VALORIZACION DE FINAL DE OBRA

CONSORCIO SUPERVISOR II
OBRA : "CREACION DE LA CARRETERA A NIVEL DE BICAPA DESDE EL CRUCE CARRETERA TARAPOTO-SISA EN EL KM 36-SANTA MARTHA HASTA LA LOCALIDAD DE NUEVO SANTA ROSA, DISTRITO DE SANTA ROSA - PROVINCIA DE EL DORADO - DEPARTAMENTO DE SAN MARTIN"

PROPIETARIO : GOBIERNO REGIONAL SAN MARTIN


CONTRATISTA : CONSORCIO VIAL SISA
RESIDENTE DE OBRA : ING.KELVIN RAMIREZ CAMPOS
INSPECTOR DE OBRA : ING. FLAVIO JHONDLITH MALQUI MERINO
VALOR REFERENCIAL : s/. 31'427,173.76
VALOR CONTRACTUAL : s/. 31'427,173.70
FECHA : NOVIEMBRE 2023

PRESUPUESTO DEL PROYECTO ACTUALIZADO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMUALDO SALDO
ITEM DESCRIPCION
UND METRADO P. UNITARIO TOTAL METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ %
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE OBRA 4.8 M X 3.6 M und 2.00 1,555.10 S/ 3,110.20 2.00 S/ 3,110.20 100.00% 0.00 S/ - 0.00% 2.00 S/ 3,110.20 100.00% - S/ - 0.00%
01.02 CAMPAMENTO glb 1.00 101,800.00 S/ 101,800.00 0.90 S/ 91,518.20 90.00% 0.10 S/ 10,180.00 10.00% 1.00 S/ 101,698.20 100.00% - S/ 101.80 0.00%
01.03 MOVILIZACIÒN Y DESMOVILIZACIÒN DE EQUIPO glb 1.00 122,358.72 S/ 122,358.72 0.95 S/ 116,118.43 95.00% 0.05 S/ 6,117.94 5.00% 1.00 S/ 122,236.37 100.00% - S/ 122.35 0.00%
01.04 TOPOGRAFIA Y GEOREFERENCIACION km 13.39 1,293.75 S/ 17,323.31 13.39 S/ 17,325.91 100.00% 0.00 S/ - 0.00% 13.39 S/ 17,325.91 100.00% - S/ (2.60) 0.00%
01.05 MANTENIMIENTO DEL TRANSITO Y SEGURIDAD VIAL
mes 10.00 9,567.74 S/ 95,677.40 10.00 S/ 95,677.41 100.00% 0.00 S/ 0.01 0.00% 10.00 S/ 95,677.42 100.00% - S/ (0.02) 0.00%
DURANTE LA EJECUCION DE TRABAJOS
01.06 MEJORAMIENTO ACCESOS A LA CANTERA km 1.00 34,318.31 S/ 34,318.31 1.00 S/ 34,318.32 100.00% 0.00 S/ - 0.00% 1.00 S/ 34,318.32 100.00% - S/ (0.01) 0.00%
01.07 MEJORAMIENTO ACCESOS A D.M.E. Y CAMPAMENTO km 0.40 34,318.31 S/ 13,727.32 0.40 S/ 13,658.69 100.00% 0.00 S/ - 0.00% 0.40 S/ 13,658.69 100.00% - S/ 68.63 0.00%
01.08 REMOCION Y REPOSICION DE CERCAS DE ALAMBRE m 3,124.74 22.08 S/ 68,994.26 3,124.74 S/ 68,994.26 100.00% 0.00 S/ - 0.00% 3,124.74 S/ 68,994.26 100.00% - S/ - 0.00%
01.09 APERTURA DE DME Y CAMPAMENTO glb 1.00 125,271.22 S/ 125,271.22 1.00 S/ 125,020.68 100.00% 0.00 S/ - 0.00% 1.00 S/ 125,020.68 100.00% - S/ 250.54 0.00%
01.10 FLETE DE MATERIALES A OBRA glb 1.00 400,069.14 S/ 400,069.14 1.00 S/ 397,186.69 100.00% 0.00 S/ - 0.00% 1.00 S/ 397,186.69 100.00% - S/ 2,882.45 0.00%
02 SEGURIDAD Y SALUD S/ -
02.01 EQUIPOS DE PROTECCION INDIVUAL glb 1.00 48,450.00 S/ 48,450.00 1.00 S/ 48,450.00 100.00% 0.00 S/ - 0.00% 1.00 S/ 48,450.00 100.00% - S/ - 0.00%
02.02 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 11,835.00 S/ 11,835.00 1.00 S/ 11,835.01 100.00% 0.00 S/ - 0.00% 1.00 S/ 11,835.01 100.00% - S/ (0.01) 0.00%
02.03 SEÑALIZACION TRANSITORIA DE SEGURIDAD EN OBRA glb 1.00 17,882.36 S/ 17,882.36 1.00 S/ 17,936.00 100.00% 0.00 S/ - 0.00% 1.00 S/ 17,936.00 100.00% - S/ (53.64) 0.00%
02.04 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN
glb 1.00 32,628.96 S/ 32,628.96 1.00 S/ 32,726.85 100.00% 0.00 S/ - 0.00% 1.00 S/ 32,726.85 100.00% - S/ (97.89) 0.00%
SEGURIDAD Y SALUD EN EL TRABAJO
03 MOVIMIENTO DE TIERRAS S/ -
03.01 DESBROCE Y LIMPIEZA ha 0.27 6,757.82 S/ 1,824.61 0.27 S/ 1,824.60 100.00% 0.00 S/ - 0.00% 0.27 S/ 1,824.60 100.00% - S/ 0.01 0.00%
03.02 EXCAVACION EN EXPLACIONES EN MATERIAL COMUN m³ 86,481.23 11.26 S/ 973,778.65 86,481.23 S/ 973,778.64 100.00% 0.00 S/ - 0.00% 86,481.23 S/ 973,778.64 100.00% - S/ 0.01 0.00%
03.03 PERFILADO Y COMPACTADO DE SUB-RASANTE EN
m² 119,702.13 2.39 S/ 286,088.09 119,702.13 S/ 286,088.09 100.00% 0.00 S/ - 0.00% 119,702.13 S/ 286,088.09 100.00% - S/ - 0.00%
ZONAS DE CORTE
03.04 CONFORMACION DE TERRAPLENES m³ 34,964.73 32.15 S/ 1,124,116.07 34,964.73 S/ 1,124,116.07 100.00% 0.00 S/ - 0.00% 34,964.73 S/ 1,124,116.07 100.00% - S/ - 0.00%
03.05 MEJORAMIENTO DE SUB RASANTE C/MAT. PRESTAMO m³ 13,097.70 31.39 S/ 411,136.80 13,097.70 S/ 411,136.81 100.00% 0.00 S/ - 0.00% 13,097.70 S/ 411,136.81 100.00% - S/ (0.01) 0.00%
04 SUB BASES Y BASES S/ -
04.01 SUB BASE GRANULAR DE 0.20 M m² 111,826.62 27.88 S/ 3,117,726.17 111,826.62 S/ 3,117,726.17 100.00% 0.00 S/ - 0.00% 111,826.62 S/ 3,117,726.17 100.00% - S/ - 0.00%
04.02 BASE GRANULAR DE 0.15 M m² 100,987.63 21.57 S/ 2,178,303.24 100,987.63 S/ 2,178,303.32 100.00% 0.00 S/ - 0.00% 100,987.63 S/ 2,178,303.32 100.00% - S/ (0.08) 0.00%
05 PAVIMENTO ASFALTICO S/ -
05.01 IMPRIMACION ASFALTICA m² 96,773.24 10.03 S/ 970,635.60 96,773.24 S/ 970,635.60 100.00% 0.00 S/ - 0.00% 96,773.24 S/ 970,635.60 100.00% - S/ - 0.00%
05.02
TRATAMIENTO SUPERFICIAL BICAPA (TSB) m² - 19.57 S/ - S/ -

05.03 RIEGO DE LIGA m² 95,719.64 5.69 S/ 544,644.75 95,719.64 S/ 544,644.75 100.00% 0.00 S/ - 0.00% 95,719.64 S/ 544,644.75 100.00% - S/ - 0.00%
06 DRENAJE S/ -
06.01 ALCANTARILLAS MCA S/ -
06.01.01 DESBROCE Y LIMPIEZA MANUAL m² 1,160.64 2.90 S/ 3,365.86 1,160.64 S/ 3,365.86 100.00% 0.00 S/ - 0.00% 1,160.64 S/ 3,365.86 100.00% - S/ - 0.00%
06.01.02 TRAZO/NIVELES Y REPLANTEO m² 1,018.57 6.00 S/ 6,111.42 1,018.57 S/ 6,111.41 100.00% 0.00 S/ - 0.00% 1,018.57 S/ 6,111.41 100.00% - S/ 0.01 0.00%
06.01.03 DESVIO PROVISIONAL DE CURSOS DE AGUA m 1,003.58 26.38 S/ 26,474.44 1,003.58 S/ 26,474.43 100.00% 0.00 S/ - 0.00% 1,003.58 S/ 26,474.43 100.00% - S/ 0.01 0.00%
06.01.04 DEMOLICION DE ALCANTARILLAS Y CABEZALES
m³ 21.31 131.81 S/ 2,808.87 21.31 S/ 2,808.88 100.00% 0.00 S/ - 0.00% 21.31 S/ 2,808.88 100.00% - S/ (0.01) 0.00%
EXISTENTES DE MCA
06.01.05 EXCAVACION PARA ESTRUCTURAS C/MAQUINARIA m³ 2,019.72 9.41 S/ 19,005.59 2,019.72 S/ 19,005.59 100.00% 0.00 S/ - 0.00% 2,019.72 S/ 19,005.59 100.00% - S/ - 0.00%
06.01.06 ENCOFRADO Y DESENCOFRADO CUERPO m² 1,807.43 52.64 S/ 95,143.12 1,807.43 S/ 95,143.12 100.00% 0.00 S/ - 0.00% 1,807.43 S/ 95,143.12 100.00% - S/ - 0.00%
06.01.07 ENCOFRADO Y DESENCOFRADO CABEZALES m² 675.76 51.52 S/ 34,815.16 675.76 S/ 34,815.16 100.00% 0.00 S/ - 0.00% 675.76 S/ 34,815.16 100.00% - S/ - 0.00%
06.01.08 ACERO DE REFUERZO F'Y = 4200 KG/CM2 kg 56,563.77 7.76 S/ 438,934.86 56,563.77 S/ 438,934.85 100.00% 0.00 S/ - 0.00% 56,563.77 S/ 438,934.85 100.00% - S/ 0.01 0.00%
06.01.09 CONCRETO F'C = 1000 KG/CM2 PARA SOLADOS m² 439.58 38.78 S/ 17,046.91 439.58 S/ 17,046.92 100.00% 0.00 S/ - 0.00% 439.58 S/ 17,046.92 100.00% - S/ (0.01) 0.00%
06.01.10 CONCRETO F'C = 210 KG/CM2 m³ 513.42 574.51 S/ 294,965.10 513.42 S/ 294,965.09 100.00% 0.00 S/ - 0.00% 513.42 S/ 294,965.09 100.00% - S/ 0.01 0.00%
06.01.11 RELLENO CON MATERIAL PROPIO PARA ESTRUCTURAS m³ 1,260.72 38.09 S/ 48,020.80 1,260.72 S/ 48,020.80 100.00% 0.00 S/ - 0.00% 1,260.72 S/ 48,020.80 100.00% - S/ - 0.00%
06.01.12 RELLENO CON MATERIAL GRANULAR ESTRUCTURAS m³ 16.00 80.26 S/ 1,284.16 16.00 S/ 1,284.16 100.00% 0.00 S/ - 0.00% 16.00 S/ 1,284.16 100.00% - S/ - 0.00%
06.01.13 MAMPOSTERIA CON PIEDRA EMBOQUILLADA F'C = 175
m³ 125.51 289.48 S/ 36,332.63 125.51 S/ 36,332.63 100.00% 0.00 S/ - 0.00% 125.51 S/ 36,332.63 100.00% - S/ - 0.00%
KG/CM2 + 60%PM
06.01.14 LIMPIEZA Y CONFORMACION DE CAUCE m 287.50 50.11 S/ 14,406.63 287.50 S/ 14,406.63 100.00% 0.00 S/ - 0.00% 287.50 S/ 14,406.63 100.00% - S/ - 0.00%
06.02 ALCANTARILLAS TMC S/ -
06.02.01 DESBROCE Y LIMPIEZA MANUAL m² 2,479.60 2.90 S/ 7,190.84 2,479.60 S/ 7,190.84 100.00% 0.00 S/ - 0.00% 2,479.60 S/ 7,190.84 100.00% - S/ - 0.00%
06.02.02 TRAZO NIVELES Y REPLANTEO m² 2,479.60 6.00 S/ 14,877.60 2,479.60 S/ 14,877.60 100.00% 0.00 S/ - 0.00% 2,479.60 S/ 14,877.60 100.00% - S/ - 0.00%
06.02.03 DESVIO PROVISIONAL DE CURSOS DE AGUA m 364.15 26.38 S/ 9,606.28 364.15 S/ 9,606.27 100.00% 0.00 S/ - 0.00% 364.15 S/ 9,606.27 100.00% - S/ 0.01 0.00%
06.02.04 DEMOLICION DE ALCANTARILLAS DE TMC L=9.00 m und 23.00 824.79 S/ 18,970.17 23.00 S/ 18,970.17 100.00% 0.00 S/ - 0.00% 23.00 S/ 18,970.17 100.00% - S/ - 0.00%
VALORIZACION DE FINAL DE OBRA
CONSORCIO SUPERVISOR II
OBRA : "CREACION DE LA CARRETERA A NIVEL DE BICAPA DESDE EL CRUCE CARRETERA TARAPOTO-SISA EN EL KM 36-SANTA MARTHA HASTA LA LOCALIDAD DE NUEVO SANTA ROSA, DISTRITO DE SANTA ROSA - PROVINCIA DE EL DORADO - DEPARTAMENTO DE SAN MARTIN"

PROPIETARIO : GOBIERNO REGIONAL SAN MARTIN


CONTRATISTA : CONSORCIO VIAL SISA
RESIDENTE DE OBRA : ING.KELVIN RAMIREZ CAMPOS
INSPECTOR DE OBRA : ING. FLAVIO JHONDLITH MALQUI MERINO
VALOR REFERENCIAL : s/. 31'427,173.76
VALOR CONTRACTUAL : s/. 31'427,173.70
FECHA : NOVIEMBRE 2023

PRESUPUESTO DEL PROYECTO ACTUALIZADO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMUALDO SALDO
ITEM DESCRIPCION
UND METRADO P. UNITARIO TOTAL METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ %

06.02.05 DEMOLICION DE ALCANTARILLAS Y CABEZALES


m³ 163.34 131.81 S/ 21,529.85 163.34 S/ 21,529.84 100.00% 0.00 S/ - 0.00% 163.34 S/ 21,529.84 100.00% - S/ 0.01 0.00%
EXISTENTES
06.02.06 EXCAVACION PARA ESTRUCTURAS C/MAQUINARIA m³ 1,536.31 9.41 S/ 14,456.71 1,536.31 S/ 14,456.71 100.00% 0.00 S/ - 0.00% 1,536.31 S/ 14,456.71 100.00% - S/ - 0.00%
06.02.07 TUBERIA CORRUGADA DE ACERO GALVANIZADO
m 136.08 784.57 S/ 106,764.29 136.08 S/ 106,764.29 100.00% 0.00 S/ - 0.00% 136.08 S/ 106,764.29 100.00% - S/ - 0.00%
CIRCULAR DE 36'' DE DIAMETRO
06.02.08 TUBERIA CORRUGADA DE ACERO GALVANIZADO
m 62.50 1,065.53 S/ 66,595.63 62.50 S/ 66,595.63 100.00% 0.00 S/ - 0.00% 62.50 S/ 66,595.63 100.00% - S/ - 0.00%
CIRCULAR DE 48'' DE DIAMETRO
06.02.09 TUBERIA CORRUGADA DE ACERO GALVANIZADO
m 37.22 1,672.37 S/ 62,245.61 37.22 S/ 62,245.61 100.00% 0.00 S/ - 0.00% 37.22 S/ 62,245.61 100.00% - S/ - 0.00%
CIRCULAR DE 60'' DE DIAMETRO
06.02.10 ENCOFRADO Y DESENCOFRADO CABEZALES m² 1,039.25 51.52 S/ 53,542.16 1,039.25 S/ 53,542.16 100.00% 0.00 S/ - 0.00% 1,039.25 S/ 53,542.16 100.00% - S/ - 0.00%
06.02.11 ACERO DE REFUERZO F'Y = 4200 KG/CM2 kg 9,107.46 7.76 S/ 70,673.89 9,107.46 S/ 70,673.89 100.00% 0.00 S/ - 0.00% 9,107.46 S/ 70,673.89 100.00% - S/ - 0.00%
06.02.12 CAMA DE GRAVA ARENOSA m³ 60.95 196.80 S/ 11,995.31 60.95 S/ 11,995.31 100.00% 0.00 S/ - 0.00% 60.95 S/ 11,995.31 100.00% - S/ - 0.00%
06.02.13 CONCRETO F'C = 1000 KG/CM2 PARA SOLADOS m² 262.97 38.78 S/ 10,197.94 262.97 S/ 10,197.94 100.00% 0.00 S/ - 0.00% 262.97 S/ 10,197.94 100.00% - S/ - 0.00%
06.02.14 CONCRETO F'C = 175 KG/CM2 CABEZALES m³ 163.16 472.31 S/ 77,063.54 163.16 S/ 77,063.54 100.00% 0.00 S/ - 0.00% 163.16 S/ 77,063.54 100.00% - S/ - 0.00%
06.02.15 RELLENO CON MATERIAL PROPIO PARA ESTRUCTURAS m³ 728.06 38.09 S/ 27,731.69 728.06 S/ 27,731.69 100.00% 0.00 S/ - 0.00% 728.06 S/ 27,731.69 100.00% - S/ - 0.00%
06.02.16 MAMPOSTERIA CON PIEDRA EMBOQUILLADA F'C = 175
m³ 293.26 289.48 S/ 84,892.90 293.26 S/ 84,892.90 100.00% 0.00 S/ - 0.00% 293.26 S/ 84,892.90 100.00% - S/ - 0.00%
KG/CM2 + 60%PM
06.02.17 LIMPIEZA Y CONFORMACION DE CAUCE m 723.46 50.11 S/ 36,252.76 723.46 S/ 36,252.76 100.00% 0.00 S/ - 0.00% 723.46 S/ 36,252.76 100.00% - S/ - 0.00%
06.03 CUNETAS S/ -
06.03.01 TRAZO DE NIVELES Y REPLANTEO m² 15,169.75 6.00 S/ 91,018.50 15,169.75 S/ 91,018.50 100.00% 0.00 S/ - 0.00% 15,169.75 S/ 91,018.50 100.00% - S/ - 0.00%
06.03.02 EXCAVACION MANUAL EN OBRAS DE ARTE m³ 1,443.88 47.46 S/ 68,526.54 1,443.88 S/ 68,526.54 100.00% 0.00 S/ - 0.00% 1,443.88 S/ 68,526.54 100.00% - S/ - 0.00%
06.03.03 ENCOFRADO Y DESENCOFRADO m² 477.98 40.46 S/ 19,339.07 477.98 S/ 19,339.07 100.00% 0.00 S/ - 0.00% 477.98 S/ 19,339.07 100.00% - S/ - 0.00%
06.03.04 CONCRETO F'C = 140 KG/CM2 m³ 1,443.88 465.55 S/ 672,198.33 1,443.88 S/ 672,198.34 100.00% 0.00 S/ - 0.00% 1,443.88 S/ 672,198.34 100.00% - S/ (0.01) 0.00%
06.03.05 JUNTA ASFALTICA m 6,454.99 7.93 S/ 51,188.07 6,454.99 S/ 51,188.07 100.00% 0.00 S/ - 0.00% 6,454.99 S/ 51,188.07 100.00% - S/ - 0.00%
06.04 BADENES S/ -
06.04.01 TRAZO NIVELES Y REPLANTEO m² 112.00 6.00 S/ 672.00 112.00 S/ 672.00 100.00% 0.00 S/ - 0.00% 112.00 S/ 672.00 100.00% - S/ - 0.00%
06.04.02 DEMOLICION DE ESTRUCTURAS EXISTENTES m³ 41.28 131.81 S/ 5,441.12 41.28 S/ 5,441.12 100.00% 0.00 S/ - 0.00% 41.28 S/ 5,441.12 100.00% - S/ - 0.00%
06.04.03 EXCAVACION PARA ESTRUCTURAS C/MAQUINARIA m³ 48.63 9.41 S/ 457.61 48.63 S/ 457.61 100.00% 0.00 S/ - 0.00% 48.63 S/ 457.61 100.00% - S/ - 0.00%
06.04.04 CONCRETO F'C = 100 KG/CM2 PARA SOLADOS m² 87.04 38.78 S/ 3,375.41 87.04 S/ 3,375.41 100.00% 0.00 S/ - 0.00% 87.04 S/ 3,375.41 100.00% - S/ - 0.00%
06.04.05 ENCOFRADO Y DESENCOFRADO m² 56.30 44.43 S/ 2,501.41 56.30 S/ 2,501.41 100.00% 0.00 S/ - 0.00% 56.30 S/ 2,501.41 100.00% - S/ - 0.00%
06.04.06 CONCRETO F'C = 210 KG/CM2 m³ 36.06 534.39 S/ 19,270.10 36.06 S/ 19,270.10 100.00% 0.00 S/ - 0.00% 36.06 S/ 19,270.10 100.00% - S/ - 0.00%
06.04.07 ACERO DE REFUERZO F'Y = 4200 KG/CM2 kg 1,756.73 6.91 S/ 12,139.00 1,756.73 S/ 12,139.00 100.00% 0.00 S/ - 0.00% 1,756.73 S/ 12,139.00 100.00% - S/ - 0.00%
06.04.08 MAMPOSTERIA CON PIEDRA EMBOQUILLADA F'C = 175
m³ 8.08 289.59 S/ 2,339.89 8.08 S/ 2,339.89 100.00% 0.00 S/ - 0.00% 8.08 S/ 2,339.89 100.00% - S/ - 0.00%
KG/CM2 + 60%PM
06.04.09 JUNTA DE CONSTRUCCION (JC) 5/8'' m 33.00 14.39 S/ 474.87 33.00 S/ 474.87 100.00% 0.00 S/ - 0.00% 33.00 S/ 474.87 100.00% - S/ - 0.00%
06.04.10 JUNTA ASFALTICA m 24.00 7.93 S/ 190.32 24.00 S/ 190.32 100.00% 0.00 S/ - 0.00% 24.00 S/ 190.32 100.00% - S/ - 0.00%
07 BUZONES S/ -
07.01 ENCIMADO DE CUERPO DE BUZON (D=1.20) Y
und 13.00 1,996.63 S/ 25,956.19 13.00 S/ 25,956.19 100.00% 0.00 S/ - 0.00% 13.00 S/ 25,956.19 100.00% - S/ - 0.00%
COLOCACION DE TECHO Y TAPA DE BUZON
08 MUROS DE CONTENCION S/ -
08.01 MUROS DE CONTENCION DE CONCRETO ARMADO S/ -
08.01.01 DESBROCE Y LIMPIEZA MANUAL m² 204.00 2.90 S/ 591.60 204.00 S/ 591.60 100.00% 0.00 S/ - 0.00% 204.00 S/ 591.60 100.00% - S/ - 0.00%
08.01.02 TRAZO NIVELES Y REPLANTEO m² 204.00 6.00 S/ 1,224.00 204.00 S/ 1,224.00 100.00% 0.00 S/ - 0.00% 204.00 S/ 1,224.00 100.00% - S/ - 0.00%
08.01.03 EXCAVACION PARA ESTRUCTURAS C/MAQUINARIA m³ 541.57 9.41 S/ 5,096.17 541.57 S/ 5,096.18 100.00% 0.00 S/ - 0.00% 541.57 S/ 5,096.18 100.00% - S/ (0.01) 0.00%
08.01.04 REFINE, NIVELACION Y COMPACTACION EN TERRENO
m² 204.40 4.98 S/ 1,017.91 204.40 S/ 1,017.91 100.00% 0.00 S/ - 0.00% 204.40 S/ 1,017.91 100.00% - S/ - 0.00%
NATURAL
08.01.05 CONCRETO F'C = 100 KG/CM2 PARA SOLADOS m² 204.40 38.77 S/ 7,924.59 204.40 S/ 7,924.59 100.00% 0.00 S/ - 0.00% 204.40 S/ 7,924.59 100.00% - S/ - 0.00%
08.01.06 CONCRETO F'C = 210 KG/CM2 m³ 125.22 574.51 S/ 71,940.14 125.22 S/ 71,940.14 100.00% 0.00 S/ - 0.00% 125.22 S/ 71,940.14 100.00% - S/ - 0.00%
08.01.07 ENCOFRADO Y DESENCOFRADO DE MURO DE
m² 337.08 47.26 S/ 15,930.40 337.08 S/ 15,930.40 100.00% 0.00 S/ - 0.00% 337.08 S/ 15,930.40 100.00% - S/ - 0.00%
CONTENCION
08.01.08 ACERO DE REFUERZO F'Y = 4200 KG/CM2 kg 9,736.48 6.91 S/ 67,279.08 9,736.48 S/ 67,279.08 100.00% 0.00 S/ - 0.00% 9,736.48 S/ 67,279.08 100.00% - S/ - 0.00%
08.01.09 JUNTA DE DILATACION Y CONSTRUCCION DE 1º CON
m 32.10 27.23 S/ 874.08 32.10 S/ 874.08 100.00% 0.00 S/ - 0.00% 32.10 S/ 874.08 100.00% - S/ - 0.00%
WATER STOP
08.02 MUROS DE CONTENCIÓN DE GAVIONES S/ -
08.02.01 TRAZO NIVELES Y REPLANTEO m² 150.00 6.00 S/ 900.00 150.00 S/ 900.00 100.00% 0.00 S/ - 0.00% 150.00 S/ 900.00 100.00% - S/ - 0.00%
08.02.02 DESVIO PARCIAL DE CAUCE DE QUEBRADA gbl 1.00 19,695.49 S/ 19,695.49 1.00 S/ 19,695.49 100.00% 0.00 S/ - 0.00% 1.00 S/ 19,695.49 100.00% - S/ - 0.00%
08.02.03 EXCAVACIÓN PARA ESTRUCTURAS C/MAQUINARIA
m³ 210.00 11.64 S/ 2,444.40 210.00 S/ 2,444.40 100.00% 0.00 S/ - 0.00% 210.00 S/ 2,444.40 100.00% - S/ - 0.00%
C/PRESENCIA DE AGUA
VALORIZACION DE FINAL DE OBRA
CONSORCIO SUPERVISOR II
OBRA : "CREACION DE LA CARRETERA A NIVEL DE BICAPA DESDE EL CRUCE CARRETERA TARAPOTO-SISA EN EL KM 36-SANTA MARTHA HASTA LA LOCALIDAD DE NUEVO SANTA ROSA, DISTRITO DE SANTA ROSA - PROVINCIA DE EL DORADO - DEPARTAMENTO DE SAN MARTIN"

PROPIETARIO : GOBIERNO REGIONAL SAN MARTIN


CONTRATISTA : CONSORCIO VIAL SISA
RESIDENTE DE OBRA : ING.KELVIN RAMIREZ CAMPOS
INSPECTOR DE OBRA : ING. FLAVIO JHONDLITH MALQUI MERINO
VALOR REFERENCIAL : s/. 31'427,173.76
VALOR CONTRACTUAL : s/. 31'427,173.70
FECHA : NOVIEMBRE 2023

PRESUPUESTO DEL PROYECTO ACTUALIZADO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMUALDO SALDO
ITEM DESCRIPCION
UND METRADO P. UNITARIO TOTAL METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ %

08.02.04 REFINE, NIVELACIÓN Y COMPACTACIÓN DE TERRENO


m² 210.00 4.98 S/ 1,045.80 210.00 S/ 1,045.80 100.00% 0.00 S/ - 0.00% 210.00 S/ 1,045.80 100.00% - S/ - 0.00%
NATURAL
08.02.05 TRANSPORTE DE AGREGADOS DE ZONA DE ACOPIO A
m³ 525.00 105.19 S/ 55,224.75 525.00 S/ 55,224.75 100.00% 0.00 S/ - 0.00% 525.00 S/ 55,224.75 100.00% - S/ - 0.00%
ZONA DE ARMADO
08.02.06 SUMINISTRO Y HABILITACIÓN DE GAVIONES TIPO A
und 72.00 527.15 S/ 37,954.80 72.00 S/ 37,954.80 100.00% 0.00 S/ - 0.00% 72.00 S/ 37,954.80 100.00% - S/ - 0.00%
(5.00X1.0X1.0M)
08.02.07 LLENADO Y AMARRE DE GAVIONES TIPO A
und 72.00 219.31 S/ 15,790.32 72.00 S/ 15,790.32 100.00% 0.00 S/ - 0.00% 72.00 S/ 15,790.32 100.00% - S/ - 0.00%
(5.00X1.0X1.0M)
08.02.08 SUMINISTRO Y HABILITACIÓN DE GAVIONES TIPO B
und 12.00 583.44 S/ 7,001.28 12.00 S/ 7,001.28 100.00% 0.00 S/ - 0.00% 12.00 S/ 7,001.28 100.00% - S/ - 0.00%
(5.00X1.50X1.00M)
08.02.09 LLENADO Y AMARRE DE GAVIONES TIPO B
und 12.00 219.31 S/ 2,631.72 12.00 S/ 2,631.72 100.00% 0.00 S/ - 0.00% 12.00 S/ 2,631.72 100.00% - S/ - 0.00%
(5.00X1.0X1.0M)
08.02.10 ENCOFRADO EN LAS PAREDES DE GAVIONES m² 360.00 46.68 S/ 16,804.80 360.00 S/ 16,804.80 100.00% 0.00 S/ - 0.00% 360.00 S/ 16,804.80 100.00% - S/ - 0.00%
08.02.11 SUMINISTRO E INSTALACIÓN DE GEOTEXTIL MACTEX
m² 245.00 31.05 S/ 7,607.25 245.00 S/ 7,607.25 100.00% 0.00 S/ - 0.00% 245.00 S/ 7,607.25 100.00% - S/ - 0.00%
Nº 40.1
09 TRANSPORTE S/ -
09.01 TRANSPORTE DE MAT. EXCEDENTE DE CORTE 1KM m³ 88,617.40 6.53 S/ 578,671.62 88,617.40 S/ 578,671.62 100.00% 0.00 S/ - 0.00% 88,617.40 S/ 578,671.62 100.00% - S/ - 0.00%
09.02 TRANSPORTE DE MAT. EXCEDENTE DE CORTE D > 1KM m³ 657,533.11 1.03 S/ 677,259.10 657,533.11 S/ 677,259.11 100.00% 0.00 S/ - 0.00% 657,533.11 S/ 677,259.11 100.00% - S/ (0.01) 0.00%
09.03 TRANSPORTE DE MAT. DE PRESTAMO PARA TERRAPLEN
m³ 34,964.73 6.53 S/ 228,319.69 34,964.73 S/ 228,319.69 100.00% 0.00 S/ - 0.00% 34,964.73 S/ 228,319.69 100.00% - S/ - 0.00%
HASTA 1KM.
09.04 TRANSPORTE DE MAT. DE PRESTAMO PARA TERRALEN
m³ 1,269,300.62 1.03 S/ 1,307,379.64 1,269,300.62 S/ 1,307,379.63 100.00% 0.00 S/ - 0.00% 1,269,300.62 S/ 1,307,379.63 100.00% - S/ 0.01 0.00%
D > 1KM
09.05 TRANSPORTE DE AGUA PARA TERRAPLEN HASTA 1KM m³ 1,000.96 12.83 S/ 12,842.32 1,000.96 S/ 12,842.31 100.00% 0.00 S/ - 0.00% 1,000.96 S/ 12,842.31 100.00% - S/ 0.01 0.00%
09.06 TRANSPORTE DE AGUA PARA TERRAPLEN D > 1KM m³ 748.23 1.54 S/ 1,152.27 748.23 S/ 1,152.28 100.00% 0.00 S/ - 0.00% 748.23 S/ 1,152.28 100.00% - S/ (0.01) 0.00%
09.07 TRANSPORTE DE MAT. DE PRESTAMO
m³ 13,097.70 6.53 S/ 85,527.98 13,097.70 S/ 85,527.97 100.00% 0.00 S/ - 0.00% 13,097.70 S/ 85,527.97 100.00% - S/ 0.01 0.00%
P/MEJORAMIENTOS HASTA 1KM
09.08 TRANSPORTE DE MAT. DE PRESTAMO
m³ 465,093.11 1.03 S/ 479,045.90 465,093.11 S/ 479,045.90 100.00% 0.00 S/ - 0.00% 465,093.11 S/ 479,045.90 100.00% - S/ - 0.00%
P/MEJORAMIENTOS D > 1KM.
09.09 TRANSPORTE DE AGUA PARA MEJORAMIENTO HASTA
m³ 699.09 12.83 S/ 8,969.32 699.09 S/ 8,969.33 100.00% 0.00 S/ - 0.00% 699.09 S/ 8,969.33 100.00% - S/ (0.01) 0.00%
1KM
09.10 TRANSPORTE DE AGUA PARA MEJORAMIENTO D > 1KM m³ 395.00 1.54 S/ 608.30 395.00 S/ 608.29 100.00% 0.00 S/ - 0.00% 395.00 S/ 608.29 100.00% - S/ 0.01 0.00%
09.11 TRANSPORTE DE MAT. GRANULAR PARA SUB BASE
m³ 22,365.32 6.53 S/ 146,045.54 22,365.32 S/ 146,045.54 100.00% 0.00 S/ - 0.00% 22,365.32 S/ 146,045.54 100.00% - S/ - 0.00%
HASTA 1KM
09.12 TRANSPORTE DE MAT. GARNULAR PARA SUB BASE D >
m³ 1,228,799.57 1.03 S/ 1,265,663.56 1,228,799.57 S/ 1,265,663.55 100.00% 0.00 S/ - 0.00% 1,228,799.57 S/ 1,265,663.55 100.00% - S/ 0.01 0.00%
1KM
09.13 TRANSPORTE DE AGUA PARA SUB BASE HASTA 1KM m³ 955.61 12.83 S/ 12,260.48 955.61 S/ 12,260.48 100.00% 0.00 S/ - 0.00% 955.61 S/ 12,260.48 100.00% - S/ - 0.00%
09.14 TRANSPORTE DE AGUA PARA SUB BASE D > 1KM m³ 739.39 1.54 S/ 1,138.66 739.39 S/ 1,138.66 100.00% 0.00 S/ - 0.00% 739.39 S/ 1,138.66 100.00% - S/ - 0.00%
09.15 TRANSPORTE DE MAT. GRANULAR PARA BASE HASTA
m³ 15,149.65 6.53 S/ 98,927.21 15,149.65 S/ 98,927.21 100.00% 0.00 S/ - 0.00% 15,149.65 S/ 98,927.21 100.00% - S/ - 0.00%
1KM
09.16 TRANSPORTE DE MAT. GRANULAR BASE D > 1KM m³ 831,443.70 1.03 S/ 856,387.01 831,443.70 S/ 856,387.01 100.00% 0.00 S/ - 0.00% 831,443.70 S/ 856,387.01 100.00% - S/ - 0.00%
09.17 TRANSPORTE DE AGUA PARA BASE HASTA 1KM m³ 642.69 12.83 S/ 8,245.71 642.69 S/ 8,245.72 100.00% 0.00 S/ - 0.00% 642.69 S/ 8,245.72 100.00% - S/ (0.01) 0.00%
09.18 TRANSPORTE DE AGUA PARA BASE D > 1KM m³ 489.69 1.54 S/ 754.12 489.69 S/ 754.13 100.00% 0.00 S/ - 0.00% 489.69 S/ 754.13 100.00% - S/ (0.01) 0.00%
09.19 TRANSPORTE DE MAT. DE AGREGADO GRUESO HASTA
m³ 6,051.26 6.53 S/ 39,514.73 6,051.26 S/ 39,514.73 100.00% 0.00 S/ - 0.00% 6,051.26 S/ 39,514.73 100.00% - S/ - 0.00%
1KM
09.20 TRANSPORTE DE MAT. DE AGREGADO GRUESO D > 1KM m³ 20,008.04 1.03 S/ 20,608.28 20,008.04 S/ 20,608.28 100.00% 0.00 S/ - 0.00% 20,008.04 S/ 20,608.28 100.00% - S/ - 0.00%
09.21 TRANSPORTE DE MAT. DE AGREGADO FINO HASTA 1KM m³ 4,236.63 6.53 S/ 27,665.19 4,236.63 S/ 27,665.19 100.00% 0.00 S/ - 0.00% 4,236.63 S/ 27,665.19 100.00% - S/ - 0.00%
09.22 TRANSPORTE DE MAT. DE AGREGADO FINO D > 1KM m³ 13,750.98 1.03 S/ 14,163.51 13,750.98 S/ 14,163.51 100.00% 0.00 S/ - 0.00% 13,750.98 S/ 14,163.51 100.00% - S/ - 0.00%
09.23 TRANSPORTE DE AGUA PARA CONCRETO HASTA 1KM m³ 1,034.00 12.83 S/ 13,266.22 1,034.00 S/ 13,266.21 100.00% 0.00 S/ - 0.00% 1,034.00 S/ 13,266.21 100.00% - S/ 0.01 0.00%
09.24 TRANSPORTE DE AGUA PARA CONCRETO D > 1KM m³ 530.43 1.54 S/ 816.86 530.43 S/ 816.86 100.00% 0.00 S/ - 0.00% 530.43 S/ 816.86 100.00% - S/ - 0.00%
10 MANTENIMIENTO DE PUENTE L=21.5 M S/ -
10.01 BARANDA CON PASAMANO DE TUBO FO.GDO.STANDARD m 43.00 333.24 S/ 14,329.32 43.00 S/ 14,329.32 100.00% 0.00 S/ - 0.00% 43.00 S/ 14,329.32 100.00% - S/ - 0.00%
10.02 PINTURA EN BARANDAS METALICAS m 43.00 29.83 S/ 1,282.69 43.00 S/ 1,282.69 100.00% 0.00 S/ - 0.00% 43.00 S/ 1,282.69 100.00% - S/ - 0.00%
10.03 LIMPIEZA DE SUPERFICIE DE PUENTES DE CONCRETO m² 422.25 14.49 S/ 6,118.40 422.25 S/ 6,118.40 100.00% 0.00 S/ - 0.00% 422.25 S/ 6,118.40 100.00% - S/ - 0.00%
10.04 REPARACION SUPERFICIAL DE ELEMENTOS DE
m² 15.00 88.90 S/ 1,333.50 15.00 S/ 1,333.50 100.00% 0.00 S/ - 0.00% 15.00 S/ 1,333.50 100.00% - S/ - 0.00%
CONCRETO
10.05 LOSA DE APROXIMACION S/ -
10.05.01 CONCRETO F'C = 280 KG/CM2 m³ 7.01 610.22 S/ 4,277.64 7.01 S/ 4,277.64 100.00% 0.00 S/ - 0.00% 7.01 S/ 4,277.64 100.00% - S/ - 0.00%
10.05.02 ENCOFRADO Y DESENCOFRADO EN LOSA m² 13.95 59.14 S/ 825.00 13.95 S/ 825.00 100.00% 0.00 S/ - 0.00% 13.95 S/ 825.00 100.00% - S/ - 0.00%
10.05.03 ACERO DE REFUERZO F'Y = 4200 KG/CM2 kg 977.67 7.76 S/ 7,586.72 977.67 S/ 7,586.72 100.00% 0.00 S/ - 0.00% 977.67 S/ 7,586.72 100.00% - S/ - 0.00%
11 SEÑALIZACION Y SEGURIDAD VIAL S/ -
11.01 SEÑALES PREVENTIVAS und 181.00 230.99 S/ 41,809.19 - S/ - 0.00% 181.00 S/ 41,809.19 100.00% 181.00 S/ 41,809.19 100.00% - S/ - 0.00%
11.02 SEÑALES REGLAMENTARIAS und 43.00 235.99 S/ 10,147.57 - S/ - 0.00% 43.00 S/ 10,147.57 100.00% 43.00 S/ 10,147.57 100.00% - S/ - 0.00%
VALORIZACION DE FINAL DE OBRA
CONSORCIO SUPERVISOR II
OBRA : "CREACION DE LA CARRETERA A NIVEL DE BICAPA DESDE EL CRUCE CARRETERA TARAPOTO-SISA EN EL KM 36-SANTA MARTHA HASTA LA LOCALIDAD DE NUEVO SANTA ROSA, DISTRITO DE SANTA ROSA - PROVINCIA DE EL DORADO - DEPARTAMENTO DE SAN MARTIN"

PROPIETARIO : GOBIERNO REGIONAL SAN MARTIN


CONTRATISTA : CONSORCIO VIAL SISA
RESIDENTE DE OBRA : ING.KELVIN RAMIREZ CAMPOS
INSPECTOR DE OBRA : ING. FLAVIO JHONDLITH MALQUI MERINO
VALOR REFERENCIAL : s/. 31'427,173.76
VALOR CONTRACTUAL : s/. 31'427,173.70
FECHA : NOVIEMBRE 2023

PRESUPUESTO DEL PROYECTO ACTUALIZADO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMUALDO SALDO
ITEM DESCRIPCION
UND METRADO P. UNITARIO TOTAL METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ % METRADO MONTO S/ %

11.03 SEÑALES INFORMATIVAS m² 25.70 579.72 S/ 14,898.80 - S/ - 0.00% 25.70 S/ 14,898.80 100.00% 25.70 S/ 14,898.80 100.00% - S/ - 0.00%
11.04 POSTES DE SOPORTE DE CONCRETO und 224.00 290.96 S/ 65,175.04 - S/ - 0.00% 224.00 S/ 65,175.04 100.00% 224.00 S/ 65,175.04 100.00% - S/ - 0.00%
11.05 ESTRUCTURA DE SOPORTES DE SEÑALES TIPO E-1 und 11.00 1,880.83 S/ 20,689.13 - S/ - 0.00% 11.00 S/ 20,689.13 100.00% 11.00 S/ 20,689.13 100.00% - S/ - 0.00%
11.06 CIMENTACION Y MONTAJE DE SEÑAL INFORMATIVA und 22.00 712.39 S/ 15,672.58 - S/ - 0.00% 22.00 S/ 15,672.58 100.00% 22.00 S/ 15,672.58 100.00% - S/ - 0.00%
11.07 POSTE DELINEADOR und 399.00 171.80 S/ 68,548.20 - S/ - 0.00% 399.00 S/ 68,548.20 100.00% 399.00 S/ 68,548.20 100.00% - S/ - 0.00%
11.08 TACHA RETROREFLECTIVA und 52.00 23.08 S/ 1,200.16 - S/ - 0.00% 52.00 S/ 1,200.16 100.00% 52.00 S/ 1,200.16 100.00% - S/ - 0.00%
11.09 MARCAS EN EL PAVIMENTO m² 3,235.54 14.50 S/ 46,915.33 - S/ - 0.00% 3235.54 S/ 46,915.33 100.00% 3,235.54 S/ 46,915.33 100.00% - S/ - 0.00%
11.10 GUARDAVIA METALICA m 242.00 260.88 S/ 63,132.96 - S/ - 0.00% 242.00 S/ 63,132.96 100.00% 242.00 S/ 63,132.96 100.00% - S/ - 0.00%
11.11 SECCION FINAL und 5.00 206.28 S/ 1,031.40 - S/ - 0.00% 5.00 S/ 1,031.40 100.00% 5.00 S/ 1,031.40 100.00% - S/ - 0.00%
11.12 SECCION DE AMORTIGUACION und 5.00 315.81 S/ 1,579.05 - S/ - 0.00% 5.00 S/ 1,579.05 100.00% 5.00 S/ 1,579.05 100.00% - S/ - 0.00%
11.13 CAPTAFAROS und 62.00 36.91 S/ 2,288.42 - S/ - 0.00% 62.00 S/ 2,288.42 100.00% 62.00 S/ 2,288.42 100.00% - S/ - 0.00%
11.14 POSTE DE KILOMETRAJE und 14.00 263.55 S/ 3,689.70 - S/ - 0.00% 14.00 S/ 3,689.70 100.00% 14.00 S/ 3,689.70 100.00% - S/ - 0.00%
11.15 GIBAS O RESALTO m 14.00 634.53 S/ 8,883.42 - S/ - 0.00% 14.00 S/ 8,883.42 100.00% 14.00 S/ 8,883.42 100.00% - S/ - 0.00%
12 PLAN DE MANEJO AMBIENTAL S/ -
12.01 PROGRAMA DE MITIGACION AMBIENTAL S/ -
12.01.01 DEPOSITOS DE MATERIAL EXCEDENTE m³ 6,783.58 1.37 S/ 9,293.50 6,783.58 S/ 9,293.49 100.00% 0.00 S/ - 0.00% 6,783.58 S/ 9,293.49 100.00% - S/ 0.01 0.00%
12.02 PROGRAMA DE MONITOREO AMBIENTAL S/ -
12.02.01 2,000.00 S/ 36,000.00 6.00 S/ 12,000.00 33.33% 12.00 S/ 24,000.00 66.67% 18.00 S/ 36,000.00 100.00% - S/ - 0.00%
MONITOREO DE LA CALIDAD DEL AGUA und 18.00
12.02.02
MONITOREO DE LA CALIDAD DEL AIRE und 3.00 1,500.00 S/ 4,500.00 1.00 S/ 1,500.00 33.33% 2.00 S/ 3,000.00 66.67% 3.00 S/ 4,500.00 100.00% - S/ - 0.00%

12.02.03 MONITOREO DE LA CALIDAD DE RUIDO und 3.00 527.53 S/ 1,582.59 1.00 S/ 527.53 33.33% 2.00 S/ 1,055.06 66.67% 3.00 S/ 1,582.59 100.00% - S/ - 0.00%
12.03
PROGRAMA DE MANEJO DE REISDUOS S/ -

12.03.01 ADQUISICION DE CONTENEDORES und 10.00 732.00 S/ 7,320.00 10.00 S/ 7,320.00 100.00% 0.00 S/ - 0.00% 10.00 S/ 7,320.00 100.00% - S/ - 0.00%
12.03.02 BAÑO QUIMICO PORTATIL mes 2.80 4,560.00 S/ 12,768.00 2.80 S/ 12,768.00 100.00% 0.00 S/ - 0.00% 2.80 S/ 12,768.00 100.00% - S/ - 0.00%
12.04 PROGRAMA DE CIERRE Y ABANDONO S/ -
12.04.01 READECUACION AMBIENTAL DE CAMPAMENTOS ha 1.00 14,955.90 S/ 14,955.90 - S/ - 0.00% 1.00 S/ 14,955.90 100.00% 1.00 S/ 14,955.90 100.00% - S/ - 0.00%
12.04.02 READECUACION AMBIENTAL DE DME ha 1.50 13,124.85 S/ 19,687.28 1.50 S/ 19,687.28 100.00% 0.00 S/ - 0.00% 1.50 S/ 19,687.28 100.00% - S/ - 0.00%

COSTO DIRECTO S/ 20,141,824.62 S/ 19,713,583.16 S/ 424,969.86 S/ 20,138,553.02 S/ 3,271.60


GASTOS GENERALES (11.61%) 11.61% S/ 2,638,582.34 S/ 2,289,155.09 S/ 49,347.80 S/ 2,338,502.89 S/ 300,079.45
UTILIDAD (5.00%) 5.00% S/ 1,007,091.24 S/ 985,679.16 S/ 21,248.49 S/ 1,006,927.65 S/ 163.59
GASTOS PARA IMPLEMENTACION DE PROTOCOLO COVID - 19 0.60% S/ 135,721.95 S/ 5,887.42 S/ - S/ 5,887.42 S/ 129,834.54
SUB TOTAL REFERENCIAL S/ 23,923,220.15 S/ 22,994,304.83 S/ 495,566.15 S/ 23,489,870.98 S/ 433,349.17
IGV (18%) S/ 4,306,179.63 S/ 4,138,974.87 S/ 89,201.91 S/ 4,228,176.78 S/ 78,002.85
PRESUPUESTO DE OBRA S/ 28,229,399.78 S/ 27,133,279.70 86.50% S/ 584,768.06 2.07% S/ 27,718,047.76 98.19% S/ 511,352.02 1.81%

También podría gustarte