Excel Nabe
Excel Nabe
Excel Nabe
Data Lab
UDS γ (kN/m3) φ (o ) Cu (kN/m2) C' (kN/m2)
A 15.7 0 11.8 - clay
B 17.7 30 - 12.8 silty sand
C 17.7 35 - - sand
V= ton
H= ton
M= ton.m
DATA SPT
NIM GENAP
Depth N1 N2 N3 N
0 0 0 0 0
2 3 4 4 8
4 2 3 5 8
6 4 4 5 9
8 10 11 12 23
10 14 15 15 30
12 10 10 12 22
14 14 15 20 35
16 13 14 15 29
18 18 20 22 42
20 30 32 35 67
SPT
0 10 20 30 40 50 60 70 80
0
8
Depth (m)
10
12
14
16
18
16
18
20
N-SPT
DATA CPT
Nilai Cw dan Tw dijumlahkan dengan Y
Tf (kg/cm)
2.00
4.00
6.00
8.00
Depth (m)
10.00 qc-depth
Tf-depth
12.00
14.00
qc-depth
Depth (
10.00
Tf-depth
12.00
14.00
16.00
18.00
20.00
0 200 400 600 800 1000 1200 1400 1600 1800 2000
qc (kN/m2)
Y= 8
dept qc
nilai kotak nilai kotak nilai kotak
2 7 20 5 200 5
0.0
0.3
0.7
1.0
1.4
1.7
2.0
2.2
2.4
2.6
2.7
2.9
3.1
3.2
3.6
3.9
4.3
4.3
4.6
4.9
6.1
7.1
8.0
8.7
9.0
9.4
9.9
10.0
10.4
10.7
11.1
11.2
11.4
11.9
12.2
12.4
12.8
12.9
13.1
13.3
13.4
13.6
13.8
13.9
14.1
14.3
14.5
14.8
15.1
15.5
15.6
16.0
16.3
16.7
16.8
17.2
17.5
18.2
18.7
19.4
20.4
21.1
21.9
22.4
22.8
23.1
23.5
23.6
24.0
24.3
24.8
25.3
25.8
26.2
26.5
27.2
27.9
28.6
28.9
29.3
29.6
30.1
30.6
30.8
31.0
31.5
32.0
32.3
32.8
33.1
33.6
34.0
34.1
34.5
34.8
35.5
36.9
38.2
39.7
41.4
43.7