Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
An optimal or a feasible harvest schedules subject to adjacency constraints is generated using exact methods or meta-heuristic optimization techniques ...
This paper proposes a timber harvest planning model based on selective cutting and generates an optimal harvest schedule subject to harvest volume restriction.
An overview of five fundamental operations research models are provided in terms of a timber harvesting system. Timber production management is a branch of ...
Feb 20, 2008 · Optimization model in timber harvest planning based on an incremental solution approach. 1 Oct 2009. Proceedings of the Fourth Meeting of the ...
The current study proposed a hierarchical two-level optimization method for tree-level planning where the cutting years are optimized at the higher level.
This is a model based on linear programming. (LP) that can be used to schedule timber harvesting and re- generation activities given available equipment, wood ...
Missing: incremental | Show results with:incremental
A model and heuristic solution methodology is presented to address stand level harvest scheduling and the associated road construction scheduling problem ...
May 23, 2014 · Abstract We consider the important problem of medium term forest planning with an inte- grated approach considering both harvesting and road ...
To handle this complexity, forest management plans are often developed using mathematical programming techniques, including linear programming, nonlinear ...
We consider the important problem of medium term forest planning with an integrated approach considering both harvesting and road construction decisions in ...