EstructCalli (10nov20) E01

Descargar como pdf o txt
Descargar como pdf o txt
Está en la página 1de 1

0.

15 REFUERZO CON MALLA


ELECTROSOLDADA 6-6/10-10
NORTE
1 5 6 9 10 0.20 N
N
1
2 VAR 2"S
0.00 3.11 4.02 6.23 6.49 0.10 CONCRETO f'c=200kg/cm²


36
DE 10cm DE ESPESOR 0.12 0.15 0.15 34
0
35
0
10 20 30 40
50
60

70
2 VAR 83"S 2 VAR 12"S 2 VAR 38"S

0
NE

33

80
0
°

32
90

280 290 300 310


4.03 2.46 0.96

NW

100 110
BARRERA PLÁSTICA DE

120 130
SE
VAPOR COMO AISLAMIENTO
3.11 0.91 1.96 0.96

14
SW

0
°

26
270

15
0
W

0
25
LIMITE DE PROPIEDAD
16
0 0

DETALLE FIRME DE CONCRETO


17
0 24 0

0.40
23
190 200 210 220

ESTRIBO


18
0.50 3
8"@20cm 0.20 ESTRIBO 0.20 ESTRIBO 0.20 ESTRIBO

LIMITE DE PROPIEDAD
1
4"@20cm
1
4"@10cm
1
4"@20cm S
BLOQUE DE REFUERZO HORIZONTAL
15x20x40cm CON VAR DE 83" @ 2 HILADAS
2 VAR 21"S 2 VAR 83"S 2 VAR 21"S 2 VAR 38"S

REFUERZO VERTICAL CON


TRABE DE LIGA TL1
CASTILLO K1 CASTILLO K2 RODAPIE R1 LOCALIZACION EN CIUDAD
VAR DE 38" @ 40 cm EN
CELDA COLADA
(CONCRETO f'c=200kg/cm²) 17 HIA 24 27 267
BA

AZ

PA
GURD

C
M
AA

UA
RA
DETALLE MURO DE ENRASE 265 CA

AH
19 23 MP
A LLE

ITL
RA 264

CU
263
16 261 CA
LLE
CA
262
LLE 260
1 1 15 ON

L
7.11

7.11
C.
2 VAR 2" 2 VAR 2"

OT
CE

OT
NO 259

L
257

OY

Y
VEN

OT
CO
A

LC

UIZ

.
258

AV
13

A
CA

IN
256

HU

AH
LLE

AL
TZ
CA

.
12
TS

TZA

HU
255

AV
LLE DEC

PA

AV.
IMA
19

TZA
PA
NO

NE
OC VE

2 VAR 38" 2 VAR 38"


NA
TAV 254
EST 38"@20cm EST 38"@20cm

NE
A
9 288

.
AV
OC
TAV

.
A

AV
8
70
BASTONES DE BASTONES DE SE
PTIM
A
3 3 SEP

8" @25cm 8" @25cm


TIM
A
1
669
REFUERZO REFUERZO

AV.
ALE
MA
N
411 C.
LONGITUDINAL LONGITUDINAL 10 CA
PUNTA LLE OC

AV.
CA SE
T
94

BR LLE
AV
EUGENIA A
40

LL LAS
U
CA
CON 1 VAR 83" CON 1 VAR 38" 642

E
PLANTILLA 5 PLANTILLA 5
PROYECTO :
cm ESP. cm ESP.
1 1
J TL1
J 2 VAR 2" 2 VAR 2" CASA HABITACION
12.83 NIVEL 3 12.83
ZAPATA ZC1
ZAPATA ZL1

N.P.T. +1.98
UBICACION:

1.70
FIRME DE CONCR.
1.84

f'c=200kg/cm² DE ZAPATA ZL1 CONCRETO ZAPATA ZL2 CONCRETO C. NOVENA, ESQ. C. AHUZOTL
10cm DE ESP. K1
K1
f'c=200kg/cm² f'c=200kg/cm²
I I COL AZTECA, ENSENADA, B.C.
11.13 TL1 11.13 MANZANA: 256 LOTE: 1
ZAPATA ZC1
H H AREA DEL LOTE SUP. DE CONST. CLAVE CATASTRAL

20.00
10.99 10.99 2 VAR 21" 2 VAR 21" 150.00 MTS. 2 110.260 MTS. 2 AZ-256-061
ZAPATA ZC1

FIRME DE CONCR.
f'c=200kg/cm² DE 10cm DE 4.04 2 VAR 38" EST 38"@20cm 2 VAR 38" EST 38"@20cm
ZAPATA ZL1

0.90

ESP. REFORZ. C/MALLA


BASTONES DE BASTONES DE
ELECTROSOLDADA
5.05

3 3
8" @25cm 8" @25cm
6-6/10-10
REFUERZO REFUERZO PERITO RESPONSABLE DE OBRA Y PROYECTO:
NIVEL 3 LONGITUDINAL LONGITUDINAL ERNESTO ALEJANDRO CARBALLO AMADOR
G G
N.P.T. +1.98 CON 2 VAR 38" CON 2 VAR 38"
7.09 7.09 FIRMA DE PERITO:
ZAPATA ZC1
K1 PLANTILLA 5 PLANTILLA 5 PERITO NUMERO CED. DEL ESTADO CED. PROFESIONAL
K1 cm ESP. cm ESP.
496
12.83

TL1

TL1

1 1
F F 2 VAR 2" 2 VAR 2"
1.63

5.94 ZAPATA ZC1 5.94

E ZAPATA ZC1 CONCRETO ZAPATA ZC2 CONCRETO


NIVEL 2
D 5.46
N.P.T. +0.72 f'c=200kg/cm² f'c=200kg/cm²
1.14

5.04
DEP. DE CONTROL URBANO
K1 K1 C
C ZAPATA Z1 4.32
4.32
ZAPATA ZC2
ZAPATA ZL2

Propietario
PENDIENTE 12%

FIRME DE CONCR.
5.94

PROY. P.A.

f'c=200kg/cm² DE 10cm DE Maria Teresa Lanz Paredes


ESP. REFORZ. C/MALLA
LIMITE DE PROPIEDAD

4.32

ELECTROSOLDADA
6-6/10-10

Estructural De
ZAPATA ZL2 NIVEL 1
Cimentación
A N.P.T. +0.00 1.16 A
0.00 K2 K2 0.00 # de Proyecto 2020-1
LIMITE DE PROPIEDAD
3.11 3.11 1.22
4.03 1.96 1.46 Fecha Sept. 2020
7.50
1 6
Dibujado por I.L.
5 8 9 10
0.00 3.11 4.02 5.99 6.23 6.49 Revisado por M.T.L.P.

Planta Estructural De Cimentación ZAPATA AISLADA Z1 EST-01


1 1 : 100 Detalles De Cimentación SIN ESCALA
2 PLANO 1 DE 7