Metrado Zapata Combinada Con y Sin Viga Rigiga
Metrado Zapata Combinada Con y Sin Viga Rigiga
Metrado Zapata Combinada Con y Sin Viga Rigiga
10.26
0.80 10.26
8.91
0.60 5.87
0.90 3.04
10.79
0.60 3.05
0.60 4.70
0.90 3.04
718.97
718.97
530.71
530.71
530.71
530.71
12.15
0.90 12.15
0.00
0.00
ø1/ 2"@0.10m
ø5/ 8"@0.20m ø1/ 2"@0.30m INTERCALADO
TRANSVERSAL
1.75m Ø 5/8" 1.75 34.00 1.00 59.50
ACERO SUPERIOR
LONGITUDINAL
Ø 1" 7.50 10.00 1.00 75.00
0.45m 6.60m 0.45m
TRANSVERSAL
1.75m Ø 3/4" 3.00 28.00 1.00 84.00
0.625m 0.625m
718.97
PLANILLA DE METRADOS ACERO ZAPATAS CON VIGA RIGIDA - (ESTRUCTURAS)
CANT DE
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
2.3. OBRAS DE CONCRETO ARMADO
2.3.2 ZAPATAS
ACERO FY=4,200KG/CM2, GRADO
2.3.2.3
60
ZAPATA COMBINADA CON VIGA
2.3.2.3.1
RIGIDA
ACERO INFERIOR
LONGITUDINAL
6.60m Ø 1/2" 6.60 11.00 1.00 72.60
TRANSVERSAL
1.75m Ø 1/2" 1.75 40.00 1.00 70.00
VIGA RIGIDA
LONGITUDINAL - SUPERIOR
Ø 1" 7.80 4.00 1.00 31.20
0.60m
6.60m
0.60m
ESTRIBOS
0.40m Ø 3/8" 2.45 53.00 1.00 129.85
0.75m 0.075m
PLANILLA DE METRADOS ACERO ZAPATAS CON VIGA RIGIDA - (ESTRUCTURAS)
CANT DE
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
TOTAL (ML) 45.97 28.80 0.00 142.60 173.05 0.00
4.04 2.26 1.60 1.02 0.58 0.25
KG
185.74 65.09 0.00 145.45 100.37 0.00
DESPERDIC 10% 8% 7% 5% 3% 3%
IO 204.31 70.30 0.00 152.72 103.38 0.00
TOTAL
(KG) 530.71
530.71
PLANILLA DE METRADOS ACERO ZAPATAS CONECTADA - (ESTRUCTURAS)
CANT DE
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
2.3. OBRAS DE CONCRETO ARMADO
2.3.2 ZAPATAS
ACERO FY=4,200KG/CM2, GRADO
2.3.2.3
60
ZAPATA COMBINADA CON VIGA
2.3.2.3.1
RIGIDA
ACERO INFERIOR
LONGITUDINAL
6.60m Ø 1/2" 6.60 11.00 1.00 72.60
TRANSVERSAL
1.75m Ø 1/2" 1.75 40.00 1.00 70.00
VIGA RIGIDA
LONGITUDINAL - SUPERIOR
Ø 1" 7.80 4.00 1.00 31.20
0.60m
6.60m
0.60m
ESTRIBOS
0.40m Ø 3/8" 2.45 53.00 1.00 129.85
0.75m 0.075m
PLANILLA DE METRADOS ACERO ZAPATAS CONECTADA - (ESTRUCTURAS)
CANT DE
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
TOTAL (ML) 45.97 28.80 0.00 142.60 173.05 0.00
4.04 2.26 1.60 1.02 0.58 0.25
KG
185.74 65.09 0.00 145.45 100.37 0.00
DESPERDIC 10% 8% 7% 5% 3% 3%
IO 204.31 70.30 0.00 152.72 103.38 0.00
TOTAL
(KG) 530.71
530.71
ZAPATA COMBINADA SIN ZAPATA COMBINADA CO
PRECIO
VIGA VIGA
ITEM PARTIDA UND REVISTA METRADO COSTO METRADO
2014
1 CONCRETO m3 S/. 290.00 10.26 S/. 2,975.40 8.91
S/. 5,887.24
ATA COMBINADA CON
ZAPATA CONECTADA
VIGA
COSTO METRADO COSTO