First, the capacities of the building blocks are determined in order to identify the potential bottleneck building block and then the capacity of this building ...
We define capacity of a railway infra-element (denoted by Nsys) as the maximal number of train movements that can be executed on the particular infra-element in ...
We consider the problem of determining the capacity of a planned railway infrastructure layout under uncertainties. In order to address the long{term.
"A probabilistic (max, +) approach for determining railway infrastructure capacity," European Journal of Operational Research, Elsevier, vol. 148(3), pages ...
A probabilistic (max,+) approach for determining railway infrastructure capacity. A.F. Kort, de, B.F. Heidergott, H. Ayhan. Research output: Book/Report ...
An approach for estimating the commercial capacity of railways using a simulation-based approach that relies on the use of an optimizer and a simulator for ...
A probabilistic (max,+) approach for determining railway infrastructure capacity. A.F. Kort, de, B.F. Heidergott, H. Ayhan. Eurandom. Research output: Book ...
Jun 15, 2020 · Bibliographic details on A probabilistic (max, +) approach for determining railway infrastructure capacity.
People also ask
What is railway capacity?
Who is the railway infrastructure manager in the UK?
What is the infrastructure of the railway?
What is the carrying capacity of a train?
The goal of railway line capacity analysis is to determine the maximum number of trains that can operate on a given railway infrastructure during a specific ...
A.F. de Kort, B. Heidergott and H. Ayhan, A Probabilistic (max,+) Approach for Determining Railway Infrastructure Capacity, EJOR , 148, (2003), 644-661. H.