Diseño Trabe de Concreto 20may24
Diseño Trabe de Concreto 20may24
Diseño Trabe de Concreto 20may24
- DISEÑO DE TRABE
REVISION DE LA CUANTIA
pmin= 0.0030 Cuantia mín pb= 0.025 CUANTÍA BALANCEADA pmax= 0.023 Cuantia max
pmin= 0.0033 Cuantia mín
pmin= 0.0033 Seleccionada LA CUANTIA ES APROPIADA
DISEÑO POR CORTANTE
CONTRIBUCION DEL CONCRETO AL CORTANTE Vcr CON REFUERZO EN EL ALMA
Rel. L/d= 10.00 ES MAYOR QUE 5 5 PARA RELACIONES MAYORES A 5
Vcr= 4299 Vcr= 10747.91472 EL Vcr NO DEBE EXCEDER ESTE VALOR CUMPLE
Vcr= 3821 Vcr= 2149.582945 EL Vcr NO DEBE SER MENOR A ESTE VALOR CUMPLE
Vcr= 4299 seleccionado
2.00 VS 5/8 PRINCIPAL
REFUERZO POR TENSION DIAGONAL 2.00 VS 5/8 BASTON
20
¿REQUIERE ESTRIBOS? SI seleccionado
Avmin= 0.1807016 cm2 Avmin= 0.2 cm2 Avmin= 0.2 cm2
Ø ESTR. 3/8 0.95 # RAMAS = 2 SI b ES DE 30 CM O MAS,
Av= 1 8/9 cm2 COLOCAR 3 RAMAS
DEFLEXIONES INMEDIATAS
DEFLEXION INMEDIATA DEBIDA A LA CARGA SOSTENIDA (CARGA MUERTA MAS EL 30 % DE LA CARGA VIVA)
W= 1650 % 90
Wcm= 1485 0.3cv= 50 w=Wcm+0.3cv= 1485 + 49.5 = 1534.5 kg/m 15.345 kg/cm
(Di)cm+0.3cv=WL^4/384EcIe= 0.079969258 CM
DEFLEXION INMEDIATA DEBIDA AL 70 % DE LA CARGA VIVA
w=W0.7cv= 115.5 kg/m 1.155 kg/cm (Di)0.7cv= 1.15 / 15.35 x (Di)cm+0.3cv= 0.006 CM
DEFLEXION DIFERIDA DEBIDA A LA CARGA SOSTENIDA.
FACTOR DADO PARA CONCRETO CLASE 1 As'/bd= ACERO A COMPRESION As'= 7.92 CM2 bd= 800 CM2
p'=As'/bd= 0.009897 2/1+50p' = 1.34 (Dd)cm+0.30cv= 1.34 x (Di)cm+0.30cv = 0.11 CM
DEFLEXION TOTAL D=(Di)cm+0.30cv+(Dd)cm+0.30cv+(Di)0.7cv= 0.08 + 0.10699 + 0.0 = 0.19 CM
DEFLEXION ADMISIBLE Dadm=L/240= 1.67 CM 0.19 < 1.67 PASA
DEFLEXION ADMISIBLE Dadm=L/480= 0.83 CM CON ELEMENTOS NO ESTRUCTURALES 0.19 < 0.83 PASA
14.- DISEÑO DE TRABE
REVISION DE LA CUANTIA
pmin= 0.0030 Cuantia mín pb= 0.025 Cuantia balanceada pmax= 0.019 Cuantia max
pmin= 0.0033 Cuantia mín
pmin= 0.0033 Seleccionada LA CUANTIA ES APROPIADA
DEFLEXIONES INMEDIATAS
DEFLEXION INMEDIATA DEBIDA A LA CARGA SOSTENIDA (CARGA MUERTA MAS EL 30 % DE LA CARGA VIVA)
W= 1650 % 90
Wcm= 1485 0.3cv= 50 w=Wcm+0.3cv= 1485 + 49.5 = 1534.5 kg/m 15.345 kg/cm
(Di)cm+0.3cv=WL^4/384EcIe= 0.0484241 CM
DEFLEXION INMEDIATA DEBIDA AL 70 % DE LA CARGA VIVA
w=W0.7cv= 115.5 kg/m 1.155 kg/cm (Di)0.7cv= 1.15 / 15.35 x (Di)cm+0.3cv= 0.004 CM
DEFLEXION DIFERIDA DEBIDA A LA CARGA SOSTENIDA.
FACTOR DADO PARA CONCRETO CLASE 1 As'/bd= ACERO A COMPRESION As'= 13.86 CM2 bd= 1000 CM2
p'=As'/bd= 0.0138553 2/1+50p' = 1.18 (Dd)cm+0.30cv= 1.18 x (Di)cm+0.30cv = 0.06 CM
DEFLEXION TOTAL D=(Di)cm+0.30cv+(Dd)cm+0.30cv+(Di)0.7cv= 0.05 + 0.057213 + 0.0 = 0.11 CM
DEFLEXION ADMISIBLE Dadm=L/240= 1.67 CM 0.11 < 1.67 PASA
DEFLEXION ADMISIBLE Dadm=L/480= 0.83 CM CON ELEMENTOS NO ESTRUCTURALES 0.11 < 0.83 PASA
14.- DISEÑO DE TRABE
REVISION DE LA CUANTIA
pmin= 0.0030 Cuantia mín pb= 0.025 Cuantia balanceada pmax= 0.025 Cuantia max
pmin= 0.0033 Cuantia mín
pmin= 0.0033 Seleccionada LA CUANTIA ES APROPIADA
DEFLEXIONES INMEDIATAS
DEFLEXION INMEDIATA DEBIDA A LA CARGA SOSTENIDA (CARGA MUERTA MAS EL 30 % DE LA CARGA VIVA)
W= 1650 % 90
Wcm= 1485 0.3cv= 50 w=Wcm+0.3cv= 1485 + 49.5 = 1534.5 kg/m 15.345 kg/cm
(Di)cm+0.3cv=WL^4/384EcIe= 0.0639754 CM
DEFLEXION INMEDIATA DEBIDA AL 70 % DE LA CARGA VIVA
w=W0.7cv= 115.5 kg/m 1.155 kg/cm (Di)0.7cv= 1.15 / 15.35 x (Di)cm+0.3cv= 0.005 CM
DEFLEXION DIFERIDA DEBIDA A LA CARGA SOSTENIDA.
FACTOR DADO PARA CONCRETO CLASE 1 As'/bd= ACERO A COMPRESION As'= 9.90 CM2 bd= 1000 CM2
p'=As'/bd= 0.009897 2/1+50p' = 1.34 (Dd)cm+0.30cv= 1.34 x (Di)cm+0.30cv = 0.09 CM
DEFLEXION TOTAL D=(Di)cm+0.30cv+(Dd)cm+0.30cv+(Di)0.7cv= 0.06 + 0.0856 + 0.0 = 0.15 CM
DEFLEXION ADMISIBLE Dadm=L/240= 1.67 CM 0.15 < 1.67 PASA
DEFLEXION ADMISIBLE Dadm=L/480= 0.83 CM CON ELEMENTOS NO ESTRUCTURALES 0.15 < 0.83 PASA