE
TOTAL DE SALIDAS
360 15% 414
FORMULAS
MCA=md+0.07*mt+10
md=metros de desnivel de cisterna a el nivel mas alto md= 18 m
mt=son los metros de tubo entre el equipo y el servicio mas lejano
mt= 65 m
MCA=18+0.07*65+10 MCA= 63.5
LPM=(gasto maximo y presion minima )(numero de salidas)
GASTO NUMERO DE SALIDAS
1.7 414
LPM=1.70*414 LMP= 703.8

MEDIDAS
MODELO DE EQUIPO MOTO BOMBAS
TANQUES LARGO ANCHO ALTO
H31-P1000-3T119 3 de hp=10
3 de 1350L 3.65 0.95 1.65