"AMPLIACION Y MEJORAMIENTO DE PISTAS, VEREDAS Y ESCALINATAS EN LOS JIRONES LOS PINOS, LOS SAUCES, LOS CIPRECES, LOS EUCALIPTOS Y LAS TUNAS EN EL
PROYECTO:
LOCALIDAD DE PITUMAMA, DISTRITO DE PILLCO MARCA - HUÁNUCO - HUÁNUCO"
SECTOR: Jr. Los Sauces KM 0+000 al 0+200.00
TRAMO: Progresivas 0+000 al 00+200 FECHA MARZO DEL 2017 Nº 02
A R E A(M2) VOLUMEN (M3) RELLENO CORTE
Progresiva Distancia RELLENO
Corte Relleno Vol.Corte Vol. Relleno Material Roca Material Terreno Roca
(Km) (ml.) (m2.) (m2) (m3.) (m3.) Suelto Fija Desechable Semirocoso Fija PROPIO PRÉSTAMO
00+000 0.09 0.00
00+010 10.00 2.02 0.00 10.55 --- --- --- 10.55 --- --- --- ---
00+020 10.00 2.92 0.00 24.70 --- --- --- 24.70 --- --- --- ---
00+030 10.00 13.12 0.00 80.20 --- --- --- 80.20 --- --- --- ---
00+040 10.00 2.38 0.13 77.50 0.65 0.65 --- 77.50 --- --- 0.65 ---
00+050 10.00 3.13 2.84 27.55 14.85 14.85 --- 27.55 --- --- 14.85 ---
00+060 10.00 0.24 2.44 16.85 26.40 26.40 --- 16.85 --- --- 26.40 ---
00+070 10.00 10.41 0.00 53.25 12.20 12.20 --- 53.25 --- --- 12.20 ---
00+080 10.00 5.20 0.00 78.05 --- --- --- 78.05 --- --- --- ---
00+090 10.00 6.24 2.22 57.20 11.10 11.10 --- 57.20 --- --- 11.10 ---
00+100 10.00 5.25 0.00 57.45 11.10 11.10 --- 57.45 --- --- 11.10 ---
00+110 10.00 2.39 0.00 38.20 --- --- --- 38.20 --- --- --- ---
00+120 10.00 3.55 0.00 29.70 --- --- --- 29.70 --- --- --- ---
00+130 10.00 6.49 0.00 50.20 --- --- --- 50.20 --- --- --- ---
00+140 10.00 3.06 0.01 47.75 0.05 0.05 --- 47.75 --- --- 0.05 ---
00+150 10.00 2.89 0.39 29.75 2.00 2.00 --- 29.75 --- --- 2.00 ---
00+160 10.00 4.24 0.00 35.65 1.95 1.95 --- 35.65 --- --- 1.95 ---
00+170 10.00 4.15 0.04 41.95 0.20 0.20 --- 41.95 --- --- 0.20 ---
00+180 10.00 3.67 2.20 39.10 11.20 11.20 --- 39.10 --- --- 11.20 ---
00+190 10.00 3.51 2.05 35.90 21.25 21.25 --- 35.90 --- --- 21.25 ---
00+200 10.00 3.01 2.21 32.60 21.30 21.30 --- 32.60 --- --- 21.30 ---
Sub-total 864.10 134.25 134.25 --- 864.10 --- --- 134.25 ---
"AMPLIACION Y MEJORAMIENTO DE PISTAS, VEREDAS Y ESCALINATAS EN LOS JIRONES LOS PINOS, LOS SAUCES, LOS CIPRECES, LOS EUCALIPTOS Y LAS TUNAS EN EL
PROYECTO:
LOCALIDAD DE PITUMAMA, DISTRITO DE PILLCO MARCA - HUÁNUCO - HUÁNUCO"
SECTOR: Jr. Los Sauces KM 0+000 al 0+200.00
TRAMO: Progresivas 0+000 al 00+200 FECHA MARZO DEL 2017 Nº 02
SUB-TOTALES VOLUMEN (M3) SUB-TOTAL RELLENO SUB-TOTAL CORTE
RELLENO
Progresiva Distancia Sub-total Vol.Corte Sub-total Vol. Relleno Material Roca Material Material Roca
(Km) (ml.) (m3.) (m3.) Suelto Fija Desechable Suelto Fija PROPIO PRÉSTAMO
0+200.00 0+200.00 864.10 134.25 134.25 --- 864.10 --- --- 134.25 ---
TOTALES --- 864.10 134.25 134.25 --- 864.10 --- --- 134.25 ---