Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
Wang et al. (2020) studied the stochastic optimization problem of flow shop with time constraints, considering renewable energy supply in ESS and DERs. An ...
On this basis, the lower model obtains the power supply allocation scheme of distributed energy resources (DERs), energy storage system (ESS) and main grid to ...
Jul 1, 2022 · The distributed two-stage RHFS problem considering renewable energy is studied. •. IHSN algorithm and energy allocation scheme are designed.
Dong et al. [11] developed a distributed two-stage reentrant hybrid flow shop-bilevel-scheduling model that considered the makespan, total carbon emissions, and ...
Apr 4, 2022 · Green scheduling of distributed two-stage reentrant hybrid flow shop considering distributed energy resources and energy storage system
This paper deals with a scheduling problem for reentrant hybrid flowshop with serial stages where each stage consists of identical parallel machines. In a ...
Nov 22, 2022 · This paper is therefore the first attempt to study this DPFSP-LB with objectives of minimizing makespan and total energy consumption ( T E C ).
May 5, 2024 · Green scheduling of distributed two-stage reentrant hybrid flow shop considering distributed energy resources and energy storage system.
Green scheduling of distributed two-stage reentrant hybrid flow shop considering distributed energy resources and energy storage system. Computers ...