Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
Nov 16, 2014 · Exact and heuristic algorithms to find MSS that minimize costs in downstream units. Abstract. We consider a master surgery scheduling (MSS) ...
We first propose a stochastic analytical approach, which calculates for a given MSS the exact demand distribution for the downstream resources. We then discuss ...
We consider a master surgery scheduling (MSS) problem in which block operating room (OR) time is assigned to different surgical specialties. While many MSS ...
We first propose a stochastic analytical approach, which calculates for a given MSS the exact demand distribution for the downstream resources. We then discuss ...
A master surgery scheduling approach that maximizes hospital revenues while considering the impact on the downstream resources—intensive care units and ...
People also ask
Scheduling OR blocks leaves many options for operational surgery scheduling and this increases the variation in usage of both the OR and downstream beds.
Feb 9, 2022 · Our approach is to level the workload in downstream units while maintaining the current MSS to earn the support of all involved medical ...
Scheduling OR blocks leaves many options for operational surgery scheduling and this increases the variation in usage of both the OR and downstream beds.
In this research the master surgical scheduling (MSS) problem at the tactical level of hospital planning and scheduling is studied.
For a master surgery schedule to be applicable in practice, multiple considerations must be taken into account. The particular focus of this work is in the ...