Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
Jul 29, 2009 · The exact algorithms exploit multiplicities to identify and fix a partial schedule, consisting of most jobs, that is contained in an optimal ...
The exact algorithms exploit multiplicities to identify and fix a partial schedule, consisting of most jobs, that is contained in an optimal schedule, and then ...
This work considers high-multiplicity parallel machine scheduling problems with identical, uniform, and unrelated machines, and two classic objectives: ...
Jul 29, 2009 · Clifford and Posner (2001) consider parallel machine high-multiplicity scheduling problems, where multiplicities are allowed on both job and ...
The algorithm exploits a convex quadratic relaxation of the problem to fix a partial schedule, consisting of most jobs, and then assigns the residual jobs ...
Exact and approximate algorithms are presented for scheduling independent tasks in a multiprocessor environment in which the processors have different ...
This work investigates parallel-machine, high-multiplicity problems, where there are three possible machine speed structures: identical, proportional, ...
Apr 26, 2024 · Abstract. Goemans and Rothvoss (SODA'14) gave a framework for solving problems which can be described as finding a point in int.cone(P ∩ ZN ) ...
Apr 26, 2024 · Exact and Approximate High-Multiplicity Scheduling on Identical Machines. Goemans and Rothvoss (SODA'14) gave a framework for solving problems ...
Missing: parallel | Show results with:parallel
The focus of this paper is to develop efficient models for a common and complex situation, i.e., the scheduling of identical parallel machines with shared, ...