Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Lamina A 02

Descargar como pdf o txt
Descargar como pdf o txt
Está en la página 1de 1

COBERTURA TRANSLÚCIDA COBERTURA TRANSLÚCIDA

POLICARBONATO (e= 1.75mm) POLICARBONATO (e= 1.75mm)


N orte
1.80 1.80
BAÑO
1.00 1.00
TERRAZA TERRAZA
N.P.T. + 6.15 N.P.T. + 6.15
0.20 0.20
BARANDA METALICA
2.80 2.80
8.95 8.95
DORMITORIO BAÑO
N.P.T. + 3.15
BAÑO DORMITORIO
N.P.T. + 3.15
PISO CERAMICO TRAVERTINO
PISO CERAMICO TRAVERTINO
0.20 0.20
2.80 2.80
VIVIENDA
COCINA COMEDOR SALA
UNIFAMILIAR
N.P.T. + 0.15 N.P.T. + 0.15 N.P.T. + 0.15
PISO CERAMICO TRAVERTINO PISO CERAMICO TRAVERTINO PISO CERAMICO TRAVERTINO
0.15 0.15
ESC: 1/50 ARQUITECTURA
COBERTURA TRANSLÚCIDA COBERTURA TRANSLÚCIDA
POLICARBONATO (e= 1.75mm) POLICARBONATO (e= 1.75mm)
NTT +8.95 NTT +8.95
1.80 1.80
1.00 1.00
TERRAZA NPT +6.15 NPT +6.15
N.P.T. + 6.15 AZOTEA AZOTEA
0.20 0.20
BARANDA METALICA
2.80 2.80
8.95 8.95
SS.HH NPT +3.15 NPT +3.15
N.P.T. + 3.15 2do PISO 2do PISO
0.20 0.20 CA LAMBAYEQUE
Mz "E1" SUB LOTE "30C"
SECTOR III- CHULUCANAS
2.80 2.80
COMEDOR
N.P.T. + 0.15 NPT +0.15 NPT +0.15
PISO CERAMICO TRAVERTINO 1er PISO 1er PISO
0.15 0.15
ESC: 1/50 ARQUITECTURA ESC: 1/50 ARQUITECTURA

También podría gustarte