FF - PlantaHidrógeno - PT 16jun21
FF - PlantaHidrógeno - PT 16jun21
FF - PlantaHidrógeno - PT 16jun21
Auxiliares
- - -
- - -
Hidrógeno USD - -
MIX GNC USD - -
Oxígeno USD - -
Agua Desmineralizada USD 609,180 1,218,361
Agua Ultrapura USD 2,030,601 4,061,202
Auxiliares
- - - NO
- - - NO
- - - NO
1,218,361 1,218,361 1,218,361 SI
4,061,202 4,061,202 4,061,202 SI
- - -
- - -
Auxiliares
- - -
- - -
Oxígeno (AR$/m3)
123.3 128.3 133.3 138.3 143.3 148.3
Flujo de Fondos Planta Hidrógeno Pico Truncado
Auxiliares
- - -
- - -
- 297,349 - - -
- 297,349 - - -
Hidrógeno USD -
MIX GNC USD -
Oxígeno USD -
Agua Desmineralizada USD 1,194,471
Agua Ultrapura USD 3,981,571
- - - - NO
- - - - NO
- - - - NO
1,194,471 1,194,471 1,194,471 1,194,471 SI
3,981,571 3,981,571 3,981,571 3,981,571 SI
75,011 - - -
75,011 - - -
- - - -
Auxiliares
- - -
- - -
Auxiliares
Cálculo Capital de Trabajo Año 1 Año 2
Días de cobro Dias 60 60
Días de pago Dias 30 30
Cuentas a cobrar USD 485,675.11 971,350.23
Cuentas a pagar USD - 126,223.89 - 228,899.88
Variación capital de trabajo USD 359,451.22 382,999.13
SI
NO
- - -
- - -
Nm3/hora
Hidrógeno 86
Hidrógeno (GNC) 14
Oxígeno 50
Gas Natural 66
Nm3/hora
Agua 0.25
m3/hora
Calor 4
Nm3/hora
Agua desmineralizada 1.80
CATEGORIAS COMERCIALES
Categorias : 11 - 12 - 21 - 22
# Tramos Desde Kw
Primer 0
Segundo 51
Tercer 301
Cuarto 501
Quinto 1501
Sexto 2501
Séptimo 4001
Octavo 5501
Noveno 8001
Décimo Tramo 10001
Fuente: SEPSE
Costo Cargo Fijo Costo Cargo Variable
40.00
240.00
545.00
154.92
10,190,595.77 18,127,935.62
Agua cruda
KWh
Consumo de energía 4.0
Compresión
CATEGORIAS COMERCIALES
Categorias : 11 - 12 - 21 - 22
# Tramos Desde Kw
Primer 0
Segundo 51
Tercer 301
Cuarto 501
Quinto 1501
Sexto 2501
Séptimo 4001
Octavo 5501
Noveno 8001
Décimo Tramo 10001
Fuente: SEPSE
Embotellado Agua
Unidades
Botellón PET 5 Litros 42.00
Botella PET 2 Litros 25.00
Gastos Comercialización
Unidades
Botellón PET 5 Litros 42.00
Botella PET 2 Litros 25.00
Gastos Comercialización
horas/año Nm3/año
8,100 696,600
8,100 113,400
8,100 405,000
8,100 534,600
horas/año m3/año
8,100 2,025
horas/año m3/año
8,100 32,400
horas/año m3/año
8,100 14,580
16,605,000
5.00 3,321,000
171,634,011
51,490,203
223,124,215
16,605,000
5.00 3,321,000
171,634,011
51,490,203
223,124,215
Oxigeno GNC MIX
50
66 Nm3/h 80 Nm3/h (4)
Nm3/h
Agua Cloaca
60% del Consumo de Energía 100% del Importe del Agua
$1,100.00
$1,210.00
$1,320.00
$1,320.00
$1,540.00
Oxigeno GNC MIX
50 66 80
Nm3/h Nm3/h Nm3/h
30 36
30 36
Agua Cloaca
60% del Consumo de Energía 100% del Importe del Agua
$1,100.00
$1,210.00
$1,320.00
$1,320.00
$1,540.00
30.00%
Estimación Gastos de Personal
Cargo
Director General
Jefes de departamento
Operarios de producción Gases
Mantenimiento
Control de calidad, H&S
Técnica y Capacitación
Administración
Comercialización
Variable
Salario bruto
Salario Social Máximo
Diferencia con Salario Bruto
Coeficiente de ajuste
Salario Social Mínimo
Diferencia con Salario Bruto
Coeficiente de ajuste
Costo Laboral
Sistema Integrado de Jubilaciones y Pensiones (Ley 24.241)
INSSJP-PAMI
Asignaciones Familiares (Ley 24.717)
Fondo Nacional del Empleo (Ley 24.013)
TOTAL
577 TOTAL Régimen Seguridad Social
50 Obra Social (Ley 23.660)
627 TOTAL Contribuciones Patronales
Agua
Cloaca
Agua
Cloaca
Cargo
Director General
Jefes de departamento
Operarios de producción Gases
TOTAL Mantenimiento
Cargo
Director General
Jefes de departamento
Operarios de producción Gases
Mantenimiento
Técnica y Capacitación
Administración
Comercialización
Cantidad de personal requerido (tareas a cargo) Perfil
1 (responsable de la gestión general de la planta) Profesional
5 (responsables de tareas) Técnico-Profesional
7 (2 despacho MIX, GNC, atención de compresores de
Técnico
hidrógeno
2 (asistir a ytareas
GNC, mezclador de gases;
de producción, tareas3 electrolizador; 2 agua.)
de mantenimiento del
Técnico
edificio)
2 (realización de análisis químicos, realización de tareas de
Técnico
higiene y seguridad)
1
2 (mantener
(compras,material bibliográfico,deasistir
mantenimiento capacitaciones,
vigilancia, manejoetc.)de Técnico-Educativo
normativa, manejo de facturación, realización de tareas de Administrativo
compras y activaciones)
3 (jefe comercial y dos analistas comerciales) Profesional
Profesionales Técnicos
126,072 88,890
125,699 88,517
373 373
100% 100%
109,203 75,209
16,870 13,681
87% 85%
11.070%
1.620%
4.830%
0.830%
18.350%
6.000%
24.350%
AR$
49,552,067.05
22,992,234.82 46%
3,059,600.91 6%
6,509,112.49 13%
16,991,118.83 34%
100%
0.00
16,991,118.83
AR$
46,018,613.14
22,992,234.82
3,059,600.91
6,509,112.49
13,457,664.92
0.00
13,457,664.92
Adicional Vacacional
Sueldo ÷ 25 días lab. × días anuales de vacación
Sueldo bruto anual (13 meses) 100.00%
Ídem mensual 7.69%
Díqas hábiles/mes 25
Salario diario 0.31%
Días de vacaciones (10 años antigüedad) 21
Adicional vacacional 6.462%
Cantidad Salario Social
1 120,947
5 84,828
7 58,049
2 58,049
2 58,049
1 58,049
2 84,828
3 120,947
2 89,325
2 89,325
1 89,325
2 127,194
3 180,711
Adicional Vacacional Cargas
8,146 32,682
5,744 23,043
4,122 16,536
4,122 16,536
4,122 16,536
4,122 16,536
5,744 23,043
8,146 32,682
Posición
Profesionales
Técnicos
Operativos
Sin Capacitación
1,509,266
1,509,266
754,633
2,205,517
4,716,927
23,064,143
2,322,457
2,322,457
1,161,228
3,307,049
7,047,724
34,906,378
Escenario Alternativa 3
40%
Salario bruto
126,072
88,890
63,788
40,564
Adicional Vacacional Cargas
11,405 45,755
8,041 32,261
5,770 23,150
5,770 23,150
5,770 23,150
5,770 23,150
8,041 32,261
11,405 45,755
Costo Laboral
233,660
164,748
118,224
118,224
118,224
118,224
164,748
233,660
Inversiones
CONCEPTO
INFRAESTRUCTURA EDILICIA
AEROGENERADORES (REPARACIONES PARQUE EÓLICO MUNICIPAL)
EQUIPOS Y TAREAS PPENDIENTE PARA PRODUCCIÓN HIDROGENO
REPUESTOS Y PROCEDIMIENTOS CRITICOS
CILINDROS DE HIDRÓGENO Y OXIGENO Y TUBOS DE BIO GAS Y NITROGENO
TANQUES INDUSTRIALES DE ALMACENAMIENTO H2, O2, MIX DE GASES Y BIO GAS (FIJOS Y DE TRANSPOR
DOCUMENTACIÓN, HABILITACIONES, PLANOS, MEDIDAS SEGURIDAD
TENDIDO DE CAÑOS PARA INVERNADERO (H2 Y CALEFACCION) Y ESTACION BIO GIGESTOR
ESTACIÓN EXPENDEDORA H2-GNC, H2 +CELDAS DE COMBUSTIBLE
SERVIDORES + SOFTWARE CONTROL DE LA PLANTA + VIGILANCIAS
CIRCUITOS ELÉCTRICOS
CONEXIÓN DE GAS A SUBSISTEMA DE RED (DISTRIGAS) CON PLANTA
LÏNEA EMBOTELLADO
SUBTOTAL
ANR Prodepro
TOTAL
Producto
Cantidad
unidades
O&M Aerogeneradores
O&M Unitario
O&M Anual
Concepto
INFRAESTRUCTURA EDILICIA
AEROGENERADORES (REPARACIONES PARQUE EÓLICO MUNICIPAL)
EQUIPOS Y TAREAS PPENDIENTE PARA PRODUCCIÓN HIDROGENO
REPUESTOS Y PROCEDIMIENTOS CRITICOS
CILINDROS DE HIDRÓGENO Y OXIGENO Y TUBOS DE BIO GAS Y NITROGENO
DUSTRIALES DE ALMACENAMIENTO H2, O2, MIX DE GASES Y BIO GAS (FIJOS Y DE TRANSPORTE)+ TANQUES PARA COMBUSTIBLES VEHI
DOCUMENTACIÓN, HABILITACIONES, PLANOS, MEDIDAS SEGURIDAD
TENDIDO DE CAÑOS PARA INVERNADERO (H2 Y CALEFACCION) Y ESTACION BIO GIGESTOR
ESTACIÓN EXPENDEDORA H2-GNC, H2 +CELDAS DE COMBUSTIBLE
SERVIDORES + SOFTWARE CONTROL DE LA PLANTA + VIGILANCIAS
CIRCUITOS ELÉCTRICOS
CONEXIÓN DE GAS A SUBSISTEMA DE RED (DISTRIGAS) CON PLANTA
USD Año 0 Vida Útil Depreciaciones
600,000 600,000 30 20,000
300,000 300,000 20 15,000
240,000 240,000 15 16,000
130,000 130,000 5 26,000
160,000 160,000 5 32,000
980,000 980,000 30 32,667
50,000 50,000
60,000 60,000 30 2,000
150,000 150,000 15 10,000
50,000 50,000 5 10,000
22,500 22,500 30 750
8,900 8,900 30 297
65,000 65,000 15 4,333
2,816,400 2,816,400 169,047
404,449
2,411,951 2,411,951
Privado
1,500,000 USD Social
609,756 USD 1,500,000
6% 36,585 USD 609,756
36,585
150,000 USD
2% 3,000 USD 150,000
3,000
39,585 USD
39,585
USD/Año
36,585
3,000
39,585
2
600
45%
540
8,174
16,348
% Impo % Nacional
0% 100% 0 600,000
100% 0% 300,000 0
100% 0% 240,000 0
50% 50% 65,000 65,000
20% 80% 32,000 128,000
20% 80% 196,000 784,000
0% 100% 0 50,000
0% 100% 0 60,000
0% 100% 0 150,000
100% 0% 50,000 0
0% 100% 0 22,500
0% 100% 0 8,900
0 0
Bienes Importados
0%
100%
100%
50%
20%
20%
0%
0%
0%
100%
0%
0%
0%
0%
GNC MIX
USD
USD
USD
USD
USD
USD
Bienes Nacionales Bienes Importados Bienes Nacionales
100% 0 600,000
0% 300,000 0
0% 240,000 0
50% 65,000 65,000
80% 32,000 128,000
80% 196,000 784,000
100% 0 50,000
100% 0 60,000
100% 0 150,000
0% 50,000 0
100% 0 22,500
100% #REF! #REF!
100% 0 8,900
100% 0 65,000
0 0
Delta M
#REF! #REF!
Inversión Operativa: moderanización para la
habilitación
0-6 meses
Infraestructura 300,000
Equipos y tareas 144,000
Repuestos Criticos
Cilindros H y O
Tanques Industriales
Documentación 30,000
Tendido de caños
Estación Expendedora
Servidores Software
Circuitos electricos 22,500
Instalación de agua 14,000
Línea de agua
Conexión de gas 8,900
Aerogeneradores 100,000
619,400
6,000
45,000
100,000 100,000
1,142,000 1,055,000
Año 1
1,055,000 2,411,951
1,055,000 2,346,951
Año 1
1,055,000 2,816,400
1,055,000 2,751,400
600,000
240,000
130,000
160,000
980,000
50,000
60,000
150,000
50,000
22,500
20,000
45,000
8,900
300,000
2,816,400
Línea Inversión Productiva BICE
Plazo Años 7
Gracia Años 2
Porcentaje a financiar % 67.07% 32.93%
Tasa BADLAR + 600 pb % 36.00%
Inversión 134,202,460.00
Desembolso - 160,000,000.00 - 90,015,163.79
Pago Principal
Saldo - 90,015,163.79
Pago Intereses
TOTAL FLUJO DEUDA - 90,015,163.79
Inversión 127,773,960.00
Desembolso - 160,000,000.00 - 88,076,898.25
Pago Principal
Saldo - 88,076,898.25
Pago Intereses
TOTAL FLUJO DEUDA - 88,076,898.25
Año 1 Año 2 Año 3 Año 4 Año 5
104,339,500.00
- 69,984,836.21
32,000,000.00 32,000,000.00 32,000,000.00 32,000,000.00
- 160,000,000.00 - 128,000,000.00 - 96,000,000.00 - 64,000,000.00 - 32,000,000.00
32,405,458.96 57,600,000.00 46,080,000.00 34,560,000.00 23,040,000.00
- 37,579,377.25 89,600,000.00 78,080,000.00 66,560,000.00 55,040,000.00
104,339,500.00
- 71,923,101.75
32,000,000.00 32,000,000.00 32,000,000.00 32,000,000.00
- 160,000,000.00 - 128,000,000.00 - 96,000,000.00 - 64,000,000.00 - 32,000,000.00
31,707,683.37 57,600,000.00 46,080,000.00 34,560,000.00 23,040,000.00
- 40,215,418.37 89,600,000.00 78,080,000.00 66,560,000.00 55,040,000.00
Año 6
32,000,000.00
-
11,520,000.00
43,520,000.00
Año 6
32,000,000.00
-
11,520,000.00
43,520,000.00
RETORNO
Inflación 0.16%
Deuda 67%
Patrimonio 33%
¿Hay ahorro? Sí Sí Sí
¿Hay ahorro? No No Sí
MdO
Variable MdO Técnica MdO Operativa
Profesional
% Salario respecto a MdO Técnica MTEySS 2020 142% 100% 72%
Salario bruto 116,374 82,052 58,882
MdO
MdO Técnica MdO Operativa
Profesional
Salario 104,640 73,779 52,944
Mínimo Relevante 64,533 64,533 0
Diferencia 40,107 9,246 0
% Relevante 9.0% 9.0% 5.0%
II.GG. Adicional 3,610 832 0
II.GG. Base 3,227 3,227 0
II.GG. Total a Pagar 6,836 4,059 0
Más de $ A$
0 64,532.64 0 5% 0
64,532.64 129,065.29 3,226.63 9% 64,532.64
129,065.29 193,597.93 9,034.57 12% 129,065.29
193,597.93 258,130.58 16,778.49 15% 193,597.93
258,130.58 387,195.86 26,458.39 19% 258,130.58
387,195.86 516,261.14 50,980.79 23% 387,195.86
516,261.14 774,391.71 80,665.80 27% 516,261.14
774,391.71 1,032,522.30 150,361.06 31% 774,391.71
1,032,522.30 en adelante 230,381.54 35% 1,032,522.30
LISTAS
¿Hay ahorro?
Sí
No
5. Sensibilidad
5.1. Profesionales % Trabajadores del "pool" de empleo alternativo
% Trabajadores del "pool" de
120,947 10% 20% 30%
desempleados
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
5.2. Técnicos % Trabajadores del "pool" de empleo alternativo
% Trabajadores del "pool" de
84,828 10% 20% 30%
desempleados
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Impuestos
perdidos sobre
el salario del
6,896 El salario de oportunidad es igual al mínimo necesario para elegir al proyecto
empleo
alternativo
actual…
… por el
porcentaje de
Pool 1: Trabajadores "seducidos" desde otros empleos, que dejan su trabajo y trabajadores
70%
van al proyecto que vienen de
dejar empleos
alternativos
Subsidio de
El trabajador desempleado que es contratado tiene, en promedio, seis meses
-3,733 desempleo
más de subsidio para cobrar
ahorrado…
Sí ¿Hay ahorro?
… y AUH
-8,699 Lo más realista es suponer que la AUH va a seguir siendo cobrada
ahorrada...
Sí ¿Hay ahorro?
… por el
porcentaje de
trabajadores
que van al
20% Pool 2: Trabajadores que se encuentran desocupados
proyecto desde
empleo
temporario y
desempleo
Distorsiones en
actividades
0
fuera del
mercado
… por % de
personas que
Pool 3: Personas que estaban fuera del mercado de trabajo y se ven atraídas al
10% se agregan a la
mismo por el proyecto
fuerza de
trabajo
SALARIO
36,008
SOCIAL
de la MdO Técnica
MdO Sin
Variable
capacitación
46% % Salario respect
37,443 Salario bruto
Proporcional
3,120
SAC
Salario bruto
40,564
total
Salario Neto
33,668
a/II.GG.
0 II.GG.
Salario Neto
33,668
a/II.GG.
17% T=
MdO Sin
capacitación
33,668
0
0
5.0%
0
0
0
o-y-por-embarazo-para-proteccion-social)
ZONA 1 (Incluye Santa Cruz)
80% 20%
3,866.40 966.6
3,866.40 966.6
12,596.80 3,149.20
- -
Promedio
mensual
8,699
Wp T , con Wp
= WgS
32,506 22,919 16,447 10,459 50%
Sí Sí Sí Sí 80%
- AUH 0 0 -8,699 -8,699 90%
No No Sí Sí 100%
0 0 0 0
10% 10% 10% 10%
Producción Hidrógeno
Volumen CO2 Evitado
Precio Unitario CO2
Valor CO2 Evitado
0 0 0 0
158,704 111,898 80,299 51,063
https://www.sendeco2.com/es/prec
pean Union Allowance (EUA) means the tradable unit under the European Union Emissions Trading Scheme (EU ETS), giving the holder the
to emit one tonne of carbon dioxide (CO2), or the equivalent amount of two more powerful greenhouse gases, nitrous oxide (N2O) and
uorocarbons (PFCs).
r the Kyoto rules, a CER is a tradable unit representing one tonne of carbon dioxide-equivalent (tCO2-e) of emissions abatement or
estration. CERs are issued for projects registered under the Clean Development Mechanism (CDM), which operates in countries that are no
x I Parties to the United Nations Framework Convention on Climate Change (UNFCCC)2 and Kyoto Protocol (developing country Parties).
60% 70% 80% 90% 100%
1.03 1.04 1.04 1.05 1.05
1.02 1.03 1.04 1.04
1.02 1.02 1.03
1.01 1.02
1
45
40
EUA CER
35
22.02 17.47
13.06 11.94 30
14.32 12.6
USD/tonCO2
25
12.89 9.96
7.33 2.97 20
4.45 0.39
5.96 0.18 15
7.68 0.39
10
5.35 0.39
5.83 0.23 5
15.88 0.24
24.84 0.22 0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
24.75 0.3
41.95 0.36 EUA
14.40 4.12
ttps://www.sendeco2.com/es/precios-co2
) of emissions abatement or
ch operates in countries that are non-
ocol (developing country Parties).
2020 2021
USD/kg kg/m3 USD/m3
3.00 0.08 36.59
4.78 58.23
Ingresos en pesos
Lts h Hs semales Semanas Total 45
AGUA MESA 1,800 45 4 8.26 2,676,240 2,676,240
1,800 90 4 8.26 5,352,480
GNC COMBUSTIÓN
m3 h
GAS 66 45 4 38.50 457,380 457,380
H2 14 45 4 20.79 52,391 52,391
GAS 66 90 4 38.50 914,760
H2 14 90 4 20.79 104,782
HIDROGENO TUBO
H2 86 45 4 20.79 321,829 321,829
H2 86 90 4 20.79 643,658
OXIGENO
O 50 45 4 133.33 1,199,970 1,199,970
O 50 90 4 133.33 2,399,940
5,352,480
3,133,620
914,760
104,782
643,658
2,399,940
17,851,500
27,267,120