Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Gabung Gambar

Télécharger au format pdf ou txt
Télécharger au format pdf ou txt
Vous êtes sur la page 1sur 9

1

1
2
3
4
5

1
2
3
4
5
6

Siteplan Drainase
7
8
9
10

Skala: 1:3500
1
2
3
4
5

1
2
14

3
1

15

4
2

16
14

5
3

17
1

15

6
4

18
2

16

7
5

19
3

17

8
6

20
4

18

21
5

19

9 1
8

22
6

20

0 1
23
7
9 1

21

1 1
0

9 1

2
0

24
8

22
1

11

13
25
11
23
2

12

12

26
9 1
0

24
3

13

13
25
11
4

14

1
12

26
5

15

2
1
13

3
2
6

16

3 4
4
7

5
5
17

6
7
8

25 8
26 9
27 10
28 11
29 12
30 13
31 14
32 15
33
1 34 16
2 35 17
3 36 18
4 37 19
5 38 20
6 39 21
20 7 40 22
21 8 41 23
22 9 42 24
23 10 43
24 11 44
25 12 45
26 13 46
27 14
28 15
29 16
30 17
1 31 18
2 32 19
3
4 33
5 34
6 35
7 36
8
9 10
11
12
13
14
U

iteplan Drainase
U
32
4.6
02
L+
MA 12
5.0
02
L+
MA

MA
L+
1

02
BL

5.6
30
2

MA
L+
MAL
O3 K

02
3
22

5.0
+02

6
MA
5.

4.92

17
2

L+
+0

.939 4

+02
AL

025
M

L
.13

MA
6

24
5

23
22

46
20 MAL
24.9 +02
4.68
L +0 3
MA 6

21
MA
L+
0 7

45
024

MA
.07
8
1

L
MA

+0
1 L+
024
2

25
20
.1

.48
02
3

44
5

35
2 MA

9
L +0

3
4

25.6
24.6

.12
35

BLO 5

024

L +0
19
6

43

MA
3

AL
7

MAL
KG

2M
MA
8 L +0
24.2 9 1 8

.13

+02

18

19
46 4
0

67
024

42

25.2
11

.763 4
L+
12

L +0
MA
13

17

18

90
MA
41

25.2
14
7
.72

1 15 28

L +0
024

2 16 31

16

17

MA
L+

3 17

40

36
MA

4 27

56

MA
25.2
5 30

15

16

L+
MA
6

L +0
39
L+

35

02
024 0
7
.24
.50

5.4
MA
78
MA
5
024

BLO

64
25.2
8

L+
16

14

15
15
14

02
L+

9 1

L +0
38

34

5.4
15
MA
K5

MA MA
L
0
KF

65
L

MA
+02 +02
4.47 4 .46 9 16 11
48

3 9
17

BLO 12 13

14
12
4.2

10

37

33
KC
18
O3 K4

13
+02

19
5

14
MA

20

13

32
36
14
13 21
22
J
4

10

13
MA
MA
23

11

12
L+ L+
024
13

024
1

31
24

35
BL2

.40 .40
.3
OK

6 2
2 25
024
3

12
3
9

12
26
L+

11
10
11
4
MA
1

34

30
I5

B
97

MAL
MA MA
5
.4

L+ L+
2
024

024 024

+
6
8

11
.26
BL

.54

24.7
6

6
L+

10
.35

9
MA
OK4

33

29
MA

K
L

68
024

MA +02

BLO 8
L+ 4.76
025 5
1

L+

.12
14 9 1
7

2 MA

10
MA

BLO
L+
024 15 0 1

9
KE
B2L 3

32

28
.52
5 19 16 1 1
64

17
4.3
6

20
2
0
.43

18 13
+02

9
7

8
024

31
19

27
L
L+

MA

20
MA

21
9

8
.42
1

7
22

A
30

26
0
4

MA
.42
+02

L +02
23
4

4.4
+02

15
L

1 24
MA

B5LO6 7
5

6
2
L

17 21
25

29

K
25
MA
4

3 26
.44
024

4
BL6O 7 MAL
L+

24
28
MA

18 22 +02
5
.53

K 8D 9
4.89
4

MAL
+02

+ 024
7

4
.893

27

23
L
MA

10
11

4
2

22
26
12
13
MAL

3
2

21
25
+02
4.96

MA
L +0

2
24.7

20
4

26

1
23 MAL
+0 24.817
MAL
+024
.831

24 MAL
25 +024.922
MAL
+024
.950
MAL +0
26 25.077
29
MAL +0
25.700

Elevasi
Lahan
MAL +0 Tertinggi
26.000

ayout Drainase

Keterangan:
: Saluran Tersier
: Saluran Sekunder
Layout Drainase : Saluran Primer
2 Skala: 1:3500
ST 4 ST 7.2 ST 6
Luas CA
- Pemukiman
- Jalan
= 2023.9 m2
= 576.1 m2
Luas CA
- Pemukiman
- Jalan
= 0 m2
= 288 m2
Luas CA
- Pemukiman
- Jalan
= 1150 m2
= 191.5 m2
U
- RTH = 611.5 m2 - RTH = 384.6 m2 - RTH = 385.9 m2
L. Saluran = 162.920 m L. Saluran = 84.685 m L. Saluran = 95.708 m
i = 0,0024 i = 0,0024 i = 0,0024

ST 8 ST 7.1 ST 5
ST 2 Luas CA
Luas CA Luas CA SS 6-7
Luas CA = 0 m2
- Pemukiman = 2913.9 m2 - Pemukiman = 0 m2 Luas CA - Pemukiman
- Pemukiman = 0 m2
- Jalan = 380.7 m2 - Jalan = 144.4 m2 - Pemukiman = 0 m2 - Jalan = 293 m2
- Jalan = 739.3 m2 = 384.6 m2
- RTH = 403.7 m2 - RTH = 384.6 m2 - Jalan = 432.5 m2 - RTH
- RTH = 384.6 m2 L. Saluran = 85.299 m
L. Saluran = 182.168 m L. Saluran
L. Saluran = 48.352 m - RTH = 769.2 m2
= 256.4 m i = 0,0024 L. Saluran i = 0,0024 SS 5-6
i = 0,0024 i = 0,0024 = 6.655 m
i = 0,0012 Luas CA
SP 1-2 - Pemukiman = 1150 m2
Luas CA - Jalan = 240 m2
- Pemukiman = 33006.2 m2 - RTH = 1541.1 m2
- Jalan = 12075.4 m2 SP 2-3 SS 4-5 L. Saluran = 39.478 m
- RTH = 8253.4 m2 Luas CA Luas CA i = 0,0012
L. Saluran = 11.662 m - Pemukiman = 33006.2 m2 - Pemukiman = 2949.8 m2
i = 0,0021 - Jalan = 11281.7 m2 - Jalan = 1267.2 m2
- RTH = 7997 m2 - RTH = 2537.2 m2
L. Saluran = 10.338 m L. Saluran = 382.080 m

1
i = 0,0021 i = 0,0012 ST 28

BL
SP 0-1 Luas CA
= 0 m2

2
Luas CA - Pemukiman
- Pemukiman = 33006.2 m2 - Jalan = 584.522 m2 ST 27

O3 K
- Jalan = 13765.3 m2 - RTH = 0 m2 Luas CA
L. Saluran = 120.153 m - Pemukiman = 0 m2
- RTH = 8253.4 m2
L. Saluran = 12.949 m i = 0,0024 - Jalan = 123.387 m2
i = 0,0021 - RTH = 138.713 m2

4
L. Saluran = 55.695 m

H
i = 0,0024

24
5
SS 3-4

23
Luas CA
- Pemukiman = 4973.7 m2
- Jalan = 1924.7 m2 SS 27-28

22
Luas CA
- RTH = 3148.6 m2

46
L. Saluran - Pemukiman = 0 m2
SP 9-10 SS 3-4 = 18.939 m
i = 0,0012 6 - Jalan = 602.5 m2
Luas CA Luas CA

21
2 2 0 7
- RTH = 0 m2

45
- Pemukiman = 22192.2 m - Pemukiman = 4973.7 m L. Saluran = 9.934 m
- Jalan = 8366.8 m2 - Jalan = 1924.7 m2
1 1 i = 0,0012
- RTH = 3978.9 m2 - RTH = 3148.6 m2 2

20
ST 31
3

44
L. Saluran = 4.135 m L. Saluran = 18.939 m 2 5 Luas CA
i = 0,0021 i = 0,0012 4 - Pemukiman = 0 m2

BLO 5 = 107 m2

19
- Jalan
6

43
SP 8-9 3 - RTH = 0 m2
7
Luas CA
- Pemukiman = 25118.7 m2
8 9 1 KG 8 L. Saluran
i
= 30.9 m

18

19
4 = 0,0024
ST 1 0

42
- Jalan = 8914.6 m2
Luas CA = 4444.7 m2
11
- Pemukiman = 0 m2
- RTH
12
L. Saluran = 52.588 m 13

17

18
= 1689.9 m2

41
- Jalan
- RTH = 0 m2
i = 0,0021 14
L. Saluran 1 15 28
ST 31
= 335.183 m
2 16 31

16

17
i Luas CA
= 0,0024
3 17

40

36
- Pemukiman = 0 m2
4 27
- Jalan = 107 m2
5 30

15

16
- RTH = 0 m2
6

39

35
L. Saluran = 30.9 m
ST 16 7 i = 0,0024
16
BLO 8

14

15
Luas CA 15
14 9 1

38

34
- Pemukiman = 625 m2 15
K5

0
- Jalan = 286.1 m2 9 16
17 KF 11

BLO 12 13

14
- RTH = 0 m2 10 12 SS 29-30

37

33
KC
18
O3 K4

L. Saluran
i
= 78.574 m
= 0,0024 19 13 Luas CA
= 2940 m2
5

- Pemukiman

14
20

13
- Jalan = 1081.8 m2

32
36
14
13 21 - RTH = 350.8 m2
22
J
4

10

L. Saluran

13
= 188.178 m
23

11

12
ST 15 SS 26-27 i = 0,0012
1

31
24

35
BL2

OK

Luas CA Luas CA
2 25
3

- Pemukiman = 416.7 m2 - Pemukiman = 3565.9 m2


12
3
9

12
26

11
10
= 94.7 m2 - Jalan = 1575.8 m2
- Jalan 11
4
1

34

30
I5

B
- RTH = 0 m2 5 - RTH = 428.2 m2
2

6 L. Saluran
8

L. Saluran = 193.087 m

11
= 52.382 m
BL

ST 25

BLO 10
i
7 i

9
= 0,0024 = 0,0012
OK4

33
Luas CA

29
K
BLO 8 - Pemukiman = 3990 m2
1

14 9 1
7

= 849.2 m2

10
- Jalan
15 0 1

9
KE
B2L 3

= 289.5 m2

32

28
- RTH
19 16 1 1 L. Saluran
ST 18 17 = 228.137 m
6

Luas CA
20
18 2 13
ST 24 i = 0,0024

9
7

8
Luas CA

31
19

27
- Pemukiman = 0 m2
- Pemukiman = 4616.6 m2
- Jalan = 732.9 m2 20 - Jalan = 849.2 m2
- RTH = 0 m2 21

8
1

7
= 263 m2
22 - RTH

A
30

26
L. Saluran = 241.512 m
L. Saluran
i = 0,0024 23 i
= 270.331 m
1 24 = 0,0024

B5LO6 7
5

6
17 21
2 25

29

K
25
3 26
4
ST 14
BL6O 7
5

4
ST 13

24
28
Luas CA Luas CA 18 22 ST 23
- Pemukiman
- Jalan
= 833.3 m2
= 556.9 m2
- Pemukiman
- Jalan
= 416.7 m2
= 110.3 m2 K 8D 9 Luas CA
- Pemukiman = 5040 m2

4
27

23
- RTH = 926.3 m2 - RTH = 0 m2 - Jalan = 1211.7 m2
L. Saluran = 103.563 m L. Saluran = 52.382 m 10 - RTH = 381.6 m2
i = 0,0024 i 11 L. Saluran = 270.331 m

4
= 0,0024
2

22
26
12 i = 0,0024
13
1

3
2

21
SS 14-15
Luas CA
ST 17 SS 12-17 25
Luas CA Luas CA

1
= 833.3 m2

2
- Pemukiman = 833.3 m2

20
- Pemukiman =416.7 m2 - Pemukiman
- Jalan = 556.9 m2 - Jalan = 199.2 m2
- Jalan = 378.8 m2
- RTH = 1594.3 m2 - RTH = 122.7 m2
- RTH = 0 m2

1
L. Saluran = 52.382 m L. Saluran = 52.383 m
L. Saluran = 28.763 m 23
i = 0,0012 i = 0,0012
i = 0,0024

24
25
SS 12-13
SS 21-22 ST 9
Luas CA
2 Luas CA Luas CA 26
- Pemukiman = 2500 m
- Pemukiman = 0 m2 - Pemukiman = 2926.4 m2
- Jalan = 1942.9 m2 29
- Jalan = 2456.5 m2 - Jalan = 282.2 m2
- RTH = 0 m2 ST 19
L. Saluran - RTH = 0 m2 - RTH = 403.7 m2 SS 29
= 29.794 m L. Saluran Luas CA Luas CA
L. Saluran = 12.503 m = 135.631 m
i = 0,0012 i = 0,0024 - Pemukiman = 2926.4 m2 - Pemukiman = 0 m2
i = 0,0012 SP 24-25
- Jalan = 282.2 m2 SP 21-23 SP 26-29 - Jalan = 85.5 m2
Luas CA
- RTH
L. Saluran
i
= 403.7 m2
= 140.561 m
= 0,0024
Luas CA
- Pemukiman
- Jalan
= 10080 m
= 2462.1 m2
2 - Pemukiman
- Jalan
= 10495.9 m
= 72.5 m2
2 Luas CA
- Pemukiman = 2940 m2
- RTH
L. Saluran
i
= 237.3 m2
= 22.462 m kema Drainase
SS 17-18 - Jalan = 1353.9 m2 = 0,0012
ST 22 - RTH = 2472.2 m2 - RTH = 1595.2 m2
Luas CA Luas CA L. Saluran
- RTH = 588 m2
L. Saluran = 149.251 m = 6.641 m L. Saluran
- Pemukiman = 0 m2 - Pemukiman = 0 m2 i i = 0,0021
= 13.890 m
= 0,0021 i = 0,0021
- Jalan = 48.8 m2 - Jalan = 2305.8 m2
- RTH = 0 m2 - RTH = 0 m2 ST 10
L. Saluran = 12.681 m L. Saluran = 444.7601 m Luas CA
i = 0,0012 i = 0,0024 - Pemukiman = 2926.4 m2
- Jalan = 380.7 m2 ST 20 SP 23-24 SP 25-26
Luas CA Luas CA Luas CA
- RTH = 403.7 m2
L. Saluran - Pemukiman = 0 m2 - Pemukiman = 5040 m2 - Pemukiman = 6505.9 m2
= 187.322 m

Skema Drainase i = 0,0024 - Jalan


- RTH
= 2305.8 m2
= 0 m2
- Jalan
- RTH
= 1250.5 m2
= 1858.2 m2
- Jalan
- RTH
= 2986.3 m2
= 1305.7 m2
3 Skala: 1:3500
L. Saluran
i
= 444.7601 m
= 0,0024
L. Saluran
i
= 44.530 m
= 0,0021
L. Saluran
i
= 44.566 m
= 0,0021
0.10 0.40 0.10
0.10 0.30 0.10

0.20

0.40
ELV Muka Air
Lubang Ø 5cm
0.30

ELV Muka Air Lubang Ø 5cm


ELV Dasar ELV Dasar

0.10
Lantai Kerja 5cm Lantai Kerja 5cm
0.10

0.10
Lapisan Pasir 10cm Lapisan Pasir 10cm
0.05

0.05
0.10

0.10
0.10 0.30 0.10 0.10 0.40 0.10

Penampang Saluran Tersier Penampang Saluran Sekunder


1 Skala 1:20
2 Skala 1:20

0.10 0.50 0.10


0.50

Lubang Ø 5cm

Lantai Kerja 5cm


0.10

Lapisan Pasir 10cm


0.05
0.10

0.10 0.50 0.10


enampang
Penampang Saluran Primer aluran
3 Skala 1:20
SP 2-3 SP 3-8

ELV Muka Air +024,423


ELV Muka Air +024,423
SS 3-4 SS 3-4 ELV Muka Air +024,423
ELV Muka Air +024,432

ELV Dasar +024,246


ELV Dasar +024,246

ELV Dasar +024,132


ELV Dasar +024,123

Potongan SP 2-3 Potongan SP 3-8


1 Skala 1:20
2 Skala 1:20

SS 3-4

ELV Muka Air +024,423 ELV Muka Air +024,432

SP 2-3
ELV Muka Air +024,423
SP 3-8
ELV Dasar +024,246

ELV Dasar +024,123 ELV Dasar +024,132

otongan SS 3-4,
SP 3-8, SP 2-3
Potongan SS 3-4
3 Skala 1:20
levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 22
1 Skala 1:2500

S 21-22

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang SS 21-22 - SP 1-0


2 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 1 & ST 2


3 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)


otongan Memanjang
emiringan Saluran

Potongan Memanjang ST 20 & ST 19


4 Skala 1:2500
levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 10 & ST 9


5 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 8
6 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 31 - SP 21-23


7 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran
otongan Memanjang
Potongan Memanjang ST 28 - SS 26-27 & ST 27
8 Skala 1:2500
levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 25
9 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 24
10 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 23
11 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran
otongan Memanjang
Potongan Memanjang ST 7.2 - SS 4-5
12 Skala 1:2500
levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 7.1 - ST 4


13 Skala 1:2500

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang SS 16 - SP 11-12


14 Skala 1:2500

ST 18 SS 17-18 SS 12-17

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran

Potongan Memanjang ST 18 - SS 12-17


15 Skala 1:2500

ST 16 ST 15 ST 14 ST 13 ST 17

levasi Saluran (m)

levasi Muka Air (m)

levasi Dasar Saluran (m)

anjang Saluran (m)

emiringan Saluran
otongan Memanjang
Potongan Memanjang ST 16, ST 15, ST 14, ST 13, ST 17
16 Skala 1:2500

Vous aimerez peut-être aussi