Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
It must complete its processing before or at its deadline. All jobs are available for processing at time t=0 and preemptions are allowed. A set of jobs is said ...
It must complete its processing before or at its deadline. All jobs are available for processing at time t=0 and preemptions are allowed. A set of jobs is said ...
Abstract. Consider n independent jobs and m identical machines in parallel. Job j has a processing time pj and a deadline ¯dj . It must complete its ...
This paper addresses, using an exact method, the parallel machine scheduling problem (PMSP) with release dates contraints to minimize the total completion ...
Missing: Deadline | Show results with:Deadline
It must complete its processing before or at its deadline. All jobs are available for processing at time t=0 and preemptions are allowed. A set of jobs is said ...
Feb 12, 2008 · This study addresses the identical parallel machine scheduling problem with job deadlines and machine eligibility constraints to minimize ...
The objective to be minimized is the total completion time. Firstly, a mixed integer linear programming model has been devised with the aim of optimally solving ...
A polynomial-time algorithm for every n independent jobs and m identical machines in parallel is presented and it is shown that the more general problem ...
People also ask
This study addresses the identical parallel machine scheduling problem with job deadlines and machine eligibility constraints to minimize total job complet.
A branch and bound algorithm is proposed for the problem of scheduling jobs on identical parallel machines to minimize the total weighted completion time.