A MATERIELS
1 Lambris Ondulé Marron Paquet 2.00 51,000 102,000 2.00 51,000 102,000
2 Lambris F29 Paquet 6.00 43,000 258,000 8.50 43,000 365,500
3 Languette J blanc U 35.00 2,000 70,000 35.00 2,000 70,000
4 Fourrures U 70.00 1,200 84,000 70.00 1,200 84,000
5 Cornières U 70.00 800 56,000 70.00 800 56,000
6 Vis 35 Paquet 1.00 7,000 7,000 1.00 7,000 7,000
7 Vis 25 Paquet 2.00 10,000 20,000 2.00 10,000 20,000
8 Cheville Pq 1.00 10,000 10,000 1.00 10,000 10,000
9 Silicone Pot 1.00 6,000 6,000 1.00 6,000 6,000
10 Echaffaudage de 6 m Jrs 5.00 6,000 30,000 9.00 6,000 54,000
11 Transport Matériel Ft 1.00 1.00 10,000 10,000
SOUS TOTAL MATERIEL STAFF 643,000 784,500
B MAIN D'ŒUVRE 180,000 240,000
RECAPITULATIF
I TOTAL SECTION I: STAFF 1,408,000 984,400 610,500
II TOTAL SECTION II: LAMBRIS PVC 823,000 1,024,500 -
TOTAL GENERAL EN FRANCS CFA HTVA 2,231,000 2,008,900 610,500 2,619,400
1/6
TRAVAUX DE PLAFONNAGE DE RESIDENCE PRIVEE A YAMOUSSOUKRO
A MATERIELS
1 Lambris Ondulé Marron Paquet 2.00 51,000 102,000 2.00 51,000 102,000
2 Lambris F29 Paquet 6.00 43,000 258,000 8.50 43,000 365,500
3 Languette J blanc U 35.00 2,000 70,000 35.00 2,000 70,000
4 Fourrures U 70.00 1,200 84,000 70.00 1,200 84,000
5 Cornières U 70.00 800 56,000 70.00 800 56,000
6 Vis 35 Paquet 1.00 7,000 7,000 1.00 7,000 7,000
7 Vis 25 Paquet 2.00 10,000 20,000 2.00 10,000 20,000
8 Cheville Pq 1.00 10,000 10,000 1.00 10,000 10,000
9 Silicone Pot 1.00 6,000 6,000 1.00 6,000 6,000
10 Echaffaudage de 6 m Jrs 5.00 6,000 30,000 9.00 6,000 54,000
11 Transport Matériel Ft 1.00 1.00
SOUS TOTAL MATERIEL STAFF 643,000 774,500
B MAIN D'ŒUVRE 180,000 240,000
RECAPITULATIF
I TOTAL SECTION I: STAFF 610,500 984,400
II TOTAL SECTION II: LAMBRIS PVC 823,000 1,014,500
TOTAL GENERAL EN FRANCS CFA HTVA 1,433,500 1,998,900
NB : Le prix du matériel dois être bien négocier ( la qualité également vérifier) pour arrêter le devis definitif
2/6
TRAVAUX DE PLAFONNAGE DE RESIDENCE PRIVEE A YAMOUSSOUKRO
A MATERIELS
1 Lambris Ondulé Marron Paquet 2.00 51,000 102,000 2.00 51,000 102,000
2 Lambris F29 Paquet 6.00 43,000 258,000 8.50 43,000 365,500
3 Languette J blanc U 35.00 2,000 70,000 35.00 2,000 70,000
4 Fourrures U 70.00 1,200 84,000 70.00 1,200 84,000
5 Cornières U 70.00 800 56,000 70.00 800 56,000
6 Vis 35 Paquet 1.00 7,000 7,000 1.00 7,000 7,000
7 Vis 25 Paquet 2.00 10,000 20,000 2.00 10,000 20,000
8 Cheville Pq 1.00 10,000 10,000 1.00 10,000 10,000
9 Silicone Pot 1.00 6,000 6,000 1.00 6,000 6,000
10 Echaffaudage de 6 m Jrs 5.00 6,000 30,000 9.00 6,000 54,000
11 Transport Matériel Ft 1.00 1.00
SOUS TOTAL MATERIEL STAFF 643,000 774,500
B MAIN D'ŒUVRE 180,000 240,000
RECAPITULATIF
I TOTAL SECTION I: STAFF 1,408,000 984,400
II TOTAL SECTION II: LAMBRIS PVC 823,000 1,014,500
TOTAL GENERAL EN FRANCS CFA HTVA 2,231,000 1,998,900
NB : Le prix du matériel dois être bien négocier ( la qualité également vérifier) pour arrêter le devis definitif
3/6
TRAVAUX DE PLAFONNAGE DE RESIDENCE PRIVEE A YAMOUSSOUKRO
A MATERIELS
1 Lambris Ondulé Marron Paquet 2.00 51,000 102,000 2.00 51,000 102,000
2 Lambris F29 Paquet 6.00 43,000 258,000 6.00 43,000 258,000
3 Languette J blanc U 35.00 2,000 70,000 35.00 2,000 70,000
4 Fourrures U 70.00 1,200 84,000 70.00 1,200 84,000
5 Cornières U 70.00 800 56,000 70.00 800 56,000
6 Vis 35 Paquet 1.00 7,000 7,000 1.00 7,000 7,000
7 Vis 25 Paquet 2.00 10,000 20,000 2.00 10,000 20,000
8 Cheville Pq 1.00 10,000 10,000 1.00 10,000 10,000
9 Silicone Pot 1.00 6,000 6,000 1.00 6,000 6,000
10 Echaffaudage de 6 m Jrs 5.00 6,000 30,000 5.00 6,000 30,000
11 Transport Matériel Ft 1.00 1.00
SOUS TOTAL MATERIEL STAFF 643,000 643,000
B MAIN D'ŒUVRE 180,000 180,000
RECAPITULATIF
I TOTAL SECTION I: STAFF 1,408,000 757,500
II TOTAL SECTION II: LAMBRIS PVC 823,000 823,000
TOTAL GENERAL EN FRANCS CFA HTVA 2,231,000 1,580,500
NB : Le prix du matériel dois être bien négocier ( la qualité également vérifier) pour arrêter le devis definitif
4/6
DEVIS QUANTITATIF
(BARÈME DES TAUX POUR LES VARIATIONS)
Objet : Travaux de construction de dalots et de murs de soutènement dans le cadre de la réparation de routes rurales dans
N° de l’AO: ITB/2021/18635, en date du [insérer la date].
LOT 3 - Construction de Dalots et Murs de soutènement sur la Route Maïssade à Madame Joie du PK 5+820 au PK
1,0 General
1.1 Mobilisation et installation sur le chantier LS
1.2 Gestion du Trafic sur le site LS
1.2 Assurances travailleurs L.S
2,0 Santé & Sécurité
2.1 Gants en cuir Pairs
2.2 Botes en plastique Pairs
2.3 Gilets fluorescents Piece
2.4 Casquette de sécurité Pcs
2.5 Tableaux de signalisation « Hommes au Travail » Pcs
2.5 Connes de signalisation h ≥90cm Pcs
2.7 Tapes réflectives
Construction desdelatrines
signalisation
temporaires (homme et Rouleau
3.0 femme) LS
Sous-To
2 Structures
2.1 Construction des Dalots
2.1.1 Dalot 1Cellule 3x2x8m au Pk 7+000 Unité
2.1.2 Dalot 1Cellule 3x2x8m au PK 10+000 Unité
2.1.3 Dalot en angle 1Cellule 3x2x10m au PK 6+820 Unité
2.2 Construction decassis
Construction de cassisenen béton
béton 400400 PSI
PSI( 8mx 4m x
0.2m) Unité
2.3 Pierre maçonne type Rip-Rap
travaux de protection type Rip-Rap m2
2.4 Travaux en pierre maçonne
2.41 Canal desoutènement
drainage format U ou Vhauteurs
inclusif excavation m3
Murs de différents inclusif
2.41 excavation et base en béton m3
Remplissage de caisses de gabions inclusif
2.5 Gabionnage
excavation et béton de propreté (Caisses de cabion
seront fournies par UNOPS) m3
2.6 Remblayages
Fournir et placer du remblai compacté en couches de
20 cm ; pour les rencontres des structures m3
Sous-To
To
TATIF
LES VARIATIONS)
de la réparation de routes rurales dans le département du Centre d'Haïti,
Quantité Total
Coût Unitaire Total
Prévu
0.00
1 0.00
1 0.00
1 0.00
0.00
100 Sera fourni par L'UNOPS Sera fourni par L'UNOPS
20 0.00
30 0.00
10 0.00
1 0.00
Sous-Total item 1 0.00
1 0.00
1 0.00
1 0.00
0.00
5 0.00
0.00
1,800 0.00
0.00
600 0.00
140 0.00
0.00
500 0.00
0.00
1,500 0.00
Sous-Total item 2 0.00