Bajada de Cargas
Bajada de Cargas
Bajada de Cargas
EQUIPO 6
QU ES LA BAJADA DE CARGAS?
Cargas muertas
Cargas vivas
CARGAS MUERTAS
= 4.96 m2 /2
= 2.48 m2
AREA TRIBUTARIA 2
= 0.675 m X 3.15 m
= 2.126 m2
AREA TRIBUTARIA 3
= 1.90 m2 /2
= 0.95 m2
AREA TRIBUTARIA 4
= 4.50 m2 /2
= 2.25 m2
AREA TRIBUTARIA 5
= 4.65 m2 /2
= 2.325 m2
SUMA TOTAL DE LA SUPERFICIE DE ENTREPISO
AT1=2.48 m2
AT2=2.126 m2
AT3=0.95 m2
AT4=2.25 m2
AT5=2.325 m2
AREA= (B + b) X ALTURA /2
m2
= (4.00 m + 0.50 m) X 1.75 m/2
= 4.50 m X 1.75m /2
= 7.87 m2 /2
= 3.93 m2
AREA TRIBUTARIA 7
= 0.675 m X 3.15 m
= 2.126 m2
AREA TRIBUTARIA 8
= 1.90 m2 /2
= 0.95 m2
AREA TRIBUTARIA 9
AREA= (B + b) X ALTURA /2
= 4.85 m X 1.675m /2
= 8.12 m2 /2
= 4.06 m2
AREA TRIBUTARIA 10
AREA= (B + b) X ALTURA /2
= 4.10 m X 1.75m /2
= 7.17 m2 /2
= 3.58 m2
SUMA TOTAL DE LA SUPERFICIE DE CUBIERTA
AT6=3.93 m2
AT7=2.126 m2
AT8=0.95 m2
AT9=4.06 m2
AT10=3.58 m2
5% DE 0.0138
ESTRUCTURA
TOTAL =0.289
=0.29
METROS LINEALES DE MURO EN PLANTA BAJA=
4.25 METROS
METROS LINEALES DE MURO EN PLANTA BAJA=
7.80 METROS
SUMA TOTAL DE METROS LINEALES DE MURO
TOTAL= 12.05 m
PESO DE LA AZOTEA=
14.64 m X 0.72 T/m3 =10.54 T/m2
DIMENSIONAMIENTO DE ZAPATA
BASE DEL CIMIENTO= W/RESISTENCIA DEL TERRENO PERALTE DEL CIMIENTO= 1.71X 0.25 m
= 0.76 m = 0.80 m