Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
Nov 30, 2015 · A two-stage artificial bee colony (TABC) algorithm is proposed for scheduling and re-scheduling with new job(s) inserting. The objective is to ...
Gao et al. established a scheduling model for the new task disturbance problem encountered in a flexible job shop manufacturing system, which was divided into ...
The problem is modeled as flexible job-shop scheduling problem (FJSP) and is divided into two stages: scheduling and re-scheduling when new job arrives. The ...
The problem is modeled as flexible job-shop scheduling problem (FJSP) and is divided into two stages: scheduling and re-scheduling when new job arrives. The ...
Hybrid artificial bee colony algorithm with a rescheduling strategy for solving flexible job shop scheduling problems · Engineering, Computer Science. Comput.
People also ask
This study addresses the scheduling problem in remanufacturing engineering. The purpose of this paper is to model effectively to solve remanufacturing ...
Bibliographic details on A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion.
The problem is modeled as flexible job-shop scheduling problem (FJSP) and is divided into two stages: scheduling and re-scheduling when new job arrives. The ...
A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion. Kai Zhou Gao, Ponnuthurai Nagaratnam ...
Gao, Suganthan, Pan, Tasgetiren, and Sadollah (2016) consider new job insertion in the flexible job shop scheduling problem with fuzzy processing times. They ...